plan details - cdn.shellharbour.nsw.gov.au
TRANSCRIPT
B
STEP IRONS
B
SECTION A-A
SECTION B-B
A
A
NOTE:
PLAN
NominalLintel Length
12001800240030003600
A B18252438304836574267
6051218182824373047
Provide AYMROO or alternate brand nameequivalent plastic encapsulated step irons inaccordance with AS 1657 and manufacturesrequirements directly under lid at 300mmcentres where pit is deeper than 1200mm.
1. Compressive strength, F'c for cast insitu concrete to be min of 32MPa to AS36002. All dimensions in mm3. Provide SL82 mesh centrally placed to walls and base for all pits >/= 1.5m deep. Minimum
50mm cover. Return mesh 300mm into base and sides, or starter bars to match wallreinforcement.
4. All exposed steelwork shall be hot dip galvanised in accordance with AS 16505. Where a heavy duty steel grate is required a Weldlok GG78-42A grate or equivalent is to be
specified.
Note: Subsoil Drain 3m long at each inlet pit.
Note: Expansion joints at 1m distance from lintel.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU GRATED GULLY PIT -Pipes up to 600Ø ASD 300
SECTION A-A
SECTION B-B
NOTE:
PLAN
NominalLintel Length
12001800240030003600
A B18252438304836574267
6051218182824373047
1. Compressive strength F'c for cast in-situ concrete to be a minimum of32MPa at 28 days.
2. All dimensions are in millimetres.3. Provide SL82 mesh centrally placed to walls and base for pits
>/=1.5m deep. Return mesh 300mm into base and sides, or starterbars to match wall reinforcement.
4. All steelwork shall be hot dip galvanised in accordance with AS 16505. Expansion joints to be 15mm wide for full depth of kerb & gutter, with
joint being of a preformed material of bituminous fibreboard.6. Where pit is deeper than 1200mm provide step irons. Refer drawing
ASD300 for Step Iron details.
Note: Subsoil Drain 3m long at each inlet pit.
Note: Expansion joints at 1m distance from lintel.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
REAR ACCESS GULLY PIT -Pipes up to 600Ø ASD 301
B
B
SECTION A-A
SECTION B-B
NOTE:
A
PLAN
NominalLintel Length
12001800240030003600
A B18252438304836574267
300913
152321322742
A
1. Compressive strength, F'c for cast insitu concrete to be min N32 toAS3600.
2. All dimensions in mm.3. Provide SL82 mesh centrally placed to walls and base for all pits >/= 1.5m
deep. Minimum 50mm cover. Return mesh 300mm into base and sides, orstarter bars to match wall reinforcement.
4. All exposed steelwork shall be hot dip galvanised in accordance with AS1650.
5. Where A > 300 provide N16 reinforcing returned min 400 into pit walls.Where A > 900 design to be certified by Engineer.
6. For connection to subsoil drainage refer to ASD305.7. For provision of grates in pits refer to ASD 303. Where a heavy duty steel
grate is required a Weldlok GG78-42A grate or equivalent is to bespecified.
8. Where pit is deeper than 1200mm provide step irons. Refer drawingASD300 for Step Iron details.
Note: Subsoil Drain 3m long at each inlet pit.
Note: Expansion joints at 1m distance from lintel.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU REAR ACCESS GULLY PIT- Pipes > 600Ø ASD 302
B
B
SECTION A-A
SECTION B-B
A
A
NOTES:
PLAN
NominalLintel Length
12001800240030003600
A18252438304836574267
6051218182824373047
1. Compressive strength, F'c for cast insitu concrete to be min N32 to AS36002. All dimensions in mm.3. Provide SL82 mesh centrally placed to walls and base for all pits Minimum
50mm cover. Return mesh 300mm into base and sides, or starter bars to matchwall reinforcement.
