Plan for the establishment and development of the NPP Owner/Operator organization in VietnamTM on Information Exchange Among Experienced and Future Operators Vienna, 16-18 October 2012
Phan Thi Hong Hanh Deputy Director of Organization and Human Resource DepartmentVietnam Electricity
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Ninh Thuan Nuclear Power Project
• Ninh Thuan 1: Phuoc Dinh• 2 x 1,000 MWe
• Ninh Thuan 2: Vinh Hai• 2 x 1,000 MWe
• COD:• Ninh Thuan 1: 2020-2021• Ninh Thuan 2: 2021-2022
• Investment Owner/Operator: EVN
• Technology: Advanced & proven (LWR)
• Cooling: Sea water
2
Vinh Hai(NinhThuan)
Phuoc Dinh(Ninh Thuan)
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
PM approved
Strategy for Peaceful
Utilization of Atomic Energy up to the year
2020
PM approved National
Strategy for Energy
Development up to 2025
with vision to 2050
National Assembly approved
Atomic Energy
Law
National Assembl
y ratified
Ninh Thuan
Nuclear Power Project
PM established State Steering Committ
ee for the Ninh
Thuan Nuclear Power Project
PM approved Planning
Orientation on Nuclear
Power Development in Vietnam up to 2030
PM approved
Master Plan on Electricit
y Develop
ment, period 2011-2020 with
vision to 2030
1/2006 12/2007 1/2008 11/2009 5/2010 7/2010 7/2011
Important Events related to Nuclear Power
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Status of Infrastructure in Vietnam
• INIR (Integrated Nuclear Infrastructure Review) Mission: 12/2009
• INIR Conclusion: • Vietnam had achieved
Milestone 1 and was implementing activities to achieve Milestone 2
• 12 Recommendations & 22 Suggestions
• 2012: Working Group on assessment of infrastructure (chaired by VAEA)
• 2nd Self-assessment report: July 2012
• 2nd INIR Mission: December 2012
• 25th Nov. 2009: Pre-FS report of the Ninh Thuan NPPproject was approved by the National Assembly
Milestone 1(Achieved in 11/2009)
• Ready to invite bids (Vietnam: ready to sign the contract)
• 2014: Construction of the 1st Unit
Milestone 2(2012-2013) • Ready to
commission and operate the first unit of the NinhThuan NPP.
Milestone 3(12/2020)
4
TVA Nguyen, Vietnam Atomic Energy Agency
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Ninh Thuan Nuclear Power Project Ø 10/2010: Vietnam-Russia Agreement on the Construction of Ninh Thuan 1 NPPØ 04/2011: Establishment of the NinhThuan Nuclear Power Project Management Board under Vietnam Electricity (EVN) Ø 09/2011: Signing of the EVN-JAPC (Japan) Consulting Contract of 18 months on Site Approval Dossier Development & FS of the Ninh Thuan 2 NPPØ 11/2011: Vietnam-Japan Bilateral Arrangement on the Construction of NinhThuan 2 NPPØ 11/2011: Official signing of the EVN-Consortium E4 Group (Russia) Consulting Contract of 18 months on Site Approval Dossier Development & FS of the Ninh Thuan1 NPPØ 11/2011: Official signing of Vietnam-Russia Agreement on Credit Support for the Construction of Ninh Thuan 1 NPP
5Recent Milestones
Oceanographic survey
TVA Nguyen, Vietnam Atomic Energy AgencyMeteorological survey
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Management System
National Assembly
Committee on Science; Technology & Environment
Prime Minister
Ministry of Science and Technology
VARANS
VAEA
VINATOM
Ministry of Industry and
Trade
General Department of
Energy
Ministry of Construction
Ninh ThuanPeople’s
Committee
Ministries of Education &Training; Planning & Investment; Finance; Natural Resources &
Environment; Defence; Public Security; Foreign Affairs; Information &
Communications; Labour &Social Affairs;
State Bank
National Nuclear Safety Committee
Office of the Government
Vietnam Electricity State Steering
Committee of the NinhThuan NPP Project
(NEPIO)Ninh Thuan
Nuclear Power Project
Management Board
6
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
EVN organization chart
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Functional relationship between EVN and NPBMEMBERS’ COUNCILMEMBERS’ COUNCIL
PRESIDENT & CEOPRESIDENT & CEO
Corporate Secrectariat
Internal Control
Vice PresidentOperation
Vice PresidentBusiness
Vice PresidentPower
Investment (Northern)
Vice PresidentPower
Investment (Sounthern)
Vice PresidentNuclear Power
Investment
Vice PresidentEconomics -
FinanceTelecom & IT
Technical & Operation
Dept
Science-Technology & Environment
Dept
Business Dept
General Affairs Dept
Power Market Dept
Organization & HR Dept
Corporate Planning
Dept
Legal Dept
Investment Management
Dept
Procurement Management
Dept
Construction Management
Dept
Telecom & IT Dept
Inspection Dept
Public Relation
Dept
Finance & Accounting
Dept
International Relation
Dept
EVNNPB
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Established under the Decision No. 135/QD-EVN dated March 22,2011 issued by EVN Chairman of Member Council.
