1. Communications and Transport. Project Description Location Contractual Scheme Scope Estimated Investment Dates / Calendar Additional Information Urban railway Mexico – Toluca. Mexico City – Toluca, México N/A High speed railway that will go from Mexico City to Toluca, Mexico. 16 different contracts for diverse works related to the construction. $38.0 billion pesos Undergoing 16 different contracts for diverse works related to the construction. Maintenance of the highway Pirámides – Tulancingo - Pachuca Hidalgo State Public- Private Partnership 183 Km of federal highway composed of two highway sections (Piramides – Tulancingo) and (Pachuca – tuxpan). $1,865.2 million pesos Tender currently under preparation. N/A Maintenance of the highway Texcoco – Zacatepec. Mexico Public- Private Partnership 292 Km of federal highway. $2,260.3 million pesos Tender currently under preparation. N/A Maintenance of the highway Matehuala – Saltillo. Saltillo Public- Private Partnership 355 Km of federal highway. $1,762.5 million pesos Tender currently under preparation. N/A Maintenance of the highway Saltillo Monterrey. Saltillo - Monterrey Public- Private Partnership 291 Km of federal highway composed of three highway sections (Saltillo Monterrey), (Monterrey North) and (Monterrey Nuevo Laredo). $1,903.5 million pesos Tender currently under preparation. N/A Construction of the highway Monterrey - Nuevo Laredo – La Gloria – San Fernando. Monterrey Public- Private Partnership Construction of a highway of 4 lanes, as well as its conservation, operation and maintenance. $3,000 million pesos Tender currently under preparation. N/A Maintenance of the federal highway Tulum - Cancún. Quintana Roo Public- Private Partnership 178 Km of federal highway located in the State of $1,183 million pesos Analysis and studies for the biding process are under N/A Infrastructure Projects Infrastructure June 2017 nEWS 2 Mexico City, June 28 th , 2017

Upload: voquynh

Post on 02-Nov-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

1. Communications and Transport.

Project Description

Location Contractual Scheme

Scope Estimated Investment

Dates / Calendar

Additional Information

Urban railway Mexico – Toluca.

Mexico City – Toluca, México

N/A High speed railway that will go from Mexico City to Toluca,

Mexico.

16 different contracts for diverse works related to the construction.

$38.0 billion pesos

Undergoing 16 different contracts for diverse works related to

the construction.

Maintenance of the highway Pirámides – Tulancingo -

Pachuca

Hidalgo State

Public-Private

Partnership

183 Km of federal highway

composed of two highway

sections (Piramides –

Tulancingo) and (Pachuca –

tuxpan).

$1,865.2 million pesos

Tender currently

under preparation.

N/A

Maintenance of the highway

Texcoco – Zacatepec.

Mexico Public-Private

Partnership

292 Km of federal highway.

$2,260.3 million pesos

Tender currently

under preparation.

N/A

Maintenance of the highway Matehuala –

Saltillo.

Saltillo Public-Private

Partnership

355 Km of federal highway.

$1,762.5 million pesos

Tender currently

under preparation.

N/A

Maintenance of the highway Saltillo – Monterrey.

Saltillo - Monterrey

Public-Private

Partnership

291 Km of federal highway composed of three highway sections (Saltillo – Monterrey), (Monterrey North) and (Monterrey – Nuevo Laredo).

$1,903.5 million pesos

Tender currently

under preparation.

N/A

Construction of the highway Monterrey -

Nuevo Laredo – La Gloria – San Fernando.

Monterrey Public-Private

Partnership

Construction of a highway of 4

lanes, as well as its conservation, operation and maintenance.

$3,000 million pesos

Tender currently

under preparation.

N/A

Maintenance of the federal

highway Tulum - Cancún.

Quintana Roo

Public-Private

Partnership

178 Km of federal highway located in the

State of

$1,183 million pesos

Analysis and studies for the biding process

are under

N/A

Infrastructure Projects

Infrastructure • June 2017 • nEWS 2

Mexico City, June 28th, 2017

Quintana Roo. Awarded

contract will have a term of

10 years.

preparation.

Maintenance of the federal

highway Las Brisas – Los Mochis.

Sinaloa Public-Private

Partnership

308 Km of federal highway located in the

State of Sinaloa. Awarded

contract will have a term of

10 years.

$3,062 million pesos

Analysis and studies for the biding process

are under preparation.

N/A

Maintenance of the federal

highway Campeche –

Merida.

Campeche - Merida

Public-Private

Partnership

330 Km of federal highway located in the

States of Campeche and

Yucatán. Awarded

contract will have a term of

10 years.

$2,490 million pesos

Analysis and studies for the biding process

are under preparation.

N/A

Maintenance of the federal

highway Arriaga - Tapachula.

Chiapas Public-Private

Partnership

473 Km of federal highway located in the

State of Chiapas. Awarded

contract will have a term of

10 years.

$4,561 million pesos

Analysis and studies for the biding process

are under preparation.

N/A

Maintenance of the federal

highway San Luis Potosí - Matehuala

San Luis Potosí

Public-Private

Partnership

374 Km of federal highway located in the

State of San Luis Potosi. Awarded

contract will have a term of

10 years.

$3,174 million pesos

Analysis and studies for the biding process

are under preparation.

N/A

Maintenance of the federal

highway Tampico – Ciudad Victoria.

Tamaulipas Public-Private

Partnership

273 Km of federal highway located in the

State of Tamaulipas.

Awarded contract will

have a term of 10 years.

$2,614 million pesos

Analysis and studies for the biding process

are under preparation.

N/A

New Mexican International

Airport

México Public works Construction of the intermodal

terrestrial transportation

center.

Development of a complex

including four levels in an area

of 81,640 m2 that will house parking spaces, bus operations,

a Metrobus station, a

N/A Proposal development.