4. All exposed steelwork shall be hot dip galvanised in accordance with AS 1650.5. Where A > 300 provide N16 reinforcing returned min 400 into pit walls. Where A
> 900 design to be certified by Engineer.6. For connection to subsoil drainage refer to ASD305.7. Where a heavy duty steel grate is required a Weldlok GG78-42A grate or
equivalent is to be specified.8. Where pit is deeper than 1200mm provide step irons. Refer drawing ASD300
for Step Iron details.
Note: Subsoil Drain 3m long at each inlet pit.
Note: Expansion joints at 1m distance from lintel.
B
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU GRATED GULLY PIT -Pipes >600Ø & Pipes in Carriageway ASD 303
SECTION AA
SECTION BBELEVATION
BNOTE:
A A
B
(GRATE NOT SHOWN)
PLAN
OD
1. Compressive strength F'c for cast insitu concrete to be a minimum of32mpa at 28 days.
2. All dimensions are in millimetres.3. Provide SL82 mesh centrally placed to walls of pits > 1.5m deep. 50mm
min cover. Return mesh 300mm into base and sides, or starter bars tomatch wall reinforcement.
4. All steelwork shall be hot dip galvanised in accordance with AS 16505. Max depth pit 3500mm.6. Provide min 50mm drop through pit.7. Where pit is deeper than 1200mm provide step irons. Refer drawing
ASD300 for Step Iron details.
Note: Subsoil Drain 3m long at each inlet pit.
Note: Expansion joints at 1m distance from gratedcover if paving surrounds pit.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU STANDARD SURFACEINLET PIT ASD 304
NOTES:
FLUSHING POINT
ON LINE
FLUSHING POINT
HEAD OF LINE
PLAN
PIT CONNECTION
TRENCH DETAILS
ALT. DETAIL
Pavement Rehabilitation
1. Construction shall be in accordance with ShellharbourEngineering Construction Code based on AUS-SPEC.
2. Provide flushing points at max 50m centres and outlets at max100m centres.
3. Select filter material in accordance with Shellharbour EngineeringConstruction Code based on AUS-SPEC - Subsurface Drainage.
4. All filter material shall be geotextile wrapped, min 140g/m3 wovengeotextile to AS 3706.
5. Subsoil drainage pipe shall be slotted UPVC or perforated,ribbed HDPE to AS2439.1.
6. Minimum longitudinal grades for pipes shall be: ribbed HDPEpipe - 1.5%, slotted UPVC pipe - 1%, 450mm strip drain - 0.5%.
7. UPVC pipe and fittings shall be min Class 12.8. Road crossings to be Sewer Heavy grade UPVC Pipe.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
STANDARD SUBSOIL DRAINAGEDETAILS ASD 305
2
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
PRECAST BOX CULVERTS - Slab andHeadwall ASD 306
PRECAST MEDIAN KERB
INLET FOR SF KERB
SECTION 'AA'
TYPE 'B'
NOTE
TYPE 'A'
SECTION 'AA'
PRECAST MEDIAN
KERB INLET
NOTE
BA
TYPE A
CONNECTION
B
CONNECTION TYPES
TYPE A:- 300-525mm Ø R.C.P.TYPE B:- 600mm + Ø R.C.P. ELEVATION
A
SECTION 'BB'
A
A
Reinforcement and end treatment to be duplicated at other end.All dimensions are in millimetres unless otherwise stated.
This plan has been adopted from the plan produced by
the Roads and Maritime Services NSW (RMS). Drawing
Number R0220-11 REFER CURRENT OR EQUIVALENT
EDITION BEFORE USE.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
PRECAST MEDIAN KERB INLET FOR SFKERB ASD 307
ELEVATION OF INLET
A
SECTION AA
A
PLAN WITH COVER AND GRILLE REMOVED
NOTES:
PLAN OF PIT COVER
This plan has been adopted from the plan produced by the
Roads and Maritime Services NSW (RMS). Drawing
Number R0220-10 REFER TO CURRENT EQUIVALENT
EDITION BEFORE USE.
