Information Exchange among Experienced and Future Operator Plan for the establishment and development of the NPP Owner/Operator organization in Vietnam TM on Information Exchange Among Experienced and Future Operators Vienna, 16-18 October 2012 Phan Thi Hong Hanh Deputy Director of Organization and Human Resource Department Vietnam Electricity

Upload: doanliem

Post on 24-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Plan for the establishment and development of the NPP Owner/Operator organization in VietnamTM on Information Exchange Among Experienced and Future Operators Vienna, 16-18 October 2012

Phan Thi Hong Hanh Deputy Director of Organization and Human Resource DepartmentVietnam Electricity

Page 2: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Ninh Thuan Nuclear Power Project

• Ninh Thuan 1: Phuoc Dinh• 2 x 1,000 MWe

• Ninh Thuan 2: Vinh Hai• 2 x 1,000 MWe

• COD:• Ninh Thuan 1: 2020-2021• Ninh Thuan 2: 2021-2022

• Investment Owner/Operator: EVN

• Technology: Advanced & proven (LWR)

• Cooling: Sea water

2

Vinh Hai(NinhThuan)

Phuoc Dinh(Ninh Thuan)

Page 3: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

PM approved

Strategy for Peaceful

Utilization of Atomic Energy up to the year

2020

PM approved National

Strategy for Energy

Development up to 2025

with vision to 2050

National Assembly approved

Atomic Energy

Law

National Assembl

y ratified

Ninh Thuan

Nuclear Power Project

PM established State Steering Committ

ee for the Ninh

Thuan Nuclear Power Project

PM approved Planning

Orientation on Nuclear

Power Development in Vietnam up to 2030

PM approved

Master Plan on Electricit

y Develop

ment, period 2011-2020 with

vision to 2030

1/2006 12/2007 1/2008 11/2009 5/2010 7/2010 7/2011

Important Events related to Nuclear Power

Page 4: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Status of Infrastructure in Vietnam

• INIR (Integrated Nuclear Infrastructure Review) Mission: 12/2009

• INIR Conclusion: • Vietnam had achieved

Milestone 1 and was implementing activities to achieve Milestone 2

• 12 Recommendations & 22 Suggestions

• 2012: Working Group on assessment of infrastructure (chaired by VAEA)

• 2nd Self-assessment report: July 2012

• 2nd INIR Mission: December 2012

• 25th Nov. 2009: Pre-FS report of the Ninh Thuan NPPproject was approved by the National Assembly

Milestone 1(Achieved in 11/2009)

• Ready to invite bids (Vietnam: ready to sign the contract)

• 2014: Construction of the 1st Unit

Milestone 2(2012-2013) • Ready to

commission and operate the first unit of the NinhThuan NPP.

Milestone 3(12/2020)

4

TVA Nguyen, Vietnam Atomic Energy Agency

Page 5: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Ninh Thuan Nuclear Power Project Ø 10/2010: Vietnam-Russia Agreement on the Construction of Ninh Thuan 1 NPPØ 04/2011: Establishment of the NinhThuan Nuclear Power Project Management Board under Vietnam Electricity (EVN) Ø 09/2011: Signing of the EVN-JAPC (Japan) Consulting Contract of 18 months on Site Approval Dossier Development & FS of the Ninh Thuan 2 NPPØ 11/2011: Vietnam-Japan Bilateral Arrangement on the Construction of NinhThuan 2 NPPØ 11/2011: Official signing of the EVN-Consortium E4 Group (Russia) Consulting Contract of 18 months on Site Approval Dossier Development & FS of the Ninh Thuan1 NPPØ 11/2011: Official signing of Vietnam-Russia Agreement on Credit Support for the Construction of Ninh Thuan 1 NPP

5Recent Milestones

Oceanographic survey

TVA Nguyen, Vietnam Atomic Energy AgencyMeteorological survey

Page 6: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Management System

National Assembly

Committee on Science; Technology & Environment

Prime Minister

Ministry of Science and Technology

VARANS

VAEA

VINATOM

Ministry of Industry and

Trade

General Department of

Energy

Ministry of Construction

Ninh ThuanPeople’s

Committee

Ministries of Education &Training; Planning & Investment; Finance; Natural Resources &

Environment; Defence; Public Security; Foreign Affairs; Information &

Communications; Labour &Social Affairs;

State Bank

National Nuclear Safety Committee

Office of the Government

Vietnam Electricity State Steering

Committee of the NinhThuan NPP Project

(NEPIO)Ninh Thuan

Nuclear Power Project

Management Board

6

Page 7: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

EVN organization chart

Page 8: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Functional relationship between EVN and NPBMEMBERS’ COUNCILMEMBERS’ COUNCIL

PRESIDENT & CEOPRESIDENT & CEO

Corporate Secrectariat

Internal Control

Vice PresidentOperation

Vice PresidentBusiness

Vice PresidentPower

Investment (Northern)

Vice PresidentPower

Investment (Sounthern)

Vice PresidentNuclear Power

Investment

Vice PresidentEconomics -

FinanceTelecom & IT

Technical & Operation

Dept

Science-Technology & Environment

Dept

Business Dept

General Affairs Dept

Power Market Dept

Organization & HR Dept

Corporate Planning

Dept

Legal Dept

Investment Management

Dept

Procurement Management

Dept

Construction Management

Dept

Telecom & IT Dept

Inspection Dept

Public Relation

Dept

Finance & Accounting

Dept

International Relation

Dept

EVNNPB

Page 9: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Established under the Decision No. 135/QD-EVN dated March 22,2011 issued by EVN Chairman of Member Council.

