ple-02 vsl brian lim

22
PRESTRESSED CONCRETE DESIGN AND CONSTRUCTION: A STATE OF THE ART REPORT ASEP SUMMIT 2012 JUNE 0809, 2012 BRIAN LIM BRIAN LIM SENIOR BUSINESS DEVELOPMENT MANAGER SENIOR BUSINESS DEVELOPMENT MANAGER VSL HONG KONG LIMITED VSL HONG KONG LIMITED ASEP SUMMIT 2012 June 08-09, 2012 Regalia Tower Hotel Suites, Cubao, Quezon City 2 OBJECTIVES Recent developments in national codes, construction material and emphasis on sustainable construction, have led to a significant departure in the way we design and construct prestressed concrete structures. In this paper, a state of the art prestressed concrete design and construction of buildings, bridges and special structures will be examined. ASEP SUMMIT 2012 June 08-09, 2012 Regalia Tower Hotel Suites, Cubao, Quezon City Gateway Bridge, Australia Structural concrete has seen an extraordinary development and has become the material of choice for structures. Significant progress through continuous innovation ASEP SUMMIT 2012 June 08-09, 2012 Regalia Tower Hotel Suites, Cubao, Quezon City GBS Platform, North Sea PT floors, Chile Success factors for concrete: Local availability of concrete materials Development of specific construction methods & specialised equipment Improved knowledge in design of structural concrete Availability of modern posttensioning technology LNG Tank, Spain ASEP SUMMIT 2012 June 08-09, 2012 Regalia Tower Hotel Suites, Cubao, Quezon City 5 1. Systems 2. Buildings 3. Bridges 4. Other Applications 5. New Developments and Applications PRESTRESSED CONCRETE ASEP SUMMIT 2012 June 08-09, 2012 Regalia Tower Hotel Suites, Cubao, Quezon City 6 1. Systems 2. Buildings 3. Bridges 4. Other Applications 5. New Developments and Applications PRESTRESSED CONCRETE

Upload: asep-summit

Post on 25-Oct-2014

72 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Ple-02 Vsl Brian Lim

1

PRESTRESSED CONCRETE DESIGN AND CONSTRUCTION: A STATE OF THE ART REPORTASEP SUMMIT 2012JUNE 08‐09, 2012

BRIAN LIMBRIAN LIMSENIOR BUSINESS DEVELOPMENT MANAGER SENIOR BUSINESS DEVELOPMENT MANAGER VSL HONG KONG LIMITEDVSL HONG KONG LIMITED

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

2

OBJECTIVES

Recent developments in national codes, construction material and emphasis on sustainable construction, have led to a significant departure in the way we design and construct prestressed concrete structures.

In this paper, a state of the art prestressed concrete design and construction of buildings, bridges and special structures will be examined. 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Gateway Bridge, Australia

Structural concrete has seen an extraordinary development and has become the material of choice for structures.Significant progress through continuous innovation 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

GBS Platform, North Sea PT floors, Chile

Success factors for concrete:‐ Local availability of concrete materials‐ Development of specific construction methods &specialised equipment‐ Improved knowledge in design of structural concrete ‐ Availability of modern post‐tensioning technology

LNG Tank, Spain

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

5

1. Systems2. Buildings3. Bridges4. Other Applications5. New Developments and Applications

PRESTRESSED CONCRETE

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

6

1. Systems2. Buildings3. Bridges4. Other Applications5. New Developments and Applications

PRESTRESSED CONCRETE

Page 2: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Strand Type:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Tendon Arrangement:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Stressing Anchorages:

Type CS Type SC

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Stressing Anchorages: Type GC

• ETAG013 Compliant for Static Load Test, Load Transfer Test and Fatigue Test.

• Will be approved by HK Highways this year.

