Application for building permit page 1 of 2
Name of the municipal council Address
Study Purposes only
Name and Address of the municipal council To be completed by the municipal council
Aalborg Kommune
Boulevarden 13 Postbox 462 9100 Aalborg
Property No. Building No. Street No House Letter
Floor Door Flat No. Building case No.
Building Regulations BR08
x Application for building permit
Building Notice
Property See guidelines
Street Name House No.
Freder Høj 1 Title No.
Sorthøj project
Nature of the works
X New build Extension Other
A short description of the work which is to be completed (ex. one family house, attached house, garage, shop, workshop, demolition of building, changing of partition walls, change of use, erection of signs, sunshade, wind turbines, farm buildings etc.)
Four-storey building in Hasseris will house the following: a basement with a gym, a hair sa-lon on the ground floor, 1st and 2nd floor apartments for total 4 families, and a penthouse
apartment with a terrace. There will be 5 balconies to the south side accompanied by wooden cladding to suit the
area. A flat roof will carry a ventilation aggregate. The building itself has area of 1093 m², with a budget over 24 million DDK. Construction of
the project currently is dead-lined to end in the beginning of year 2013.
The works demands no dispensation
The works demands dispensation (A substantiated application for dispensation must be attached)
Necessary appendices must be attached the application (see guidelines)
Applicant (architect, engineer or the like) Name, address, phone number and CVR number
UP Architecture Porthusgade 1, Aalborg 9000, Denmark Representative: Marianne Proomet
Date and signature
5/23/2012 MP
Owner of the property in accordance with the land charges register The owner’s signature is demanded, unless applicant in some way documents his right to complete the building works
Name, address, phone number and CVR number
EDC-gruppen a/s Jens Hansen Mynstersvej 5, 1827 Frederiksberg C, Denmark
Date and signature
5/23/2012 JH
Application for building permit page 2 of 2
Guidelines – Study purpose only, for further information see chapter 1 Administrative provision in BR08
The following building works must not be commenced without a permit from the municipal council: Unless otherwise provided in 1.7 or 1.9, building work may not com-mence without the permission of the municipal council Garages, carports, sheds, green houses and roofed-over terraces and similar structures may be carried out subject to a building notice being submitted to the municipal council as long as the total area does not exceed 50 square meters, see paragraph 1.7 in BR08. The conversion and other alterations to buildings as example one family houses, sum-mer houses, carports, sheds or greenhouses, which do not entail the increase of the floor area or significant changes of use, see paragraphs 1.9 BR08 The application for a building permit must include a clear description of the work to be carried out. It should normally include: a. Necessary information for the identification of the property, building or unit b. Information on any provision of the Building Act, the Building Regula-tions, easements and other building guidelines with which the project may be in conflict. The application must contain a substantiated applica-tion for any necessary exemptions or permissions. c. Information on the proposed use of the building and, in case of con-versions and changes of use, information on the previous use. d. Information as to the extent to which the works have been designed under the less restrictive provisions on conversion work, see part 3, Design, layout and fitting out in BR08. e. Information clarifying how measures essential for construction and necessitated by climatic conditions have been implemented, see para-graph 4.1 in BR08. f. Information relating to buildings covered by 7.2, Energy Parameters for new buildings in BR08, the calculated energy needs of the building, documentation demonstrating compliance with the energy parameters; and information on low energy class, where appropriate. The application must include a statement concerning the existing build-ings which are of importance for the consideration of the application. Application for a building permit must be made in writing to the munici-pal council. The application must be accompanied by relevant drawings stating the scale used. The application and supplementary documenta-tion may be submitted in digital form provided the municipal council has the facility for receiving and reading such electronic documents and drawings the municipal council may stipulate detailed technical re-quirements for the use of digital communication on the municipality’s website, including acceptable forms of digital signatures, see paragraph 1.3 and 1.4 in BR08 Building works subject to service of a building notice before com-mencement The following building works may be carried out subject to a building notice being