Page 1: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

SSccrreeeenniinngg CCrriitteerriiaa CC ll aa rr ii ff ii cc aa tt ii oo nn tt oo PP aa rr tt 99 Date of Draft – January 8, 2009

PPllaannnniinngg DDeeppaarrttmmeenntt

Page 2: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

January 8, 2009

Screening CriteriaClarification to Part 9

1

1. Purpose: Document the Airport’s interpretations of Section 15 Screening of Part Nine - Oil and Gas Exploration and Production.

2. Site definitions: The Airport classifies drilling or operation sites as follows:• Greenfield Site, low visibility - Site is located in a remote, non-developed area and is not

readily visible from streets, highways, rail or nearby buildings.• Greenfield Site, high visibility - Site is located in a remote, non-developed area, but is

visible to the public from streets, highway, rail or nearby buildings.• Developed Site, low visibility - Site is located within an area of current development or

adjacent to streets, highways or rail, but is not in the direct view of such facilities.• Developed Site, high visibility - Site is located within an area of current development or

adjacent to a street, highway or rail, and is in the direct view of such facilities and the public.• High Profile Site, retail/resort/entertainment - Site is located near or within a planned

development or in the direct line of sight of such a building as determined by airport planning staff.

• DFWAirportreservestherighttocreateadditionalsitedefinitionsormodifytheabovedefinitions as conditions warrant over the duration of the natural gas exploration lease.

3. Operator:asdefinedbyDFWAirport’sConstructionandFirePreventionStandardsResolution&AmendmentstotheCodes,Part9,Section2.

4. Initial Installation: Operator is responsible for the initial installation of all elements of these standards during Operation Site development. If these standards are adopted after Operation Sites have been developed, Operator is responsible for upgrading Operation Site to conform with these standards.

5. Alternatives: In many instances alternates to these criteria are available due to issues such as availabilityorcost.OperatorsmaythereforesubmitalternatestothesecriteriatoDFWPlanningfor review and consideration. All submittals shall include a written justification as well as a sample material (if available), specification, and image.

6. Cost:Operatorisresponsibleforallcostsincluding,butnotlimitedto:initialinstallation,upgrading, maintenance, replacement, and restoration.

7.Maintenance&Replacement:OperatorisresponsibleformaintainingallOperationSitestoensure compliance as set forth with the development criteria as stated herein. In the event elements of these criteria cannot be restored, maintenance may include replacing elements forsuchproblemsas,butnotlimitedto,damage,destruction,ordeathasdeterminedbyDFWAirport. Plant materials must be maintained for the life of the lease and replacement is required within six months of damage, destruction, or death. All other elements must be repaired or replaced within 45 days of damage or destruction.

8. Upgrading a Site from Drilling to Production: The status of a site shall be changed from drilling to production when the earliest of the following occurs: 1) the last planned well is placed into production, or 2) drilling activities on the site have been dormant for 12 months, or 3) an operation site is in use for its intended purpose. The Operator must complete construction and installation of screening elements within 45 days and complete installation of all plant materials within six months.

9.Restoration:TheOperatorisresponsibleforrestoringtheelementsofthiscriteriawithin30daysofdamage or modifications required during re-drilling or re-working.

10.Branding:AtDFWAirportallOperatorstoragetankswillbepaintedwhite(SherwinWilliamsCityLoftSW1032).DFWreservestherighttobrandtheleadtankinpublicviewfromtheroadwaywiththeDFWlogo;however,thistankmaybebrandedwithanapprovedstandardsizelogooftheoperatingcompanyinthecenterofthetank.Componentsofbranding(logos,striping,andotherelements)willbe reviewed on a site-by-site basis. To review proposed branding, Operator must submit the following for each operation site:a.Typicalcondition:OperatormustsubmitacolorphotoofatypicaltankforDFWrecordsdimensioningthesizeofthebluebandsandthesizeofthelogo

b.Witheachpadconstructionpermit,OperatormustsubmitanoperationsiteplanindicatingwhichtankanddirectionforthelogoonthesiteforDFWreviewandapproval.