Ruling to

award contract is

expected for the 4th

Bimester of 2017

N/A

subway station, car rental and commercial

areas. New Mexican International

Airport

México Public works Visual aids are aeronautical

lighting systems designed to

allow the safe and efficient use

of runways under specific conditions of

visibility.

These include: 17,000 lights for the 3 runways

and 6 electrical substations.

N/A Under preparation

Request of proposals, proposals

reception are expected for

the 4th bimester of

2017

N/A

New Mexican International

Airport

México Public works Design, equipment and installation of the navigation and visual aid

system

N/A Under preparation

Request of proposals, proposals

reception are expected for

the 4th bimester of

2017

N/A

New Mexican International

Airport

México Public works Construction of entrance

junction to the air terminal.

Road junctions

are road infrastructure in the south of the polygon that will allow access to

the terminal and facilities of

the southeastern

campus of the New Mexico City

International Airport (NAICM).

N/A Under preparation

Request of proposals, proposals

reception are expected for

the 4th bimester of

2017

N/A

New Mexican International

Airport

México Public works This construction, on the eastern side

of the New Mexico City

International Airport (NAICM),

will provide vehicular access

to the federal zone from the

Piramides-Texcoco road.

N/A Under preparation

Request of proposals, proposals

reception are expected for

the 4th bimester of

2017

N/A

New Mexican International

México Public works Express train from the New

N/A Under preparation

N/A

Airport Mexico City airport

connecting to Mexico City.

Connection to

the New Mexico City Airport

(NAICM) - CDMX, through an

express passenger train.

New Mexican International

Airport

México Public works Set of buildings intended for preventive and corrective maintenance, motor vehicles and equipment repairs. Consists of 9 buildings as follows: • Air-side maintenance building (1) in an area of approx. 4,195 m2; • Vehicle maintenance building (2 buildings with 1 shed) in an area of approx. 4,536 m2; • General maintenance building (2 buildings) in an area of approx. 6,296 m2; • Central warehouse (1) in an area of approx. 4,770 m2; • Air-side administrative building (1) in an area of approx. 4,200 m2; • Waste plant (1) in an area of approximately 4,346 m2; • Gardening Center (1 building with 1 shed) in an area of approx. 1,271 m2

N/A Under preparation

N/A

New Mexican International

Airport

México Public works Construction of an upper road to

access the

N/A Under preparation

N/A

2. Water and Natural Resources.

Project

Description Location Contractual

Scheme Scope Estimated

Investment

Dates / Calendar

Additional Information

Renewal and maintenance of

the electro mechanic and civil

infrastructure of the storage dam

“Trojes-Solidaridad”.

Municipality of

Pihuamo, State of Jalisco.

Public works Renewal and maintenance of

the electro mechanic and

civil infrastructure of the storage dam

“Trojes-Solidaridad”

including the cleaning of the

valves, repair and substitution

of damaged pieces, works inspections.

N/A Proposals will be received no later than June

26th, 2017.

The agreement will be executed for a 117

natural day period, estimating the start of construction works on

July 7th, 2016.

For further reference please refer to File No. 1386915; file reference

LO-016B00053-E2-2017 at

https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1170726&oppLis

t=CURRENT

Extension of the fresh water distribution

system of the municipal capital.

Municipality of

Tejupilco, State of Mexico.

Public works agreement. Invitation to at least three participants.

Extension of the fresh water distribution

system of the municipal

capital, first stage (new work)

in the

N/A The proposal can be

submitted until June 23,

2017.

For further reference please refer to File No. 1399884; file reference

at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?oppor

terminal building, tunnel

and subway station structure.

This work

includes the construction of the main access

roads of entrance and

exit to the New Mexico City

International Airport (NAICM), in six lanes with an approximate

length of 700 meters.

Request for proposals: 4th quarter 2017

Proposals

reception: 1st quarter 2018

Ruling

expected to take place of

1st quarter 2018

Execution starting date:

2nd quarter 2018

New Mexican International

Airport

México Public works Construction of fire stations.

4 building-

complexes for fire

extinguishing purposes in

aircrafts that will serve to attend

possible damages within

the NAICM.

N/A Under preparation

N/A

Municipality of Tejuplico.

tunityId=1186158&oppList=CURRENT

Dill, electro-mechanical

equipment and interconnection of

the deep well number 4 in the locality of Salina

Cruz.

Municipality of Salina Cruz, State of Oaxaca.

Public works Dill, electro-mechanical

equipment and interconnection of the deep well number 4 in the locality of Salina

Cruz.

N/A Any bid proposal

should be submitted no

later than June 26th, 2017.

The agreement will be executed on July 7th,

2017, and the construction works

should be concluded in a 120 day term.

For further reference

please refer to File No. 1395023 at

https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1178653&oppLis

t=CURRENT

Construction of an interconnection

line for the wells 1, 2, 3 and 4 in Salina

Cruz.

Municipality of Salina Cruz, State of Oaxaca.

Public Work. Invitation to at least three participants.

Construction of an

interconnection line for the wells 1, 2, 3 and 4 (km

0+000 to km 2+000) in Salina

Cruz.

N/A Any bid proposal

should be submitted no

later than June 26, 2017.

The agreement will

be executed on July 3rd,

2017.

The construction works should be concluded in

a 120-day term.

For further reference please refer to File No.

1395239 at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179087&oppLis

t=CURRENT

Normal conservation of the building for

the Water District 099 Quitupan La

Magdalena.

State of Michoacán.

Public work. Restricted.

Invitation to at least three participants.

Normal conservation of the building for

the Water District 099 Quitupan La Magdalena.

N/A Any bid proposal

should be submitted no

later than June 26th, 2017

The agreement will

be executed on July 21,

2017.

The construction works should be concluded in

a 60-day term. For further reference

please refer to File No. 1373681, at

https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1158067&oppLis

t=CURRENT

Construction of the pumping sump in San

Pedro Cholula.