submitted to the municipal council (paragraph 1.7 I BR08) - Garages, carports, outbuildings, greenhouses, roofed-over terraces and similar structures; and plant and equipment houses for electronic communications networks or services of no more than 50 m² - Extensions to garages, carports, outbuildings, greenhouses, roofed-over terraces and similar structures; and plant and equipment houses for electronic communications networks or services, provided the area after the extension does not exceed 50 m². - Wind turbines - Individual conversions and other structural alterations that only affect a single residential unit of no more than 150 m², such individual conver-sions or alterations may not entail any expansion of the area. - Satellite antennas/dishes with a diameter of more than 1.0 m. - farm buildings and agriculture-related buildings on agricultural, forestry and horticultural holdings which either do not require a rural zone permit or only require permission under section 36(2) of the Planning Act. - Demolition of buildings not covered by 1.10. If the municipal council has not responded within two weeks of receipt of the notice, the building work may commence. The building notice must include the postal or the BBR address and the title number, The building notice must include a clear description of the work to be carried out; and drawings – with the scale marked and a specification appended – showing the location of the buildings on the site, its height, length and width, its distance to boundaries and other buildings on site, and indicating the materials chosen for the external walls and roofing.
In the case of farm buildings and agriculture-related buildings and wind turbines, the application must include, in addition to the infor-mation set out in 1.7(4), a drawing showing any existing and/or pro-posed drainage pipes and their connections to the building, and nay permits by other legislation. In the case of individual conversions and alterations, the building notice must include, in addition to the information set out in 1.7(4), a drawing showing the structures that are to be altered and new service connections to existing stack pipes, details of previous use; and clarification of whether the design of the works is in accordance with the less restrictive provisions on conversion work; supplementary by report on the existing structures and other construction issues rele-vant to the processing of the application In the case of demolition, the building notice must contain, in addition to details on the address and title number of the property and building identification, information on the approximate height and surface area of the building. The municipal council may impose guidelines for the demolition in each individual case. All appendices must be dated and clearly state, who is responsible for their preparation. The application/notice must be dated and signed by the property’s owner, unless the applicant documents his right to complete the project. Access/Accessibility (see 3.2 in BR08) Accessibility for all means, inter alia, that buildings must be accessi-ble, laid out and fitted for everyone, irrespective of their disability. The requirements have the same legal standing as all other requirements in the building regulations and should be considered when the build-ing is designed. Accessibility requirements include: - Level access to units and to any lifts on the ground floor - Entry telephones and intercom systems - Toilets suitable for all including those with impaired mobility - Appropriate design of corridor and ramps - Appropriate design of stairs - Appropriate design of guarding - Appropriate design of landings by entrances - Appropriate design of landings by ramps - Lifts in buildings with 3 floors and above. Insurance A developer, whom builds a new building primary for dwelling use, must insure the building against building damages. Documentation for an offer of this insurance must be attached to the applica-tion/notice. Fees The municipal council may charge for permits, temporary permissions and notices pursuant to the Building Regulations. The municipal council may also charge for exemptions in respect of building works that do not require a building permit or notice. The municipal council may decide not to make any charge, or only to charge fees for certain types of works. Fees may not be charged for notices or exemptions in respect of farm buildings and agriculture-related buildings for the agricultural occupa-tions. The method for calculating and charging is determined by the munici-pal council. The fee is payable when the permit or exemption is granted. If the fee is calculated on the basis of construction costs, it is payable as soon as the fee can be calculated accordingly. In the case of notices in accordance with the building regulations, the fee is payable on submission of the building notice The municipal council may withhold the permit or exemption until the fee has been paid.
