Page 1: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Platte to Park Hill: Stormwater Systems

March 2016

Page 2: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

• Project Need• Open Channel• Detention Options (Cole, City Park Golf Course)• Park Hill Detention• Globeville Landing Outfall• Funding, Timing & Next Steps

Topics

Page 3: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

PROJECT NEED

Page 4: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

36th & High, 2011

Project Need

Page 5: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Natural Drainage Patterns

Page 6: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Existing Pipes

7

Page 7: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Priority Areas

8

Page 8: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Priority Areas

9

Page 9: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Open Drainage Channel

10

Page 10: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Example: Harvard Gulch

Page 11: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Basin Low Areas

12

Page 12: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Detention Option 1: Cole

Page 13: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Example: Crestmoor Park

Page 14: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Detention Option 2: City Park Golf Course

Page 15: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Example: Lakewood Golf Course

Page 16: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Hole 1 2 3 4 5 6 7 8 9 Total 10 11 12 13 14 15 16 17 18 TotalPar 4 4 5 3 4 4 3 4 4 35 5 5 3 4 4 4 3 5 4 37

PAR72

City Park Golf Course:Feasibility Study Option 1

DRAFT

Page 17: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 1

Page 18: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

5-year storm (DRAFT)

City Park Golf Course:Feasibility Study Option 1

Page 19: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 1

10-year storm (DRAFT)

Page 20: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 1

100-year storm (DRAFT)

Page 21: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Hole 1 2 3 4 5 6 7 8 9 Total 10 11 12 13 14 15 16 17 18 TotalPar 4 4 3 4 4 3 5 3 5 35 4 3 4 4 4 5 4 3 4 35

PAR70

City Park Golf Course:Feasibility Study Option 2

DRAFT

Page 22: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 2

Page 23: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 2

5-year storm (DRAFT)

Page 24: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 2

10-year storm (DRAFT)

Page 25: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 2

100-year storm (DRAFT)

Page 26: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Hole 1 2 3 4 5 6 7 8 9 Total 10 11 12 13 14 15 16 17 18 TotalPar 4 4 4 4 3 5 3 4 4 35 4 4 3 4 5 4 4 3 4 35

PAR70

City Park Golf Course:Feasibility Study Option 3

DRAFT

Page 27: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 3

Page 28: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 3

5-year storm (DRAFT)

Page 29: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 3

10-year storm (DRAFT)

Page 30: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

City Park Golf Course:Feasibility Study Option 3

100-year storm (DRAFT)

Page 31: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

153 trees impacted out of 872

Of the trees impacted, 47% of them are under 12” diameter and 5% of them are 36”+ diameter

Tree Impacts: Option 1

DRAFT

Page 32: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Tree Impacts: Option 2

280 trees impacted out of 872

Of the trees impacted, 49% of them are under 12” diameter and 4% of them are 36”+ diameter

DRAFT

Page 33: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Tree Impacts: Option 3

246 trees impacted out of 872

Of the trees impacted, 49% of them are under 12” diameter and 5% of them are 36”+ diameter

DRAFT

Page 34: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Cole Detention City Park Golf Course Detention

Two Detention Location Options

Page 35: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Areas of Reduced Flooding

Page 36: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

PARK HILL BASIN

Page 37: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Park Hill Detention

38

Page 38: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Park Hill Detention

39

Page 39: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Alternative Pipe Alignments

40

Page 40: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

GLOBEVILLE LANDING OUTFALL

Page 41: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Globeville Landing Outfall

42

Page 42: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Globeville Landing Outfall

• New outfall (with existing)

• Natural open channel

• Incorporating water quality

• Opportunity to re-envision park and uses

Existing Outfall

New Outfall

Page 43: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

FUNDING, TIMING & NEXT STEPS

Page 44: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Funding for Citywide Stormwater Projects

• Denver pays for stormwater and drainage projects through wastewater fees and through partnerships when feasible

• Four types of stormwater projects:– Citywide storm improvements– Major basin projects– Urban waterways (gulches)– Water quality

• Over the last 20 years, Denver has only had 2 stormwater rate increases

• City Council is scheduled to hear full proposal for rate increase in spring 2016

Page 45: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Funding for Platte to Park Hill

• Platte to Park Hill: Stormwater Systems will be one of many projects paid for through wastewater fees

• Other funding partners may include:– Urban Drainage and Flood Control District– CDOT– RTD

Page 46: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Overall Timeline

Fall/ Winter 2015 Spring 2016 Summer/Fall 2016 Late 2016 2017 2018 2019

Montclair/Park Hill Basin Conceptual Planning

Montclair/Park Hill Preliminary Design

Montclair/Park Hill Basin operational

Globeville Landing Outfall Construction

Montclair/Park Hill Basin Construction

Globeville Landing Outfall operational

Globeville Landing Outfall Conceptual Planning and Preliminary Design

Page 47: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Preliminary Construction Timeline

• Globeville Landing Outfall construction– Begin 2016, complete by 2017

• Open Channel– Begin 2017, complete by 2018

• Cole or City Park Golf Course Detention construction– Begin 2017, complete by 2018

• Park Hill Detention & Pipe construction– Begin 2018, complete 2019

Page 48: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Next Steps

• Extending the public comment window

• Ramping up community outreach between now and the selection of the preferred optiono Project updates, website, small community

meetings

• Further refinement of the draft options based on additional input

• Announcement of preferred option in early April

Page 49: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

ADDITIONALINFORMATION

Page 50: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

2014 Storm Drainage Master Plan

• Citywide planning tool that identifies basic stormwater needs

• Master Plan identifies and prioritizes projects, which consist of pipes that meet 5-year storm criteria

• Platte to Park Hill was not included in the master plan because it solves the 100-year event

• Modeling for Platte to Park Hill area indicated a need to consider higher level of criteria (100-year) due to high flood risk

Page 51: Platte to Park Hill: Stormwater Systems · • Project Need • Open Channel • Detention Options (Cole, City Park Golf Course) • Park Hill Detention • Globeville Landing Outfall

Thank YouVisit the project website at:

http://denvergov.org/PlattetoParkHill