• Replaces Type Sc, which complies to the superseded BS4447

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Type KC

Coupling Anchorages:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Type P

Non‐Stressing Anchorages:

Type H

Type AF

Systems:

Page 3: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Sheathing:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Type S

Stressing Anchorages:

Type VSLAB

S Series

S6‐1

S6‐2

S6‐3

S6‐4

S6‐5

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Type Bondtech                       Type S5‐2                   S5‐1, S6‐1

Stressing Anchorages:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Type SK Type H

Other Anchorages:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Individual Strand Stressing

Systems:

Page 4: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Multi‐Strand Stressing

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Systems:

Cable Stay System & Dampers

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Cable Stays SSI2000:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Cable Stays SSI2000:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Cable Stay Anchorages:

Systems:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Cable Stay Damper Assembly

Deck connector

Anti‐Vandalism Pipe(AVP)

Gensui Pad

Guide Pipe(GP)

GP bracket

Damper Support(DS)

Cable flange

Systems:

Page 5: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

25

1. Systems2. Buildings3. Bridges4. Other Applications5. New Developments and Applications

PRESTRESSED CONCRETE

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

1. Systems2. Buildings3. Bridges4. Other Structures5. New Developments

and Applications

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Examples of:

Long Span Structures

Grade A Offices

Commercial Buildings

Transfer Beams & Plates

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Hang Seng Bank:  PT Beams & RC Slab

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

900mm deep PT beams spanning 29.0m

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

During construction  Completed

Buildings:

Page 6: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Gateway II: Artist’s impression

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

10~12m span, 260mm flat slab w/ drops

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Typical floor tendon layout 

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Large cantilever span – 4.5m

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Three towers constructed at the same time

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Gateway II Completed

Buildings:

Page 7: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

One Island East

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Variable Floor Outline

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Typical Floor PT Layout

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Concreting in progress

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

One Island East:

• 70 storey building (60PT)

• 2,000m2 per floor

• 4/5‐day cycle

• Use of 

– VSL Climbform

– Mini tables and

– Safety screens

Buildings:

Page 8: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Macao Yaohan: PT band beams with 230mm slab 

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

During Construction                                        Completed

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Artist’s Impression

Venetian Cotai, Macau, Parcel 1

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Artist’s Impression

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Precast Construction: 20 x 20 m bay

Buildings:

Page 9: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Example: Level 3 (20 x 20 m Grid)

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

During Construction

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Completed (Right) 

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Transfer Beams

Festival Walk, Kowloon Tong

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

PT Transfer Beams: 4.5m deep x 46m span

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Transfer Plates

• Transfer of high concentrated forces

• Thick plates or beams with high rebar content

• Shear Controlled

Buildings:

Page 10: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Arrangement of Load Bearing Wall & Columns

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Layered Construction

Stage 1: Casting 1st layer (~ 1/3 d)Stressing bottom tendons

Stage 2: Casting remaining plate(supported by 1st layer)

Stage 3: Stressing middle and top tendons

Stage 4: Construction of floors above can proceed

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

0

20

40

60

80

100

120

Concrete Rebars Fmwk Cost

RC

PT

MATERIAL & COST COMPARISONPT VS RC TRANSFER PLATE

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Transfer Plates in Hong Kong

0

5

10

15

20

25

30

35

40

45

88-89 90-91 92-93 94-95 96-97 98-99 00-01 02-03 04-05 06-07 08-09 10-11

Year

Nu

mb

er o

f P

late

s

Design

Completed

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Concrete

0%

20%

40%

60%

80%

100%

120%

RC PC

Reinforcement

0%

20%

40%

60%

80%

100%

120%

RC PC

PT floors help to reduce material handling and labour

Note: Reductions• Concrete: ‐20%• Reinforcement: ‐ 65%• Labour: ‐ 60% Sustainability

Buildings:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

95.3129.9Total CO2 emission 

3.00

PT steelRC = 0PC = 5 kg / m2

8.324.8

Reinforcing steelRC = 42 kg / m2

PC = 14 kg / m2

84.0  105.1  

Concrete (300kg cement / m3)RC = 0.35 m3 / m2

PC = 0.28 m3 / m2

PC(kg CO2 / m

2)RC

(kg CO2 / m2)

Materials and quantities

CO2 emission for building floor:

PT offers 27% reduction in CO2 emission in floors!

