1. Communications and Transport.
Project Description
Location Contractual Scheme
Scope Estimated Investment
Dates / Calendar
Additional Information
Urban railway Mexico – Toluca.
Mexico City – Toluca, México
N/A High speed railway that will go from Mexico City to Toluca,
Mexico.
16 different contracts for diverse works related to the construction.
$38.0 billion pesos
Undergoing 16 different contracts for diverse works related to
the construction.
Maintenance of the highway Pirámides – Tulancingo -
Pachuca
Hidalgo State
Public-Private
Partnership
183 Km of federal highway
composed of two highway
sections (Piramides –
Tulancingo) and (Pachuca –
tuxpan).
$1,865.2 million pesos
Tender currently
under preparation.
N/A
Maintenance of the highway
Texcoco – Zacatepec.
Mexico Public-Private
Partnership
292 Km of federal highway.
$2,260.3 million pesos
Tender currently
under preparation.
N/A
Maintenance of the highway Matehuala –
Saltillo.
Saltillo Public-Private
Partnership
355 Km of federal highway.
$1,762.5 million pesos
Tender currently
under preparation.
N/A
Maintenance of the highway Saltillo – Monterrey.
Saltillo - Monterrey
Public-Private
Partnership
291 Km of federal highway composed of three highway sections (Saltillo – Monterrey), (Monterrey North) and (Monterrey – Nuevo Laredo).
$1,903.5 million pesos
Tender currently
under preparation.
N/A
Construction of the highway Monterrey -
Nuevo Laredo – La Gloria – San Fernando.
Monterrey Public-Private
Partnership
Construction of a highway of 4
lanes, as well as its conservation, operation and maintenance.
$3,000 million pesos
Tender currently
under preparation.
N/A
Maintenance of the federal
highway Tulum - Cancún.
Quintana Roo
Public-Private
Partnership
178 Km of federal highway located in the
State of
$1,183 million pesos
Analysis and studies for the biding process
are under
N/A
Infrastructure Projects
Infrastructure • June 2017 • nEWS 2
Mexico City, June 28th, 2017
Quintana Roo. Awarded
contract will have a term of
10 years.
preparation.
Maintenance of the federal
highway Las Brisas – Los Mochis.
Sinaloa Public-Private
Partnership
308 Km of federal highway located in the
State of Sinaloa. Awarded
contract will have a term of
10 years.
$3,062 million pesos
Analysis and studies for the biding process
are under preparation.
N/A
Maintenance of the federal
highway Campeche –
Merida.
Campeche - Merida
Public-Private
Partnership
330 Km of federal highway located in the
States of Campeche and
Yucatán. Awarded
contract will have a term of
10 years.
$2,490 million pesos
Analysis and studies for the biding process
are under preparation.
N/A
Maintenance of the federal
highway Arriaga - Tapachula.
Chiapas Public-Private
Partnership
473 Km of federal highway located in the
State of Chiapas. Awarded
contract will have a term of
10 years.
$4,561 million pesos
Analysis and studies for the biding process
are under preparation.
N/A
Maintenance of the federal
highway San Luis Potosí - Matehuala
San Luis Potosí
Public-Private
Partnership
374 Km of federal highway located in the
State of San Luis Potosi. Awarded
contract will have a term of
10 years.
$3,174 million pesos
Analysis and studies for the biding process
are under preparation.
N/A
Maintenance of the federal
highway Tampico – Ciudad Victoria.
Tamaulipas Public-Private
Partnership
273 Km of federal highway located in the
State of Tamaulipas.
Awarded contract will
have a term of 10 years.
$2,614 million pesos
Analysis and studies for the biding process
are under preparation.
N/A
New Mexican International
Airport
México Public works Construction of the intermodal
terrestrial transportation
center.
Development of a complex
including four levels in an area
of 81,640 m2 that will house parking spaces, bus operations,
a Metrobus station, a
N/A Proposal development.
Ruling to
award contract is
expected for the 4th
Bimester of 2017
N/A
subway station, car rental and commercial
areas. New Mexican International
Airport
México Public works Visual aids are aeronautical
lighting systems designed to
allow the safe and efficient use
of runways under specific conditions of
visibility.
These include: 17,000 lights for the 3 runways
and 6 electrical substations.
N/A Under preparation
Request of proposals, proposals
reception are expected for
the 4th bimester of
2017
N/A
New Mexican International
Airport
México Public works Design, equipment and installation of the navigation and visual aid
system
N/A Under preparation
Request of proposals, proposals
reception are expected for
the 4th bimester of
2017
N/A
New Mexican International
Airport
México Public works Construction of entrance
junction to the air terminal.
Road junctions
are road infrastructure in the south of the polygon that will allow access to
the terminal and facilities of
the southeastern
campus of the New Mexico City
International Airport (NAICM).
N/A Under preparation
Request of proposals, proposals
reception are expected for
the 4th bimester of
2017
N/A
New Mexican International
Airport
México Public works This construction, on the eastern side
of the New Mexico City
International Airport (NAICM),
will provide vehicular access
to the federal zone from the
Piramides-Texcoco road.
N/A Under preparation
Request of proposals, proposals
reception are expected for
the 4th bimester of
2017
N/A
New Mexican International
México Public works Express train from the New
N/A Under preparation
N/A
Airport Mexico City airport
connecting to Mexico City.
Connection to
the New Mexico City Airport
(NAICM) - CDMX, through an
express passenger train.
