Planetary Protection: Background and Planning for PP Compliance
Karen BuxbaumMars Program Planetary Protection Manager
Jet Propulsion Laboratory, California Institute of Technology
Presentation toMAVEN Instrument Tutorial
October 20, 2010Berkeley, California
![Page 2: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/2.jpg)
2
So, what is planetary protection?
• An international agreement • A NASA Policy Directive (NPD 8020.7)• A set of requirements (found in NPR 8020.12) that
robotic planetary flight missions must meet in order to be in compliance with NASA policy
• A “way of life” in solar system exploration—integral to the endeavor, not an add-on or afterthought
10/20/10
AA for Space Science, or designee, is responsible for overall administration.Planetary Protection Officer is designee for managing and implementing.
![Page 3: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/3.jpg)
3
Planetary Protection Goals
• Avoid inadvertently taking Earth organisms to another Solar System body (forward contamination)– Necessary to preserve planetary conditions for future
biological and organic constituent exploration
• Avoid introduction of alien microbes into Earth’s biosphere (back or backward contamination)– Necessary step to protect Earth and its biosphere from
potential extraterrestrial sources of biological contamination
10/20/10
Complies with Article IX of the Outer Space Treaty of 1967Basic concept dates from 1950s, and before
![Page 4: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/4.jpg)
4
PP Goal #1 Restated
Or, as the NASA PPO has been known to say…
On Earth, life is everywhere. How do we ensure that we don’t find what we brought with us when we go to explore somewhere else?
10/20/10
![Page 5: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/5.jpg)
5
Outbound to Mars Any Sample Return “Back PP”“Forward PP”
Avoid false positive life detection event
Life detection event in this context is considered to mean detection of
contamination that could be confused with extraterrestrial (ET) life
Any Mars mission must comply with international PP policy, but not all missions face all three aspects shown here. Some implementation options overlap, but each requirement has intent that is distinct from the others.
Protect Earth from potential harmful effects
(biohazards/toxins)
Requirements & Mission Scenarios
Avoid contamination of Mars with Earth life
Introduction of viable Earth life into a favorable martian environment is
considered harmful contamination by definition
Forward PP, Back PP, Round-trip PP
10/20/10
“Round-trip PP”
![Page 6: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/6.jpg)
6
Historic Perspective
• Implications appreciated in fiction even before space age• Policy formulation began in 1950’s (e.g., quarantine
standards introduction by International Council of Scientific Unions (ICSU))
• Introduction into law as Article IX of 1967 Outer Space Treaty• Full history is a longer story, but COSPAR and NASA PP policy
continue to evolve based on science, coupled with internal and external recommendations
• For NASA, primary recommendations come from SSB with programmatic and operational advice from the Planetary Protection Subcommittee of the NASA Advisory Council; for projects and programs, specific advice flows from the PPO
10/20/10
![Page 7: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/7.jpg)
7
Categories and Scope of Work
• Categories I and II– Little cost or risk, technically simple, but expert
assistance needed
• Categories III and IVa– Significant costs and risks, technically difficult– Should delegate to single Project PP Manager– Implementation methods and required tasks cross
several areas of typical project WBS
• Categories IVb, IVc, and V “restricted Earth return”– Greater costs and risks, technically challenging
10/20/10
![Page 8: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/8.jpg)
8
Planetary Protection Categories for Mars Missions
• Category III, IV, and V mission categories apply to Mars exploration– Arose from 1992 SSB advice on Forward Contamination of
Mars– Specify acceptable limits of possible contamination, based
on mission type– Categories do NOT specify or indicate the specific
implementation (e.g., IVb does not imply full system sterilization) or the degree of difficulty
10/20/10
![Page 9: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/9.jpg)
9
Planetary Protection Categories for Sample Return
• Category V mission category can be “restricted” or “unrestricted” Earth return– No guesswork about which applies to Mars– Even this category still does not fully specify or indicate the
specific implementation (e.g., how the forward contamination requirements will be implemented)
– The exploration program uses advice from 1997 and 2009 SSB reports Mars Sample Return—Issues and Recommendations and Assessment of Planetary Protection Requirements for Mars Sample Return Missions
10/20/10
![Page 10: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/10.jpg)
10
From Policy to Implementation
• NASA HQ sets policy for the U.S. – Early on in exploration, less is known and policy is more conservative– Early on in exploration, guidelines have tended to be probabilistic– Special issues with regard to definition of sterility, e.g., extremophiles,
non-spore-formers• Projects plan and implement to achieve PP compliance– Requirements are project-specific; apply to all the hardware, including
instruments– Sterility definition is sometimes an issue (“bioburden reduction” is
often the correct operational term)– Options may require much study and iteration with PPO
• Technology planning for PP is difficult (not a MAVEN issue)– Policy has ambiguities; often unclear whether specific technology
would be judged to achieve compliance– Timeline to approval is long; multiple stakeholders– PP technology readiness is judged differently than for flight hardware
10/20/10
![Page 11: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/11.jpg)
11
PP Implementation
• Conceptually simple but complicated in practice!• Forward contamination control (remember, this
includes the “round trip” issues)– Issues often more controversial – Operational and monetary costs– Consequences not as dire—preserve future science
• Back contamination– Common sense purpose—protect the home planet– Even greater operational and monetary costs
10/20/10
![Page 12: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/12.jpg)
12
Planetary Protection vs. Contamination Control
• Contamination control– Particulate and molecular contamination on flight systems
to ensure proper function of instruments and sensors– Typically derived from science requirements
• Planetary protection (forward contamination)– Requirements levied by NASA for benefit of future science
• Overlaps– Some but not all methodologies in common– PP interest in life detection and sample return
10/20/10
![Page 13: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/13.jpg)
13
PP Implementation
• Planning– PP Plan, Subsidiary Plans, PP Implementation Doc
• Analysis• Bacterial burden accounting• Biological contamination control• Reports and reviews• Record keeping
10/20/10
![Page 14: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/14.jpg)
14
Typical Documents and Schedule
• Certification Request—typically in Phase A• PP Plan—draft ~PDR -30d; approved by PDR• Subsidiary Plans (part of PP Plan)—draft @PPP +3mo• Implementation Document—proj. app’d draft @CDR• Pre-launch Report—due @launch -90d• Post-launch Report—due @launch +60d• Extended Mission Report (if applicable) —due
@nominal EOM -60d• End of Mission PP Report—due at EOM plus 60d
10/20/10
![Page 15: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/15.jpg)
15
Guidelines and Methods
• Current forward PP guidelines for Mars are attached to levels of acceptable bioburden
• Levels of acceptable bioburden, bioburden reduction and assay methods are based substantially on research conducted during the Viking program during the 1970s– Bioburden assay methods are culture based
• Concern about bioburden also depends on Mars environments and ability of microorganisms to survive and grow there—information on both is constantly increasing– Understanding “what” as well as “how much” is now considered
important– Concept of “special regions;” creation of new PP category IVc for Mars
• Has there been other progress or change relevant to planetary protection in recent years?