11.UpgradingSitetoaNewCategory:Atsuchtimeassurroundingdevelopmentactivityshouldchangethedefinitionofthesitetoamorestringentcategory,asdeterminedbyDFWAirport,thesiteshallbeupgraded at the operator’s expense to the new criteria. The Operator must complete construction and installationofadditionallyrequiredbuiltelementswithin90daysandcompleteinstallationofallplantmaterialswithinsixmonthsofthedateofnoticebyDFWAirport.

12.Landscaping:Wherevegetativescreeningisrequired,landscapingshallbeincompliancewithstandard engineering and design practices. Operator must submit landscape plans, which include all featuresdesignatedherein,specifictoeachoperationsitetoDFWforreviewandapproval.

Standard planting size:

Common Name Scientific Name Standard Planting SizeCedarElm Ulmus crassifolia 4”caliper,ballsizetomeetAmerican

Nursery Association StandardsEasternRedCedar Juniperus virginiana 12-14’ tall, b&b transplant, ball

sizetomeetAmericanNurseryAssociation Standards

WaxMyrtle Myrica cerifera 30gallon,Ht.6-7’

YauponHolly Ilex vomitoria 30gallon,Ht.6-7’

HeavenlyBamboo Nandina domestica 15 gallon

‘Bright’NTight’CherryLaurel Prunus caroliniana ‘Bright’NTight’ 30gallon,Ht.5-6’

definitions and procedures

tree

smal

ltr

eesh

rub

Page 3: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

January 8, 2009

Screening CriteriaClarification to Part 9

2

Greenfield Site“low visibility”1. Definition: Site is located in a remote, non-developed area and is not readily visible from

streets, highways, rail or nearby buildings. 2. Hardscape:surfacetreatmentofpadsite• drilling–crushedconcreteaggregate• production–dust-freeaggregateofadecomposedgraniteorcoloredgravelmaterialatadepthto

provide uniform reddish-brown color and coverage–wheresitedisturbancesexceedthefencedareaofthepad,naturalgroundcovershall

be restored with aggregate native grass seeding or buffalo grass sod3. Fencing• drilling–6’tall(minimum)chainlinkfenceincludingtakeback• production–6’tall(minimum)chainlinkfencewithtoprail

4. Gate: • duringdrilling–6’tallchainlinkgate• duringproduction–6’tallchainlinkgate

5. AccessRoad• material:crushedconcrete• curbcuts–whenanaccessroadconnectstoanexistingpavedroad,acurbcutisrequired.–curbcutsshallincludepavingtomatchadjacentroadforaminimumof65feet.

6. Landscaping:notrequired7. Lighting:Fixturesshallcontainalllighton-siteutilizinghighpressuresodiumbulbs.Fixturemustbedirecteddownward,shieldedtorestricthorizontalcut-offangle.Maximumfixtureheightisrestrictedto30’.• drilling–LumarkNightHawkIII• production–sameasdrilling

8. Paint: All tanks and production equipment will be painted soft white equal to Sherwin WilliamsCityLoftSW1032andmaybebrandedatoperator’sand/orDFWAirport’sdiscretion.

9.Setbacks:Thesetbackshallbe10feetexceptwhereitconflictswithexistingcoderequirements. In the case of conflict with existing code, the setback shall be the maximum allowed by the code (typically 8 feet).

HardscapeExample Pad Site:BW

AL

AK

AS

AVAQ

AE

AP

AT

AW

AR

AM

AX

AZ

BJ

AUBFBG

EA EB

AD

BH

BX BY

BW BV

BN

CM

CL

EC

CDCF

CJ

DC

DD

DB

CC

CGCK

CE

CP

CB

CQ

CT

CH

CR

CA

CS

CN

DE

AN

DA

AC

AY

Paint

Decomposed Granite Production Hardscape: Decomposed Granite

Drilling Hardscape: Crushed Concrete Aggregate

Soft White - Sherwin Williams SW1032

Lighting

Lumark Nighthawk III

Diagram-SetbackRequirements

Gate

Standard Chain Link Gate

ProductionFencing

6’ Tall Chain Link Fence with Top Rail

Page 4: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

January 8, 2009

Screening CriteriaClarification to Part 9

3

Greenfield Site“high visibility”1. Definition: Site is located in a remote, non-developed area, but is visible to the public from

