Planning for MSSS
● System and pipeline functionality● Data management and operations● Specifications and scheduling
Outline
ASTRON LOFAR Surveys Meeting, 09 March 20103
Why do an MSSS ?
LOFAR needs a Global Sky Model (GSM) for the northern sky which — has a proper flux scale
— has validated (initial) source parameters (spectrum, structure, ..)
— is astrometrically correct to better than 0.5”— interfaces efficiently to calibration & imaging pipeline (through LSM)
Moreover, carrying out MS3 will
— create a joint focus for activities— integrates scheduling, monitoring, processing, calibration & imaging
— test all KSP-pipelines
— provides a field-test for storage and processing resource needs— provide the conditions for a rehearsal of full LOFAR operations
*Registered trademark, Ger de Bruyn (2007)
ASTRON LOFAR Surveys Meeting, 09 March 20104
Initial Proposal for MSSSObservations: — 20 NL stations (13+7) => multiple snapshots for decent uv coverage
— limit to two (broad?) frequency ranges: 60 MHz & 150 MHz
— complete in < 3 months (30% efficiency) & ‘real-time’ processing — 4 beams of ~10 MHz (+ CasA beam, ~1 MHz)
Products:
— 1 million sources, of which ~ 100,000 will be high S/N (i.e. ~ 5 / deg2 )— spectral indices for the ~ 100,000 sources seen in both bands
— structural information: ~20 - 60” PSF (~VLSS/WENSS/NVSS)
— fully tested pipelines
— arcsec images of ~ 4,000 European-LOFAR calibrator sources— lists of polarized calibration sources for ionospheric RM-monitoring
ASTRON LOFAR Surveys Meeting, 09 March 20105
Multiple cuts of 5m + Very broadband (30 MHz)
LBA Band uv Coverages
ASTRON LOFAR Surveys Meeting, 09 March 20106
Tasks StatusPreparation
MSSS Observation proposal draftMSSS scheduling neededFlux scale in progressFinalized station beam models implemented
Stations20 validated stations readyHBA ring splitter readymulti beam observations readyHBA station taper neededStation Calibration LBA implementedStation Calibration HBA in progress
SAS / MACsingle beam observations implementedmulti beam observations implemented
OLAPwriting to new storage facilities readymulti beam observations implementedqueue scheduling in progressrapid switching in progressparallel incoherent beam mode implemented
System Functionality
ASTRON LOFAR Surveys Meeting, 09 March 20107
Pipeline Functionality
ASTRON LOFAR Surveys Meeting, 09 March 20108
Place, date- 1 -Title
Standard Imaging Pipeline
• General– Integration of Pipeline with MAC under way. Expected to be ready for
MSSS dress rehearsal (in 4 weeks)– Assessment and improvement of pipeline performance has high priority– UVW coordinate flip is fixed. Other differences are being looked into.– Major Cycle closed for CASApy source components. Source Finding
components remain to be done.• DPPP
– overhaul: 40% performance gain. Needs final testing. ParSet file changes: Cookbook needs updating.
– full resolution flags will be kept in compressed data– Andre Offringa improved his Flagger. It remains outside DPPP.
• BBS– HBA station beams ready for testing. Who?– Caching in Predict is implemented.– Groups of sources can have same instrumental gains.– Gaussian source models operational
Imaging Pipeline Status
ASTRON LOFAR Surveys Meeting, 09 March 20109
Imaging Pipeline Status
Place, date- 2 -Title
• BBS Ionosphere– Clock – ionosphere phase separation works, but suffers from 2 pi
ambiguities.– SPAM processing with distributed files is implemented– Next step: direction dependent calibration– First working version could be available for MSSS dress rehearsal
• Imager– Initial implementation for Direction Dependent Corrections available for 2
months now! Who will test this?– Comparing performance of CImager with CASA Imager under way
• Source Finding– Hanno Spreeuw documented the Source Finding module
• Some remarks– The 5th busy week provided great feedback. A lot of issues are being
followed up on.– Warning: using non-LOFAR software may be the way of least
resistance, but we do need feedback on DPPP / BBS / CIMager!– MSSS dress rehearsal is being planned for
ASTRON LOFAR Surveys Meeting, 09 March 201010
Operations and Archiving
ASTRON LOFAR Surveys Meeting, 09 March 201011
Estimated Data Volumes
Current archive resources● Currently using ~50 TBytes● 300 TBytes available @ SARA in Amsterdam● 60 TBytes @ Astrowise server in Groningen● 500 TBytes (to 1 PBytes) via TARGET in Groningen● 1 PBytes tape storage @ Jülich● Additional 2-3 PBytes to be added @ BiGGRID in Amsterdam
(R. Nijboer, March 2009)
MSSS Dry Runs
16 pointing centersCircumpolar fieldsAll-day observing
4 beams of 12 MHz6 hrs per field45 & 150 MHzTotal of 4 days
(courtesy D. Rafferty, N. Mohan)
⇒ March 15-19 April 12-16
ASTRON LOFAR Surveys Meeting, 09 March 201013
Scheduling
Busy WeeksEngineering timeMSSS
WorkshopsDry runs
ASTRON LOFAR Surveys Meeting, 09 March 201014
The End