Municipality of

Ocoyoacac, Satiate of Mexico.

Public work Construction of the pumping sump in San

Pedro Cholula.

N/A Any bid proposal

should be submitted no

later than June, 26, 2017.

For further reference please refer to File No.

1388978, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1172661&oppLis

t=CURRENT

Electro-mechanical

equipment and regularization tank

in “el Ponedero”.

Municipality of Matías

Romero Avedaño, State of Oaxaca.

Public work. Invitation to at least three participants.

Electro-mechanical

equipment and regularization

tank in “el Ponedero” in the Locality of Matías

Romero

N/A Any bid proposal

should be submitted no

later than June 27, 2016.

The construction works should be concluded in

a 120-day term.

For further reference please refer to File No.

1395930, at https://compranet.funci

Avedaño, Municipality of Matias Romero Avedaño, State

of Oaxaca.

onpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179460&oppLis

t=CURRENT

Renewal and maintenance of the dam “Juan

Sabines”

Municipality of La

Concordia, State of Chiapas.

Public work. Invitation to at least three participants.

Renewal and maintenance of the dam “Juan

Sabines” located in the Water

District No. 101 Cuxtepeques in

the Municipalities of la Concordia and Trinitaria, state of

Chiapas.

N/A Any bid proposal

should be submitted no

later than June 13, 2017.

The construction works should be concluded in

a 91-day term.

For further reference please refer to File

No.1390409, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1174591&oppLis

t=CURRENT

Drilling and equipment of a new well in the locality of San Mateo del Mar

Municipality of San

Mateo del Mar, State of Oaxaca.

Public work Drilling and equipment of a new well in the locality of San Mateo del Mar

N/A Any bid proposal

should be submitted no

later than June 27, 2017.

The agreement will

be executed on July 3rd,

2017.

The construction works should be concluded in

a 120-day term.

For further reference please refer to File No.

1396002, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179522&oppLis

t=CURRENT

Drilling and equipment of a new well in the locality of San

Juan Guichicovi.

Municipality of San

Juan Guichicovi,

State of Oaxaca

Public work. Invitation to at least three participants.

Drilling and equipment of a new well in the locality of San

Juan Guichicovi.

N/A Any bid proposal

should be submitted no

later than June 27, 2017.

The present is For further reference

please refer to File No. 1396007, at

https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179531&oppList

=CURRENT

Drilling and equipment of a new well in the locality of San

Pedro Huilotepec.

Municipality of San Pedro

Huilotepec, State of Oaxaca.

Public work. Invitation to at least three participants.

Drilling and equipment of a new well in the locality of San

Pedro Huilotepec.

N/A Any bid proposal

should be submitted no

later than June 27.

The construction works should be concluded in

a 120-day term.

For further reference please refer to File No.

1396016, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179540&oppLis

t=CURRENT

Regular conservation of structures and mechanisms.

Municipalities of

Tepalcatepec,

Buenavista, Gabriel

Public work. Invitation to at least three participants.

Regular conservation of structures and

mechanisms for the electro mechanical

N/A Any bid proposal

should be submitted no

later than June 27, 2017.

The construction works should be concluded in

a 71-day term.

For further reference please refer to File No.

Zamora, Múgica, Ka Huacana

and Paracuaro,

in the State of

Michoacán.

operation of the wells and

channels of the Water District

No. 097 “Lázaro Cárdenas, in the Municipalities of

Tepalcatepec, Buenavista,

Gabriel Zamora, Múgica, Ka

Huacana and Paracuaro, in the

State of Michoacán

1373501, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1157889&oppLis

t=CURRENT

Maintenance of the electro-mechanical

structures Jala and Peñitas.

Municipality of

Tecomán and Vila de Álvarez in

the State of Colima.

Public work. Maintenance of the electro-

mechanical and civil structures of

the diversion dams Gregorio Torres Quintero

and Peñitas.

N/A Any bid proposal

should be submitted no

later than June 27, 2017.

The construction works should be concluded in

a 120-day term.

For further reference please refer to File No.

1396024, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179547&oppLis

t=CURRENT

Extension of the fresh water system

in Santa Fe.

Municipality of

Rosamorada, State of

Nayarit.

Public work. The work implies the distribution system with an installation of 950 meters of PVC pipeline

and the installation of 9

sectioning valves of diferent diameters,

demolish of 4 operation valves and reposition of

4 valves for operation. Also,

implies the installation of 13 domestic water intake with PVC triple clamp and

13 tables of nipples and

shut-off valves

N/A Any bid proposal

should be submitted no

later than June 28, 2017.

The construction works should be concluded in

a 40-day term.

For further reference please refer to File No.

1391591, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175098&oppLis

t=CURRENT

Renewal and maintenance of

the derivative dam “Lagartero”.

Municipality of La

Trinitaria, State of Chiapas.

Public work. Invitation to at least three participants.

Renewal and maintenance of

the derivative dam “El

Lagartero”, of the Water District

No. 107.

N/A Any bid proposal

should be submitted no

later than June 27, 2017.

The construction works should be concluded in

a 91-day term.

For further reference please refer to File No.

1390430, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1174682&oppLis

t=CURRENT

Construction of the sewage and

fresh water system in the community

of San Joaquin.

Municipality of

Cuauhtemoc, State of

Colima.

Public works. Construction of the sewage and

fresh water system in the community of San Joaquin,

Municipality of Cuauhtemoc,

State of Colima.

N/A Any bid proposal

should be submitted no

later than June 29, 2017.

The construction works should be concluded in

a 150-day term.

For further reference please refer to File No.

1387939, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis

t=CURRENT

Relocation of the Héroes Revolución Collector, and the

stream Adelita.

Municipality of

Hidalgo del Parral,

State of Chihuahua.