streets, highway, rail or nearby buildings.2. Hardscape:surfacetreatmentofpadsite• drilling–crushedconcreteaggregate• production–dust-freeaggregateofadecomposedgraniteorcoloredgravelmaterialatadepthto

provide uniform reddish-brown color and coverage–wheresitedisturbancesexceedthefencedareaofthepad,naturalgroundcovershall

be restored with aggregate native grass seeding or buffalo grass sod.3.Fencing •drilling–6’tall(minimum)chainlinkfenceincludingtakeback •production–6’tall(minimum)chainlinkfencewithtoprail4. Gate: • duringdrilling–6’tallchainlinkgate• duringproduction –6’tallchainlinkgate

5. AccessRoad• material:crushedconcrete• curbcuts–whenanaccessroadconnectstoanexistingpavedroad,acurbcutisrequired.–curbcutsshallincludepavingtomatchadjacentroadforaminimumof65feet.

6. Landscaping:completevegetativescreeningutilizingnaturalisticappearanceplantingconcept on side(s) visible from adjacent buildings or streets, highways or rail as determined byDFWAirport.

7. Lighting:Fixturesshallcontainalllighton-siteutilizinghighpressuresodiumbulbs.Fixturemustbedirecteddownward,shieldedtorestricthorizontalcut-offangle.Maximumfixtureheightarerestrictedto30’.• drilling–LumarkNightHawkIII• production–sameasdrilling

8. Paint: All tanks and production equipment will be painted soft white equal to Sherwin Williams-CityLoftSW1032.

9.Setbacks:Thesetbackshallbe10feetexceptwhereitconflictswithexistingcoderequirements. In the case of conflict with existing code, the setback shall be the maximum allowed by the code (typically 8 feet).

Vegetative Screening - Naturalistic Appearance

Yaupon Holly(Ilex vomitoria)

Eastern Red Cedar(Juniperus virginiana)

Wax Myrtle(Myrica cerifera)

Heavenly Bamboo(Nandina domestica)

Cherry Laurel(Prunus Caroliniana)

Yaupon Holly(Ilex vomitoria)

Eastern Red Cedar(Juniperus virginiana)

Heavenly Bamboo(Nandina domestica)

Cherry Laurel(Prunus caroliniana)

Wax Myrtle(Myrica cerifera)

Plan and Elevation - 10 years

Elevation - at planting

HardscapeExample Pad Site:AW

AL

AK

AS

AVAQ

AE

AP

AT

AW

AR

AM

AX

AZ

BJ

AUBFBG

EA EB

AD

BH

BX BY

BW BV

BN

CM

CL

EC

CDCF

CJ

DC

DD

DB

CC

CGCK

CE

CP

CB

CQ

CT

CH

CR

CA

CS

CN

DE

AN

DA

AC

AY

Paint

Decomposed Granite Production Hardscape: Decomposed Granite

Drilling Hardscape: Crushed Concrete Aggregate

Soft White - Sherwin Williams SW1032

Gate

Standard Chain Link Gate

ProductionFencing

6’ High Chain Link Fence

Page 5: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

January 8, 2009

Screening CriteriaClarification to Part 9

4

Developed Site“low visibility”1. Definition: Site is located within an area of current development or adjacent to streets,

highways or rail, but is not in the direct view of such facilities.2. Hardscape:surfacetreatmentofpadsite• drilling–crushedconcreteaggregate• production–dust-freeaggregateofadecomposedgraniteorcoloredgravelmaterialatadepthto

provide uniform reddish-brown color and coverage–wheresitedisturbancesexceedthefencedareaofthepad,naturalgroundcovershall

be restored with aggregate native grass seeding or buffalo grass sod.3. Fencing•drilling–6’tall(minimum)chainlinkfencewithPVCverticalslats(darkbrownorcharcoal

black in color on all sides)•production–6’tall(minimum)chainlinkfencewithtoprailandPVCverticalslats(dark

brown or charcoal black in color on all sides)4. Gate: • duringdrilling–6’chainlinkgate• duringproduction–ifnotvisiblefromdevelopedarea:6’tallchainlinkgate–ifvisiblefromdevelopedarea:6’tallarchitecturalmetalgate

