Job#1 This job is to replace 2 Exchangers. This job will need hand tools and possibly need a cutting torch to cut beams to lift out exchangers. If we have to cut any braces will need to replace with new braces. Crane will pull and replace both exchangers. Need safety equipment Will need new bolting hardware Safety line while lifting exchanger Unbolt from Valve Crain will have to be used to pull 2 Exchangers

Upload: stuart-fondon

Post on 07-Feb-2017

42 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Planning with Pic

Job#1This job is to replace 2 Exchangers.

This job will need hand tools and possibly need a cutting torch to cut beams to lift out exchangers. If we have to cut any braces will need to replace with new braces. Crane will pull and replace both exchangers.

• Need safety equipment

• Will need new bolting hardware

• Safety line while lifting exchanger Unbolt from Valve

Crain will have to be used to pull 2 Exchangers

Page 2: Planning with Pic

Job#1

Page 3: Planning with Pic

Job#2This job consist of demoing structure and rebuilding with new structure. Pic 1 of 2

This structure is very rusted and has a lot of loss slag. This picture only shows one side of the structure. All four side will need to be replaced. A lot of the bolts are rusted and need to be cut with a torch. There is also a acid line under the structure. (see photo #2) most of the structure can be cut with torch but there is a few bolts that can be loosened by impact. There is also grading that will ether be replaced or put back, that will depend on customer. Crane could be used to demo and erect structure.

• Safety: Mono Goggles, hard hat, chemical jacket and face shield, fire ext, Tarps, water hose. Leather Gloves.

• Tools: hand tools, torch, Faceshield

• Crain

Page 4: Planning with Pic

Job#2PIC#2 This picture is of the acid line.

We are not demoing the line acid just working around it. While working around the acid line you will need to have acid gear on.

• Acid Gear: Acid Jacket, Gloves, Face Shield and Mono Goggles

Acid Line

Structure

Page 5: Planning with Pic

Job#3This job is to replace two Fin Fan Housings.

The Fin Fan Housing has bolts on two sides that will need to be loosened or cut off. There are no lifting eyes on the old housings so you will need to cut holes in the top of housing to attach your ringing to. The new housings have lifting eyes so you can use your ringing on. I would advise to build a scaffold around housing so the workers have a safe platform to work off of.

• Safety: Scaffold, Safety Harness, Gloves, Hard Hat, Safety Glasses

• Tools: Hand tools, torch if needed, rigging

Need to pull 2 fin fan shrouds

Need Scaffold build around fin fans to have a safe work area

Page 6: Planning with Pic

Job#3

Power Outlet

New fin Fan Housings