Main functions:- Managing component projects of Ninh Thuan NuclearPower Project:
o Feasibility study of Ninh Thuan 1 NPP project ;o Feasibility study of Ninh Thuan 2 NPP project;o Infrastructure project for construction of nuclear
power plant projects in Ninh Thuan province;o Project on operational zone, specialists zone and
headquarters of EVNNPB;o Public Relation Center Project on nuclear power;o Human resource training project for the nuclear
power plant projects in Ninh Thuan province.
NINH THUAN NUCLEAR POWER PROJECTS MANAGEMENT BOARD (EVNNPB)
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Main functions (cont.)• Preparation for the O&M phase of the Ninh Thuan 1 and
Ninh Thuan 2 Nuclear Power Plants Project.• Consulting services in developing feasibility study, bidding
consulting, equipment and material export-import service,cost estimate development and construction supervision forthe nuclear power works and synchronous grid works.
• Management of human resource training and developmentfor Ninh Thuan 1 and Ninh Thuan 2 NPP projects
• Management of propaganda activities on Ninh ThuanNuclear Power Project.
NINH THUAN NUCLEAR POWER PROJECTS MANAGEMENT BOARD (EVNNPB)
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
EVNNPB Organization chart (Current)
Director General
Deputy Director General
Adm
inist
ratio
n De
pt.
Org
aniza
tion
&
Pers
onne
l Dep
t
Econ
omic
and
Pl
anni
ng D
ept.
Tech
nica
l Dep
t.Deputy Director General
Fina
nce
and
Acco
untin
g De
pt.
Inte
rnat
iona
l Rel
atio
n De
pt.
Nuc
lear
Saf
ety
and
Regu
lato
ry
Cons
truc
tion
Man
agem
ent D
ept.
Hano
i Rep
. Offi
ce
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
EVNNPB Organization chart (at peak time)
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
ISO in EVNNPBEVNNPB
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Organization chart of Ninh Thuan NPP (2x1000MW)DirectorNPP [1]
Deputy DirectorAdministration
Deputy DirectorBusiness
]
Technical Deputy DirectorOperation
Technical Deputy DirectorMaintenance
Deputy DirectorSafety
Deputy DirectorTechnical
Office/General Dept. [30]
Personnel-Organization Dept. [10]
Finance &Accounting Dept. [10]
Planning Dept. [10]
Materials & Equipment Dept. [15]
Public Relation Dept.& Center [10]
Health Physics Dept. [9]
Security & Safeguard Dept. [132]
Unit 1 Operation Workshop [131]
Unit 2 Operation Workshop [131]
Reactor Maintenance Workshop [180]
Mechanic-Electric Maintenance Workshop
[220]
Laboratory Dept. [20]
Fuel Management Dept. [6]
Safety & Regulation Dept. [40]
Waste Management Workshop PX [40]
Technical Dept. [48]
Quality Control Dept. [19]
Training Center [32]
Total number: 1100 employees
14
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Organization chart of Operation Workshop
Unit 2 shift leader [9]
Vice shift leader [16]
Shift leader [8]
Unit 1 shift leader [9]
Reactor [24]
Electric (16)
Turbine (16)
Automation, I&C (12)
Cooling System (12)
Chemistry, water treatment (8)
HVAC (4)
Reactor [24]
Electric (16)
Turbine (16)
Automation, I&C (12)
Cooling System (12)
Chemistry, water treatment (8)
HVAC (4)
Unit 1 vice shift leader [18] Unit 2 vice shift leader [18]
15
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
16
0
200
400
600
800
1000
1200
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Num
ber o
f per
sons
Year
NPBPre-OperationPower plant
<------------- Phase 3 ------------>Design, Construct, Comm'n
<-- --Phase 1---->Feasibility
<------------- Phase 2------------>Site Investigation, Bid
Preparations
Milestone 1Milestone 2 Milestone 3
STAFFING SCHEDULE
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Nuclear power, 47.50%
Radiation Safety, 9.05%
Chemistry, 7.25%
Others, 36.20%
17
University degree disciplines
University degree 40.20%
Vocational college 41.90%
Unskilled worker 17.90%
WORKFORCE IN THE NPP
By education level
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
18
Select experienced staffs from
operating power plants
OJT at site
Thermal power
training
2 years
High-school students
University under/graduate
Vocational training
2 years
O&M5 – 7 years
3 years
6 months
Training in EPC contract
Core member training
Education and Training flow chart
Language training
1 year
6 months
Maintenance training
5 - 8 year
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Education PlanQuantity Place Field of study
University degree 884
Oversea Nuclear-related fields
Vietnam Electric, mechanic, automation, IT…
Vocational training 922 Vietnam Electric, mechanic, chemistry…
Unskilled worker 394
Total 2200
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Training plan (1)# Targeted audience Training contents Duration Venue
1 All staffs related to the project Nuclear Power Basics 1 month Vietnam
2 Management personnel of EVNNPB, EVN and consulting firms
Knowleges relates to nuclear power project management
1/2 month Oversea
3Staff of technical department and construction management department of EVNNPB
Provide knowledges on thermal power, on the job training at the thermal power project management board
3 months Vietnam
4EVNNPB staff