ID Task Mode
Task Name Duration Start Finish PredeceResource Names Finish Slack
1 Tender schedule for Sorthøj project
95 days Mon 10/1/12 Thu 2/28/13 0 days
2 Mobilisation 5 days Mon 10/1/12 Mon 10/8/12 Site manager 0 days3 Plot preparation 4 days Mon 10/8/12 Fri 10/12/12 2 Earth and Concrete 0 days4 Site clearance 3 days Fri 10/12/12 Wed 10/17/12 3 Earth and Concrete 0 days5 Excavation 4 days Wed 10/17/12Wed 10/24/12 4 Earth and Concrete 0 days6 Foundation 10 days Wed 10/24/12Wed 11/7/12 5 Earth and Concrete 0 days7 Basement wall and floor 20 days Thu 11/8/12 Fri 12/7/12 6 Earth and Concrete 0 days8 Installing pipe system around
building10 days Fri 12/7/12 Fri 12/28/12 7 Plumber 0 days
9 Basement services 5 days Wed 1/2/13 Wed 1/9/13 8 Plumber 15 days10 Gr. Fl services installations 3 days Wed 1/9/13 Mon 1/14/13 9 Plumber 15 days11 1st floor services´ 3 days Mon 1/14/13 Thu 1/17/13 10 Plumber 15 days12 2nd floor services 3 days Thu 1/17/13 Wed 1/23/13 11 Plumber 15 days13 3rd floor services 3 days Wed 1/23/13 Mon 1/28/13 12 Plumber 15 days14 Ground floor slabs 5 days Wed 1/2/13 Wed 1/9/13 8 Element contract FL 0 days15 1st floor slabs 4 days Wed 1/9/13 Tue 1/15/13 14 Element contract FL 0 days16 2nd floor slabs 4 days Tue 1/15/13 Tue 1/22/13 15 Element contract FL 0 days17 3rd floor slabs 4 days Tue 1/22/13 Mon 1/28/13 16 Element contract FL 0 days18 Roof slabs 4 days Mon 1/28/13 Fri 2/1/13 17 Element contract FL 4 days19 Staircase basement‐gr.fl. 3 days Wed 1/9/13 Mon 1/14/13 14 Element contract STA 15 days20 Staircase ground fl.‐1st floor 3 days Mon 1/14/13 Thu 1/17/13 19 Element contract STA 15 days21 Staircase 1st and 2nd floor 3 days Thu 1/17/13 Wed 1/23/13 20 Element contract STA 15 days22 Staircase 2nd and 3rd floor 3 days Wed 1/23/13 Mon 1/28/13 21 Element contract STA 15 days23 Gr. Fl loadbearing wall 3 days Wed 1/2/13 Mon 1/7/13 8 Element contract WL 20 days24 1st floor loadbearing walls 3 days Mon 1/7/13 Thu 1/10/13 23 Element contract WL 20 days25 2nd floor loadbearing walls 3 days Thu 1/10/13 Tue 1/15/13 24 Element contract WL 20 days26 3rd floor loadbearing walls 3 days Tue 1/15/13 Mon 1/21/13 25 Element contract WL 20 days27 Basement column 2 days Wed 1/2/13 Thu 1/3/13 8 Element contract COL 0 days28 Gr. Fl column 2 days Wed 1/9/13 Fri 1/11/13 14,27 Element contract COL 6 days29 1st floor columns 2 days Tue 1/15/13 Thu 1/17/13 15,28 Element contract COL 4 days30 2nd floor column 2 days Tue 1/22/13 Thu 1/24/13 16,29 Element contract COL 2 days31 3rd floor columns and beams 4 days Mon 1/28/13 Fri 2/1/13 17,30 Element contract COL 0 days32 1st floor balcony 4 days Fri 2/1/13 Thu 2/7/13 31 Element contract BAL 0 days33 2nd floor balcony 4 days Thu 2/7/13 Thu 2/14/13 32 Element contract BAL 0 days34 3rd floor balcony 3 days Thu 2/14/13 Tue 2/19/13 33 Element contract BAL 0 days35 Basement windows and doors 3 days Fri 1/4/13 Wed 1/9/13 27 Carpenter 0 days
36 Gr. Fl windows and doors 4 days Wed 1/9/13 Tue 1/15/13 35 Carpenter 4 days37 1st floor windows and doors 4 days Tue 1/15/13 Tue 1/22/13 36 Carpenter 4 days38 2nd floor windows and doors 4 days Tue 1/22/13 Mon 1/28/13 37 Carpenter 4 days