Public works. First step of the project that includes the

relocation of the Heroes de la Revolución

collector and the channeling of the stream Las Adelitas in the

locality of Hidalgo del

Parral.

N/A Any bid proposal

should be submitted no

later than June 30, 2017.

For further reference please refer to File No.

1395972, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis

t=CURRENT

Distribution system (4th stage of 6) in Francisco

Portillo and Lomas de Oriente.

Municipality of Aquiles

Serdán, State of

Chihuahua.

Public works. Distribution system (4th stage of 6) in Francisco

Portillo and Lomas de

Oriente: 270 home sockets,

incorporation to the Portal del

Valle well, construction of the conduction line, bombing

equipment, automatization,

distribution system,

secondary system, electro

mechanical equipment and

interconnections.

N/A Any bid proposal

should be submitted no

later than June 29, 2017.

For further reference please refer to File No.

1392515, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis

t=CURRENT

Construction of a treatment plant for waste waters

“El Porvenir”

Municipality of

Camargo, State of

Chihuahua

Public Works. Construction of a treatment plant for waste waters

based on a stabilization lake

system with a capacity of 0.6

lps, which involves a pre-

treatment system of

grinding and de-sanding, primary treatment with a

N/A Any bid proposal

should be submitted no later than July

5th, 2017.

For further reference please refer to File No.

1395914, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1175326&oppLis

t=CURRENT

sedimentation lake and a secondary

treatment with a facultative lake, in the locality of

El Porvenir. Construction of

seven water catching systems for pluvial water.

Municipality of

Morelos, State of

Chihuahua.

Public works. Construction of seven catching

systems for pluvial water,

distribution and renovation in the

localities that comply with the 1,500 mm of rain per year, in the Municipality of Morelos. This work involves

the supply and installation of a

galvanized sheet, a 10,000

liters tank, collection

channels of PVC and UV rays protection, separation

systems, turbulence

redactors, septic tanks.

N/A Any bid proposal

should be submitted no later than July

5th, 2017.

For further reference please refer to File No.

1395812, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179372&oppLis

t=CURRENT

Regular maintenance of

the Main Channel Santa Rosa Tlahualilo

Municipalities of Lerdo,

Gómez Palacio and Tlahualilo,

State of Durango

Public Works. Regular maintenance of

the channels and control

structures of the Main Channel of

Santa Rosa Tlahualilo in the

Water District 017, Lagunera

Region.

N/A Any bid proposal

should be submitted no later than July

6th, 2017.

For further reference please refer to File No.

1391677, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179372&oppLis

t=CURRENT

Maintenance of the storage dam

and buildings.

Municipalities of Inde,

Nazas, Lerdo,

Gomez Palacio, in the States

of Durango.

Municipality of

Torreón, State of

Coahuila.

Public Works. Maintenance of the storage dam

and derivative dams, bombing

plants, main system, control buildings and

structures for the Water District 017 Lagunera

Region.

N/A Any bid proposal

should be submitted no later than July

3rd, 2017.

For further reference please refer to File No.

1391677, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1179372&oppLis

t=CURRENT

Ending of construction of

the dam “El Chihuero”.

Municipality of

Huetamo, State of

Michoacán.

Public Works. Ending of construction of

the dam El Chihuero,

involving the closing of works.

N/A Any bid proposal

should be submitted no later than July

3rd, 2017.

For further reference please refer to File No.

1394710, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opp

ortunityDetail.do?opportunityId=1178273&oppLis

t=CURRENT

Construction of a sewage and

sanitary system in San Miguel de la

Michil.

Municipality of

Durango, State of

Durango.

Public Works. Construction of a sewage and

sanitary system in the locality of San Miguel de la

Michi.

N/A Any bid proposal

should be submitted no later than July

19rd, 2017.

For further reference please refer to File No.

1402214, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1185403&oppLis

t=CURRENT

Extension of the sewage system in the locality of San Lucas de Ocampo.

Municipality of San Juan del

Río State of Durango.

Public Works. Extension of the sewage system in the locality of

San Lucas de Ocampo.

N/A Any bid proposal

should be submitted no later than July

19rd, 2017.

For further reference please refer to File No.

1402061, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1185310&oppLis

t=CURRENT

Extension of the fresh water system

of the Station Nanchi.

State of Nayarit.

Public Works. Invitation to at least three participants.

Extension of the fresh water

system of the Station Nanchi,

involving the distribution

system and the installation of

pipelines, valves, domestic sockets.

N/A Any bid proposal

should be submitted no later than July

7rd, 2017.

For further reference please refer to File No.

1400753, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1184044&oppLis

t=CURRENT

Extension of the fresh water system

in Mesa de Picachos.

Municipality of Tepic, State of Nayarit.

Public Works. Invitation to at least three participants.

Extension of the fresh water

system of the Station Mesa de

Picachos, involving the distribution

system and the installation of

pipelines, valves, domestic sockets.

N/A Any bid proposal

should be submitted no later than July

17rd, 2017.

For further reference please refer to File No.

1404177, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1187196&oppLis

t=CURRENT

Renewal of the fresh water and

sewage systems in roads of Ahome.

Municipality of

Ahome, State of Sinaloa.

Public Works.

Renewal of the fresh water and sewage systems

in roads of Ahome.

N/A Any bid proposal

should be submitted no later than July

11rd, 2017.

For further reference please refer to File No.

1405365, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1188793&oppLis

t=CURRENT

Construction of the fresh water system in the

locality of Rahum.

Municipality of

Guaymas, State of Sonora.

Public Works. Construction of the fresh water system in the

locality of Rahum.

N/A Any bid proposal

should be submitted no later than July

7th, 2017.

For further reference please refer to File No.

