Example (1) DFI_D00038.dgn
U.P.R.R.
I-5
18"
PLANN.T.S.
12"
N
SCHEMATIC OF PIPE DRAINAGE SYSTEM
18"
N.T.S.
24"
A
A12"
24"
Off Ramp To Ku
ebler Blvd.
A
C
B
252.05Mile Point
252.00Mile Point
12"
Jim Holeman
DFI D00034
Facility B
orand
orand
DFI D00039
Facility
OREGON DEPARTMENT OF TRANSPORTATION
Prepared By:
Drafted By:
DFI D00038
MAINTENANCE DISTRICT 3 HWY 1
MARION COUNTY
DETENTION TANK / PIPEPACIFIC HIGHWAY MP 252.00-252.05
Inlet (Schematic View)
Pavement / Facility Flow Path
Conveyance Direction
Storm Pipe
Storm Pipe (Facility)
(DFI D00038)
Detention Tank / Pipe
CB
Manhole
(DFI D00038)
Detention Tank / Pipe
C C12"
Exit Sign
Kuebler Blvd.
3
4
5
1
2
6, 7
to Ditch
Outfall
Ditc
h
Ditch
Bob Knorr
C
72" Dia., 146 Ft. Length72" Dia., 146 Ft. Length
72" Dia., 146 Ft. Length 72" Dia., 146
Ft. Length
(Interstate 5)(Pacific Hwy 001
)Northbound lan
es
(Interstate 5)(Pacific Hwy 001
)Southbound la
nes
Bridge No. 20026
Sht. 1 of 1
Manhole lid
3
2
1
4
Outlet
Inlet
Roadway Asphalt
N.T.S.
and repair. Reattach wire strainer after cleaning.the lower orifice. It can be removed for cleaningdebris, trash, and sand/gravel from pluggingWire cloth Strainer: Purpose is to prevent
with support bands.riser pipe is secured to the manhole wallFlow Control Riser Pipe Assembly: Vertical
for additional instructions.Push rod down to close drain. See NotesControl Rod: Pull rod up to open drain.
when water levels reach (3).to allow stormwater to drain out of manholeTop of Riser Pipe: Opening is provided
the manhole is between (2) and (3).this small orifice when the water level inUpper Orifice: Stormwater drains out of
(1) and (2).when the water level in the manhole is betweenout of the manhole and into the outlet pipeLower Orifice: Stormwater begins to drain
FLOW CONTROL STRUCTURE
inspect or during maintenance work. Shear gate is closed during normal operation.is open. Vactor pumping is necessary to remove water below (1). Draining manhole maybe necessary toControl Rod can be used to open shear gate (4). Water level can be drained to (1) when the shear gate
Stormwater from manhole structure will drain into the outlet pipe when reaching elevations (1), (2), and (3).
Notes:
Inlet
Manhole
Detention Pipe - 6' Dia.
Southern Most Manhole
Flow Control Structure - 9' Dia.
Photo Location / Direction
LEGEND:
18" Dia.
72" Dia.
|15 Ft.Depth
9 Ft.Diameter
Example (2) DFI_D00041.dgn
Manhole lid
3
2
1
4
OutletInlet
N.T.S.
with support bands.riser pipe is secured to the manhole wallFlow Control Riser Pipe Assembly: Vertical
the manhole is between (2) and (3).this small orifice when the water level inUpper Orifice: Stormwater drains out of
FLOW CONTROL STRUCTURE
manhole when water levels reach (3).to allow stormwater to drain out ofTop of Riser Pipe: Opening is provided
between (1) and (2).when the water level in the manhole isout of the manhole and into the outlet pipeLower Orifice: Stormwater begins to drain
for additional instructions.Push rod down to close drain. See NotesControl Rod: Pull rod up to open drain.
inspect or during maintenance work. Shear gate is closed during normal operation.is open. Vactor pumping is necessary to remove water below (1). Draining manhole maybe necessary toControl Rod can be used to open shear gate (4). Water level can be drained to (1) when the shear gate
Stormwater from manhole structure will drain into the outlet pipe when reaching elevations (1), (2), and (3).