Buildings:

Page 11: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

61

1. Systems2. Buildings3. Bridges4. Other Applications5. New Developments and Applications

PRESTRESSED CONCRETE

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Standard Bridges: Cast‐in‐place post‐tensioned box girders

Colorado, USA

Bridges

In‐situ post‐tensioned construction

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

In‐situ construction (form‐traveller method)

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

In‐situ construction (form‐traveller method)

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Precast Beam construction (with O/H Gantry)

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Bridges

Precast Beam construction (with O/H Gantry)

Page 12: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Savings in formwork and scaffolding and improved aesthetics favour precast segmental construction

Precast segmental bridges

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Balanced cantilever construction (with O/H Gantry)

Span‐by‐span construction (with O/H Gantry)

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Balanced cantilever construction (with Lifting frames)

Span‐by‐span construction (with crawler cranes)

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Precast segmental bridges

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Large‐scale projects became feasible through introduction of precast segmental construction

Dallas High Five Interchange, USA

Precast segmental bridges

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

West Rail project, Hong Kong 13.5km of viaduct 658 spans of 35 to 44m  9400 segments 3500 t internal pt

From highway applications to light rail applicationsPrecast segmental bridges

Bridges

Page 13: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Avignon viaducts, France  1.5km of twin viaduct Spans of 100m and 50m  Precast segmental deck Internal and external pt

…. to high-speed rail bridge applicationsPrecast segmental bridges

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Cable Stays for all Climatic Conditions

Cable stay bridges

Bridges

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

75

1. Systems2. Buildings3. Bridges4. Other Structures5. New Developments and Applications

PRESTRESSED CONCRETE

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Union Square, Hong Kong

PT Transfer Plates

PT Out‐Rigger 

VSL AF6‐31

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

ELEVATIONPLAN

International Commerce Center (ICC), Hong Kong

Prestressed Out-Riggers

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

IR Sands, Singapore

Vertical Prestressing

Other Applications: 

Page 14: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

34 storey leaning tower (18 degrees). Vertical tendons in building core to control leaning of tower (> tower of Pisa). 

ABU DHABI, Capital Gate Tower

Vertical Prestressing

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Harbour Side, Union Square K11, Hanoi Road, TST

Vertical Prestressing

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Cable‐Stayed Roof

Alamo Dome StadiumTexas, USA

Borlmage, Sweden

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Thermal Storage Reservoir (14m high x 33m dia)Texas, USA

Silos and Tanks

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Monostrand post‐tensioning for roof (33 m diameter)

Silos and Tanks

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Horizontal & vertical prestressing in walls (355 mm thick)

Silos and Tanks

Other Applications: 

Page 15: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Egg‐Shaped Digestors, Singapore

Silos and Tanks

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Circumferential Prestressing

Silos and Tanks

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Omeshi Nuclear Plant, Kansai Electric Power, Japan

Nuclear Containment Vessel (PCCV)

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Off‐Shore Structures

Olje Hedrun GBS

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Skirts and lower domes under construction in dry dock.

Troll Gravity Base Offshore Platform

Off‐Shore Structures

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Platform legs completed and ready to being sunk and towed out

Off‐Shore Structures

Other Applications: 

Page 16: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Dimensions : 220 m x 46 m x 16 mDisplacement : 107,000 tons

N’KOSSA‐CONGO Barge

Off‐Shore Structures

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

N’KOSSA‐CONGO Barge

Off‐Shore Structures

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Quantities: 26,400 m3  HPC,4,700 tons Reinf2,700 tons PT

N’KOSSA‐CONGO Barge

Off‐Shore Structures

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

N’KOSSA‐CONGO Barge – towed out

Off‐Shore Structures

Other Applications: 

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

95

1. Systems2. Buildings3. Bridges4. Other Structures5. New Developments and Applications

PRESTRESSED CONCRETE

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

CONTENTS:

(1)MATERIALS

Concrete 

(2)TECHNOLOGIES

PT SYSTEMS

DAMPING DEVICES

New Developments and Applications

Page 17: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Strength of construction materials has evolved over last 20‐30 years, mainly for concrete