Main functions:- Managing component projects of Ninh Thuan NuclearPower Project:

o Feasibility study of Ninh Thuan 1 NPP project ;o Feasibility study of Ninh Thuan 2 NPP project;o Infrastructure project for construction of nuclear

power plant projects in Ninh Thuan province;o Project on operational zone, specialists zone and

headquarters of EVNNPB;o Public Relation Center Project on nuclear power;o Human resource training project for the nuclear

power plant projects in Ninh Thuan province.

NINH THUAN NUCLEAR POWER PROJECTS MANAGEMENT BOARD (EVNNPB)

Page 10: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Main functions (cont.)• Preparation for the O&M phase of the Ninh Thuan 1 and

Ninh Thuan 2 Nuclear Power Plants Project.• Consulting services in developing feasibility study, bidding

consulting, equipment and material export-import service,cost estimate development and construction supervision forthe nuclear power works and synchronous grid works.

• Management of human resource training and developmentfor Ninh Thuan 1 and Ninh Thuan 2 NPP projects

• Management of propaganda activities on Ninh ThuanNuclear Power Project.

NINH THUAN NUCLEAR POWER PROJECTS MANAGEMENT BOARD (EVNNPB)

Page 11: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

EVNNPB Organization chart (Current)

Director General

Deputy Director General

Adm

inist

ratio

n De

pt.

Org

aniza

tion

&

Pers

onne

l Dep

t

Econ

omic

and

Pl

anni

ng D

ept.

Tech

nica

l Dep

t.Deputy Director General

Fina

nce

and

Acco

untin

g De

pt.

Inte

rnat

iona

l Rel

atio

n De

pt.

Nuc

lear

Saf

ety

and

Regu

lato

ry

Cons

truc

tion

Man

agem

ent D

ept.

Hano

i Rep

. Offi

ce

Page 12: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

EVNNPB Organization chart (at peak time)

Page 13: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

ISO in EVNNPBEVNNPB

Page 14: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Organization chart of Ninh Thuan NPP (2x1000MW)DirectorNPP [1]

Deputy DirectorAdministration

Deputy DirectorBusiness

]

Technical Deputy DirectorOperation

Technical Deputy DirectorMaintenance

Deputy DirectorSafety

Deputy DirectorTechnical

Office/General Dept. [30]

Personnel-Organization Dept. [10]

Finance &Accounting Dept. [10]

Planning Dept. [10]

Materials & Equipment Dept. [15]

Public Relation Dept.& Center [10]

Health Physics Dept. [9]

Security & Safeguard Dept. [132]

Unit 1 Operation Workshop [131]

Unit 2 Operation Workshop [131]

Reactor Maintenance Workshop [180]

Mechanic-Electric Maintenance Workshop

[220]

Laboratory Dept. [20]

Fuel Management Dept. [6]

Safety & Regulation Dept. [40]

Waste Management Workshop PX [40]

Technical Dept. [48]

Quality Control Dept. [19]

Training Center [32]

Total number: 1100 employees

14

Page 15: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Organization chart of Operation Workshop

Unit 2 shift leader [9]

Vice shift leader [16]

Shift leader [8]

Unit 1 shift leader [9]

Reactor [24]

Electric (16)

Turbine (16)

Automation, I&C (12)

Cooling System (12)

Chemistry, water treatment (8)

HVAC (4)

Reactor [24]

Electric (16)

Turbine (16)

Automation, I&C (12)

Cooling System (12)

Chemistry, water treatment (8)

HVAC (4)

Unit 1 vice shift leader [18] Unit 2 vice shift leader [18]

15

Page 16: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

16

0

200

400

600

800

1000

1200

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Num

ber o

f per

sons

Year

NPBPre-OperationPower plant

<------------- Phase 3 ------------>Design, Construct, Comm'n

<-- --Phase 1---->Feasibility

<------------- Phase 2------------>Site Investigation, Bid

Preparations

Milestone 1Milestone 2 Milestone 3

STAFFING SCHEDULE

Page 17: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Nuclear power, 47.50%

Radiation Safety, 9.05%

Chemistry, 7.25%

Others, 36.20%

17

University degree disciplines

University degree 40.20%

Vocational college 41.90%

Unskilled worker 17.90%

WORKFORCE IN THE NPP

By education level

Page 18: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

18

Select experienced staffs from

operating power plants

OJT at site

Thermal power

training

2 years

High-school students

University under/graduate

Vocational training

2 years

O&M5 – 7 years

3 years

6 months

Training in EPC contract

Core member training

Education and Training flow chart

Language training

1 year

6 months

Maintenance training

5 - 8 year

Page 19: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Education PlanQuantity Place Field of study

