planning engineer 7 yrs gulf exp
TRANSCRIPT
CURRICULAM VITAE
MUHAMMAD ISHTIAQ
PERSONAL DATA
DATE OF BIRTH: 01-AUG-1987AGE: 28 YearsSEX: MaleNATIONALITY: PakistaniMARITAL STATUS: MarriedDriving License: Yes (U.A.E)
Total Experience – 7 Yrs.Notice Period – Immediate
CURRENT ADDRESSAl Ain, Abu Dhabi, United Arab Emirates.
PASSPORT DETAILSPassport No: DZ1849472Date of Issue: Apr, 2014Date of Expiry: Apr, 2019Issued at: Sialkot -Pakistan
CONTACT NO.Cell #: +971-50-7861719EMAIL ID: [email protected]
PLANNING ENGINEER(Building & Infrastructure)
BRIEF INTRODUCTION
Civil Planning Engineer with 7 years of exposure to Project Planning, Management and Control Systems out of this 6 years in U.A.E. I have been effectively involved in the Planning, Monitoring and Cost Controlling of Construction Projects. I am fully equipped with the modern planning & scheduling software, like Primavera (P3.1 & P6 (8.2), and well versed with Project Management Tools such as Earned Value Management, Resource Management, Critical Path Method and Cost Analysis.
CAREER OBJECTIVE
To Seek Challenging and Innovative career in Substantial Organization which provides me scope to enhance my knowledge towards my career growth as well as to fortify and certify the growth of Organization.
EDUCATIONAL PROFILE
Bachelors of Engineering (BSc Civil Engg) University of Engineering and Technology Taxila. 2005 – 2009
FSc PRE ENGINEERING (HSSC)Islamabad Model College for Boys G-10/4, Pakistan.2003 – 2005
MATRICULATION (SSC)Govt High School Gujranwala, Pakistan.2001 – 2003
EMPLOYMENT SUMMARY:
Significant Project Management Experience in Construction Industry.
EXPERIENCE OVERVIEW (7 years)
PERIODEMPLOYER/
CONTRACTORCONSULTANT / LOCATION OWNER PROJECT DESIGNATION
Feb 15 – To Date Bin Ham Group Hyder Consulting Middle
East Ltd
Abu Dhabi Sewerage Services Company (ADSSC)
Sewerage Connection for 4
Nos areas in Al Ain
Planning & Tendering Engineer
Mar 14 – Feb 15
Ecco General Contracting Co
LLC
ARCHGROUP CONSULTANTS INTERNATIONA / Dubai SBK Real estate
Construction of commercial &
Residential Buildings
Planning Engineer
Nov 10 – Mar 14
Doosan Heavy Ind & Construction Co
Fitchner / DubaiDubai Electricity & Water Authority
(DEWA)
Construction of Jabel Ali Power &
Desalination Station ‘M’
Building Dept
Planning Engineer
Flour / ABU DHABI Al Hosn Gas ,Abu Dhabi
Shah Gas Development Project ,Civil Works Dept
Planning Engineer
Oct 09 – Nov 10
GHAZI RAMZAN BIN ASHOOR TRAD & CONTRACTING CO
Al Manara Engineering Consultancy/ Salalah,Oman
Private Owners Construction of Residential Villas Project Engineer
PERIODEMPLOYER/
CONTRACTORCONSULTANT / LOCATION OWNER PROJECT DESIGNATION
BRIEF JOB DESCRIPTION
BIN HAM AGRICULTURAL CO (BIN HAM GROUP).
PROJECTS: Sewerage Connection for 4 No’s Areas in Al AinDuration: Feb-2015 – To DateClient: Abu Dhabi Sewerage Services Company (ADSSC)Position: Planning Engineer (Planning, Scheduling Cost Analysis, Tenders)
PROJECT DESCRIPTION: Sewerage connections for 4 Nos Areas in Al Ain, Abu Dhabi and Project is owned by Abu Dhabi sewerage Services Company and Bin Ham is working as a main contractor where as the consultant is Hyder Consulting Middle East Ltd.
Responsibilities:
Development of Baseline EPC Schedules followed by Look Ahead / Accelerated / Recovery Schedules (Up to required levels) by using P6.
Making cost analysis and Participate in tenders filling. Monitoring & Updating Schedule, Computing Variance and suggesting remedial actions. Monitoring project execution and evaluating Performance using EVMS (Earned Value Management System). Generation / Updating of Progress S-Curves. Preparation and Updating the Invoicing / Cash Flow Curve. Preparation of Progress Reports for Client and Management. Preparation of EOT (Extension of Time) Claims using Windows Analysis. Responsible for all planning activities on the project in accordance with the Quality
Management Procedure
ECCO GENERAL CONTRACTING CO LLC (DUBAI,BR).
PROJECTS: Construction of Residential and Commercial Building, Khawaneej, DubaiDURATION: MAR-2014 – FEB-2015CLIENT: SBK Real EstatePosition: Planning Engineer
PROJECT DESCRIPTION: Project consists of G+4+Roof building in Al Khawaneej, Dubai UAE. The Building is owned by SBK real estate and ECCO GENERAL CONTRACTING worked as a subcontractor where as the main contractor was Al Arif Contracting Company. Ecco was responsible for all civil works from planning, execution, approval from consultant up to final handing over to client.