New Mexican International
Airport
México Public works Set of buildings intended for preventive and corrective maintenance, motor vehicles and equipment repairs. Consists of 9 buildings as follows: • Air-side maintenance building (1) in an area of approx. 4,195 m2; • Vehicle maintenance building (2 buildings with 1 shed) in an area of approx. 4,536 m2; • General maintenance building (2 buildings) in an area of approx. 6,296 m2; • Central warehouse (1) in an area of approx. 4,770 m2; • Air-side administrative building (1) in an area of approx. 4,200 m2; • Waste plant (1) in an area of approximately 4,346 m2; • Gardening Center (1 building with 1 shed) in an area of approx. 1,271 m2
N/A Under preparation
N/A
New Mexican International
Airport
México Public works Construction of an upper road to
access the
N/A Under preparation
N/A
2. Water and Natural Resources.
Project
Description Location Contractual
Scheme Scope Estimated
Investment
Dates / Calendar
Additional Information
Renewal and maintenance of
the electro mechanic and civil
infrastructure of the storage dam
“Trojes-Solidaridad”.
Municipality of
Pihuamo, State of Jalisco.
Public works Renewal and maintenance of
the electro mechanic and
civil infrastructure of the storage dam
“Trojes-Solidaridad”
including the cleaning of the
valves, repair and substitution
of damaged pieces, works inspections.
N/A Proposals will be received no later than June
26th, 2017.
The agreement will be executed for a 117
natural day period, estimating the start of construction works on
July 7th, 2016.
For further reference please refer to File No. 1386915; file reference
LO-016B00053-E2-2017 at
https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1170726&oppLis
t=CURRENT
Extension of the fresh water distribution
system of the municipal capital.
Municipality of
Tejupilco, State of Mexico.
Public works agreement. Invitation to at least three participants.
Extension of the fresh water distribution
system of the municipal
capital, first stage (new work)
in the
N/A The proposal can be
submitted until June 23,
2017.
For further reference please refer to File No. 1399884; file reference
at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?oppor
terminal building, tunnel
and subway station structure.
This work
includes the construction of the main access
roads of entrance and
exit to the New Mexico City
International Airport (NAICM), in six lanes with an approximate
length of 700 meters.
Request for proposals: 4th quarter 2017
Proposals
reception: 1st quarter 2018
Ruling
expected to take place of
1st quarter 2018
Execution starting date:
2nd quarter 2018
New Mexican International
Airport
México Public works Construction of fire stations.
4 building-
complexes for fire
extinguishing purposes in
aircrafts that will serve to attend
possible damages within
the NAICM.
N/A Under preparation
N/A
Municipality of Tejuplico.
tunityId=1186158&oppList=CURRENT
Dill, electro-mechanical
equipment and interconnection of
the deep well number 4 in the locality of Salina
Cruz.
Municipality of Salina Cruz, State of Oaxaca.
Public works Dill, electro-mechanical
equipment and interconnection of the deep well number 4 in the locality of Salina
Cruz.
N/A Any bid proposal
should be submitted no
later than June 26th, 2017.
The agreement will be executed on July 7th,
2017, and the construction works
should be concluded in a 120 day term.
For further reference
please refer to File No. 1395023 at
https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1178653&oppLis
t=CURRENT
Construction of an interconnection
line for the wells 1, 2, 3 and 4 in Salina
Cruz.
Municipality of Salina Cruz, State of Oaxaca.
Public Work. Invitation to at least three participants.
Construction of an
interconnection line for the wells 1, 2, 3 and 4 (km
0+000 to km 2+000) in Salina
Cruz.
N/A Any bid proposal
should be submitted no
later than June 26, 2017.
The agreement will
be executed on July 3rd,
2017.
The construction works should be concluded in
a 120-day term.
For further reference please refer to File No.
1395239 at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179087&oppLis
t=CURRENT
Normal conservation of the building for
the Water District 099 Quitupan La
Magdalena.
State of Michoacán.
Public work. Restricted.
Invitation to at least three participants.
Normal conservation of the building for
the Water District 099 Quitupan La Magdalena.
N/A Any bid proposal
should be submitted no
later than June 26th, 2017
The agreement will
be executed on July 21,
2017.
The construction works should be concluded in
a 60-day term. For further reference
please refer to File No. 1373681, at
https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1158067&oppLis
t=CURRENT
Construction of the pumping sump in San
Pedro Cholula.
Municipality of
Ocoyoacac, Satiate of Mexico.
Public work Construction of the pumping sump in San
Pedro Cholula.
N/A Any bid proposal
should be submitted no
later than June, 26, 2017.
For further reference please refer to File No.
1388978, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1172661&oppLis
t=CURRENT
Electro-mechanical
equipment and regularization tank
in “el Ponedero”.
Municipality of Matías
Romero Avedaño, State of Oaxaca.
Public work. Invitation to at least three participants.
Electro-mechanical
equipment and regularization
tank in “el Ponedero” in the Locality of Matías
Romero
N/A Any bid proposal
should be submitted no
later than June 27, 2016.
The construction works should be concluded in
a 120-day term.
For further reference please refer to File No.
1395930, at https://compranet.funci
Avedaño, Municipality of Matias Romero Avedaño, State
of Oaxaca.
onpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179460&oppLis
t=CURRENT
Renewal and maintenance of the dam “Juan
Sabines”
Municipality of La
Concordia, State of Chiapas.
Public work. Invitation to at least three participants.
Renewal and maintenance of the dam “Juan
Sabines” located in the Water
District No. 101 Cuxtepeques in
the Municipalities of la Concordia and Trinitaria, state of
Chiapas.
N/A Any bid proposal
should be submitted no
later than June 13, 2017.
The construction works should be concluded in
a 91-day term.