1399910, at https://compranet.funcionpublica.gob.mx/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=1185491&oppLis

t=CURRENT

Comments: Although some of the above-mentioned projects have concluded their tender process, they will represent important investments in México, as well as investment opportunities to develop them. 3. Ports. Project

Description Location Contractual

Scheme Scope Estimated

Investment

Dates / Calendar

Additional Information

Maintenance to railways of the Altamira Port.

Port of Altamira.

Public works agreement, awarded by Restricted Invitation.

The scope is the maintenance to railways, within the Industrial

Port of Altamira.

N/A Any bid proposal shall be submitted no later than

June 15th, 2017.

The agreement will commence on July 7th, 2017; and shall be

enforceable up to 175 calendar

days.

The terms for the bid (“Bases”) may be reviewed at Compranet webpage.

The entity responsible for this public procurement is the Procurements and Contracts Bureau of the

Port of Altamira.

The email provided by the entity is the following: sgonzalez@puertoaltamir

a.com.mx

Concrete works with hydraulic

concrete on the superstructure of

the Port of Veracruz.

Port of Veracruz.

Public works agreement, awarded by Restricted Invitation.

The scope is the concrete works with hydraulic

concrete on the superstructure of the referred port.

N/A Any bid proposal shall be submitted no later than

June 16th, 2017.

The agreement will commence on July 5th, 2017; and shall be

enforceable up to 60 calendar

days.

The terms for the bid (“Bases”) may be reviewed at Compranet webpage.

The authority responsible

for this public procurement is the Head

of the Engineering Department.

The email provided by

the entity is the following: jramirez@puertodeveracr

uz.com.mx Construction works on the

south access road within the Port of Lázaro Cárdenas.

Port of Lazaro

Cardenas, State of

Michoacán.

Public works agreement, awarded by Public Bid.

The scope is the construction works on the south access

road within the referred Port.

N/A Any bid proposal shall be submitted no later than

June 14th, 2017.

The terms for the bid (“Bases”) may be reviewed at Compranet webpage.

The entity responsible is

the Administración Portuaria Integral de

Lázaro Cárdenas, S.A. de C.V.

The email provided by

the entity is the following: gingenieria@puertolazaro

cardenas.com.mx Design,

construction of a dock with two

attack positions for discharge of

gasoline and diesel in Tuxpan,

Veracruz

Tuxpan, Veracruz

N/A The project consists of

increasing the capacity to receive and discharge

gasoline and diesel, by

building a dock with two docking positions

USD $78.00 million

Under implementatio

n

N/A

Design and construction of

the west breakwater arm in

Oaxaca

Oaxaca, Oaxaca

N/A The project consists of the

activities required to finish

a 1,600-meter breakwater arm , as well as of the construction of

four docking positions.

Objective: to allow access to

larger draft vessels, and to help minimize

adverse weather conditions that interfere with

the operation of Antonio Dovalí Jaime Refinery. Benefits: higher

revenues by improving

export volumes as there will be

fewer disruptions in

the production process.

USD $520,000 thousand

dollars

Under implementatio

n

N/A

Comments: Accordingly, to the Master Program of the Port of Veracruz published 1n 2011, the Port of Veracruz is the country’s largest commercial port and it is the only one that manipulates 100% of the purely commercial cargo and the only that manipulates significantly the most important six segments of cargo at national level (containerized cargo, general cargo, agricultural bulk, ore bulk, vehicles and non-oil fluids). The General Coordinator of the Ports and Merchant Navy (hereinafter referred as the “Coordinator”) declared in an interview to the media on December 15th, 2015 that the New Port of Veracruz might become the largest terminal of the country, with greater capacity than Lázaro Cárdenas and Manzanillo Ports. New ships arrival to the New Port of Veracruz are expected on 2018. The Coordinator stated that the Port of Veracruz will not be closed, and pointed that part of the new area will be used for containers On June 5th, 2017, it was published in the Official Federal Gazette, a decree which expropriates the area of 14,941.94 m², located in the Municipality of Veracruz, State of Veracruz, to be used for the construction of the new customs as part of the works and facilities necessary for the expansion of the Port of Veracruz.

In addition to the above mentioned, new public procurements shall be notified after the property’s expropriation, for a public works agreement for the sole purpose of construct the new custom’s facilities. 4. Energy.

a. Petróleos Mexicanos (PEMEX) and/or State Owned Productive Subsidiaries.

Project Description Location Contractual

Scheme Scope Estimated

Investment Dates /

Calendar Additional

Information PEMEX Logistics

Open Season tender

1.2

Storage and pipelines

transportation

Northern part of México

(phase two)

Second open season

for private use of

storage terminals

and transport pipelines owned by

PEMEX Logístics

Biding procedure, by which any participant can compete for the capacity required by

them.

Pemex Industrial Transformation will be the one “price taker” of

the bidding process.

N/A Process is expected to

be called during June – July 2017.

N/A

Rehabilitation of existing

hydrotreatment plants of ultra-low

sulfur diesel (DUBA) and installation of new plants in six refineries in the

States of Tamaulipas, Guanajuato, Veracruz, Hidalgo, Oaxaca and

Nuevo León.

States of Tamaulipas, Guanajuato,

Veracruz, Hidalgo,

Oaxaca and Nuevo León.

N/A The project consists of the rehabilitation of

existing hydrotreatment plants and the installation of

new plants in six refineries.

USD $3.089 million

Request for proposals expected

during 2017

N/A

Construction of coke drums in the

Cadereyta Refinery in Nuevo León

Nuevo León N/A The project consists of the construction of

two additional coking drums for the

Cadereyta Refinery, as well as the

replacement of the existing four due to

evident damage.

USD $300,000 thousand

Request for proposals expected

during 2017

N/A

Rehabilitation of Madero refinery

State of Tamaulipas

Provision of Services

The project consists of the rehabilitation and

optimization of primary, catalytic,

hydrodesulphurization and coking plants

since in recent years the refinery has

operated at 44% of its installed capacity

(190,000 barrels per day) due to lack of

maintenance.

