OBJECTIVES
To know about material handling.
To know about material flow. To understand the importance of location & its
study.
To develop ACTIVITY-RELATIONSHIP Chart. To develop architectural brief.
To develop a plant layout having optimum
material flow
-
8/3/2019 Plant Layout Jury
3/19
5/5/12
COMPANY PROFILE
-
8/3/2019 Plant Layout Jury
4/19
5/5/12
THE BASIC LAYOUT DESCRIPTION
-
8/3/2019 Plant Layout Jury
5/19
5/5/12ACTIVITY RELATIONSHIP CHARTActivities Stores Spreadi
ng &
Cutting
Sewing Finishing Warehous
e
Merchand
ising
Sampli
ng
Quality CAD
room
IE-
Dept.
Accoun
ts
Mainte
nance
IT-
Dept.
Stores A O U U O U U U U U U E
Spreading & cutting A A O U U U U I U U O U
Sewing O A A U X U O U O O O U
Finishing U O A A U U O U O O O O
Warehouse U U U A U U U U U U U U
Merchandising U U X U U A U O O O X A
Sampling U U U U U A U O O O X I
Quality U U O O U U U O U U X X
CAD room U I U U U O O U U U X A
IE- Dpt. U U O O U O O U U O O U
Accounts U U O O U O O U U O X E
Maintenance U O O O U X X X X O X U
IT-Dpt. E U U O U A I X A U E U
KEYS
A: Abso
lutely necessary E: Especially important I:ImportantO: Ordinary closeness OK U: Unimportant X: Undesirable
-
8/3/2019 Plant Layout Jury
6/19
5/5/12
ARTITECTURE BRIEF
The Plant has a FRAME STRUCTURE withcolumns and pillars
The no. of floor in the Shop Floor will be one witha Basement.
Ground Floor Area: 51427.5 Sq.Ft.
Basement Floor Area: 51427.5 sq.Ft
The Roof is a truss
Type of truss = King post truss
-
8/3/2019 Plant Layout Jury
7/19
5/5/12
ARTITECTURE BRIEF
Sheet used: Aluminium Coated steel sheets
Trust Area has DOUBLE SKIN Double Skin means two layers with 100mm
insulation material in between to safe guardfrom heat.
The truss has certain cut out parts covered withtransparent sheets to get natural light in theindustry.
Floor :Mezzanine with RCC floor.
-
8/3/2019 Plant Layout Jury
8/19
5/5/12
ARTITECTURE BRIEF
Roof is of Coarse and same truss material
This area accommodates the offices of theproduction unit and a store unit.
The height of this area is 3 mts and less which isappropriate for the office area.
-
8/3/2019 Plant Layout Jury
9/19
5/5/12
ARTITECTURE BRIEF
FOUNDATION: The 8 9 feet deepfoundation with load bearing pillars
The foundation is in accordance with the soil ofthe area. (Hard soil)
The 2 floors are built in accordance with the
framed structure having columns of pillars andbeams that interconnect these columns, thusacting as a supporting structure.
-
8/3/2019 Plant Layout Jury
10/19
5/5/12
ARTITECTURE BRIEF
Flooring used in the building is concrete.
The concrete flooring is used as the machineryused is of medium weight in nature, whichrequires strong flooring.
Concrete offers compressive strength to the floor
that is about 60% higher than usual flooringsolutions used.
Tensile Strength of flooring tiles increases by 70%
in case of concrete flooring.
-
8/3/2019 Plant Layout Jury
11/19
5/5/12
ARTITECTURE BRIEF
VENTILATION: The places requiring moreventilation are fusing, finishing and ironing
section.
These departments or sections are placed in theindustry which had large windows and ventilators
to exhaust the excess heat. Windows are 20% of the floor area.
-
8/3/2019 Plant Layout Jury
12/19
5/5/12
ARTITECTURE BRIEF
LIGHTING: Lighting system consists of tubelights and natural lights.
Sufficient tube light should be installed forproper light
The places near to walls have huge windows
providing lighting. Huge number of tube light attachments is
provided for artificial lighting.
-
8/3/2019 Plant Layout Jury
13/19
5/5/12
ARTITECTURE BRIEF
LIGHTING STANDARDS
General office : 500 lux
Inspection : 1,000 lux
Cutting : 750 lux Sewing : 500 lux
Computer workstation : 500 lux
Fabric Store & Trim Store: 300 lux
-
8/3/2019 Plant Layout Jury
14/19
5/5/12SAFETY NORMS AND FACTORY ACT
-
8/3/2019 Plant Layout Jury
15/19
5/5/12
SAMPLING DEPARTNMENT Sub Total Space: 693.8 sq.ft
Allowance :(150%) 1040.7 sq.ft Total Required Area: 1734.5sq.ft
Flooring Material: Epoxy Coated HardenedFloor
-
8/3/2019 Plant Layout Jury
16/19
5/5/12
SAMPLING WORKFORCE
DESIGNATION NO.
SAMPLING Executive 1
Pattern Master 2
Cutting Master 1
Supervisor 2
Cutting Operator 2
Sewing Operator 22
Helper 6
Ironing Operator 4
-
8/3/2019 Plant Layout Jury
17/19
5/5/12
PM & CAD DEPARTMENT
Sub Total Space: 584sq.ft
Allowance (150%): 876sq.ft Total Required Area: 1460sq.ft
Flooring Material: Epoxy Coated HardenedFloor
-
8/3/2019 Plant Layout Jury
18/19
5/5/12PM & CAD DEPARTMENT
SL.NO Description
No. Of
M/C
M/c
Length
M/C
Width
M/C
Area
Operator
Space(Length)
Operator
Space
(Width)
Operato
r Area
1 pm table 4 6 5 120 6 2 48
2 Plotter 2 8 3 48 7 2 28
3 computer table 5 5 3 75 3 2 30
4
Inspection
Table 4 6 3 72 6 2 485 Digitizer 1 6 1.5 9 6 2 12
6 pattern cutter 1 6 5 30 6 2 12
7
Pattern Storage
Rack 1 6 3 18
Total O/P
Space 178
8 Paper Storage 2 3 3 18
9
Waste Paper
Bin 1 4 4 16
Total
M/c
Space 406
-
8/3/2019 Plant Layout Jury
19/19
5/5/12
FABRIC STORE DEPARTMENT