For further reference please refer to File
No.1390409, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1174591&oppLis
t=CURRENT
Drilling and equipment of a new well in the locality of San Mateo del Mar
Municipality of San
Mateo del Mar, State of Oaxaca.
Public work Drilling and equipment of a new well in the locality of San Mateo del Mar
N/A Any bid proposal
should be submitted no
later than June 27, 2017.
The agreement will
be executed on July 3rd,
2017.
The construction works should be concluded in
a 120-day term.
For further reference please refer to File No.
1396002, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179522&oppLis
t=CURRENT
Drilling and equipment of a new well in the locality of San
Juan Guichicovi.
Municipality of San
Juan Guichicovi,
State of Oaxaca
Public work. Invitation to at least three participants.
Drilling and equipment of a new well in the locality of San
Juan Guichicovi.
N/A Any bid proposal
should be submitted no
later than June 27, 2017.
The present is For further reference
please refer to File No. 1396007, at
https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179531&oppList
=CURRENT
Drilling and equipment of a new well in the locality of San
Pedro Huilotepec.
Municipality of San Pedro
Huilotepec, State of Oaxaca.
Public work. Invitation to at least three participants.
Drilling and equipment of a new well in the locality of San
Pedro Huilotepec.
N/A Any bid proposal
should be submitted no
later than June 27.
The construction works should be concluded in
a 120-day term.
For further reference please refer to File No.
1396016, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179540&oppLis
t=CURRENT
Regular conservation of structures and mechanisms.
Municipalities of
Tepalcatepec,
Buenavista, Gabriel
Public work. Invitation to at least three participants.
Regular conservation of structures and
mechanisms for the electro mechanical
N/A Any bid proposal
should be submitted no
later than June 27, 2017.
The construction works should be concluded in
a 71-day term.
For further reference please refer to File No.
Zamora, Múgica, Ka Huacana
and Paracuaro,
in the State of
Michoacán.
operation of the wells and
channels of the Water District
No. 097 “Lázaro Cárdenas, in the Municipalities of
Tepalcatepec, Buenavista,
Gabriel Zamora, Múgica, Ka
Huacana and Paracuaro, in the
State of Michoacán
1373501, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1157889&oppLis
t=CURRENT
Maintenance of the electro-mechanical
structures Jala and Peñitas.
Municipality of
Tecomán and Vila de Álvarez in
the State of Colima.
Public work. Maintenance of the electro-
mechanical and civil structures of
the diversion dams Gregorio Torres Quintero
and Peñitas.
N/A Any bid proposal
should be submitted no
later than June 27, 2017.
The construction works should be concluded in
a 120-day term.
For further reference please refer to File No.
1396024, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179547&oppLis
t=CURRENT
Extension of the fresh water system
in Santa Fe.
Municipality of
Rosamorada, State of
Nayarit.
Public work. The work implies the distribution system with an installation of 950 meters of PVC pipeline
and the installation of 9
sectioning valves of diferent diameters,
demolish of 4 operation valves and reposition of
4 valves for operation. Also,
implies the installation of 13 domestic water intake with PVC triple clamp and
13 tables of nipples and
shut-off valves
N/A Any bid proposal
should be submitted no
later than June 28, 2017.
The construction works should be concluded in
a 40-day term.
For further reference please refer to File No.
1391591, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175098&oppLis
t=CURRENT
Renewal and maintenance of
the derivative dam “Lagartero”.
Municipality of La
Trinitaria, State of Chiapas.
Public work. Invitation to at least three participants.
Renewal and maintenance of
the derivative dam “El
Lagartero”, of the Water District
No. 107.
N/A Any bid proposal
should be submitted no
later than June 27, 2017.
The construction works should be concluded in
a 91-day term.
For further reference please refer to File No.
1390430, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1174682&oppLis
t=CURRENT
Construction of the sewage and
fresh water system in the community
of San Joaquin.
Municipality of
Cuauhtemoc, State of
Colima.
Public works. Construction of the sewage and
fresh water system in the community of San Joaquin,
Municipality of Cuauhtemoc,
State of Colima.
N/A Any bid proposal
should be submitted no
later than June 29, 2017.
The construction works should be concluded in
a 150-day term.
For further reference please refer to File No.
1387939, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis
t=CURRENT
Relocation of the Héroes Revolución Collector, and the
stream Adelita.
Municipality of
Hidalgo del Parral,
State of Chihuahua.
Public works. First step of the project that includes the
relocation of the Heroes de la Revolución
collector and the channeling of the stream Las Adelitas in the
locality of Hidalgo del
Parral.
N/A Any bid proposal
should be submitted no
later than June 30, 2017.
For further reference please refer to File No.
1395972, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis
t=CURRENT
Distribution system (4th stage of 6) in Francisco
Portillo and Lomas de Oriente.
Municipality of Aquiles
Serdán, State of
Chihuahua.
Public works. Distribution system (4th stage of 6) in Francisco
Portillo and Lomas de
Oriente: 270 home sockets,
incorporation to the Portal del
Valle well, construction of the conduction line, bombing
equipment, automatization,
distribution system,
secondary system, electro
mechanical equipment and
interconnections.
N/A Any bid proposal
should be submitted no
later than June 29, 2017.
For further reference please refer to File No.
1392515, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis
t=CURRENT
Construction of a treatment plant for waste waters
“El Porvenir”
Municipality of
Camargo, State of
Chihuahua
Public Works. Construction of a treatment plant for waste waters
based on a stabilization lake
system with a capacity of 0.6
lps, which involves a pre-
treatment system of
grinding and de-sanding, primary treatment with a
N/A Any bid proposal
should be submitted no later than July
5th, 2017.