USD $300,000 thousand

Request for proposals expected

during 2017

N/A

b. Federal Electric Commission (CFE) and/or State Owned Productive Subsidiaries.

Project Description

Location Contractual Scheme

Scope Estimated Investmen

t

Dates / Calendar

Additional Information

Topolobampo gas pipeline branch.

Sinaloa State.

Trust agreement

for the development

of infrastructure

.

Project comprises the engineering,

procurement, acquisition of

real estate rights for the funding,

construction, operation and

maintenance of a pipeline with capacity of 248

million standard cubic feet per

day.

USD $55.0 million

Publication of final bidding

guidelines was carried out on

July 2016.

Proposal filings was expected to take place

on September 2016 but was

differed.

Commercial operation is expected for December

2018.

Tender procedure under process.

The terms for the bid

(“Bases”) may be reviewed at:

http://www.cfe.gob.mx/Licitaciones/Licitaciones/Paginas/PrincipalesProyectos.

aspx

Natural gas supply to Baja California

Sur.

Baja California

Sur.

Transport service

contract.

The scope is to supply natural

gas to new power

generation plants owned by CFE, as well as to those currently operating with

fuel oil or diesel. Carrier will

receive natural gas so it may be

transported across the sea

and deliver it to Baja California

Sur.

USD $800.0 million

Publication of Final bidding

guidelines were

published on August 24,

2015.

Filing of proposals was expected to

take place on October, 2016.

Awarding of contract was expected to

take place on November,

2016.

Commercial operation is expected for March 2019.

Tender procedure under process.

The terms for the bid

(“Bases”) may be reviewed at:

http://www.cfe.gob.mx/Licitaciones/Licitaciones/Paginas/PrincipalesProyectos.

aspx

New electric transmission lines.

Oaxaca to

Morelos

Public-Private

Partnership

1,200 Km of transmission

lines to run from Oaxaca though

the center of Mexico until

Morelos State

USD $1.7 billion

The pre- call for the tender

procedure took place on October 2016.

Tender

procedure expected to take place

during 2017

Pre-bidding guidelines pending to be published.

Delays have been

announced by the Energy Ministry, mainly related to

the financial and technical terms of the

contract

New electric transmission lines.

Sonora and Baja California.

Not available. 700 Km of transmission lines which

purpose will be to interconnect Baja California

System with the National System.

USD $1.2 billion

The call is expected to take place at

the end of 2016 or

beginning of 2017.

Tender procedure pending to be called by

CFE.

Biding guidelines have not been released.

San Luis Potosí combines cycle

San Luis Potosí.

Lump sum price

The power plant will be built in

USD $864 million

The call is pending to be

Tender procedure pending to be called by

power plant. contract, which

comprises engineering,

design, supply of all equipment

and materials,

spare parts and special

tools, testing as well as an

electrical substation.

Villa de Reyes, San Luis Potosí. The plant will

have a capacity of 789.53 +/- 20%

MW under summer design conditions and will be bided

under a Turnkey scheme.

Project consists of a lump sum price contract,

which comprises engineering,

design, supply of equipment,

testing, commissioning

and a power substation.

defined. CFE.

Topolobambo III combined cycle

power plant.

Municipality of

Ahome, Sinaloa State.

Lump sum price

contract, which

comprises engineering,

design, supply of all equipment

and materials,

spare parts and special

tools, testing as well as an

electrical substation.

Lump sum price contract which will comprise engineering,

design, supply of equipment and materials for a

combined cycle power plant that will operate with

natural gas.

USD $631 million

The call is pending to be

defined.

Tender procedure pending to be called by

CFE.

Sureste II and III Wind Power Plant

State of Oaxaca

It consists of the design,

programming,

construction and

commissioning of this

wind power plant

In order to meet this demand,

while maintaining

regional reserve margins at

appropriate levels, this wind power plant will

be built in Ixtepec, Oaxaca.

USD $1.0 billion

The call is pending to be

defined.

Tender procedure pending to be called by

CFE.

Comments: Federal Electric Commission (CFE) pilot project: CFE has recently announced that it will call for a pilot project to liberalize and rent its fuel storage capacity for over 10 million barrels, until 2030. The process will be conducted by the State-Owned Subsidiary of CFE known as CFE Energy and is expected to take place during this first semester of 2017. In Baja California, CFE will offer 10 tanks with a storage capacity of 574 thousand barrels located in Rosarito, Ensenada and Mexicali.

In Sonora, 21 tanks will be offered with a capacity of one thousand and twenty barrels in Guaymas, Puerto Libertad and Caborca. Although the documents related to this process have not been released by CFE, the announcement was formally made by CFE Director. c. National Centre for Electric Energy Control (CENACE)

Project

Description Location Contractual

Scheme Scope Estimated

Investment Dates /

Calendar Additional Information

Firs long term electric auction

2017

Mexico Power purchase

agreements

Purchase electric energy,

power and clean energy

certificates

USD $4.0 billion

Bidding guidelines: May

08, 2017

Payment period May 18, 2017 – August

31, 2017

Release of final bidding

guidelines June 27, 2017

Purchase offers from CENACE July 25, 2017

Prequalification

petition submission

September 12 – 20, 2017

Revision of economic

offers November 14,

2017

Awarding November 22,

2017

Please be advised that additional relevant dates

are provided in the official auction calendar

which is published in the official website of

CENACE www.cenace.gob.mx

d. Natural Gas National Centre (CENAGAS)

Project

Description Location Contractual

Scheme Scope Estimated

Investment

Dates / Calendar

Additional Information

Project Jáltipan – Salina Cruz.

States of Veracruz

and Oaxaca.

Not available. The purpose of the pipeline is to strengthen the

existing infrastructure in

the region by constructing a pipeline of 247 Kilometers of

length.

USD $643.0 million

Biding call and guidelines

have not been released.