10/20/10
![Page 16: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/16.jpg)
16
Relevant ProgressGuidelines and Methods
• Methods for bioburden reduction and assessment have advanced in recent years and progress continues– Improved understanding of effective cleaning methodologies– New molecular assays for faster measurement of spacecraft and facility cleanliness
(LAL and Total-ATP assays)– Faster cultivation-based assays in development or validation phase– Expanded options for dry heat bioburden reduction—new specification likely– Vapor hydrogen peroxide specification near final NASA (and ESA) certification– Other bioburden reduction methods in R&D– Contamination transport measurement and modeling– Genetic inventory capability development– Biobarrier developed and flown (Phoenix)– Aseptic assembly experience (Beagle 2)
• System engineering studies and technology gap assessment– Feasibility case studies for system level sterilization (a la Viking)
10/20/10
YES!
![Page 17: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/17.jpg)
17
Relevant ProgressScience and Missions
• Advances in planetary science and mission implementation experience– Mars landers (e.g., Pathfinder, Mars Polar Lander, Mars Exploration
Rovers, Beagle 2, Phoenix, Mars Science Laboratory)– Mars orbiters (Mars Global Surveyor, Mars Climate Orbiter, Odyssey,
Nozomi, Mars Express, Mars Reconnaissance Orbiter)– Sample return (Genesis, Stardust, Hayabusa)– Extensive study in preparation for possible MSR– Expanded knowledge through astrobiology programs worldwide– Added perspective through preparation for possible exploration of icy
moons of outer planets– Expanded knowledge about Mars
• Advances in genomics and biocontainment experience in the private and gov’t sectors, domestically and internationally
10/20/10
![Page 18: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/18.jpg)
Mars Global Surveyor: 1996 Launch
Artist concept
![Page 19: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/19.jpg)
2005 Mars Reconnaissance Orbiter
• First US Mars Orbiter Mission to use the bioburden reduction option for planetary protection compliance
• Implemented pre-launch bioburden controls plus extensive burn & breakup analysis
Artist concept
![Page 20: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/20.jpg)
20
Points to Remember
• NASA HQ sets policy; projects plan and implement to achieve compliance
• Requirements are typically quite project-specific• Introduce into project early
– Get official category– Get requirements early (applies to all hardware)
• Develop an approach to PP compliance that is integral to flight system and mission design
• Record-keeping required for launch approval by NASA PPO and for End-of-Mission Report
• PP compliance for the mission does not end with launch10/20/10
![Page 21: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/21.jpg)
21
QUESTIONS?
10/20/10
![Page 22: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/22.jpg)
22
BACKUP CHARTS
10/20/10
![Page 23: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/23.jpg)
2310/20/10
“Planetary protection implementation on Mars Reconnaissance Orbiter mission”
J. Barengoltz and J. WitteAdvances in Space ResearchVolume 42, Issue 6, 15 September 2008, Pages 1108-1119
Definitive MRO PP Reference
![Page 24: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/24.jpg)
A Viking Casserole
![Page 25: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/25.jpg)
Back to the Surface: Mars Pathfinder
![Page 26: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/26.jpg)
Lost on la
nding, 1999
Mars Climate Orbiter
(Late 1998 Launch)
Lost in orbita
l inser
tion, 1
999
Mars is not very forgiving....
Mars Polar Lander(Early 1999 Launch)
Artist concepts
Case Study for PP Caution: Mars ‘98
![Page 27: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/27.jpg)
MER-1 at KSC/ATLO
Getting Bigger: MER 2003
![Page 28: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/28.jpg)
2007 Scout Mission: Phoenix
• First US mission required to comply with intent of COSPAR Category IVc established in 2002
• Implemented Viking-level sterilization of the hardware used to access (and touch) the martian subsurface
• Challenges included hardware sterilization, maintenance of sterility using a biobarrier, deployment of the biobarrier at Mars, prevention of recontamination of sterile hardware during operations
![Page 29: Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California](https://reader035.vdocument.in/reader035/viewer/2022081603/56649f175503460f94c2da39/html5/thumbnails/29.jpg)
Bigger Still: MSL 2011
• Planning to achieve unprecedented levels of organic cleanliness• Nuclear power system raised additional complexities, affected
mission options• Responsive to concerns about martian special regions (staying away)• Currently implementing its planetary protection strategy, taking into
account its science payload and possible landing sites
Artist concept