39 3rd floor windows and doors 4 days Mon 1/28/13 Fri 2/1/13 38 Carpenter 4 days40 Curtain wall 7 days Fri 2/1/13 Wed 2/13/13 39 Carpenter 4 days41 Base. Interior walls 2 days Wed 1/9/13 Fri 1/11/13 27,35 Carpenter 2 0 days42 Gr. Fl interior walls 3 days Fri 1/11/13 Wed 1/16/13 41 Carpenter 2 0 days43 1st floor interior walls 4 days Wed 1/16/13 Wed 1/23/13 42 Carpenter 2 0 days44 2nd floor interior walls 3 days Wed 1/23/13 Mon 1/28/13 43 Carpenter 2 0 days45 3rd floor interior walls 5 days Mon 1/28/13 Mon 2/4/13 44 Carpenter 2 0 days46 Cladding 10 days Mon 2/4/13 Tue 2/19/13 45 Carpenter 2 0 days47 Roof construction 8 days Fri 2/1/13 Thu 2/14/13 18 Carpenter 3 4 days48 Terrace construction 6 days Thu 2/14/13 Fri 2/22/13 47 Carpenter 3 4 days49 Basement finishes 3 days Wed 1/23/13 Mon 1/28/13 43 Painter and decorator 1 day50 Gr. Fl finishes 3 days Mon 1/28/13 Thu 1/31/13 49 Painter and decorator 1 day51 1st floor finishes 3 days Thu 1/31/13 Tue 2/5/13 50 Painter and decorator 1 day52 2nd floor finishes 3 days Tue 2/5/13 Mon 2/11/13 51 Painter and decorator 3 days53 3rd floor finishes 3 days Mon 2/11/13 Thu 2/14/13 52 Painter and decorator 3 days54 Electrical work 8 days Tue 2/5/13 Mon 2/18/13 51 Electrician 1 day55 Site finishing 7 days Tue 2/19/13 Thu 2/28/13 53,54,1Earth and Concrete 0 days
Site managerEarth and Concrete
Earth and ConcreteEarth and Concrete
Earth and ConcreteEarth and Concrete
Plumber
PlumberPlumber
PlumberPlumber
PlumberElement contract FL
Element contract FLElement contract FL
Element contract FLElement contract FL
Element contract STAElement contract STA
Element contract STAElement contract STA
Element contract WLElement contract WL
Element contract WLElement contract WL
Element contract COLElement contract COL
Element contract COLElement contract COL
Element contract COLElement contract BAL
Element contract BALElement contract BAL
Carpenter
CarpenterCarpenter
Carpenter
CarpenterCarpenter
Carpenter 2Carpenter 2
Carpenter 2Carpenter 2
Carpenter 2Carpenter 2
Carpenter 3Carpenter 3
Painter and decoratorPainter and decorator
Painter and decoratorPainter and decorator
Painter and decoratorElectrician
Earth and Concrete
16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10Oct '12 Nov '12 Dec '12 Jan '13 Feb '13 Mar '13
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration‐only
Manual Summary Rollup
Manual Summary
Start‐only
Finish‐only
Deadline
Progress
Page 1
Project: Tender schedule for projeDate: Thu 6/7/12
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S30, '12 Oct 7, '12 Oct 14, '12 Oct 21, '12 Oct 28, '12 Nov 4, '12 Nov 11, '12 Nov 18, '12 Nov 25, '12 Dec 2, '12 Dec 9, '12 Dec 16, '12 Dec 23, '12 Dec 30, '12 Jan 6, '13 Jan 13, '13 Jan 20, '13 Jan 27, '13 Feb 3, '13 Feb 10, '13 Feb 17, '13 Feb 24, '13 MResource Name Unscheduled Tasks
Site manager
Earth and Concrete
Mobilisation
Plot preparation Site clearance Excavation Foundation Basement wall and floor Site finishing
Plumber
Element contract
Installing pipe system around building Basement services Gr. Fl services installations
1st floor services´
2nd floor services 3rd floor services
Carpenter
Painter and decorator
Basement windows and doors
Gr. Fl windows and doors 1st floor windows and doors 2nd floor windows and doors 3rd floor windows and doors
Curtain wall
Basement finishes Gr. Fl finishes 1st floor finishes 2nd floor finishes 3rd floor finishes
Electrician
Element contract FL
Electrical work
Ground floor slabs 1st floor slabs 2nd floor slabs 3rd floor slabs Roof slabs
Element contract STA
Element contract WL
Staircase basement-gr.fl.