N/A

Project Lazaro Cárdenas – Acapulco.

States of Guerrero

and Michoacá

Not available. Construction of a gas pipeline with

a length of approximately

USD $456.0 million

Biding call and guidelines

have not been released.

N/A

n. 331 Kilometers. Project Salina

Cruz-Tapachula. States of Oaxaca

and Chiapas.

Not available. Construction of a gas pipeline with

a length of approximately

400 Kilometers.

USD $442.0 million

Biding call and guidelines

have not been released.

N/A

Project Ramones – Cempoala.

States of Nuevo

León and Veracruz.

Not available. Construction of a gas pipeline with

a length of approximately 855 Kilometers.

USD $2.0 billion

Biding call and guidelines

have not been released.

Pursuant to the latest review made by

CENAGAS and the Energy Ministry to this project

and due to the fact that the pipeline Sur of Texas –

Tuxpan offers a similar route, SENER will analyze the convenience of this

call. Comments: The projects referred herein above have been announced by CENGAS and are included in the document entitled “First Review of the Five Year Term Plan for the Expansion of the Sistragas 2015 – 2019” which can be consulted in the web page: http://www.gob.mx/cms/uploads/attachment/file/116777/511_DGGNP_260_16_OT_11_Primera_Revisi_n_PQ.pdf e. National Hydrocarbons Commission. Project

Description Location Contractual

Scheme Scope Estimated

Investment

Dates / Calendar

Additional Information

Second Tender, Round 2

North and

South of Mexico

License Contracts

Tender comprises 12 contractual

areas in onshore fields which

have as main resource wet

and dry gas as well as oil

Estimated investment

s of USD $5.0 billion

Request to access to

virtual data room

September 05, 2016 to

December 05, 2016

Access to

virtual data room

September 09, 2016 to April

04, 2017

Visit to contractual

areas December 05, 2016 to March

03, 2017

First queries stage August

24, 2016 to November 21,

2016

Second queries stage

August 24, 2016 to

Process has begun.

All related information may be consulted at:

www.rondasmexico.gob.mx

December 08, 2016

Third queries stage August

24, 2016 to March 03, 2017

Inscription payment

September 09, 2016 to

December 08, 2016

Reception of

prequalification documents December 19,

2016

Filing of proposals April

05, 2017

Third Tender. Round 2

Oil provinces of Burgos, Tampico-Misanta, Veracruz

and South basins

Licensee Contracts

Tender comprises 14 contractual

located in the oil provinces.

Estimated investment

s UDS $11,250

Bidding guidelines

published on November 15th,

2016.

Process has begun.

All related information may be consulted at:

www.rondasmexico.gob.mx

PEMEX Farm-out Ayin-Batsil

Shallow waters of

the Mexican

Gulf

Production Sharing

Agreement

Tender comprises 2

contractual area to be exploited in partnership with PEMEX

Estimated investment

s USD $4.2

billion

Bidding guidelines

published on March 07, 2017.

Process has begun.

All related information may be consulted at:

www.rondasmexico.gob.mx

PEMEX Farm-out Cardenas-Mora

Onshore areas

located in the

State of Tabasco

Licensee Contract

Tender comprises 2

contractual area to be exploited in partnership with PEMEX

N/A Bidding guidelines

published on May 02, 2017.

Process has begun.

All related information may be consulted at:

www.rondasmexico.gob.mx

PEMEX Farm-out

Ogarrio Onshore

area located in the

State of Tabasco

Licensee Contract

Tender comprises 1

contractual area to be exploited in partnership with PEMEX

N/A Bidding guidelines

published on May 02, 2017.

Process has begun.

All related information may be consulted at:

www.rondasmexico.gob.mx

Additionally, on May, 2017, the Energy Ministry released information related to the short-term expected plans, which include: • Round 2.4 in deep waters of the Mexican Gulf and onshore areas with none-conventional

resources.

• Round 3 for shallow water blocks, onshore conventional areas, deep-waters and areas with none-

conventional resources.

• Farm out for the area known as Nobilis-Maximino in ultra-deep waters of the Mexican Gulf. 5. Other Energy Projects.

Project Description

Location Contractual Scheme

Scope Estimated Investment

Dates / Calendar

Additional Information

New Mexican International

Airport

Mexico City

Public works

The fuel terminal at the New Mexico City International Airport (NAICM) is a storage area with capacity of 50 million liters in 4 tanks, while the distribution network includes 40 km of fuel distribution and recovery lines, as well as substations and transformers. The most relevant characteristics are: Storage of fuel: 4-tank farm. - Recovery fuel area: 300 m2 surface. - Substations, transformers and emergency generators (in an area of 270 m2). - Diesel storage: 83 m2. - Parking for trucks: includes 2 parking areas, the first one occupies an area of 1,320 m2 and the second one occupies an area of 460 m2. - Fuel pumps: 2,700 m2. - Reception, filtration, measurement and PEMEX fuel transfer zone: includes 2 phases, each with an area of 1,370 m2; only the first one will be built in this phase of the project.

N/A Under preparation.

Request for proposals

and proposal reception

expected to take place during the

third quarter of

2017

Ruling to take place during the

fourth quarter of

2017

N/A

New Mexican International

Airport

Mexico City

Public works

Construction of the fuel terminal in the southeastern campus of the New Mexico City International Airport. Fuel storage Fuel recovery area Substations, transformers and emergency generator Diesel Storage Parking for trucks Fuel pumps Reception, filtration, measurement and PEMEX fuel transfer zone Capacities:

N/A Under preparation.