1. Compressive strength, F'c for cast insitu concrete to be min N32 to AS 3600.2. All exposed edges to be rounded with 20mm radius.3. All mild steel material to be galvanised on completion in accordance with AS1650.4. Side walls of all pits deeper than 1500 are to be reinforced with one layer of SL82 mesh. Return mesh
300mm into base and sides, or starter bars to match wall reinforcement.5. Depth of pit not to exceed 3500.6. Where pit is deeper than 1200mm provide step irons. Refer drawing ASD300 for Step Iron details.7. For connection to subsoil drainage refer to ASD305.8. All dimensions are in millimetres.
Note: Subsoil Drain 3m long at each inlet pit.
Note: Expansion joints at 1m distance from lintel.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
STANDARD DOUBLE INLET GULLY PITFOR TYPE SF KERB ASD 308
ELEVATION OF INLET
SECTION A - A
NOTES:
PLAN WITH COVER AND GRILLE REMOVED
CONCRETE COVER
This plan has been adopted from the plan produced by
the Roads and Maritime Services NSW (RMS). Drawing
Number R0220-09 REFER TO CURRENT EQUIVALENT
EDITION BEFORE USE.
1. Compressive strength, F'c for cast insitu concrete to be min N32 to AS 3600.2. Side walls of pits deeper than 1500 are to be reinforced with one layer of SL82 mesh. Return mesh
300mm into base and sides, or starter bars to match wall reinforcement.3. Depth of pit not to exceed 3500.4. Where pit is deeper than 1200mm provide step irons. Refer drawing ASD300 for Step Iron details.5. All exposed edges to be rounded to 20 radius.6. For pipes greater than 450mm Ø* = nOD + (n - 1) OD/2 + 200 n = number of pipes7. Surface of precast cover to be finished with materials and method similar to that specified for
median paving.8. All mild steel material to be galvanised on completion in accordance with AS 1650.9. For connection to subsoil drainage refer to ASD305.10. All Dimensions are in millimetres.
Note: Subsoil Drain 3m long at each inlet pit.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
SINGLE INLET GULLY PIT FOR TYPE SFKERB ASD 309
SECTION C - C
SECTION A-A
OUTLET DETAILS TO HEADWALL
SECTION D - D
PLAN OF JOINT
SECTION B - B(Used where subsurface drain turned at
right angles across shoulder to outlet.)
NOTES:
PLAN
STEEP BATTER
Steeper than 4 Hor. : 1 Vert.
PLAN
FLAT BATTER
4 Hor. : 1 Vert. or flatter.
This plan has been adopted from the plan produced by
the Roads and Maritime Services NSW (RMS). Drawing
Number MD.R33.A04 Sheet 1 and 2. REFER CURRENT
EQUIVALENT EDITION BEFORE USE
1. Compressive strength F'c for cast insitu.Concrete to be min N32 to AS 3600.
2. All dimensions in millimetres unless otherwisestated
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU OUTLET STRUCTURESFOR SUBSURFACE DRAINS ASD 310
SECTION A-ASECTION B-B
SECTION A-A
SECTION B-B
B BA A A A
B B
PLAN
'V' DRAIN FOR PIPE Ø450 OR LESS
NOTE:
PLAN
'V' DRAIN FOR PIPE Ø525 OR GREATER
1. Compressive strength, F'c for cast insitu concrete to be min N32 toAS3600
2. All dimensions in mm3. Provide SL82 mesh centrally placed to walls and base for all pits >1.5m
deep. Minimum 50mm cover. Return mesh 300mm into base and sides, orstarter bars to match wall reinforcement.
