Planning and Development

March 28, 2013

0

MTC / ABAG Plan Bay Area (2040)

Regional Sustainability

2Note: For five BART served counties: Alameda, Contra Costa, San Francisco, San Mateo, and Santa Clara

Job Growth• ~ 1,000,000• > 25% of growth near BART

Household Growth• ~ 625,000

• San Francisco 100,000• Alameda 160,000• Contra Costa

90,000 • San Mateo

60,000• Santa Clara 215,000

• > 25% of growth near BART

Agenda

A. Current Projects

B. BART Challenges / Opportunities

Oakland Airport ConnectorAutomated People Mover System (APM)

Replace AirBART Bus with:

Automated People Mover (APM)

Driverless

Electrically driven

Exclusive 3.1 mile guideway

Extremely consistent & reliable

Seamless ticketing

Comfortably carry 3.2 Million Annual Passengers (MAP)

Expandable to 4.9 MAP

Trains every 4.5 minutes

Ride time 8 minutes – door to door 14 min

4

OAC Alignment

Doppelmayr Cable Car • DCC’s Development of Pinched Loop Technology

Page # 14

OAK BART

OAC Construction Progress

Col

iseu

m B

AR

T

I-880 Hegenberger

Hegenberger

Connector Station

6

OAC Look Ahead

Activity Start Estimated Finish

Station(s) Construction September 2011 November 2013

Guideway Construction June 2011

Maintenance & Storage Facility July 2011

Vehicle Fabrication December 2012

Train Control System Fabrication January 2013 June 2013

System Testing

Start of OAC Service

September 2013

August 2013

August 2013

September 2014

Fall 2014

December 2013

7

Project Location

8