please comply with the lean construction institute’s usage

34
Please comply with the Lean Construction Institute’s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you.

Upload: others

Post on 09-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Please comply with the Lean Construction Institute’s Usage

Please comply with the Lean Construction Institute’s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf

when using this file. Thank you.

Page 2: Please comply with the Lean Construction Institute’s Usage

LEAN CONSTRUCTION

DEAN REED | DPR CONSTRUCTION, INC.

Opportunities | Concepts | Practices

| ,

LEAN CONSTRUCTION INSTITUTE CASCADIA CHAPTER INTRODUCTION TO LEAN DESIGN

© 2008 DPR CONSTRUCTION, INC.

INTRODUCTION TO LEAN DESIGNSEATTLE, WA | SEPTEMBER 15, 2008

Page 3: Please comply with the Lean Construction Institute’s Usage

THREE CONNECTED OPPORTUNITIES

IMPECCABLE COORDINATIONPREDICTABLE WORKFLOW

FREEING HUMAN CAPACITY TO FOCUS ON

INNOVATION & CONTINUOUS IMPROVEMENT

PROJECTS AS PRODUCTION SYSTEMSCHANGING THE STRUCTURE OF WORK

G COS & O S

PROJECTS AS COLLECTIVE ENTERPRISEALIGN FINANCIAL INCENTIVESMOVE MONEY ACROSS BOUNDARIESELEVATING COST & OTHER VALUES

TO DRIVE DESIGNMOVE MONEY ACROSS BOUNDARIESFOR PROJECT OPTIMIZATIONRATHER THAN TRADE OR SILO FOCUS

© 2008 DPR CONSTRUCTION, INC.

Page 4: Please comply with the Lean Construction Institute’s Usage

WHAT IS YOUR LEVEL OF AMBITION?

McDonough Holland & Allen PCAttorneys At Law | www.mhalaw.com

Page 5: Please comply with the Lean Construction Institute’s Usage

GOAL OF THE TOYOTA PRODUCTION SYSTEM

“To produce the right product at the right time in the right quantity for the right time in the right quantity for the customer and to produce exactly what you need and nothing more ”you need and nothing more…”.

Taiichi Ohnocreator of the Toyota Production System

© 2008 DPR CONSTRUCTION, INC.

Page 6: Please comply with the Lean Construction Institute’s Usage

WASTEAnything that Consumes Resources but Does Not Provide Value for the CustomerAnything that Consumes Resources but Does Not Provide Value for the Customer

1. Overproduction 2. Waiting 3. Inventory

4. Movement 7. Processing5. Effort 6. Rework of EErrors

Page 7: Please comply with the Lean Construction Institute’s Usage

WASTES IN CONSTRUCTION

Overproduction:– Putting as much work in place as possible, making it harder to do priority

work– Ordering additional material because of poor quality or fit

Waiting: for materials, direction, information or prerequisite workInventory: information or material delivered before it is neededMo ement i t i l f l t th b f i t lli itMovement: moving materials from one place to another before installing itEffort:– Returning to the shop to pick up plans, materials or tools not at the site– Hunting for information or toolsHunting for information or tools

Rework: re-doing work because of errorsProcessing:– Recreating work because it cannot be shared

U i– Unnecessary reporting– Expediting material not ordered in time– Excessive coordination of multiple levels of suppliers

© 2008 DPR CONSTRUCTION, INC.

Page 8: Please comply with the Lean Construction Institute’s Usage

LEAN THINKING

Eliminate waste through application of 5Eliminate waste through application of 5 principles

1 Id tif V l1. Identify Value2. Map the Value Stream3. Make value-creating steps flow4 At the pull of the customer4. At the pull of the customer5. Strive for perfection

J W k i L Thi ki g

© 2008 DPR CONSTRUCTION, INC.

James Womack in Lean Thinking

Page 9: Please comply with the Lean Construction Institute’s Usage

PRESIDENT OF TOYOTA NORTH AMERICA’S ADVICE ADVICE

Keep everything simpleMake it visibleMake it visibleTrust your people to do the right thing

Cited by Michael Kennedy in “Ready Set Dominate”

© 2008 DPR CONSTRUCTION, INC.

Page 10: Please comply with the Lean Construction Institute’s Usage

SUTTER HEALTH’S FIVE BIG IDEAS FOR LEAN PROJECT DELIVERYLEAN PROJECT DELIVERY

Collaborate, Really Collaborate

OptimizeThe Whole

IncreaseRelatedness

Projects asProjects as Networks ofCommitment

Tightly CoupleLearning w/ Action

© 2008 DPR CONSTRUCTION, INC.

Page 11: Please comply with the Lean Construction Institute’s Usage

LEAN PROJECT DELIVERY

Purposes DesignConcepts

ProductDesign

Fabrication& Logistics Commissioning Alteration &

Decommissioning

DesignCriteria

ProcessDesign

DetailedEngineering Installation

Operations & Maintenance

Project Definition

Lean Design Lean Supply Lean Assembly

Usey

Production ControlWork Structuring

© 2008 DPR CONSTRUCTION, INC.

