8/17/1748/FULAvon Beach, Mudeford, Christchurch
To raise the middle section of Avon Beach Promenadeby 900mm over approx. 250m to improve flood andcoastal erosion risk protection; by joining the newretaining structure into existing raised defence’s ateither end of the promenade. Widen promenade by1.5m.New Surfacing and two bench seats.
Site Location Plan
Block Plan
A
A
B
B
Looking west towards site
of works compound
Existing Promenade and Beach Levels
Promenade Realignment and Cross Sections
Level change at Avon Beach shop
Trees overhanging
beach huts
Project publicity
EXISTING ACCESS ROUTES THROUGH SLOPE
BEACH HUTS
FROM
FOOTPATH
ABOVE
Level change
at eastern
end
Looking westLooking east