4. All exposed steelwork shall be hot dip galvanised in accordance with AS1650
Note: Subsoil Drain 3m long at each inlet pit.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU GRATED "V" DRAIN PITFOR SH TYPE DISH DRAIN ASD 311
NOTES:
SECTION AA
ISOMETRIC VIEW
A A
PLAN
[ Cover removed ]
150
This plan has been adopted from the plan produced by
the Roads and Maritime Services NSW (RMS). Drawing
Number R0220-46. REFER TO CURRENT EDITION
BEFORE USE.
1. Compressive strength F'c for cast insitu concrete to be minN32 to AS 3600.
2. All dimensions in millimetres3. Side walls of all pits deeper than 1500mm are to be reinforced
with one layer of SL82 mesh. Return mesh 300mm into baseand sides, or starter bars to match wall reinforcement.
4. Depth of pit not to exceed 3500mm5. Pits deeper than 1200mm to be fitted with galvanised step
irons at 300mm centres. Refer to ASD 3006. All exposed edges to be rounded with 200mm radius7. Median width as shown is for minimum conditions8. All reinforcement laps to be 300mm long9. For use with flexible pavement only
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU SLIMDRAIN MEDIAN PIT ASD 312
1. Compressive strength F'c for cast insitu concrete tobe min N32 to AS 3600
2. All dimensions in millimetres3. Rods at 100 centres, placed longitudinally and
transversely; or F81 mesh. Return mesh 300mminto base and sides, or starter bars to match wallreinforcement.
4. Location and level of junction box shown in thedrawings refer to this point:
5. Side walls of all pits deeper than 1500mm are to bereinforced with one layer of RL1218 mesh. Returnmesh 300mm into base and sides, or starter bars tomatch wall reinforcement.
6. Depth of pit not to exceed 3500mm7. Pits deeper than 1200mm to be fitted with
galvanised step irons at 300mm centres. See ASD300
8. All exposed edges to be rounded with 200mmradius
9. At right angle change in pipe direction outlet invertto be 150 below inlet invert
10. All reinforcement laps to be 300mm long11. Minimum cover of reinforcement shall be 50 unless
shown otherwise.
NOTES:
SECTION A-A
ELEVATION
B
SECTION B-B
A A
(LID REMOVED)
B
PLAN
OD
OD
This plan has been adopted from the plan produced by the
Roads and Maritime Services NSW (RMS). Drawing Number
R0220-29. REFER TO CURRENT EQUIVALENT EDITION
BEFORE USE .
Note: Subsoil Drain 3m long at each inlet pit.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
STANDARD JUNCTION PITASD 313
NOTES:
SECTION B-B
SECTION A-A
B
A
Flow
A
125
B
PLAN
(GRATE REMOVED)
Dep
th a
s S
peci
fied
Flow
Dep
th a
s re
quire
d
O.D.
1. Compressive strength F'c for cast insitu concrete to bemin N32 to AS 3600
2. All dimensions in millimetres3. Where pit is located in a sag, inlet depressions are to be
provided on both sides of the pit4. Location and level of grated surface inlet pit shown in the
drawings refer to this point:5. Side walls of all pits deeper than 1500mm are to be
reinforced with one layer of SL82 mesh. Return mesh300mm into base and sides, or starter bars to match wallreinforcement.
6. Depth of pit not to exceed 3500mm7. Pits deeper than 1200mm to be fitted with step irons at
300mm centres. See ASD 3008. All exposed edges to be rounded with 200mm radius9. All reinforcement laps to be 300mm long10. Minimum cover of reinforcement shall be 50 unless
shown otherwise
This plan has been adopted from the plan produced by the
Roads and Maritime Services NSW (RMS). Drawing Number
R0220-27. REFER TO CURRENT EQUIVALENT EDITION
BEFORE USE .