5. AccessRoad• material:aconcretedrivewayisrequiredforthefirst65feetfromstreetafterwhich

crushed concrete is allowed.• curbcuts:whenanaccessroadconnectstoanexistingpavedroad,acurbcutis

required. 6. Landscaping:completevegetativescreeningonallsides.Screeningoptionsincludeeither

an ordered or naturalistic appearance, or shall be consistent with the character of adjacent developmentsorroadwaysasdeterminedbyDFWAirport.

7. Lighting:Fixturesshallcontainalllighton-siteutilizinghighpressuresodiumbulbs.Fixturemustbedirecteddownward,shieldedtorestricthorizontalcut-offangle.Maximumfixtureheightisrestrictedto30’.• drilling–LumarkNightHawkIII• production–sameasdrilling

8. Paint: All tanks and production equipment will be painted soft white equal to Sherwin WilliamsCityLoftSW1032.

9.Setbacks:Thesetbackshallbe10feetexceptwhereitconflictswithexistingcoderequirements. In the case of conflict with existing code, the setback shall be the maximum allowed by the code (typically 8 feet).

Vegetative Screening - Naturalistic Appearance

Yaupon Holly(Ilex vomitoria)

Eastern Red Cedar(Juniperus virginiana)

Heavenly Bamboo(Nandina domestica)

Cherry Laurel(Prunus caroliniana)

Wax Myrtle(Myrica cerifera)

Plan and Elevation - 10 years

Vegetative Screening - Ordered AppearanceCedar Elm(Ulmus crassifolia)

Heavenly Bamboo(Nandina domestica)

Plan and Elevation - 10 years

HardscapeExample Pad Site: DA

AL

AK

AS

AVAQ

AE

AP

AT

AW

AR

AM

AX

AZ

BJ

AUBFBG

EA EB

AD

BH

BX BY

BW BV

BN

CM

CL

EC

CDCF

CJ

DC

DD

DB

CC

CGCK

CE

CP

CB

CQ

CT

CH

CR

CA

CS

CN

DE

AN

DA

AC

AY

Paint

Decomposed Granite Production Hardscape: Decomposed Granite

Drilling Hardscape: Crushed Concrete Aggregate

Soft White - Sherwin Williams SW1032

Gate

6’ Tall Architectural Metal, Visible from Developed Area

Fencing

Chain Link with All-Weather Fabric

Page 6: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

January 8, 2009

Screening CriteriaClarification to Part 9

5

Developed Site“high visibility”1. Definition: Site is located within an area of current development or adjacent to a street,

highway or rail, and is in the direct view of such facilities and the public.2. Hardscape:surfacetreatmentofpadsite• drilling–crushedconcreteaggregate.• production–dust-freeaggregateofadecomposedgraniteorcoloredgravelmaterialatadepthto

provide uniform reddish-brown color and coverage.–wheresitedisturbancesexceedthefencedareaofthepad,naturalgroundcovershallbe

restored with aggregate native grass seeding or buffalo grass sod.3. Fencing• duringdrilling–6’tall(minimum)chainlinkfencewithPVCverticalslats(darkbrownor

charcoal black in color on all sides)• duringproduction–8’architecturalmetalfencehavinganexpansenogreaterthan50’betweenmasonryfeaturesnolessthan10’long.Cornersofproductionscreeningshallbemasonrywitha10’lengthonbothsidesofcorner.Gatesshallbeflankedbymasonryfeatureswithaminimumlengthof10’.Masonryfeaturesshallbeconsistentwiththeadjacent development and shall be either brick, stone, patterned concrete or textured concrete.CMUmasonryfeaturesareprohibited.Masonryfeaturesshallhavebothverticalandhorizontalarticulation.OperatormustsubmitadimensionedplanforDFWAirportapproval.