N.B.: Prestressing steel may see increase to 2160MPa soon

Evolution of material strengths

0

500

1000

1500

2000

Structural steel Reinforcing steel Prestressing steel Concrete

Str

en

gth

s (

MP

a)

1980

2000

30200

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Development of:

High‐Strength, High‐Performance Concrete

Ultra‐High Strength Fibre Reinforced Concrete (UHPC)  very low water content, small aggregates with high packing density, large amounts of relatively short fibres (≥ 2% of volume, 10‐20mm long)

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Ductal®-FM 300 MPa 150 - 180 MPa

Maximum Charact ValueCompressive strength

0

20

40

60

80

100

120

140

160

180

200

220

0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6 1,8 2

Strain in %

Com

pres

sive

str

ess

in M

Pa

Ordinary concrete

Ductal

Compression test

®

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Porosity

Low total porosity in range of nano-meters (10-9 m)

Cu

mu

late

d p

oro

sity

of

the

ma

trix

(in

%)

Diameter of pores (nm)

1 10 100 1µm2 3 5 20 50 200

Micro-pores Capillary

C30

C60

C100FSDuctal®

50

40

30

20

10

0

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Applications – Pedestrian bridges

Seonyu / Seoul, Korea

Sherbrooke, Canada Auckland, New Zealand

Sakata Mirai, Japan

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Several highway bridges were built in Australia, Japan, France, USA

GSE Bridge, Haneda Airport Tokyo (2008)

Shepherds Creek bridge, Australia (2004)

New Developments and Applications

Applications – Highway bridges

Page 18: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

• Haneda International Airport extension, Tokyo Japan

• One third of runway is built on steel jackets with composite 

steel‐concrete deck made of HPC and UHPC precast panels

Durability & 55% weight saving the winning UHPC arguments

Applications – Haneda International Airport, Tokyo

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

104

• Fabrication 7000 pretensionedslabs; size 3.8 x 7.8m, total 22’000m3

• 55% weight savings due to use of Ductal®

Applications – Haneda International Airport, Tokyo

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Applications – Protection

UHPC panels as linings to protect pile caps, exposed areas of piers, and tunnels(examples from Japan)

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

CONTENTS:

(1)MATERIALS

Concrete 

(2)TECHNOLOGIES

PT SYSTEMS

DAMPING DEVICES

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Approval of PT systems (ETA)

European Approval and Certification scheme ensure that all systems offered on market satisfy essential criteria specified in ETAG013 and have continuous surveillance (FPC and independent audits) 

Initial assessment and approval of PT system

by AB

Attestation of 

Conformityby CB

Continuous Surveillance(FPC and

control by CB)

Renewal of Certificate of Conformity after 5 years

This concept is considered preferrable over project specific assessment by engineerRef: Guideline for European Technical Approval of PT Kits (ETAG013) 

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Page 19: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Qualification of PT company and personnel

PT works shall be carried out by PT specialist companies who have qualified and trained personnel and supervisors / managers Ref: CWA 14646, FIP Recommendations (1996) 

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Corrosion protection of tendons must be a key consideration in design of any PT structure

fib/IABSE workshops in Ghent and Zurich

fib Bulletin 33 provides recommendations for corrosion protection of tendons

Ynys‐Y‐Gwas Ynys‐Y‐Gwas

Corrosion protection

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Main problem is access of water with chlorides from the outside into the tendon (or water only if not fully grouted)

Hence, provide leak tight encapsulation to avoid ingress of water and chlorides where applicable

Problem: Access of Problem: Access of water to tendonwater to tendon

Grout voids with water: Corrosion Grout voids without water: No corrosion

Corrosion protection

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Proposal of three protection levels for PT tendons adapted to environment/exposure and structural protection : PL1, PL2 or PL3

PL2

PL3

PL1

Lo

wM

ed

ium

Hig

h

Ag

gre

ssiv

ity

/ E

xp

os

ure

LowMediumHighAction

Structural protection layersStructuralProtection

Corrosion protection

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

PL 1 PL 2

PL1: A duct and a filling material providing durable corrosion protection (metal duct, cement grout)

