pks for new hires
DESCRIPTION
pks new hiresTRANSCRIPT
Product Knowledge Seminar
ABOITIZLAND, INC
OUR PROJECTS
Location Map
Monday, April 24, 2023 Presentation Template
Bare 1.6 MFinished 1.8 M
Bare 1.5 MFinished 1.8 M
Bare 2.2 MFinished 2.8 M
Bare 2.8 MFinished 3.2 M
Bare 1.8 MFinished 2.1 M
Bare 3.5 MFinished 3.8 M
LAST TRANCH
Amenities
Monday, April 24, 2023 Presentation Template
Amenities centralized at the riverside •Open Type Clubhouse•Basketball court w/ benches•Community Area w/ Pinoy childhood games•Playground •Picnic area w/ bbq station and benches•Leisure Pool•Aboitizland Community shapes in
the landscaping•Green landscaping around
* Road Network12.5 m – spine road8-10 m – other road networks
* 3 Water Treatment Facilities (WTF)
*2 Elevated Water Tank (EWT)
Site Development
Monday, April 24, 2023 Presentation Template
CONCRETE SHEAR WALL
- the system produces solid concrete construction that is quick to install and structurally superior to conventional buildings.
• Concrete Shear Walls are cast-in-place vertical structural elements with a dual role of resisting both gravity and lateral loads.
Shear Wall Panels
• pre-manufactured 6mm Hardiflex fiber cement board that are sandwich together using 100mm light gauge steel (metal studs); and then
• erected and poured at site using 3,000 psi concrete to form a monolithic structure.
Other Applications Institutional Buildings Dormitory Buildings
School Bldg
Museum Bldg
Offices
Steps in Housing Construction
School Bldg
Mat Foundation – is a large, thick reinforced concrete mat which transfer loads from columns and walls, to the underlying soil. It reduces differential settlements.
School Bldg
Steps in Housing Construction
Major Advantages
• Top quality finish - uses Hardiflex board to guarantee crack-free and smooth finish walls. - straight-to-finish, eliminates plastering.
• Tested for durability - uses 3,000psi concrete fill
• Termite proof structure - solid concrete wall - uses less wood
• More efficient floor space - no protruding columns on walls
• Higher fire rating - maximize use of fire proof materials
• Faster installation
Presentation Template
CommercialCommercial
ResidentialResidential
Presentation Template
Area Development
Unit Type House AreaDownhill Mid Unit 150Downhill End Unit 163Uphill Mid Unit 162Uphill End Unit 175
8 M – 10 M
Presentation Template
Downhill Side section
Presentation Template
Interior Garden view
8 M – 10 M
Presentation Template
Uphill Side section
Monday, April 24, 2023
2011 Sales and Marketing Campaign
Presentation Template
Financing Scheme In-House Financing Lot Only 20% Downpayment payable in 10 months; 80% balance
House and Lot 20% Downpayment payable up to 12 months; 80% balance
Interest Rates : 5 years @ 14% interest per annum 7 years @ 16% interest per annum 10 years @ 18% interest per annum
Bank Financing 20% Downpayment payable in 12 months; 80% Balance upon Loan
Take-out