University degree 884

Oversea Nuclear-related fields

Vietnam Electric, mechanic, automation, IT…

Vocational training 922 Vietnam Electric, mechanic, chemistry…

Unskilled worker 394

Total 2200

Page 20: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Training plan (1)# Targeted audience Training contents Duration Venue

1 All staffs related to the project Nuclear Power Basics 1 month Vietnam

2 Management personnel of EVNNPB, EVN and consulting firms

Knowleges relates to nuclear power project management

1/2 month Oversea

3Staff of technical department and construction management department of EVNNPB

Provide knowledges on thermal power, on the job training at the thermal power project management board

3 months Vietnam

4EVNNPB staff

Advanced training on project managemet (minimum 50%OJT)

3 months Oversea

5 Consulting firms, staff of EVNNPB

Training design consultant, supervision consultant (minimum 50% OJT)

6 months Oversea

Page 21: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Training plan (2)# Targeted audience Training contents Duration Venue

6 Engineers, operators Knowledges on thermal power plants, OJT at thermal power plants

3 months Vietnam

7 Key O&M personnel Foreign language training 12 months Vietnam/Japan/Russia

8 Key O&M personnelProvide knowledges on operation management and maintenance of NPP

24 months Russia/Japan

9 Training for maintenance workers

OJT at NPP on mechanic maintenance, electric maintenance, C&I system maintenance

6 months Russia/Japan

10 University lecturers Proffessional courses and/or reseach at universities 3 months Oversea

11 University lecturers Master/PhD on nuclear related fields 2-3 years Oversea

Page 22: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

22

CHALLENGESvHuman Resourceo Lack of experienced persons in nuclear-related fields.o Outstanding students do not choose nuclear field of study.o Lack of experienced persons in developing comprehensive and proper

staffing and training plan for the first NPP.

vLegal frameworko Mechanism to attract outstanding students and competent persons to

nuclear power field is not available.o Legal document to define competency requirement for key positions in

NPP is not available.

vFinanceo Constraint financial resources.o Complicated financial disbursment.

Page 23: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

23

RISK ANALYSIS• Experienced and competent persons donot choose to

work for the project. • Outstanding students don’t choose to follow nuclear

power fields. Or the university could not supply adequate students for the project to recruit.

Risk 1: Shortage in required manpower for

the project

• Wrong competency definition of certain position.• Could not attract well-experienced staffs to work for the

project or outstanding students to follow nuclear field.

Risk 2: Recruited personnel or the trained staffs are not competent enough to meet the work

requirement

• No experience in workforce and training planning for a NPP project.

• Changes in national policy or legal framework; changes in the project (technology, schedule…)

Risk 3: The workforce plan and training plan is

not appropriate

• Language constrain• Cultural shock and cultural difference• Change in the mood of trainees• Limited information provided because of the sensitivity of

the nuclear power field

Risk 4: Training oversea is not as efficient as

needed

Page 24: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

24

RISK MITIGATION• The policy and mechanism to give more incentives to

people working and studying nuclear power should be in force soon.

• Increase public communication about nuclear power to get public acceptance and awareness on nuclear power.

Risk 1: Shortage in required manpower for

the project

• Close cooperation with vendor to review and revise the competency discription for each position.

• Regular monitoring and evaluating the training efficiency.• Focus on OJT. • Develop Knowledge Management system.

Risk 2: Recruited personnel or the trained staffs are not competent enough to meet the work

requirement

• Regular review and revise the manpower and training plan in response to changes of the project.

• Close cooperation with EPC contractor during project implementation.

Risk 3: The workforce plan and training plan is

not appropriate

• Adequate language training for trainees to study oversea.• Introduction of the destination country culture should be

given to the trainees.• Carefully select trainees with good attitude (eg. eager for

discovering new technology, for being promoted…)• Detailed training program should be discussed and agreed

with the contractor.

Risk 4: Training oversea is not as efficient as

needed

Page 25: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

IAEA supportsWS on IMS and safety culture on August 2011

Review Mission to review the report of Training plan for the Ninh Thuan NPP projects on August 2012

WS on the Development of Management System for Key Involved Organizations during 2-4 October 2012

Page 26: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

Conclusion• IAEA guideline is the “north star”, which gives clear and

comprehensive information for the newcomer in nuclear power development.

• IAEA review mission concluded that we are “on the right track” in developing workforce and training plan for the 1st

NPP project and gave valuable recommendation for EVN to complete our report to the Prime Minister.

• NPP project is very sophisticated in terms of technology and management which requires every activities should be intergrated. Meanwhile, it will take place in a long time (a decade for building and some other decades for operating), that means that there will be a lot of changes that should be well managed => we really need further and long-time support from experienced countries, especially from IAEA.

Page 27: Plan for the establishment and development of the NPP · PDF file · 2012-10-19Plan for the establishment and development of the NPP Information Exchange among Experienced and Future

Info

rmat

ion

Exch

ange

am

ong

Expe

rienc

ed a

nd F

utur

e O

pera

tor

THANK YOU FOR YOUR ATTENTION!