Notes:
areas or behind guardrail)Existing Ground (Grassed
and repair. Reattach wire strainer after cleaning.the lower orifice. It can be removed for cleaningdebris, trash, and sand/gravel from pluggingWire cloth Strainer: Purpose is to prevent
24"
N.T.S.
N.T.S.
32nd Ave. S.E.Marietta S
t. S.E.
12"
Ditch
24"
24"
Litchfield Pl.
15"
A
12"
A
A
24"
Kuebler Blvd off I-5Facility access from
12"
12"
12"
12"
12"
12"
Access Gate
I-5 On Ramp
(DFI D00041)
Biofiltration Swale Combo
Detention Pond/WQ
12"
12"
12"
(DFI D00041)
Biofiltration Swale Combo
Detention Pond/WQ
From Kuebler Boulevard
24" Dia. 18" Dia. |8.5 Ft.Depth
6 Ft.Diameter
251.70Mile Point
251.74Mile Point
E
C
SECTION A-A
PLAN
D
B
C
D
E
F
Ground
B
C
E
D
F
A
F
24" Outlet pipe from pond
Ground
Barrier
24"
12"
A
18"
18"
Pond/swale bottom
Maximum water depth
Pond/swale storage volume
Jim Holeman
14
3
5
orand
orand
OREGON DEPARTMENT OF TRANSPORTATION
Prepared By:
Drafted By:
DFI D00041
MARION COUNTY
PACIFIC HIGHWAY MP 251.70-251.74
Median
10
6
B
78, 9Manhole
2
DETENTION POND/WQ BIOFILTRATION SWALE
Wynee Hu MAINTENANCE DISTRICT 3 HWY 001
| 268 ft.
12"
(Interstate 5)
(Pacific Highway, Hwy 001)
Northbound Lanes
(Interstate 5)
(Pacific Highway, Hwy 001)
Southbound Lanes
| 268 ft.
24"
Pavement / Facility Flow Path
Conveyance Direction
Storm Pipe
Storm Pipe (Facility)
Inlet
Manhole
Access Gate Drain To Conveyance Line
Manhole Connecting Area
Flow Control Manhole - 6' Dia.
Type 'D' Ditch Inlet Structure
Flow Spreader
Facility Inlet B
Facility Inlet A
Photo Location / Direction
LEGEND:
Top of Swale
Bottom of Swale
Sht. 1 of 1
Example (3) DFI_D00122.dgn
N.T.S.
S.W. 66TH AVE.
S.W. 68T
H P
AR
KW
AY
Ditch
Ditch
B C
N.T.S.
I-5 O
n Ramp
A
A
A
D
A
I-5(Interstate 5)
Southbound lanes
(Interstate 5)
Northbound lanes
I-5 Off R
amp
B
D
A
D
36"
(DFI D00122)
Detention Pond
WQ Extended Dry
Ball Creek
AreaWetland
Ball C
reek
Wetla
nd Area
Beaverton-Tigard H
wy
US 217 (H
wy 144)
Ball Creek
SECTION A-A
36"
PLAN
I-5 Off Ramp
84"
18"
Bangy RD
292.31Mile Point
292.37Mile Point
36"
12"
Pond bottom
36" Pipe
B
C
E
E
C
E
drains into Ball Creek
Connects to 84" and
Maintenance access
5
(DFI D001
22)Det
ention P
ondWQ E
xtended Dry
2
Pond
Jim Holeman
Emergency Overflow
1
DFI D00118
WQ Swale Facility
DFI D00121
WQ Swale Facility
31
4
M. Wittenbrink
Pavement / Facility Flow Path
Conveyance Direction
Storm Pipe
Storm Pipe (Facility)
Inlet
Manhole
Maintenance access
Riprap Splash Pad
Special Manhole with emergency overflow grate
Control Structure Outlet
Pond Inlet
Photo Location / Direction
LEGEND:
orand
orand
AreaWetland
Dike
Kruse W
ay
84"
|247 Ft.
|247 Ft.
Sht. 1 of 1
OREGON DEPARTMENT OF TRANSPORTATION
Prepared By:
Drafted By:
DFI D00122
MAINTENANCE DISTRICT 2B HWY 1
CLACKAMAS COUNTY
WQ EXTENDED DRY DETENTION PONDPACIFIC HIGHWAY MP 292.32-292.37