Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments Systems & Software Technology Conference Salt Lake City Salt Lake City April 2010 Dr. Suzette S. Johnson Northrop Grumman Corporation Agile Engineering and Leadership © Copyright 2010 Northrop Grumman [email protected]

Upload: others

Post on 29-May-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Planning, Estimating, and Monitoring Progress in g g

Agile Systems Development Environments

Systems & Software Technology ConferenceSalt Lake CitySalt Lake City

April 2010

Dr. Suzette S. JohnsonNorthrop Grumman Corporation

Agile Engineering and Leadership

© Copyright 2010 Northrop Grumman

[email protected]

Page 2: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE APR 2010 2. REPORT TYPE

3. DATES COVERED 00-00-2010 to 00-00-2010

4. TITLE AND SUBTITLE Planning, Estimating, and Monitoring Progress in Agile SystemsDevelopment Environments

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Northrop Grumman Corporation,2980 Fairview Park Drive,Falls Church,VA,22042

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES Presented at the 22nd Systems and Software Technology Conference (SSTC), 26-29 April 2010, Salt LakeCity, UT. Sponsored in part by the USAF. U.S. Government or Federal Rights License

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

31

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Discussion Outline

• Agile Systems Development Introduction

• Scenario– Levels of Planning – Estimatingg– Monitoring Progress

• Summary

• Recommended Readings and References

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman2

Page 4: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Agile Systems DevelopmentAgile Systems Development

Promote rapid delivery of value to customers

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman3

Page 5: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

What is Agile Systems Development?

• Agility is a set of demonstrated industry best practices for developing software systemssoftware systems

• Agility focuses on:– Principles and Valuesp– Inspect and Adapt– Constant Commitment to Quality– Focus on the Value StreamFocus on the Value Stream– Team Ownership and

Empowerment

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman4

Page 6: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Agile Principles

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman5 5

Business People and Developers Must Work

Together Daily

The Best Architectures,

Requirements and Designs Emerge From Self-Organizing Teams

NORTHROP GRUMMAN

Continuous Attention to Technical Excellence

Regular Team Reflection on How to

Become More Effective

http:// a!Jilemanifesto.orgf Nt:JRJ'HRDP GRUMMAN

Page 7: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Agile Terminology

Term Definition

P d B kl R i /U S i b l dProduct Backlog Requirements/User Stories to be completed

Iteration Fixed time-box in which development occurs

User Story Similar to a requirement“As a user I want to action so that purpose”

Velocity The number of user story “points” delivered in a iteration

Capacity The hours the development team is available to work within an iteration

Product Burn Down Chart Progress for the release; Focuses on the remaining userProduct Burn Down Chart Progress for the release; Focuses on the remaining user story points

Iteration Burn Down Chart A development team’s progress; Focuses on the remaining hourshours

Product Owner Owns the product backlog, assigns priority to user stories

The Team Cross functional team

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman6

The Team Cross functional team

6

Page 8: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

High Level Agile Stages

Planning Estimating Monitoring

Product Roadmap

Iteration Planning

Iteration Execution

VisionCustomer

Needs

Release Planning

Needs

Iteration Demo and

RetrospectiveDelivery

Retrospective

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman7

Page 9: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Agile Scrum Framework Commitment

The work to be done

The Daily Tasks

managed by

Identification of Impediments

Communication

Prioritized by Product Owners

g ythe team System

Development

Feature Demonstration and Retrospective

Inspect and AdaptAn example of an agile

management framework

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman8

Visibility and TransparencyImage from: Mike Cohn, MountainGoatSoftware.com

Reference: Ken Schwaber, www.controlchaos.org

Page 10: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

ScenarioScenarioPlanning, Estimating, and Monitoring

© Copyright 2010 Northrop Grumman

Page 11: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Project Scenario: RestEZj

• Duration: One ReleaseP d t D l t f h t l b it f R tE• Product: Development of a hotel website for RestEz