Note: Subsoil Drain 3m long at each inlet pit.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
CAST IN-SITU GRATED SURFACE INLETFOR CATCH DRAINS & TABLE DRAINS ASD 314
NOTES:
SECTION A-A
B
A A
SECTION B-B
B
COVER
REINFORCED WITH AS 1304SL81 CENTRALLY PLACED
(COVER REMOVED)PLAN
DETAIL OF ALTERNATE INLET ARRANGEMENT
ONE INLETTWO INLETS
1. Compressive strength F'c for cast insitu concrete to be minN32 1. to AS3600.
2. All dimensions in millimetres unless otherwise shown.3. Location and level of surface inlet pit shown in the drawings
refer to this point :4. Side walls of all pits deeper than 1500mm are to be reinforced
with one layer of SL82 mesh. Return mesh 300mm into baseand sides, or starter bars to match wall reinforcement.
5. Depth of pit not to exceed 3500mm. All exposed edges to berounded with 200mm radius.
6. All reinforcement laps to be 300mm long.7. Minimum cover of reinforcement shall be 50 unless shown
otherwise.8. Where pit is deeper than 1200mm provide step Irons. Refer to
drawing ASD300 for Step Iron details.
This plan has been adopted from the plan produced by the
Roads and Maritime Services NSW (RMS). Drawing Number
R0220-37. REFER TO CURRENT EQUIVALENT EDITION
BEFORE USE .
Note: Subsoil Drain 3m long at each inlet pit.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
SURFACE INLET PIT ASD 315
A 150mm layer of compacted granular bedding material shall be provided under the unit and to manufacturersrequirements.
AS3725,
General1.2.
Precast concrete stormwater pits that are damaged with unacceptable defects shall be discarded.Precast unit shall be finished design surface levels.
Excavation3.
Assembly4.
5.6.7.
8.
All excavation must be 150mm clear of the precast unit and to manufacturer's requirements.
DO NOT oversize the knockout hole. Only the required size hole to accommodate the outside pipe diameter shouldbe removed.
Nothing outside the prescribed knockout section is to be removed.Pipes shall not enter the pit.
Pipes shall sit flush with the knockout ledge. Where the base of the pit is lower than pipe invert a false floor shall bepoured. The floor shall be graded between upstream and downstream pipe inverts with a smooth finish.
For connection to subsoil drainage refer to ASD305. All subsoil drainage connections shall only be through theknockout section and then rendered in accordance with note 12.
9.The knockout area width shall be the pipe horizontal skew dimensions.
10. The angle of entry shall be no less then 45 degrees. See table for maximum pipe size.11. The jointing surface must be clean.12. Pipe entry joints are to be rendered with an epoxy mortar to be smooth and free from intrusions and to ensure a
watertight joint.13. Concrete backfill (3:1 Sand /cement mortar) shall surround the pipe inlet and outlet to form a bell-housing effect with
a smooth finish14. Step irons at 300 centres required in pits greater than 1200mm deep. Unused step iron holes to be rendered. Refer
drawing ASD300 for Step Iron details.
Backfilling15. Backfilling around external faces of the precast unit to be selected material, in accordance with C220.08, added in
150mm layers and compacted simultaneously around the structure to avoid differential loading.
Knockout section and then render in accordance with note 12. Within the knockout area.
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
PRECAST PIT INSTALLATION ASD 316
1 2 3 4
225Ø
Detail A
Council System
Fall of land
5 6NOTES
Pit spacing to be no greater than 60mPit at change indirection(Refer to note 6)
PLANEasement 0.5m
75x50 hardwood peg, 600long painted green on peg,positioned over dead end.
FSL
225Ø MIN150Ø
Tape tied to endof sideline.
FLOW
225Ø (MIN)
DETAIL A
ELEVATION
150Ø
CONTOURS
75mm wide polyethylene tape colouredgreen, inscribed with "CAUTION BURIEDSTORMWATER LINE" printed in heavyblack letters.