PL2: PL1 plus an envelope over full tendon length, leak tight barrier (plastic duct and cap)

Corrosion protection

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Rebar

PL3: PL2 plus integrity of tendon or encapsulation to be monitorable or inspectable at any time (e.g. EIT in acc. with Swiss Guidelines)

PL 3

ASTRA Guideline: Measures to ensure the durability of post-tensioning tendons in structures (2001, 2007)

Corrosion protection

New Developments and Applications

Page 20: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

EIT measuring : Alternating current – resistance measurement  High resistance = intact encapsulation

Corrosion protection

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

EIT Tendon  : Locating of defect with measurement of magnetic field

Sector A Sector B

i

Alternating current

Pavement

DEFECT

246810121416

Length [m]

Corrosion protection

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Grout:

• Corrosion protection of strands.

• Transfer of forces from strands to concrete.

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Grout Specifications

≥30MPa≥30MPaStrength at 28 days

Cube or cylinder

(50‐100mm)

≥27MPa≥20MPaStrength at 7 days

Plastic Cylinder (100‐200mm high)

≤ 2%≤ 2%Bleed

Plastic Cylinder (100‐200mm high)

‐1% to +5%‐2% to +5%Volume Change

Flow cone

(Dia 10 or 12.7mm)

≤ 25 sec.Flowability / Fluidity

Test MethodEN447FIP GuideProperty

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Standard Grout Tests :

Optimised Grout  Common Grout

Standard bleed test is able to identify which grout unstable.

Grout:

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Recommended Types of Testing

TESTS REASONS PROCEDURE

Initial testingof grout

confirmnew grout

Common: tests on sitespecial: optimisation

Approval testingof grout

approvenew grout

confirm grout complieswith requirements

Suitability testingof grout

compare testson site

and laboratory

flow time, bleed, shrinkage,expansion, strength

Quality controltest

control grouton site

local standard testsproject specifications

Full scale sitetesting

if requiredno void, no bleed,

no corrosionat high points

New Developments and Applications

Grout:

Page 21: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

New Grout Tests :• Wick‐Induced Test• Inclined Tube Test

Common Grout

Optimized Grout

New Developments and Applications

Grout:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Inclined Tube Test:

Common Grout

Optimised Grout

New Developments and Applications

Grout:

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Issue of protection of internal tendons in segment joints

Sealing of segment joints withepoxy resin and foam seal

Sealing plastic ducts across segment jointswith leak tight coupling device

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Innovative bridge deck structure for span range100‐200 m

Pakse Bridge, Laos (2000):Extradosed tendons exposed similarly to stay cables

Extradosed bridges

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Pakse Bridge, Laos (143 m extradosed span)

• Span range: 100 - 200 m• Girder depth at mid span:

Span/55• Girder depth at pier: Span/35• Height of pylon above deck:

span/12• ED tendon stress range: 20 -

50 MPa

Note: Continuous transition from segmental span into extradosed span

Extradosed bridges

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Ibigawa/Kisogawa Bridges in Japan Completion 2001 Designer: JBS Inst. Contractors: 4 JVs

New Developments and Applications

Extradosed bridges Extradosed composite bridges with 275 m main spans 

Page 22: Ple-02 Vsl Brian Lim

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Saddle offer simplified detailing of pylon, reduction of pylon dimensions, and savings in overall cost of pylon

Extradosed tendon specification:‐Max tendon stress 60% GUTS‐Max stress range 140MPa

Extradosed bridges

New Developments and Applications

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

128

Cable saddles with improved static, fatigue and friction performance with individual holes for each strand to comply with tendon performance

New Developments and Applications

Cable Saddles

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Through continuous innovations in structural concrete: materials, technologies and applications

Structural prestressed concrete will remain a material of choice for structures

Conclusions

ASEP SUMMIT 2012June 08-09, 2012Regalia Tower Hotel Suites, Cubao, Quezon City

Creating

Solutions

Together

The End