• Size of Project: ~10 persons/team; 10 teams = 100 people• Release cycle is January 4 – March 31Release cycle is January 4 March 31• Six two-week iterations within the Release• Planning for the Release is started prior to January 4th

– Determining high level capabilities for the release– Story Writing workshop (Capability to User stories)

• Release Planning meeting is January 4the ease a g eet g s Ja ua y• Iteration 1 detailed planning is in the afternoon of January 4th

• January 5th is the first day of development

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman10

Page 12: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Agile Metrics During the Releaseg g

• PlanningVelocity– Velocity

– Capacity– Total story points planned for the release – Length of iteration and release– Planned work hours

• Monitoring Progress• Monitoring Progress– Product Burndown– Iteration Burndown– User Stories by State– Tracking Defects– Test Metrics– Actual worked hours

Scenario Walkthrough…

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman11

Page 13: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Planning and Estimatingg g

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman12

Page 14: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Levels of Planning

Vision, Roadmap, Release, Iteration, DailyVision, Roadmap, Release, Iteration, Daily

Iteration 1

Product Backlog(prioritized

requirements by Task

~2 - 6 months

~2 – 4 weeks fixed

Product

business value) Release 1 Story

Story

Task

Story

TaskTaskTaskGoals &User Stories

Daily Stand

Up

Vi i

Roadmap

Iteration 3

Iteration 2

VisionCustomer Needs

Iteration n…

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman13

Page 15: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Product Roadmap

Release 1Room

reservations and payment

User profiles forUser profiles for future visits Release 2

Conference offerings

Online chat support

Release 3Special discountsSpecial discountsLocal information

Release 4Google maps

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman

14

Page 16: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Release Planning: Use Case and User Stories g

Use Case

Capability/ScenarioWritten at the

capability level and can be completed in

one Release

Sum of all the test cases to fulfill the Release level test

criteriaone ReleaseEvery

Epic has validation criteria

Written at a level that the team can complete

in one iterationOwned by the Product

Unit Tests Component testing

Systems TestingDemo to

User Storiesy

OwnerDemo to

stakeholdersEvery story

has acceptance

criteria

Tasks

Tasks written by the Team<=8 hours of work

Based on a definition of “d ”

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman15

“done”Owned by the Team

Page 17: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

User Stories

What is a User Story? Estimation

• Functional stories– often based off a scenario of a

use case

• User Story Points– Bigness of the task– Influenced by (a) how hard it is– On large projects a user can be

another system

• Non-functional stories

Influenced by (a) how hard it is (b) how much there is to do and (c) amount of uncertainty

– Estimated by the teamNon functional stories

• Definition of Done– Design, Write tests, code, unit

t t d t ti t

Estimated by the team– Relative values– Total story points for the Release

tests, documentation, etc.

• No credit for partial work –either done or not doneeither done or not done

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman16

Page 18: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Roadmap to Release PlanExample: Hotel Website

Release Plan (User Stories)

Example: Hotel Website

Release 1 Capability 1: Make Room Reservations

How much can we do?

PointsBusiness Value

80 As a vacationer I want to • Test with search on 1 12

TestUser Stories

How much can we do?

80 As a vacationer, I want to search room availability…

• Test with search on 1 room

• Test with search on ti it

12

executive suite….

75 As a vacationer, I want to save my request…

Test 8save my request…

Objective

70 As a vacationer, I want to pay with a credit card…

Test

Objective

16

Objective

Story n…

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman17

Page 19: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Release Plan, Iteration Plan, Daily PlanExample: Hotel Website

Release Plan (User Stories)

Example: Hotel Website

Capability 1: Make Room Reservations

Design Review 4Yesterday I started on the

Release Plan (User Stories) Iteration Plan (Tasks)Points

Hours

The Daily PlanBusiness

Value

80 As a Test with h

12

Test

Design Review 4

Install Baseline 4

ICD Updates 8

interface…. Today I plan to…

The one thing standing in my way…

vacationer, I want to

search room availability…

search on 1 room

Test with search on

Acquire Test Data 8

Code 24

Develop Tests 8

s a oexecutive suite….