Responsibilities:
Development of Baseline EPC Schedules followed by Look Ahead / Accelerated / Recovery Schedules (Up to required levels) by using P6.
Monitoring & Updating Schedule, Computing Variance and suggesting remedial actions. Monitoring project execution and evaluating Performance using EVMS (Earned Value Management System). Generation / Updating of Progress S-Curves. Preparation and Updating the Invoicing / Cash Flow Curve. Preparation of Progress Reports for Client and Management. Preparation of EOT (Extension of Time) Claims using Windows Analysis. Responsible for all planning activities on the project in accordance with the
Quality Management Procedure.
DOOSAN HEAVY IND & CONSTRUCTION CO, (DUBAI,BR). PROJECTS: Construction of Jabel Ali Power & Desalination Station ‘M’ Building Dept.
DURATION: NOV-2010 – MAY 2012CLIENT: Dubai Electricity & Water Authority (DEWA)Position: PLANNING ENGINEER PROJECT DESCIPTION:
Jabel Ali Power & Desalination Station ‘M’ is power generation plant constructed by Doosan Heavy Ind and Construction Co with other subcontractors where as all civil works like underground utilities, cable tunneling, construction of carpentry workshops, firefighting and plant room buildings being done by Gusan Construction co the sister company of Doosan heavy ind & construction co.
PROJECT: Shah Gas Development Project, Civil Works DeptDURATION: MAY-2012 – MARCH 2014CLIENT: Al Hosn Gas , Abu DhabiPosition: PLANNING ENGINEER
PROJECT DESCRIPTION:
Shah ‘Gas development project is construction of gas processing plant in the western region of Abu Dhabi ,UAE where the main contractor was Samsung E & C subcontract all civil works of building construction to Gusan construction Co .The construction of administration and plant room buildings are main work being done by Gusan Construction co. Gusan construction co is responsible for all works of building construction from initiating ,planning, execution ,managing up to final closing.
Responsibilities: Development of Baseline EPC Schedules followed by Look Ahead / Accelerated / Recovery Schedules (Up to
required levels) by using P6. Resources loading to Schedule as per Company Norms & experience. Monitoring & Updating Schedule, Computing Variance and suggesting remedial actions. Preparing Material Approval Requests for construction Materials and Method statements for Construction
Activities. Coordinating with commercial department, providing technical assistance in sub-contractor selection and
making comparative statements, cost and time impacts for subcontracted activities. Monitoring project execution and evaluating Performance using EVMS (Earned Value Management System). Generation / Updating of Progress S-Curves. Preparation and Updating the Invoicing / Cash Flow Curve. Enterprise Resource Planning and generating Craft-wise & overall Manpower Histograms. Preparation of Progress Reports for Client and Management. Preparation of EOT (Extension of Time) Claims. Coordination with Client & Sub-Contractors at all levels. Attending Weekly Internal Office Meeting and preparing the Minutes of Meeting. Responsible for all planning activities on the project in accordance with the Quality Management Procedure. Plan out the Daily job on supervisor level as per the work front availability.
GHAZI RAMZAN BIN ASHOOR TRAD & CONTRACTING CO
PROJECT: Construction of Residential Villas, Salalah, OmanDURATION: OCT 2009 – NOV-2010CLIENT: Private OwnersPOSITION: PROJECT ENGINEER
PROJECT DESCRIPTION:The company main projects were the Construction of villas G+1 for private owners. The
company is also credited with the engineering, procurement and construction of small up to large-scale of villas.Responsibilities
The detailed planning of all stages of construction, including workers, equipment and materials. The construction phase, including site inspection and checking material, measurements and workmanship. Scheduling Base Line, Progress Tracking, Organizing Activities, Developing Bar Chart/Histograms, and
Identifying Critical Path.
Preparing inspection request and inspection follow up approvals, coordinating with Electro- mechanical Services and quality management teams.
Studying Structural and architectural drawings and execution on site. Preparing Bar Bending Schedules and monitoring steel re-bar fixing. Supervision of Concrete Works, installation of formwork, installation of reinforcement and involved in
QA/QC activities. Applying safety measures to prevent any accident and prevent construction structures from any climatic
impacts.
INFORMATION TECHNOLOGY SKILLS
Primavera Project Planner (P3 & P6) Ms Word. Ms Excel. Power point. AutoCAD
LINGUISTIC SKILLS
English – Advanced Level Urdu – Advanced Level Arabic- Basic
STRENGTHS
Personal Professional Engineering
Problem solving Customer focused Site supervision
Professional manner Financial management Operational analysis
Safety conscious People management Technical plan execution
Can handle stress Quality assurance Structural Engineering
Always pro-active Conducting research Carrying out site audits
Attention to detail Risk assessments Estimating techniques
Logical thinker HSE reviews Engineering concepts
Communication skills Planning regulations
EXTRA CURRICULAR ACTIVITIES
Playing Cricket, Table Tennis, Foot Ball, Cards, Reading Newspaper.
REFERENCES
Provided Upon Request.