Advanced training on project managemet (minimum 50%OJT)
3 months Oversea
5 Consulting firms, staff of EVNNPB
Training design consultant, supervision consultant (minimum 50% OJT)
6 months Oversea
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Training plan (2)# Targeted audience Training contents Duration Venue
6 Engineers, operators Knowledges on thermal power plants, OJT at thermal power plants
3 months Vietnam
7 Key O&M personnel Foreign language training 12 months Vietnam/Japan/Russia
8 Key O&M personnelProvide knowledges on operation management and maintenance of NPP
24 months Russia/Japan
9 Training for maintenance workers
OJT at NPP on mechanic maintenance, electric maintenance, C&I system maintenance
6 months Russia/Japan
10 University lecturers Proffessional courses and/or reseach at universities 3 months Oversea
11 University lecturers Master/PhD on nuclear related fields 2-3 years Oversea
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
22
CHALLENGESvHuman Resourceo Lack of experienced persons in nuclear-related fields.o Outstanding students do not choose nuclear field of study.o Lack of experienced persons in developing comprehensive and proper
staffing and training plan for the first NPP.
vLegal frameworko Mechanism to attract outstanding students and competent persons to
nuclear power field is not available.o Legal document to define competency requirement for key positions in
NPP is not available.
vFinanceo Constraint financial resources.o Complicated financial disbursment.
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
23
RISK ANALYSIS• Experienced and competent persons donot choose to
work for the project. • Outstanding students don’t choose to follow nuclear
power fields. Or the university could not supply adequate students for the project to recruit.
Risk 1: Shortage in required manpower for
the project
• Wrong competency definition of certain position.• Could not attract well-experienced staffs to work for the
project or outstanding students to follow nuclear field.
Risk 2: Recruited personnel or the trained staffs are not competent enough to meet the work
requirement
• No experience in workforce and training planning for a NPP project.
• Changes in national policy or legal framework; changes in the project (technology, schedule…)
Risk 3: The workforce plan and training plan is
not appropriate
• Language constrain• Cultural shock and cultural difference• Change in the mood of trainees• Limited information provided because of the sensitivity of
the nuclear power field
Risk 4: Training oversea is not as efficient as
needed
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
24
RISK MITIGATION• The policy and mechanism to give more incentives to
people working and studying nuclear power should be in force soon.
• Increase public communication about nuclear power to get public acceptance and awareness on nuclear power.
Risk 1: Shortage in required manpower for
the project
• Close cooperation with vendor to review and revise the competency discription for each position.
• Regular monitoring and evaluating the training efficiency.• Focus on OJT. • Develop Knowledge Management system.
Risk 2: Recruited personnel or the trained staffs are not competent enough to meet the work
requirement
• Regular review and revise the manpower and training plan in response to changes of the project.
• Close cooperation with EPC contractor during project implementation.
Risk 3: The workforce plan and training plan is
not appropriate
• Adequate language training for trainees to study oversea.• Introduction of the destination country culture should be
given to the trainees.• Carefully select trainees with good attitude (eg. eager for
discovering new technology, for being promoted…)• Detailed training program should be discussed and agreed
with the contractor.
Risk 4: Training oversea is not as efficient as
needed
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
IAEA supportsWS on IMS and safety culture on August 2011
Review Mission to review the report of Training plan for the Ninh Thuan NPP projects on August 2012
WS on the Development of Management System for Key Involved Organizations during 2-4 October 2012
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
Conclusion• IAEA guideline is the “north star”, which gives clear and
comprehensive information for the newcomer in nuclear power development.
• IAEA review mission concluded that we are “on the right track” in developing workforce and training plan for the 1st
NPP project and gave valuable recommendation for EVN to complete our report to the Prime Minister.
• NPP project is very sophisticated in terms of technology and management which requires every activities should be intergrated. Meanwhile, it will take place in a long time (a decade for building and some other decades for operating), that means that there will be a lot of changes that should be well managed => we really need further and long-time support from experienced countries, especially from IAEA.
Info
rmat
ion
Exch
ange
am
ong
Expe
rienc
ed a
nd F
utur
e O
pera
tor
THANK YOU FOR YOUR ATTENTION!