Page 1: PLACE AN IMAGE ON THIS INTRO PAGE - CMU · Geologists 4 yrs $33,000- $45,000 $59,586 College 12000/yr o Research and Design Industry Chemical Engineer 4 yrs $50,000 $84,640 College

Larimer CampusTraining School + Youth Center

LarimerRami el Samahy

(Annie) Saovanee Sethiwan

PLACE AN IMAGE ON THIS INTRO PAGEClassroom

Training StudioLaboratories

Support SpacesYouth Center/Day Care

Indoor Public SpaceOutdoor Public SpacesTraining Farm

SECTION B

WINSLOW STREET ELEVATION

MOVEMENT DIAGRAM

VISUAL CORRIDOR DIAGRAM

FACADE CONFIGURATION DIAGRAM

1

2

3

4

Page 2: PLACE AN IMAGE ON THIS INTRO PAGE - CMU · Geologists 4 yrs $33,000- $45,000 $59,586 College 12000/yr o Research and Design Industry Chemical Engineer 4 yrs $50,000 $84,640 College

Section A

Section B

N

PARKING GARAGE

YOUTH CENTER

PLAYGROUND

LOBBY

CAFE

GREENHOUSElounge

PARKING

TRAINING FARM

TRAINING FARM

RESEARCHGREENHOUSE

OUTDOORTRAING

AREA

TRAINING STORAGEAND AMMENITIES

MAXWELL WAY

WINSLOW STREET

RESE

ARC

HG

REEN

HO

USE

LARI

MER

AVE

NU

E

AGRICULTURE FIELD

AGRICULTURE FIELD

AGRICULTURE FIELD

OUTDOOR SEATING

TRAINING CENTER TRAININGCENTER

The Larimer Campus houses training school and youth center facilities. The project is part of a larger framework which aimed to remove housing in one area of the neighborhood and densify another area. The emptied land would then be transform into urban argricul-ture land to generate revenue for the neighborhood. Thus the teaching programs of the school focused on jobs that would benefit construction and building retrofit industires, as well as agricultural training.

Types of current green jobs were studied, and the programs of this project is laid out inaccordance with the information displayed in the chart to the left.

The project central itself around an existing builidng, the old Larim-er School. This old school builidng was built since the 1800, with vari-ous notable features such as gothic arches, it has been abandoned for over 30 years.

A green house is attached to the Southern façade of the building, framing the existing archways. The screen of the greenhouse extends out and peal away to frame sur-rounding arches of the existing builidng.

Many features of the old build-ing are not as convenient as those of more modern buildings. For instance, the main entryways are located in the second level. Thus Ramp and extended platforms be-came the characteristic of the main public space. This project aim to hightlight the notable features of the old building, while allowing the users to experience the building in a new way.

1 Elevated Path inside the Green House2 Green House Lounge3 View from Existing Building into Green House Lounge4 Public Space on Larimer Avenue

5,400

JOB Number of Students Classrooms Indoor Training Outdoor Training Laboratories Training on Larimer Building

o Energy Production Industry60 600 007,2

Solar Thermal Installer 60 600 007,2 Wind Energy and Turbine Technologist 60 600 2,700 o Research and Design Industry

60 600 2,700 SEY

o Building Industry Heating and Cooling Technologist 60 600 2,700 SEY Electrician 60 600 2,700 SEY Green Wall Installation 60 600 2,700 007,2 SEY Construction 60 600 2,700 007,2 SEY o Lighting Industry

60 600 2,700 SEY TOTAL 540 18,900 008,01 - - TOTAL Training Area 35,100 SQFT

SUPPORT SPACES (20%) 7,020 SQFTLobbyLonguesCaféOfficesInfirmry Restroom

Youth Center 500Day Care 500

TOTAL INDOOR 32,320

TOTAL 43,120 SQFT

(NOTE: Existing Building Floor Areas is 56582 sqft)

Requried Facilities (SQFT)Program Computation | PHASE 1

SQFT

SQFTSQFT

ALTERNATIVE ENERGY PRODUCTION AND EFFCIENCY

GREEN BUILDING CONSTRUCTION AND RETROFITTING

ClassroomTraining StudioLaboratories

Support SpacesYouth Center/Day Care

Indoor Public SpaceOutdoor Public SpacesTraining Farm

1F

2F

3F

1 Greenhouse Lounge with Cafe2 O�ce3 Youth Center4 Classrooms5 Lounge6 Training Studios

12

1

4

4

4

5

6

6

6

6

3

ClassroomTraining StudioLaboratories

Support SpacesYouth Center/Day Care

Indoor Public SpaceOutdoor Public SpacesTraining Farm

1F

2F

3F

12

1

4

4

4

5

6

6

6

6

3

7

7

8 8

910

Cleared Land

Cleared Land

Cleared Land

7 Laboratories8 Training Farm9 Training Area10 Storage and Amenitiesfor Training

Program Computation | PHASE 3

ALTERNATIVE ENERGY PRODUCTION AND EFFCIENCY

GREEN BUILDING CONSTRUCTION AND RETROFITTING

AGRICULTURAL AND NATURAL RESOURCE CONSERVATION

10,000

Requried FacilitiesJOB Number of Students Classrooms Indoor Training Outdoor Training Laboratories Training on Larimer Building