For further reference please refer to File No.
1395914, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis
t=CURRENT
sedimentation lake and a secondary
treatment with a facultative lake, in the locality of
El Porvenir. Construction of
seven water catching systems for pluvial water.
Municipality of
Morelos, State of
Chihuahua.
Public works. Construction of seven catching
systems for pluvial water,
distribution and renovation in the
localities that comply with the 1,500 mm of rain per year, in the Municipality of Morelos. This work involves
the supply and installation of a
galvanized sheet, a 10,000
liters tank, collection
channels of PVC and UV rays protection, separation
systems, turbulence
redactors, septic tanks.
N/A Any bid proposal
should be submitted no later than July
5th, 2017.
For further reference please refer to File No.
1395812, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179372&oppLis
t=CURRENT
Regular maintenance of
the Main Channel Santa Rosa Tlahualilo
Municipalities of Lerdo,
Gómez Palacio and Tlahualilo,
State of Durango
Public Works. Regular maintenance of
the channels and control
structures of the Main Channel of
Santa Rosa Tlahualilo in the
Water District 017, Lagunera
Region.
N/A Any bid proposal
should be submitted no later than July
6th, 2017.
For further reference please refer to File No.
1391677, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179372&oppLis
t=CURRENT
Maintenance of the storage dam
and buildings.
Municipalities of Inde,
Nazas, Lerdo,
Gomez Palacio, in the States
of Durango.
Municipality of
Torreón, State of
Coahuila.
Public Works. Maintenance of the storage dam
and derivative dams, bombing
plants, main system, control buildings and
structures for the Water District 017 Lagunera
Region.
N/A Any bid proposal
should be submitted no later than July
3rd, 2017.
For further reference please refer to File No.
1391677, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179372&oppLis
t=CURRENT
Ending of construction of
the dam “El Chihuero”.
Municipality of
Huetamo, State of
Michoacán.
Public Works. Ending of construction of
the dam El Chihuero,
involving the closing of works.
N/A Any bid proposal
should be submitted no later than July
3rd, 2017.
For further reference please refer to File No.
1394710, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opp
ortunityDetail.do?opportunityId=1178273&oppLis
t=CURRENT
Construction of a sewage and
sanitary system in San Miguel de la
Michil.
Municipality of
Durango, State of
Durango.
Public Works. Construction of a sewage and
sanitary system in the locality of San Miguel de la
Michi.
N/A Any bid proposal
should be submitted no later than July
19rd, 2017.
For further reference please refer to File No.
1402214, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1185403&oppLis
t=CURRENT
Extension of the sewage system in the locality of San Lucas de Ocampo.
Municipality of San Juan del
Río State of Durango.
Public Works. Extension of the sewage system in the locality of
San Lucas de Ocampo.
N/A Any bid proposal
should be submitted no later than July
19rd, 2017.
For further reference please refer to File No.
1402061, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1185310&oppLis
t=CURRENT
Extension of the fresh water system
of the Station Nanchi.
State of Nayarit.
Public Works. Invitation to at least three participants.
Extension of the fresh water
system of the Station Nanchi,
involving the distribution
system and the installation of
pipelines, valves, domestic sockets.
N/A Any bid proposal
should be submitted no later than July
7rd, 2017.
For further reference please refer to File No.
1400753, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1184044&oppLis
t=CURRENT
Extension of the fresh water system
in Mesa de Picachos.
Municipality of Tepic, State of Nayarit.
Public Works. Invitation to at least three participants.
Extension of the fresh water
system of the Station Mesa de
Picachos, involving the distribution
system and the installation of
pipelines, valves, domestic sockets.
N/A Any bid proposal
should be submitted no later than July
17rd, 2017.
For further reference please refer to File No.
1404177, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1187196&oppLis
t=CURRENT
Renewal of the fresh water and
sewage systems in roads of Ahome.
Municipality of
Ahome, State of Sinaloa.
Public Works.
Renewal of the fresh water and sewage systems
in roads of Ahome.
N/A Any bid proposal
should be submitted no later than July
11rd, 2017.
For further reference please refer to File No.
1405365, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1188793&oppLis
t=CURRENT
Construction of the fresh water system in the
locality of Rahum.
Municipality of
Guaymas, State of Sonora.
Public Works. Construction of the fresh water system in the
locality of Rahum.
N/A Any bid proposal
should be submitted no later than July
7th, 2017.
For further reference please refer to File No.
1399910, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1185491&oppLis
t=CURRENT
Comments: Although some of the above-mentioned projects have concluded their tender process, they will represent important investments in México, as well as investment opportunities to develop them. 3. Ports. Project
Description Location Contractual
Scheme Scope Estimated
Investment
Dates / Calendar
Additional Information
Maintenance to railways of the Altamira Port.
Port of Altamira.
Public works agreement, awarded by Restricted Invitation.
The scope is the maintenance to railways, within the Industrial
Port of Altamira.
N/A Any bid proposal shall be submitted no later than
June 15th, 2017.
The agreement will commence on July 7th, 2017; and shall be
enforceable up to 175 calendar
days.
The terms for the bid (“Bases”) may be reviewed at Compranet webpage.
The entity responsible for this public procurement is the Procurements and Contracts Bureau of the
Port of Altamira.
The email provided by the entity is the following: sgonzalez@puertoaltamir
a.com.mx
Concrete works with hydraulic
concrete on the superstructure of
the Port of Veracruz.
Port of Veracruz.
Public works agreement, awarded by Restricted Invitation.