Proposals reception: 1stquarter

2018

Ruling is expected for the 1st quarter of

2018

Execution starting date: 1st quarter

N/A

Total annual demand: 47.3 million liters of jet fuel Total monthly demand: 3.9 million liters of jet fuel Average daily demand: 129.6 thousand liters of jet fuel

2018

6. Public Private Partnership Projects (undergoing and pending to be called)

The Mexican Finance Ministry has recently announced a strategy to promote public-private partnership projects in Mexico in order to develop new infrastructure, mainly related to transportation, security, education, health and water. These projects have been divided in two blocks that comprise undergoing tenders and tenders expected to be called soon. The estimated investments for the projects referred herein below is of $58.261 billion pesos. Block I Social Security Mexican Institute (IMSS)

Process Project Description Stage Investments General Hospital in Bahía de Banderas, Nayarit.

Design, construction, finance, operation and maintenance of a hospital with a capacity of 144 beds, 35 doctors’ offices, among others.

Tender currently under preparation. Bidding guidelines expected to be released on March 2017.

$1,287.7 mdp

General Hospital in the Municipality of García, Nuevo León.

Design, construction, finance, operation and maintenance of a hospital with a capacity of 260 beds, 46 doctors’ offices, among others.

Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on June 2017.

$2,056.6 mdp

General Hospital in the Municipality of Tepotzotlán, Mexico.

Design, construction, finance, operation and maintenance of a hospital with a capacity of 260 beds, 46 doctors’ offices, among others.

Tender currently under preparation. Bidding guidelines expected to be released on May 2017.

$2,010.6 mdp

General Hospital in the Municipality of Tapachula, Chiapas.

Design, construction, finance, operation and maintenance of a hospital with a capacity of 180 beds, 36 doctors’ offices, among others.

Bidding guidelines were published on September 2016. Awarding of contract is expected to take place on May 2017.

$1,539 mdp

Security and Social Services Institute for the State Workers (ISSSTE)

Process Project Description Stage Investments General Hospital Aquiles Calles Ramírez in the Municipality of Tepic, Nayarit.

Construction of a new medical unit with capacity of 150 beds and 35 doctors’ offices.

Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on July 2017.

$1,341.4 mdp

General Hospital in Mexico City.

Construction of a new medical unit with capacity of 150 beds and 35 doctors’ offices.

Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on July 2017.

$1,933.2 mdp

General Hospital Dr. Daniel Gurria Urgell in the Municipality of Villahermosa, Tabasco.

Construction of a new medical unit with capacity of 90 beds and 29 doctors’ offices.

Bidding guidelines were published on February 2017. Awarding of contract is expected to take place on June 2017.

$862.2 mdp

Block II

Security and Social Services Institute for the State Workers (ISSSTE)

Process Project Description Stage Investments Substitution of the General Hospital “Dr. Santiago Ramón Cajal” in Durango, Durango.

Construction of a new medical unit with 126 beds and 30 doctor´s offices. Awarded contract will have a term of 25 years.

Analysis and studies for the biding process are under preparation.

$1,127 mdp

Substitution of the General Hospital in Tampico, Tamaulipas.

Construction of a new medical unit with 150 beds and 27 doctor´s offices. Awarded contract will have a term of 25 years.

Analysis and studies for the biding process are under preparation.

$1,341 mdp

Substitution of the General Hospital “Dr. Francisco Galindo Chavez” in Torreón, Coahuila.

Construction of a new medical unit with 120 beds and 24 doctor´s offices. Awarded contract will have a term of 25 years.

Analysis and studies for the biding process are under preparation.

$1,073 mdp

Construction of a new General Hospital in the North zone of Mexico City.

Construction of a new medical unit with 200 beds and 35 doctor´s offices. Awarded contract will have a term of 25 years.

Analysis and studies for the biding process are under preparation.

$1,547 mdp

Construction of a new General Hospital in the east zone of Mexico City.

Construction of a new medical unit with 250 beds and 29 doctor´s offices. Awarded contract will have a term of 25 years.

Analysis and studies for the biding process are under preparation.

$1,933 mdp

Substitution of the General Hospital of Acapulco, Guerrero.

Construction of a new medical unit with 150 beds and 27 doctor´s offices. Awarded contract will have a term of 25 years.

Analysis and studies for the biding process are under preparation.

$1,341.38 mdp

Security

Process Project Description Stage Investments Expansion and equipment of the penitentiary complex Papantla, Veracruz.

Expansion of the penitentiary complex of Papantla, Veracruz, which has a surface area of 28.1 hectares designed for 2,160 persons,

Analysis and studies for the biding process are under preparation.

3,479 mdp

Education

Process Project Description Stage Investments Maintenance and modernization of the basic education infrastructure.

Maintenance and modernization of 1m545 basic level schools in different States on Mexico.

Analysis and studies for the biding process are under preparation.

$2,124.2 mdp

7. Other Infrastructure Projects.

Project Description Location Contractual

Scheme Scope Estimated

Investment Dates /

Calendar Additional Information

Complementary and Conservation

works of Track Lighting Systems

05L-2.

Mexico City International

Airport.

Public works

agreement, awarded by Public Bid.

The Scope is the

complementary and

conservation works of Track

N/A Any bid proposal shall be

submitted no later

than June

The terms for the bid (“Bases”) may be

reviewed at Compranet webpage.

The entity responsible

Lighting Systems 05L-2, of the referred International

Airport.

26th, 2017 for this public procurement is the Procurements and

Contracts Bureau of the Mexico City

International Airport.

The email provided by the entity is the

following: [email protected]

Comments: It is important to inform, that early this month, January 2017, was announced by the Ministry of Communications and Transportation, that the consortium owned by the business man, Carlos Slim Helú, acquired a nearly $4 billion contract for the construction of the terminal for the New Airport of Mexico City. The consortium which acquired such contract, is controlled by Grupo Carso (Group owned by Slim). The infrastructure of this new airport will be one of the largest infrastructure projects that will be developed in Latin America (according to information provided by Forbes.com).

SINCERELY

Juan Carlos Serra [email protected] Jorge Eduardo Escobedo Montaño [email protected]