o Energy Production Industry007,2

00606rellatsnI lamrehT raloS 007,2 Wind Energy and Turbine Technologist 60 600 2,700 o Research and Design Industry

2,700 SEY

o Building Industry 2,700 SEY 2,700 SEY

000,1001noitallatsnI llaW neerG 4,500 005,4 SEY 000,1001noitcurtsnoC 4,500 005,4 SEY

o Lighting Industry 2,700 SEY

o Agricultural Industry007,2 3120

00606tsitneicS lioS 007,2 3120100 1,000 005,4 SEY

o Resource Conservation Industry100 1,000 SEY0025

0213 TOTAL 1,000.00 22,500 003,42 14,560 TOTAL Training Area 71,360 SQFT

SUPPORT SPACES (20%) 14,272 SQFTLobbyLonguesCaféOfficesInfirmry RestroomConvenience StoreBusiness StationLibrary 3500

Youth Center 1000Daycare 500

Total Indoor Space 52,060 SQFT

TOTAL 90,632 SQFT

SQFT

SQFT SQFT

ClassroomTraining StudioLaboratories

Support SpacesYouth Center/Day Care

Indoor Public SpaceOutdoor Public SpacesTraining Farm

2F

3F

14

4

5 6

6

7

7

2

4

6

63

1

8

8

910

Cleared Land

Agriculture

Cleared Land

Cleared Land

Agriculture

Agriculture

11

12

3 Expanded Youth Center11 Playground12 Parking

Program Computation | PHASE 4

ALTERNATIVE ENERGY PRODUCTION AND EFFCIENCY

GREEN BUILDING CONSTRUCTION AND RETROFITTING

AGRICULTURAL AND NATURAL RESOURCE CONSERVATION

10,000

Requried FacilitiesJOB Number of Students Classrooms Indoor Training Outdoor Training Laboratories Training on Larimer Building

007,2 00606rellatsnI lamrehT raloS 007,2

Wind Energy and Turbine Technologist 60 600 2,700 o Research and Design Industry

2,700 SEY

o Building Industry 2,700 SEY 2,700 SEY

000,1001noitallatsnI llaW neerG 4,500 005,4 SEY 000,1001noitcurtsnoC 4,500 005,4 SEY

o Lighting Industry 2,700 SEY

o Agricultural Industry007,2 3120

00606tsitneicS lioS 007,2 3120100 1,000 005,4 SEY

o Resource Conservation Industry100 1,000 SEY0025

0213 TOTAL 1,000.00 22,500 003,42 14,560 TOTAL Training Area 71,360 SQFT

SUPPORT SPACES (20%) 14,272 SQFTLobbyLonguesCaféOfficesInfirmry RestroomConvenience StoreBusiness StationLibrary 3500

Youth Center 3000Daycare 1000

Total Indoor Space 54,560 SQFT

TOTAL 93,132 SQFT

SQFT SQFT

SQFT

o Energy Production Industry

ClassroomTraining StudioLaboratories

Support SpacesYouth Center/Day Care

Indoor Public SpaceOutdoor Public SpacesTraining Farm

2F

3F

14

4

5 6

6

7

7

2

4

6

63

1

8

8

910

Agriculture

Agriculture

11

12

14

13 Green Roofson New Buildings14 Green House

Program Computation | PHASE 2

ALTERNATIVE ENERGY PRODUCTION AND EFFCIENCY

GREEN BUILDING CONSTRUCTION AND RETROFITTING

AGRICULTURAL AND NATURAL RESOURCE CONSERVATION

9,200

Requried Facilities

JOB Number of Students Classrooms Indoor Training Outdoor Training Laboratories Training on Larimer Building

o Energy Production Industry007,2

00606rellatsnI lamrehT raloS 007,2 Wind Energy and Turbine Technologist 60 600 2,700 o Research and Design Industry

2,700 SEY

o Building Industry 2,700 SEY 2,700 SEY

Green Wall Installation 100 1,000 4,500 005,4 SEY Construction 100 1,000 4,500 005,4 SEY o Lighting Industry