The scope is the concrete works with hydraulic
concrete on the superstructure of the referred port.
N/A Any bid proposal shall be submitted no later than
June 16th, 2017.
The agreement will commence on July 5th, 2017; and shall be
enforceable up to 60 calendar
days.
The terms for the bid (“Bases”) may be reviewed at Compranet webpage.
The authority responsible
for this public procurement is the Head
of the Engineering Department.
The email provided by
the entity is the following: jramirez@puertodeveracr
uz.com.mx Construction works on the
south access road within the Port of Lázaro Cárdenas.
Port of Lazaro
Cardenas, State of
Michoacán.
Public works agreement, awarded by Public Bid.
The scope is the construction works on the south access
road within the referred Port.
N/A Any bid proposal shall be submitted no later than
June 14th, 2017.
The terms for the bid (“Bases”) may be reviewed at Compranet webpage.
The entity responsible is
the Administración Portuaria Integral de
Lázaro Cárdenas, S.A. de C.V.
The email provided by
the entity is the following: gingenieria@puertolazaro
cardenas.com.mx Design,
construction of a dock with two
attack positions for discharge of
gasoline and diesel in Tuxpan,
Veracruz
Tuxpan, Veracruz
N/A The project consists of
increasing the capacity to receive and discharge
gasoline and diesel, by
building a dock with two docking positions
USD $78.00 million
Under implementatio
n
N/A
Design and construction of
the west breakwater arm in
Oaxaca
Oaxaca, Oaxaca
N/A The project consists of the
activities required to finish
a 1,600-meter breakwater arm , as well as of the construction of
four docking positions.
Objective: to allow access to
larger draft vessels, and to help minimize
adverse weather conditions that interfere with
the operation of Antonio Dovalí Jaime Refinery. Benefits: higher
revenues by improving
export volumes as there will be
fewer disruptions in
the production process.
USD $520,000 thousand
dollars
Under implementatio
n
N/A
Comments: Accordingly, to the Master Program of the Port of Veracruz published 1n 2011, the Port of Veracruz is the country’s largest commercial port and it is the only one that manipulates 100% of the purely commercial cargo and the only that manipulates significantly the most important six segments of cargo at national level (containerized cargo, general cargo, agricultural bulk, ore bulk, vehicles and non-oil fluids). The General Coordinator of the Ports and Merchant Navy (hereinafter referred as the “Coordinator”) declared in an interview to the media on December 15th, 2015 that the New Port of Veracruz might become the largest terminal of the country, with greater capacity than Lázaro Cárdenas and Manzanillo Ports. New ships arrival to the New Port of Veracruz are expected on 2018. The Coordinator stated that the Port of Veracruz will not be closed, and pointed that part of the new area will be used for containers On June 5th, 2017, it was published in the Official Federal Gazette, a decree which expropriates the area of 14,941.94 m², located in the Municipality of Veracruz, State of Veracruz, to be used for the construction of the new customs as part of the works and facilities necessary for the expansion of the Port of Veracruz.
In addition to the above mentioned, new public procurements shall be notified after the property’s expropriation, for a public works agreement for the sole purpose of construct the new custom’s facilities. 4. Energy.
a. Petróleos Mexicanos (PEMEX) and/or State Owned Productive Subsidiaries.
Project Description Location Contractual
Scheme Scope Estimated
Investment Dates /
Calendar Additional
Information PEMEX Logistics
Open Season tender
1.2
Storage and pipelines
transportation
Northern part of México
(phase two)
Second open season
for private use of
storage terminals
and transport pipelines owned by
PEMEX Logístics
Biding procedure, by which any participant can compete for the capacity required by
them.
Pemex Industrial Transformation will be the one “price taker” of
the bidding process.
N/A Process is expected to
be called during June – July 2017.
N/A
Rehabilitation of existing
hydrotreatment plants of ultra-low
sulfur diesel (DUBA) and installation of new plants in six refineries in the
States of Tamaulipas, Guanajuato, Veracruz, Hidalgo, Oaxaca and
Nuevo León.
States of Tamaulipas, Guanajuato,
Veracruz, Hidalgo,
Oaxaca and Nuevo León.
N/A The project consists of the rehabilitation of
existing hydrotreatment plants and the installation of
new plants in six refineries.
USD $3.089 million
Request for proposals expected
during 2017
N/A
Construction of coke drums in the
Cadereyta Refinery in Nuevo León
Nuevo León N/A The project consists of the construction of
two additional coking drums for the
Cadereyta Refinery, as well as the
replacement of the existing four due to
evident damage.
USD $300,000 thousand
Request for proposals expected
during 2017
N/A
Rehabilitation of Madero refinery
State of Tamaulipas
Provision of Services
The project consists of the rehabilitation and
optimization of primary, catalytic,
hydrodesulphurization and coking plants
since in recent years the refinery has
operated at 44% of its installed capacity
(190,000 barrels per day) due to lack of
maintenance.
USD $300,000 thousand
Request for proposals expected
during 2017
N/A
b. Federal Electric Commission (CFE) and/or State Owned Productive Subsidiaries.
Project Description
Location Contractual Scheme
Scope Estimated Investmen
t
Dates / Calendar
Additional Information
Topolobampo gas pipeline branch.
Sinaloa State.
Trust agreement
for the development
of infrastructure
.
Project comprises the engineering,
procurement, acquisition of
real estate rights for the funding,
construction, operation and
maintenance of a pipeline with capacity of 248
million standard cubic feet per
day.
USD $55.0 million
Publication of final bidding
guidelines was carried out on
July 2016.
Proposal filings was expected to take place
on September 2016 but was
differed.