4. Gate: • duringdrilling–6’chainlinkgate• duringproduction–8’architecturalmetalgate.Gatesshallbeflankedbymasonryfeatureswithaminimumlengthof10’.

5. AccessRoad• material:reinforcedconcretepaving• curbcuts:whenanaccessroadconnectstoanexistingpavedroad,acurbcutisrequired.

6. Landscaping:completevegetativescreeningonallsides.Screening options include either an ordered or naturalistic appearance, or shall be consistent with the character of adjacent developmentsorroadwaysasdeterminedbyDFWAirport.

7. Lighting:Fixturesshallcontainalllighton-siteutilizinghighpressuresodiumbulbs.Fixturemustbedirecteddownward,shieldedtorestricthorizontalcut-offangle.Maximumfixtureheightrestrictedto30’.• drilling–LumarkNightHawkIII• production–“Concord”bySterner,(orequaldesignbySpauldingorMcGrawEdison)

factory painted gray finish to match pole8. Paint:AlltanksandproductionequipmentwillbepaintedsoftwhiteequaltoSherwinWilliams-CityLoftSW1032.

9.Setbacks:Thesetbackshallbe10feetexceptwhereitconflictswithexistingcoderequirements. In the case of conflict with existing code, the setback shall be the maximum allowed by the code (typically 8 feet).

HardscapeExample Pad Site: AN

AL

AK

AS

AVAQ

AE

AP

AT

AW

AR

AM

AX

AZ

BJ

AUBFBG

EA EB

AD

BH

BX BY

BW BV

BN

CM

CL

EC

CDCF

CJ

DC

DD

DB

CC

CGCK

CE

CP

CB

CQ

CT

CH

CR

CA

CS

CN

DE

AN

DA

AC

AY

Paint

Decomposed Granite Production Hardscape: Decomposed Granite

Drilling Hardscape: Crushed Concrete

Soft White - Sherwin Williams SW1032

Gate

8’ Tall Architectural Metal, Visible from Developed Area

ProductionFencing

Metal Fence with Masonry Feature

Lighting

“Concord” by Sterner

AccessRoad

Reinforced Concrete Paving

Vegetative Screening - Naturalistic Appearance

Yaupon Holly(Ilex vomitoria)

Eastern Red Cedar(Juniperus virginiana)

Heavenly Bamboo(Nandina domestica)

Cherry Laurel(Prunus caroliniana)

Wax Myrtle(Myrica cerifera)

Plan and Elevation - 10 years

Vegetative Screening - Ordered AppearanceCedar Elm(Ulmus crassifolia)

Heavenly Bamboo(Nandina domestica)

Plan and Elevation - 10 years

Page 7: Planning Department - DFW International Airport€¦ · Planning Department. January 8, 2009 Screening Criteria Clarification to Part 9 1 1. Purpose: Document the Airport’s interpretations

January 8, 2009

Screening CriteriaClarification to Part 9

6

High Profile Site“retail/resort/entertainment”1. Definition: Site is located near or within a planned development or in the direct line of sight of such

a building as determined by airport planning staff.2. Hardscape:surfacetreatmentofpadsite• drilling–crushedconcreteaggregate• production–dust-freeaggregateofadecomposedgraniteorcoloredgravelmaterialatadepthtoprovide

uniform reddish-brown color and coverage.–wheresitedisturbancesexceedthefencedareaofthepad,naturalgroundcovershallbe