2,700 SEY

o Agricultural Industry60 600 007,2 3120

Soil Scientist 60 600 007,2 312060 600 007,2 SEY

o Resource Conservation Industry60 600 SEY0213 60 600 0213

TOTAL 920 22,500 005,22 12,480 TOTAL Training Area 66,680 SQFT

SUPPORT SPACES (20%) 13,336 SQFTLobbyLonguesCaféOfficesInfirmry RestroomConvenience StoreBusiness Station

Youth Center 500Day Care 500

Total Indoor Space 45,680 SQFT

TOTAL 81,016 SQFT

SQFTSQFT

GREEN JOBS: TRAINING AND SALARYJOB YRS OF TRAINING AVE Starting SALARY AVE Salary Exisitng Course PriceALTERNATIVE ENERGY PRODUCTION AND EFFICIENCYAutomotive Industry� Automotive Engineers 2-4 yrs 30,000 $80,000 College 11600/yr� Automotive Technologiest 2-4 yrs $18,000 $30,000 College 11600/yr� Diesel Technologisto Energy Production Industry� Photovoltaic Installer 17 weeks - 2 yrs $25,000 $60,000 Training 400, College 4000/yr Solar Thermal Installer 12 weeks-1 yrs $25,000 $60,000 Training 300, College 7000/yr Wind Energy and Turbine Technologist 2 yrs $35,000-$40,000 $60,000 College 4600/yr� Geologists 4 yrs $33,000- $45,000 $59,586 College 12000/yro Research and Design Industry� Chemical Engineer 4 yrs $50,000 $84,640 College 11600/yr� Electrical Engineer 4 yrs $50,000 $81,116 College 11600/yr� Mechanical and Industrial Technologists 2 yrs $23,000 $50,640 College 11600/yr� Mechanical Engineers 4 yrs $53,298 $68,468 College 11600/yrGREEN BUILDING CONSTRUCTION AND RETROFITTINGo Building Industry� Heating and Cooling Technologist 6 months - 1.5 yrs $25,000 $57,000 (Some free) College 3255/yr� Electrician 2 $28,339 $57,600 (Some free) College 2819/yr� Civil Engineer 4 yrs $48,191 $80,000 College 11,448/yr� Architects 4-5 yrs $40,000 $70,000 College 11448/yro Lighting Industry� Electrical Technologists 2 $25,000 $57,000 (Some free) College 2819/yrAGRICULTURE AND NATURAL RESOUCE CONSERVATIONo Agricultural Industry� Irrigation Technician Soil Scientist 4 yrs $51,200 College 11600/yr� Botanist 8 yrs (Doctoral) 60,000 $62,207 College 30280/yr� Farm Manager 2-4 yrs $54,900 College 11635/yr**o Resource Conservation Industry� Forester $37,097 $51,037 College 5501/yr**� Wildlife and Fisheries Technologist $18,000 - $36,000 $60,000 College 11680/yrOTHEREnvironmental Lawer $75,000-$500,000

Note: college = based off PA minimun tuition in 2008**Note: closest college offereing this program is in NY, instate cost is 5375/yr

SOURCESSun Pirate Inc. http://www.sunpiratesolar.com/Training.htm?gclid=COCL3uu0zJYCFQgRFQodgQpazQ

http://www.techvalleycareers.org/Sect_Career//Alternative_Energy/jobProfile.cfm?Career_ID=27&Subcategory_ID=24Wind Technology http://www.iowalakes.edu/programs_study/industrial/wind_energy_turbine/index.htmGeologistTechnitians http://www.refrigerationschool.com/course-mechanical.htmOther payscale.com/research

http://collegesearch.collegeboard.com/search/servlet/advsearchservlet?buttonPressed=viewResults&navigateTo=9&viewpage=1http://careers.stateuniversity.com/pages/63/Geologist.htmlhttp://collegesearch.collegeboard.comwww.boston.com/bostonglobe/magazine/articles/2007/11/18/hot_ jobs _in_a_ green _economy/

ClassroomTraining StudioLaboratories

Support SpacesYouth Center/Day Care

Indoor Public SpaceOutdoor Public SpacesTraining Farm

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASING AND PROGRAM LAYOUT

JOB MARKET

EXISTING BUILDING

SECTION A

LARIMER AVENUE ELEVATION

FLOOR PLAN

Phase

Three

Dev

elopm

ent

scale

1:25

0

Farm

er Mark

et

House

ing C

onstr

uctio

n

Housin

g Dev

elopm

ent

Road C

onstr

uctio

n

Farm

Dev

elopm

ent

Train

ing S

choo

l

Cleared

Land

LOCATION IN LARIMER NEIGHBORHOOD