Commercial operation is expected for December
2018.
Tender procedure under process.
The terms for the bid
(“Bases”) may be reviewed at:
http://www.cfe.gob.mx/Licitaciones/Licitaciones/Paginas/PrincipalesProyectos.
aspx
Natural gas supply to Baja California
Sur.
Baja California
Sur.
Transport service
contract.
The scope is to supply natural
gas to new power
generation plants owned by CFE, as well as to those currently operating with
fuel oil or diesel. Carrier will
receive natural gas so it may be
transported across the sea
and deliver it to Baja California
Sur.
USD $800.0 million
Publication of Final bidding
guidelines were
published on August 24,
2015.
Filing of proposals was expected to
take place on October, 2016.
Awarding of contract was expected to
take place on November,
2016.
Commercial operation is expected for March 2019.
Tender procedure under process.
The terms for the bid
(“Bases”) may be reviewed at:
http://www.cfe.gob.mx/Licitaciones/Licitaciones/Paginas/PrincipalesProyectos.
aspx
New electric transmission lines.
Oaxaca to
Morelos
Public-Private
Partnership
1,200 Km of transmission
lines to run from Oaxaca though
the center of Mexico until
Morelos State
USD $1.7 billion
The pre- call for the tender
procedure took place on October 2016.
Tender
procedure expected to take place
during 2017
Pre-bidding guidelines pending to be published.
Delays have been
announced by the Energy Ministry, mainly related to
the financial and technical terms of the
contract
New electric transmission lines.
Sonora and Baja California.
Not available. 700 Km of transmission lines which
purpose will be to interconnect Baja California
System with the National System.
USD $1.2 billion
The call is expected to take place at
the end of 2016 or
beginning of 2017.
Tender procedure pending to be called by
CFE.
Biding guidelines have not been released.
San Luis Potosí combines cycle
San Luis Potosí.
Lump sum price
The power plant will be built in
USD $864 million
The call is pending to be
Tender procedure pending to be called by
power plant. contract, which
comprises engineering,
design, supply of all equipment
and materials,
spare parts and special
tools, testing as well as an
electrical substation.
Villa de Reyes, San Luis Potosí. The plant will
have a capacity of 789.53 +/- 20%
MW under summer design conditions and will be bided
under a Turnkey scheme.
Project consists of a lump sum price contract,
which comprises engineering,
design, supply of equipment,
testing, commissioning
and a power substation.
defined. CFE.
Topolobambo III combined cycle
power plant.
Municipality of
Ahome, Sinaloa State.
Lump sum price
contract, which
comprises engineering,
design, supply of all equipment
and materials,
spare parts and special
tools, testing as well as an
electrical substation.
Lump sum price contract which will comprise engineering,
design, supply of equipment and materials for a
combined cycle power plant that will operate with
natural gas.
USD $631 million
The call is pending to be
defined.
Tender procedure pending to be called by
CFE.
Sureste II and III Wind Power Plant
State of Oaxaca
It consists of the design,
programming,
construction and
commissioning of this
wind power plant
In order to meet this demand,
while maintaining
regional reserve margins at
appropriate levels, this wind power plant will
be built in Ixtepec, Oaxaca.
USD $1.0 billion
The call is pending to be
defined.
Tender procedure pending to be called by
CFE.
Comments: Federal Electric Commission (CFE) pilot project: CFE has recently announced that it will call for a pilot project to liberalize and rent its fuel storage capacity for over 10 million barrels, until 2030. The process will be conducted by the State-Owned Subsidiary of CFE known as CFE Energy and is expected to take place during this first semester of 2017. In Baja California, CFE will offer 10 tanks with a storage capacity of 574 thousand barrels located in Rosarito, Ensenada and Mexicali.
In Sonora, 21 tanks will be offered with a capacity of one thousand and twenty barrels in Guaymas, Puerto Libertad and Caborca. Although the documents related to this process have not been released by CFE, the announcement was formally made by CFE Director. c. National Centre for Electric Energy Control (CENACE)
Project
Description Location Contractual
Scheme Scope Estimated
Investment Dates /
Calendar Additional Information
Firs long term electric auction
2017
Mexico Power purchase
agreements
Purchase electric energy,
power and clean energy
certificates
USD $4.0 billion
Bidding guidelines: May
08, 2017
Payment period May 18, 2017 – August
31, 2017
Release of final bidding
guidelines June 27, 2017
Purchase offers from CENACE July 25, 2017
Prequalification
petition submission
September 12 – 20, 2017
Revision of economic
offers November 14,
2017
Awarding November 22,
2017
Please be advised that additional relevant dates
are provided in the official auction calendar
which is published in the official website of
CENACE www.cenace.gob.mx
d. Natural Gas National Centre (CENAGAS)
Project
Description Location Contractual
Scheme Scope Estimated
Investment
Dates / Calendar
Additional Information
Project Jáltipan – Salina Cruz.
States of Veracruz
and Oaxaca.
Not available. The purpose of the pipeline is to strengthen the
existing infrastructure in
the region by constructing a pipeline of 247 Kilometers of
length.
USD $643.0 million
Biding call and guidelines
have not been released.
N/A
Project Lazaro Cárdenas – Acapulco.
States of Guerrero
and Michoacá
Not available. Construction of a gas pipeline with
a length of approximately
USD $456.0 million
Biding call and guidelines
have not been released.
N/A
n. 331 Kilometers. Project Salina
Cruz-Tapachula. States of Oaxaca
and Chiapas.
Not available. Construction of a gas pipeline with
a length of approximately
400 Kilometers.
USD $442.0 million
Biding call and guidelines
have not been released.