1. All dimensions are in millimetres.2. Locate inspection openings in accordance with design drawings or Council
requirements.3. All connection types shown in this drawing are applicable to PVC (RRJ)
pipes unless otherwise shown.4. Property connection riser is part of the private stormwater service unless
specified otherwise.5. The maximum number of allotments connected to any interallotment system
shall not exceed 66. Pit shall be in accordance with with SCC standard drawing ASD313 (Min 600
x 600 internal dimensions)7. Pits shall be constructed at all changes in direction and the distance between
pits shall be no greater than 60m
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
INTERALLOTMENT PROPERTY DRAINCONNECTIONS ASD 317
100mm Ø UPVC (SEWER GRADE)
STANDARD PLAN
DETAIL
FOOTPATH
EXISTING/PROPOSED PIPE
A-
STANDARD SECTION
A-
BU
ILD
ING
LIN
EB
UIL
DIN
G L
INE
FOO
TPA
TH
BA
CK
OF
KE
RB
100mm Ø UPVC (SEWER GRADE)
CONNECT 100mm Ø UPVC (SEWER GRADE) PIPEINTO EXISTING/PROPOSED PIPE AT BUILDINGLINE WITH A PROPRIETARY ADAPTOR.
CONNECT INTOBACK OF KERB
EXISTING/PROPOSEDPIPE
KERB BLOCK REFERTO STANDARDDRAWING ASD319
100mm Ø UPVC(SEWER GRADE)
ADOPT 100mm TO 90mm STORMWATER ADAPTORWHEN CONNECTING TO EXISTING/PROPOSED 100mmUPVC STORMWATER PIPE IN KERB BLOCK
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
STORMWATER CONNECTION TO KERB ASD 318
NOTE:
SA HEAVY DUTYKERB ADAPTOR
EXISTING SA KERBPROFILE
SE HEAVY DUTYKERB ADAPTOR
EXISTING SE KERBPROFILE
SE KERB WITH HEAVYDUTY KERB ADAPTOR
SECTIONAL VIEW
SE HEAVY DUTYKERB ADAPTOR
SA KERB WITH HEAVYDUTY KERB ADAPTOR
SECTIONAL VIEW
SA HEAVY DUTYKERB ADAPTOR
1. All heavy duty kerb adapters are to be constructed from 125x75x3mm mildsteel
2. All mild steel must be hot dipped galvanised before installation3. The heavy duty kerb adaptors require a UPVC kerb adaptor to be inserted
inside4. Both kerb adaptors must be grouted in place to stop movement.5. Where the existing connection point is not available in either normal kerb and
gutter or roll type kerb and gutter, the kerb must be saw cut to provide for theconnection of the pipe. The saw cut must ensure that a minimum of 50mmcover is available on all 3 sides of the pipe to permit adequate strength andthickness for the concrete finish. The kerb and gutter connection must be a100mm diameter galvanised steel circular for 150mm kerb and gutter or a150mm x 150mm galvanised rectangular steel section for roll kerb ensuringthat the galvanised section is fully encased by concrete.
INSERT UPVC90/100mm ØKERB ADAPTOR
INSERT UPVC90/100mm ØKERB ADAPTOR
E
W
S
T
MOF
G
SURVEYEDOFFICER:
DATE:
SURVEY MARKS:
LIST OF REVISIONSREV. DATE OFFICER
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
.......... ................. ..........
AMENDMENT DETAILS APPROVED - Manager Subdivision Development
DATE:
DESIGNED:
DATE:
SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage
DRAWN:
DATE:
SERVICESGas:
Electricity:
Water:
Sewer:
TelComm Local Cable:
TelComm Major or Optic Fibre:
LEGENDLOCATIONS
Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas, electricity, water and telecommunications serviceproviders, including the RMS, for most recent service locations and precautions that may be necessary
ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE
Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529
PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE
PLAN DETAILS FILE:
PLAN No:
REVISION
SHEET:
76 CYGNET AVENUE(Cnr Cygnet & College Avenue)
POSTAL ADDRESS SCC STANDARD DRAWINGA21 NOVEMBER 2019
HEAVY DUTY KERB ADAPTORS ASD 319