restored with aggregate native grass seeding or buffalo grass sod.3. Fencing• duringdrilling–6’highchainlinkfencewithall-weatherfabricorPVCverticalslatsonallsides• duringproduction–8’architecturalmetalfencehavinganexpansenogreaterthan50’betweenmasonryfeaturesnolessthan10’long.Cornersofproductionscreeningshallbemasonrywitha10’expanseonbothsidesofcorner.Gatesshallbeflankedbymasonryfeatureswithaminimumlengthof10’.Masonryfeaturesshallbeconsistentwiththeadjacentdevelopmentandshallbeeitherbrick,stone,patternedconcreteortexturedconcrete.CMUmasonryfeaturesareprohibited.Masonryfeaturesshallhavebothverticalandhorizontalarticulation.OperatormustsubmitadimensionedplanforDFWAirportapproval.

4. Gate: • duringdrilling–6’chainlinkgate• duringproduction–8’ architectural metal gate. Gates shall be flanked by masonry features with aminimumlengthof10’thatareconsistentwithmasonryfeaturesusedinfencing.

5. AccessRoad• material:reinforcedconcretepaving,whichshallcontainaneight-footwidebandofstamped,

colored concrete complying with the standards established by the Airport, shall be provided acrossalldriveways.Bandalignswithleaselineandprojectsintostreetright-of-way.

–color:mediumgreyintegralcolorconcrete –texture:slate –patterntwo-footbytwo-footgrid• curbcuts:whenanaccessroadconnectstoanexistingpavedroad,acurbcutisrequired.

6. Landscaping• vegetativescreeningoptionrequiredonallsidesutilizingeitheranorderedornaturalistic

appearance, or shall be consistent with the character of adjacent developments or roadways as determinedbyDFWAirport.Eachlandscapedareashallincorporating feature plants that are consistent with adjacent developments.

• featureplantsspacednomorethan20’andshouldbeconsistentwithlandscapingelementsofadjacentdevelopmentsasdeterminedbyDFWAirportPlanning.

7. Lighting:Fixturesshallcontainalllighton-siteutilizinghighpressuresodiumbulbs.Fixturemustbedirecteddownward,shieldedtorestricthorizontalcut-offangle.Maximumfixtureheightrestrictedto30’.• drilling–LumarkNightHawkIII• production–fixturetomatchstandardestablishedforneighborhoodorifnostandardis

established, “Concord”bySterner,(orequaldesignbySpauldingorMcGrawEdison)factorypainted gray finish to match pole

8. Paint:AlltanksandproductionequipmentwillbepaintedsoftwhiteequaltoSherwinWilliams-CityLoftSW1032.

9.Thesetbackshallbe10feetexceptwhereitconflictswithexistingcoderequirements.Inthecaseof conflict with existing code, the setback shall be the maximum allowed by the code (typically 8 feet).

Vegetative Screening - Naturalistic Appearance

Yaupon Holly(Ilex vomitoria)

Eastern Red Cedar(Juniperus virginiana)

Heavenly Bamboo(Nandina domestica)

Cherry Laurel(Prunus caroliniana)

Wax Myrtle(Myrica cerifera)

Plan and Elevation - 10 years

Vegetative Screening - Ordered AppearanceCedar Elm(Ulmus crassifolia)

Heavenly Bamboo(Nandina domestica)

Plan and Elevation - 10 years

HardscapeExample Pad Sites: AS, AK, AV, AQ

AL

AK

AS

AVAQ

AE

AP

AT

AW

AR

AM

AX

AZ

BJ

AUBFBG

EA EB

AD

BH

BX BY

BW BV

BN

CM

CL

EC

CDCF

CJ

DC

DD

DB

CC

CGCK

CE

CP

CB

CQ

CT

CH

CR

CA

CS

CN

DE

AN

DA

AC

AY

Paint

Decomposed Granite Production Hardscape: Decomposed Granite

Drilling Hardscape:Crushed Concrete Aggregate

Soft White - Sherwin Williams SW1032

Gate

8’ Tall Architectural Metal, Visible from Developed Area

ProductionFencing

Architectural metal wall with masonry features

AccessRoad

Reinforced Concrete Paving with Stamped Concrete Access Band