N/A
Project Ramones – Cempoala.
States of Nuevo
León and Veracruz.
Not available. Construction of a gas pipeline with
a length of approximately 855 Kilometers.
USD $2.0 billion
Biding call and guidelines
have not been released.
Pursuant to the latest review made by
CENAGAS and the Energy Ministry to this project
and due to the fact that the pipeline Sur of Texas –
Tuxpan offers a similar route, SENER will analyze the convenience of this
call. Comments: The projects referred herein above have been announced by CENGAS and are included in the document entitled “First Review of the Five Year Term Plan for the Expansion of the Sistragas 2015 – 2019” which can be consulted in the web page: http://www.gob.mx/cms/uploads/attachment/file/116777/511_DGGNP_260_16_OT_11_Primera_Revisi_n_PQ.pdf e. National Hydrocarbons Commission. Project
Description Location Contractual
Scheme Scope Estimated
Investment
Dates / Calendar
Additional Information
Second Tender, Round 2
North and
South of Mexico
License Contracts
Tender comprises 12 contractual
areas in onshore fields which
have as main resource wet
and dry gas as well as oil
Estimated investment
s of USD $5.0 billion
Request to access to
virtual data room
September 05, 2016 to
December 05, 2016
Access to
virtual data room
September 09, 2016 to April
04, 2017
Visit to contractual
areas December 05, 2016 to March
03, 2017
First queries stage August
24, 2016 to November 21,
2016
Second queries stage
August 24, 2016 to
Process has begun.
All related information may be consulted at:
www.rondasmexico.gob.mx
December 08, 2016
Third queries stage August
24, 2016 to March 03, 2017
Inscription payment
September 09, 2016 to
December 08, 2016
Reception of
prequalification documents December 19,
2016
Filing of proposals April
05, 2017
Third Tender. Round 2
Oil provinces of Burgos, Tampico-Misanta, Veracruz
and South basins
Licensee Contracts
Tender comprises 14 contractual
located in the oil provinces.
Estimated investment
s UDS $11,250
Bidding guidelines
published on November 15th,
2016.
Process has begun.
All related information may be consulted at:
www.rondasmexico.gob.mx
PEMEX Farm-out Ayin-Batsil
Shallow waters of
the Mexican
Gulf
Production Sharing
Agreement
Tender comprises 2
contractual area to be exploited in partnership with PEMEX
Estimated investment
s USD $4.2
billion
Bidding guidelines
published on March 07, 2017.
Process has begun.
All related information may be consulted at:
www.rondasmexico.gob.mx
PEMEX Farm-out Cardenas-Mora
Onshore areas
located in the
State of Tabasco
Licensee Contract
Tender comprises 2
contractual area to be exploited in partnership with PEMEX
N/A Bidding guidelines
published on May 02, 2017.
Process has begun.
All related information may be consulted at:
www.rondasmexico.gob.mx
PEMEX Farm-out
Ogarrio Onshore
area located in the
State of Tabasco
Licensee Contract
Tender comprises 1
contractual area to be exploited in partnership with PEMEX
N/A Bidding guidelines
published on May 02, 2017.
Process has begun.
All related information may be consulted at:
www.rondasmexico.gob.mx
Additionally, on May, 2017, the Energy Ministry released information related to the short-term expected plans, which include: • Round 2.4 in deep waters of the Mexican Gulf and onshore areas with none-conventional
resources.
• Round 3 for shallow water blocks, onshore conventional areas, deep-waters and areas with none-
conventional resources.
• Farm out for the area known as Nobilis-Maximino in ultra-deep waters of the Mexican Gulf. 5. Other Energy Projects.
Project Description
Location Contractual Scheme
Scope Estimated Investment
Dates / Calendar
Additional Information
New Mexican International
Airport
Mexico City
Public works
The fuel terminal at the New Mexico City International Airport (NAICM) is a storage area with capacity of 50 million liters in 4 tanks, while the distribution network includes 40 km of fuel distribution and recovery lines, as well as substations and transformers. The most relevant characteristics are: Storage of fuel: 4-tank farm. - Recovery fuel area: 300 m2 surface. - Substations, transformers and emergency generators (in an area of 270 m2). - Diesel storage: 83 m2. - Parking for trucks: includes 2 parking areas, the first one occupies an area of 1,320 m2 and the second one occupies an area of 460 m2. - Fuel pumps: 2,700 m2. - Reception, filtration, measurement and PEMEX fuel transfer zone: includes 2 phases, each with an area of 1,370 m2; only the first one will be built in this phase of the project.
N/A Under preparation.
Request for proposals
and proposal reception
expected to take place during the
third quarter of
2017
Ruling to take place during the
fourth quarter of
2017
N/A
New Mexican International
Airport
Mexico City
Public works
Construction of the fuel terminal in the southeastern campus of the New Mexico City International Airport. Fuel storage Fuel recovery area Substations, transformers and emergency generator Diesel Storage Parking for trucks Fuel pumps Reception, filtration, measurement and PEMEX fuel transfer zone Capacities:
N/A Under preparation.
Proposals reception: 1stquarter
2018
Ruling is expected for the 1st quarter of
2018
Execution starting date: 1st quarter
N/A
Total annual demand: 47.3 million liters of jet fuel Total monthly demand: 3.9 million liters of jet fuel Average daily demand: 129.6 thousand liters of jet fuel
2018
6. Public Private Partnership Projects (undergoing and pending to be called)
The Mexican Finance Ministry has recently announced a strategy to promote public-private partnership projects in Mexico in order to develop new infrastructure, mainly related to transportation, security, education, health and water. These projects have been divided in two blocks that comprise undergoing tenders and tenders expected to be called soon. The estimated investments for the projects referred herein below is of $58.261 billion pesos. Block I Social Security Mexican Institute (IMSS)
Process Project Description Stage Investments General Hospital in Bahía de Banderas, Nayarit.