Staircase ground fl.-1st
Staircase 1st and 2nd floor
Staircase 2nd and 3rd floor
Gr. Fl loadbearing wall 1st floor loadbearing
2nd floor loadbearing walls
3rd floor loadbearing walls
Element contract COL
Element contract BAL
Basement col
Gr. Fl column
1st floor columns
2nd floor col
3rd floor columns and beams
1st floor balcony 2nd floor balcony 3rd floor balcony
Carpenter 2
Carpenter 3
Base. Interior
Gr. Fl interior walls 1st floor interior walls 2nd floor interior walls 3rd floor interior walls Cladding
Roof construction Terrace construction
Budget - Sorthøj project
Owner
Project costs for
Building phase
Index 126.8
Area ( m2 ): 1093
11,065,000.00kr.
9,554,000.00kr.
3,851,000.00kr.
Total project cost ( new index ) 24,470,000.00kr.
25 % VAT 6,117,500.00kr.
Total project cost (Incl. VAT) 30,587,500.00kr.
Total project cost / m² ( Incl. VAT ) 27,985.00kr.
Sorthøj project
Private
Scheme Design
A Site costs
B Construction costs
C Administration costs
Budget - Sorthøj project
The buildings total cost consists of 3 main components:A. Site, B. Construction og C. Administration.
A. Site
1. Land purchase. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8,969,6002. Connections to sewer, water, district heating and electricity* . . . . . . . . . . . . . . . . . . . . . . . . . 85,0003. Connection charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -4. Ground adjustment* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -5. Extra foundation and piling* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -6. Ground consolidation * (internal roads and car park) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 844,0007. Construction and planting of communal garden* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -8. Fees, taxes and interest charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 269,0889. Other (specify) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -10. Unforseeable expenses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 896,960
Total site costs (transferred to front page) 11,065,000
B. Construction11. Total expenditure craftsmen* (Excl. pkt. 12) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8,599,937
(Successive calculation or building part estimates)12. Garages, car port and shed* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100,00013. Special winter measures* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197,11114. Unforseen expenses* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 657,035
Total construction costs (transferred to front page) 9,554,000
C. Administration15. Total consultancy costs (lanning and follow-up). . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,368,00016. Fees for trade supervision and construction management . . . . . . . . . . . . . . . . . . . . . 761,80017. Fees for other consultants assigned to the project. . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000,00018. Soil investigation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23,28019. Surveyor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25,63520. Press, advertisements etc, jf. ABR 89. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197,11021. Construction case fees / manager. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80,00022. Management fess 70,00023. Building loan interest. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -24. Drying out. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32,85225. Guarantee commission, registration and stamp duties, etc. . . . . . . . . . . . . . . . . . . . . 98,55526. Contribution to Construction Injury Fund. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65,70427. State promille fee. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13,14128. Local Authority fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16,42629. Insurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32,85230. Building approval. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32,85231. Site water and electicity use. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32,85232. Other (specify) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -
Total administration costs (transferred to front page) 3,851,000
*) Fee amounts.