LearningLoops

Page 12: Please comply with the Lean Construction Institute’s Usage

RBPDECPS

LPSCoordination Fork

Co-opetition Confluence

PDCA A3sLPS

A3 Thinking Fork

Blue Book

5 WhyA3 Thinking Fork

Blue Book

Lean Leadership Fork

TVDKaizen

Page 13: Please comply with the Lean Construction Institute’s Usage

Integrated TeamTarget Costing

Built in QualityThe Road to

UnderstandingWork Structuring

There

Network of Commitments Just Partnering

Integrated TeamUnderstanding Lean Construction

4

Last Planner System™

Just Design Build Contracting

g

O l Pl i S t

3

Last Planner System™

“I’m a Helpless Victim Of Fate”

Only a Planning System

2Just Manufacturing

Interdependence & Variability Just Risk Management

1 Current PracticeProduction System / Workflow

Road To NoExposure

HereOther Person’s Problem

Road To No Possibilities

pto Lean

Page 14: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 15: Please comply with the Lean Construction Institute’s Usage

LEAN CONSTRUCTION CONCEPTS & PRACTICES

Relational Contracts

Virtual Design &

C t ti

Set Based Design

Target Value

Contracts

Built-in Quality

Construction

Integrated Project

Standard

Value Design

Last

Quality Project Delivery

Work & Kaizen Work

Structuring

Last Planner

© 2008 DPR CONSTRUCTION, INC.

Page 16: Please comply with the Lean Construction Institute’s Usage

INTEGRATED PROJECT DELIVERY TEAM

Landscape DesignCivil Engineer Skin

OwnerTelecom

Structural EngineerC

Drywall

Architect

Structural Engineer

Mechanical Engineer

Concrete

SteelCM/GC PMArchitect

Electrical EngineerHVAC

CM/GC PM

ElectricalPlumbing

Fire Protection

Core Group

© 2008 DPR CONSTRUCTION, INC.

Page 17: Please comply with the Lean Construction Institute’s Usage

Real value is not the low bid on a higher cost design. It’s achieving g g gthe lowest true cost on the right design.g

Eric LambEVP, DPR Construction, Inc.EVP, DPR Construction, Inc.

© 2008 DPR CONSTRUCTION, INC.

Page 18: Please comply with the Lean Construction Institute’s Usage

TARGET VALUE DESIGN FEEDBACK LOOP

© 2008 DPR CONSTRUCTION, INC.

Page 19: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 20: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 21: Please comply with the Lean Construction Institute’s Usage

SMCCV Value Stream Mapping

© 2008 DPR CONSTRUCTION, INC.

Page 22: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 23: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 24: Please comply with the Lean Construction Institute’s Usage

RELATIONAL CONTRACTS

One Agreement signed by O-A-C

Integrated Project Delivery Team

“Joined” by jointly selected team members

OwnerNo separate “general conditions”Provides for formation of:Provides for formation of:– Core Group– Integrated Project Delivery Team

Architect Contractor

– Senior Management Group

Incentives for team performance

Core Group

Sr. Mgmt. Group

© 2008 DPR CONSTRUCTION, INC.

performance

Page 25: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 26: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 27: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 28: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 29: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 30: Please comply with the Lean Construction Institute’s Usage

TOYOTA PROVERB

Stop production so production Stop production so production never has to stop

© 2008 DPR CONSTRUCTION, INC.

Page 31: Please comply with the Lean Construction Institute’s Usage

© 2008 DPR CONSTRUCTION, INC.

Page 32: Please comply with the Lean Construction Institute’s Usage

BUILT-IN QUALITY CYCLE

© 2008 DPR CONSTRUCTION, INC.

Page 33: Please comply with the Lean Construction Institute’s Usage

ACT PLAN

DOCHECK DOCHECK

© 2008 DPR CONSTRUCTION, INC.

Page 34: Please comply with the Lean Construction Institute’s Usage

THREE CONNECTED OPPORTUNITIES

IMPECCABLE COORDINATIONPREDICTABLE WORKFLOW

G C CFREEING HUMAN CAPACITY TO FOCUS ON

INNOVATION & CONTINUOUS IMPROVEMENT

PROJECTS AS PRODUCTION SYSTEMSCHANGING THE STRUCTURE OF WORKELEVATING COST & OTHER VALUES

PROJECTS AS COLLECTIVE ENTERPRISEALIGN FINANCIAL INCENTIVESMOVE MONEY ACROSS BOUNDARIESELEVATING COST & OTHER VALUES

TO DRIVE DESIGNMOVE MONEY ACROSS BOUNDARIESFOR PROJECT OPTIMIZATIONRATHER THAN TRADE OR SILO FOCUS

© 2008 DPR CONSTRUCTION, INC.