75 As a Test 8 p

Run Tests 8vacationer, I want to save my request…

Objective

70 As a Test 1670 As a vacationer, I want to pay with a credit

card…

Test

Objective

16

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman18

Page 20: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Velocity (Based on history)

• Velocity is the amount of work a development team completes in an iteration (story points completed)( y p p )

• Velocity is a range; Look for the high, the low, and the mean.

35

40

45

Velocity for Team A

140

160

Project Velocity

10

15

20

25

30

35

40

60

80

100

120

Story Points

0

5

1 2 3 4 5 6 7

Iteration

T A V l it P j t V l it It ti

0

20

1 2 3 4 5 6 7

Project Velocity per Iteration

Team A Velocity

High: 45 story points

Low: 30 story points

Project Velocity per Iteration

High: 155 story points

Low: 120 story points

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman19

Mean: 37 story points Mean: 137 story points

Page 21: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Determining Team Capacity for an Iteration

• Capacity is the development team members’ available hours

Example for a two-week iterationteam members available hours to work per iteration

• Revisited each iteration

Team Member

Hours per day

Total hours per iteration

Bill 5 50

• Compare planned hours versus actual hours

Bill 5 50

Scott 5 50

Chris 8 80

• Compare team capacity hours to the hours in the iteration

Andy 7 70

Cindy 7 70

Mike 8 80

TEAM TOTAL 40 400

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman20

Page 22: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

The Release Plan

• What is in the release plan?Capabilities identified– Capabilities identified

– User stories (functional and non-functional requirements)• Story points and prioritized• Project Teams average about 137 user story points per iteration; for a

release with 6 iterations this is about 900 story points. The scope is 720-930 user story points of work.

T t l b f t i l d (125)– Total number of user stories planned (125)– Total number user story points planned (~910 user story points)– Known or assumed velocity by development team and project team– Planned hours (WBS element)

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman21

Page 23: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Monitoring Progressg g

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman22

Page 24: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

RestEZ: Product Burndown for the ReleaseProduct Burndown for the Release

1000

700

800

900

Focuses on the Points Remaining

400

500

600

Stor

y Po

ints

PlannedCompleted

100

200

300

S

0

100

Iteration1 Iteration2 Iteration 3 Iteration 4 Iteration 5 Iteration 6 Iteration 7

• 910 points planned • Initiates discussion• Project team or development team

perspective

• Progress made and work remaining

• Reviewed every iteration

• Can be a “Burnup” chart

• Reports user stories completed against

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman23

• Based on story points• Reports user stories completed against

the plan for the release

Page 25: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

A Development Team’s Iteration Burndown

Week1Iteration 0 Tasks Owner Status Mon Tues Wed Thur Fri Mon Tues Wed ThurD i R i S tt C l t d 4 4 4 3 2 0 0 0 0

User Story: As a vacationer, I want to search room availability…

Design Review Scott Completed 4 4 4 3 2 0 0 0 0Install baseline Bill Completed 4 4 4 0 0 0 0 0 0ICD updates Scott Completed 8 8 6 3 3 2 0 0 0Acquire test data Bill Completed 8 5 0 0 0 0 0 0 0Code Scott Completed 24 20 16 14 10 10 3 0 0pDevelop tests Scott Completed 8 8 8 6 4 4 4 3 0Run Tests Scott Completed 8 8 8 8 5 3 4 2 0

1

• Emphasis on effort in hours

• Based on task hours for each story rseach story

• Hours remaining

• Updated daily

Hou

r

• Reviewed daily

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman24

The Iteration Burndown is The Iteration Burndown is for the Teamfor the Team

Page 26: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Tracking Stories by State

• How work is progressing during the iteration• State examples: Opened In Progress Verified Accepted and Completed• State examples: Opened, In Progress, Verified, Accepted, and Completed• Based on total number of stories for the release • May help identify bottlenecks• Verified means all tests have passed on the system• Completed means it is ready for release (i.e. potentially shippable)