Page: 1
Private Date: 5/22/2012 Case nr Sem 4 project
Red 2008 Index: 126.8 Control
Pos. V&S nr. Text Unit Quantity Price Total price(1)
(10)21.05 Excavation m³ 1067 147.00kr. 156,849.0(12)11.30 Foundation lbm 94 560.00kr. 52,640.0
(2)(21)11.05 Basement wall lbm 78 5,672.00kr. 442,416.0(21)31.05 Exterior concrete panel m² 547 2,010.00kr. 1,099,470.0(21)35.32 Exterior wooden wall m² 472 2,400.00kr. 1,132,800.0(22)23.15 Interior loadbearin wall m² 233 1,386.00kr. 322,938.0(22)24.50 Interior wall with insulation m² 898 615.00kr. 552,270.0(23)21.10 Floor deck m² 1016 661.00kr. 671,576.0(24)35.35 Stairs stk 5 60,500.00kr. 302,500.0(25)24.51 Column lbm 17 1,340.00kr. 22,780.0(25)24.70 Beam lbm 18 699.00kr. 12,582.0(26)34.05 Balcony stk 5 27,700.00kr. 138,500.0
(3)(31)22.35 Single flush doors stk 50 5,500.00kr. 275,000.0(31)24.55 Double flush doors stk 11 26,000.00kr. 286,000.0(31)45.10 Windows stk 42 4,600.00kr. 193,200.0(35)11.05 Ceiling m² 887 468.00kr. 415,116.0(37)65.35 Parapet eaves lbm 65 200.00kr. 13,000.0(37)71.05 Drainage pipe (horiz.) lbm 65 481.00kr. 31,265.0(37)71.10 Downpipe lbm 30 1,530.00kr. 45,900.0
(4)(40)45.10 Terrace construction lbm 59 490.00kr. 28,910.0(43)22.06 Floor covering - tiles m² 352 1,670.00kr. 587,840.0(43)25.10 Floord covering - wooden m² 487 649.00kr. 316,063.0(47)19.20 Flat roof construction m² 232 1,032.00kr. 239,424.0
(5)(50)12.05 Incpection chamber stk 2 5,500.00kr. 11,000.0(50)22.02 Drainage pipes lbm 1000 85.00kr. 85,000.0(59)52.05 Wastewater m² 1093 90.00kr. 98,370.0(59)52.10 Sanitarequipment m² 1093 220.00kr. 240,460.0(59)53.05 Water installations m² 1093 178.00kr. 194,554.0(59)56.10 Disctrict heating m² 1093 490.00kr. 535,570.0(59)57.05 Ventilation sum m² 1093 47.00kr. 51,371.0
(6)(66)11.07 Elevator stk 1 326,000.00kr. 326,000.0(69)63.05 Electrical installations m² 1093 476.00kr. 520,268.0
SUMMARY 9,401,632Index in book: 2008 119.5Index today: May 2012 128.6Index difference 9.1 715,940.18kr. Geographical Variation 0.85 NordjyllandTotal with variationswith indexwith geographical var.
Substructures
10,117,572.18kr. 8,599,936.35kr.