Design, construction, finance, operation and maintenance of a hospital with a capacity of 144 beds, 35 doctors’ offices, among others.
Tender currently under preparation. Bidding guidelines expected to be released on March 2017.
$1,287.7 mdp
General Hospital in the Municipality of García, Nuevo León.
Design, construction, finance, operation and maintenance of a hospital with a capacity of 260 beds, 46 doctors’ offices, among others.
Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on June 2017.
$2,056.6 mdp
General Hospital in the Municipality of Tepotzotlán, Mexico.
Design, construction, finance, operation and maintenance of a hospital with a capacity of 260 beds, 46 doctors’ offices, among others.
Tender currently under preparation. Bidding guidelines expected to be released on May 2017.
$2,010.6 mdp
General Hospital in the Municipality of Tapachula, Chiapas.
Design, construction, finance, operation and maintenance of a hospital with a capacity of 180 beds, 36 doctors’ offices, among others.
Bidding guidelines were published on September 2016. Awarding of contract is expected to take place on May 2017.
$1,539 mdp
Security and Social Services Institute for the State Workers (ISSSTE)
Process Project Description Stage Investments General Hospital Aquiles Calles Ramírez in the Municipality of Tepic, Nayarit.
Construction of a new medical unit with capacity of 150 beds and 35 doctors’ offices.
Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on July 2017.
$1,341.4 mdp
General Hospital in Mexico City.
Construction of a new medical unit with capacity of 150 beds and 35 doctors’ offices.
Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on July 2017.
$1,933.2 mdp
General Hospital Dr. Daniel Gurria Urgell in the Municipality of Villahermosa, Tabasco.
Construction of a new medical unit with capacity of 90 beds and 29 doctors’ offices.
Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on June 2017.
$862.2 mdp
Block II
Security and Social Services Institute for the State Workers (ISSSTE)
Process Project Description Stage Investments Substitution of the General Hospital “Dr. Santiago Ramón Cajal” in Durango, Durango.
Construction of a new medical unit with 126 beds and 30 doctor´s offices. Awarded contract will have a term of 25 years.
Analysis and studies for the biding process are under preparation.
$1,127 mdp
Substitution of the General Hospital in Tampico, Tamaulipas.
Construction of a new medical unit with 150 beds and 27 doctor´s offices. Awarded contract will have a term of 25 years.
Analysis and studies for the biding process are under preparation.
$1,341 mdp
Substitution of the General Hospital “Dr. Francisco Galindo Chavez” in Torreón, Coahuila.
Construction of a new medical unit with 120 beds and 24 doctor´s offices. Awarded contract will have a term of 25 years.
Analysis and studies for the biding process are under preparation.
$1,073 mdp
Construction of a new General Hospital in the North zone of Mexico City.
Construction of a new medical unit with 200 beds and 35 doctor´s offices. Awarded contract will have a term of 25 years.
Analysis and studies for the biding process are under preparation.
$1,547 mdp
Construction of a new General Hospital in the east zone of Mexico City.
Construction of a new medical unit with 250 beds and 29 doctor´s offices. Awarded contract will have a term of 25 years.
Analysis and studies for the biding process are under preparation.
$1,933 mdp
Substitution of the General Hospital of Acapulco, Guerrero.
Construction of a new medical unit with 150 beds and 27 doctor´s offices. Awarded contract will have a term of 25 years.
Analysis and studies for the biding process are under preparation.
$1,341.38 mdp
Security
Process Project Description Stage Investments Expansion and equipment of the penitentiary complex Papantla, Veracruz.
Expansion of the penitentiary complex of Papantla, Veracruz, which has a surface area of 28.1 hectares designed for 2,160 persons,
Analysis and studies for the biding process are under preparation.
3,479 mdp
Education
Process Project Description Stage Investments Maintenance and modernization of the basic education infrastructure.
Maintenance and modernization of 1m545 basic level schools in different States on Mexico.
Analysis and studies for the biding process are under preparation.
$2,124.2 mdp
7. Other Infrastructure Projects.
Project Description Location Contractual
Scheme Scope Estimated
Investment Dates /
Calendar Additional Information
Complementary and Conservation
works of Track Lighting Systems
05L-2.
Mexico City International
Airport.
Public works
agreement, awarded by Public Bid.
The Scope is the
complementary and
conservation works of Track
N/A Any bid proposal shall be
submitted no later
than June
The terms for the bid (“Bases”) may be
reviewed at Compranet webpage.
The entity responsible
Lighting Systems 05L-2, of the referred International
Airport.
26th, 2017 for this public procurement is the Procurements and
Contracts Bureau of the Mexico City
International Airport.
The email provided by the entity is the
following: [email protected]
Comments: It is important to inform, that early this month, January 2017, was announced by the Ministry of Communications and Transportation, that the consortium owned by the business man, Carlos Slim Helú, acquired a nearly $4 billion contract for the construction of the terminal for the New Airport of Mexico City. The consortium which acquired such contract, is controlled by Grupo Carso (Group owned by Slim). The infrastructure of this new airport will be one of the largest infrastructure projects that will be developed in Latin America (according to information provided by Forbes.com).
SINCERELY
Juan Carlos Serra [email protected] Jorge Eduardo Escobedo Montaño [email protected]