Stories by StateCumulative Flow

80100

120140

160

f Sto

ries

CompletedAccepted V ifi d

020

4060

80

009

009

009

009

009

009

009

009

009

009

009

009

Num

ber o

VerifiedIn ProgressOpened

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman25

1/8/

2

1/15

/2

1/22

/2

1/29

/2

2/5/

2

2/12

/2

2/19

/2

2/26

/2

3/5/

2

3/12

/2

3/19

/2

3/26

/2

Reference and for additional information: http://leanandkanban.wordpress.com/2009/04/04/useful-agile-metrics-cumulative-flow/

Page 27: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Testing the User Stories

Testing User Stories (Features)

80100

120

140 Compare the two graphs.Graph 1 indicates a relatively

constant increase in

0

2040

60

80Number of passed tests “passed” user stories.

What about graph 2? 01 2 3 4 5 6

Testing User Stories (Features)

g p

Metrics can help teams identify bottlenecks and

Iteration

100120140

Testing User Stories (Features) yother challenges on the

project.

20406080

Number of passed tests What is the challenge in graph 2?

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman26

01 2 3 4 5 6

Iteration

Page 28: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Defect Metrics

• Defect metrics include:Number of open defects at the end of each iteration– Number of open defects at the end of each iteration

– Number of defects found during systems integration– Number of defects found in production– The type of defects occurring

• Useful in determining root cause

• May give indication as to what processes need to change• May give indication as to what processes need to change

• Agile teams strive for “zero” defects– Part of the Definition of Done is “no critical defects against the story” or the– Part of the Definition of Done is no critical defects against the story or the

story isn’t “done”

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman27

Page 29: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Summary

• Agile systems development environments:Emphasize ongoing iterative development with completed demonstrable– Emphasize ongoing iterative development with completed, demonstrable functionality at the end of every iteration

– Embrace practices that support changing requirements and mission needsE i lti l l l f l i– Engage in multiple levels of planning

• Valuable measures for estimating and monitoring progress:– Velocity (scope)– Velocity (scope)– User stories planned versus user stories completed (progress)– User stories added to a release; not part of the original plan

T k h b d (d il )– Task hour burndown (daily progress)– Tests passed (what’s working)– Hours planned and hours worked

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman28

Page 30: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

Recommended Reading and References

Creating Adaptive BusinessesAd ti E t i St H k lAdaptive Enterprise Steven Haeckel

Complexity leadership theory: Shifting leadership from the industrial age to the knowledge era

Marion, McKelvey, & Uhl-Bien. (2007). Leadership Quarterly, 18(4), 298-318.

Agile Development PracticesAgile Project Management with Scrum Ken Schwaber

Agile Software Development: Adaptive systems principles and best Meso and Jain g p p y p ppractices

Agile Software Development with Scrum Ken Schwaber and Mike Beedle

Agile Testing Lisa Crispin and Janet Gregory

Implementing Lean Software Development Poppendeick

MetricsAgile EVM – Earned Value Management in Scrum Projects Sulaiman, Barton, Blackburn

Agile Metrics (Agile 2009 Conference proceedings) Dan Rawsthorne, Danube

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman29

Page 31: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman30

IVORTI-IROP GRU~~AIV

Page 32: Planning, Estimating, and Monitoringgg Progress in Agile … · Planning, Estimating, and Monitoring Progress in Agile Systems Development Environments 5a. CONTRACT NUMBER 5b. GRANT

The Need for Change

• Shortened product life cycle and technological advancements

• Shortened development times

• Decreased time to market• Decreased time-to-market

• Complexity of systems

• Large program failures

• Desire for improved transparency of progressDesire for improved transparency of progress

• Reduce risk

© Copyright 2009 Northrop Grumman Copyright 2009 Northrop Grumman CorporationCopyright 2010 Northrop GrummanCopyright 2010 Northrop Grumman31