Project: Sorthøj project
Client:Pricebook:
B - Construction costs (brutto)
Electrical/mechanical services
Services
Applied finishes
Completions
Primary elements
Project SorthøjDate 5/23/2012
(10)21.05 Excavation m³ 1067 147.00kr. 156,849.0(12)11.30 Foundation lbm 94 560.00kr. 52,640.0(21)11.05 Basement wall lbm 78 5,672.00kr. 442,416.0
651,905.0
(23)21.10 Floor deck m² 1016 661.00kr. 671,576.0(26)34.05 Balcony stk 5 27,700.00kr. 138,500.0
810,076.0
(24)35.35 Stairs stk 5 60,500.00kr. 302,500.0
(25)24.51 Column lbm 17 1,340.00kr. 22,780.0
(25)24.70 Beam lbm 18 699.00kr. 12,582.0
(21)31.05 Exterior concrete panel m² 547 2,010.00kr. 1,099,470.0(21)35.32 Exterior wooden wall m² 472 2,400.00kr. 1,132,800.0(22)23.15 Interior loadbearing wall m² 233 1,386.00kr. 322,938.0
2,555,208.0
(66)11.07 Elevator stk 1 326,000.00kr. 326,000.0
(22)24.50 Interior wall with insulationm² 898 615.00kr. 552,270.0(31)22.35 Single flush doors stk 50 5,500.00kr. 275,000.0(31)24.55 Double flush doors stk 11 26,000.00kr. 286,000.0(31)45.10 Windows stk 42 4,600.00kr. 193,200.0(35)11.05 Ceiling m² 887 468.00kr. 415,116.0(37)65.35 Parapet eaves lbm 65 200.00kr. 13,000.0(40)45.10 Terrace construction lbm 59 490.00kr. 28,910.0(43)25.10 Floord covering - wooden m² 487 649.00kr. 316,063.0(47)19.20 Flat roof construction m² 232 1,032.00kr. 239,424.0(43)22.06 Floor covering - tiles m² 352 1,670.00kr. 587,840.0
2,906,823.0
(37)71.05 Drainage pipe (horiz.) lbm 65 481.00kr. 31,265.0(37)71.10 Downpipe lbm 30 1,530.00kr. 45,900.0(50)12.05 Incpection chamber stk 2 5,500.00kr. 11,000.0(50)22.02 Drainage pipes lbm 1000 85.00kr. 85,000.0(59)52.05 Wastewater m² 1093 90.00kr. 98,370.0(59)52.10 Sanitarequipment m² 1093 220.00kr. 240,460.0(59)53.05 Water installations m² 1093 178.00kr. 194,554.0(59)56.10 Disctrict heating m² 1093 490.00kr. 535,570.0(59)57.05 Ventilation sum m² 1093 47.00kr. 51,371.0
1,293,490.0
(69)63.05 Electrical installations m² 1093 476.00kr. 520,268.0Electrician
Total:
Element ‐ stairs
Budget according to trades
Element ‐ walls
Total:Element ‐ additional
Carpenter
Total:Plumber
Earth and Concrete
Total:
Total:
Element ‐ floor, balcony
Element ‐ columns
Element ‐ beam
BPS Quality Assurence 6
Project Control
Case nr.:
Page: By: UP
Case: Multistory apartment building in Hasseris area
Doc.nr.: 1
Area/Location/Identifikation:
Phase: Brief
Outline Proposal Scheme design DD1 DD2
Ref.:/ Approwed Reference/ Nr.: Activity/Toppic: Drawing nr..: Date: Sign: Comment:
1 Basement plan
(99)3.1
2 Ground floor plan
(99)3.2
3 1st floor plan
(99)3.3
4 2nd floor plan
(99)3.4
5 3rd floor plan
(99)3.5
6 Roof plan
(99)3.6
7 Section A-A
(99)2.1
8 Section C-C
(99)2.3
9 Ground floor story partition
(23)3.1
10 1st floor story partition plan
(23)3.2
11 2nd floor story partition plan
(23)3.3
12 Foundation plan
(12)3.1
Nr.: Comment: 1
Drawing number is missing.
2 Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
3 Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
4 Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
5 Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
6 Drawing number is missing.
7
Wrong drawing name, drawing number is missing, more dimensions should be shown,
section names are missing.
8
Wrong drawing name, drawing number is missing, section names are missing, callout
names are missing.
9
Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
BPS Quality Assurence 6
10
Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
11
Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall
parts for technical shafts.
12
Drawing number is missing.
Date:
Made by UP Date: Seen/appr.:
Copy :
Bem.: