pm check liststp
TRANSCRIPT
-
8/2/2019 PM Check ListsTP
1/40
1 MSW002 EES MHUB SAHIWAL SAHIWAL
2 MSW014 EES HUB SAHIWAL SAHIWAL
3 MSWE01 EES MHUB SAHIWAL SAHIWAL
4 MSHR95 EES HUB JHANG FSD
5 MSHR96 EES MHUB JHANG FSD
6 MAWR32 EES BTS SAHIWAL SAHIWAL
7 MAWR39 EES BTS SAHIWAL SAHIWAL
8 MAWR41 EES BTS SAHIWAL SAHIWAL
9 MSPR27 EES BTS JHANG FSD10 MSPR21 EES MHUB JHANG FSD
11 MSPR31 EES BTS JHANG FSD
12 MMGR58 EES MHUB SARGODHA FSD
13 MBUW01 EES MHUB SARGODHA FSD
14 MBUW02 EES BTS SARGODHA FSD
15 MABR20 EES BTS SAHIWAL SAHIWAL
16 MABR17 EES BTS SAHIWAL SAHIWAL
17 MABR21 EES BTS SAHIWAL SAHIWAL
18 MHRR12 EES BTS SAHIWAL SAHIWAL
19 MMTR81 EES MHUB SAHIWAL SAHIWAL
20 MHR001 EES HUB SAHIWAL SAHIWAL21 MSHR98 EES BTS JHANG FSD
22 MTB001 EES HUB JHANG FSD
23 MTB007 EES BTS JHANG FSD
24 MBK003 EES BTS SARGODHA FSD
25 MBK004 EES BTS SARGODHA FSD
26 MBK001 EES BTS SARGODHA FSD
S.No Site ID
Domain
(EES ,
Enercom)
Site Type BSCRegion LHR,
FSD, GJW
-
8/2/2019 PM Check ListsTP
2/40
6-Apr-12 6-Apr-12 MAZHAR 78749
6-Apr-12 6-Apr-12 MAZHAR 78749
7-Apr-12 6-Apr-12 MAZHAR 78749
6-Apr-12 6-Apr-12 MEHTAB AHMED 78749
6-Apr-12 6-Apr-12 MEHTAB AHMED 78749
8-Apr-12 7-Apr-12 MAZHAR 78749
9-Apr-12 7-Apr-12 MAZHAR 78749
10-Apr-12 7-Apr-12 MAZHAR 78749
13-Apr-12 7-Apr-12 MEHTAB AHMED 78749
12-Apr-12 7-Apr-12 MEHTAB AHMED 78749
13-Apr-12 7-Apr-12 MEHTAB AHMED 78749
22-Apr-12 7-Apr-12 SHAHZAD 78749
28-Apr-12 7-Apr-12 SHAHZAD 78749
28-Apr-12 7-Apr-12 SHAHZAD 78749
7-Apr-12 8-Apr-12 MAZHAR 78749
6-Apr-12 8-Apr-12 MAZHAR 78749
7-Apr-12 8-Apr-12 MAZHAR 78749
12-Apr-12 10-Apr-12 MAZHAR 78749
15-Apr-12 10-Apr-12 MAZHAR 78749
13-Apr-12 10-Apr-12 MAZHAR 787497-Apr-12 10-Apr-12 MEHTAB AHMED 78749
13-Apr-12 10-Apr-12 MEHTAB AHMED 78749
15-Apr-12 10-Apr-12 MEHTAB AHMED 78749
24-Apr-12 10-Apr-12 SHAHZAD 78749
24-Apr-12 10-Apr-12 SHAHZAD 78749
23-Apr-12 10-Apr-12 SHAHZAD 78749
PM Plan Date PM Visit Date Team Name WO # Site Time in
-
8/2/2019 PM Check ListsTP
3/40
Tower Check
M.LAIQAT 3414598818
M.AYOOB 3414598797
QASHIF 347911255
RAZWAN 3474911252
M.ANWER
M.ANWER 3414598764
FARAZ 3474911148
AHAD 3474911134
FAZAL ABBAS 3474911189
NIAZ 3036484912
ALI 3474911419
SADDIQ 3424658322
AMDAD ALI 3427162698
M.YASEEN 3414598782
M.ASFAHQ 3414598772
GALAM FAREED 3414598789
M.AMIN 3414598749
ABUBAKER 3414598784SHOUKAT 3414597970
FEIAZ 3414597963
SAJAD 3414597954
RIAZ 3474911429
ASLAM KHAN 3008051954
HAGI RAMZAN 3448025639
Site Time out Guard Cell #Guard Name
-
8/2/2019 PM Check ListsTP
4/40
Major-No marks of
erosion on the ground
around the guy anchors
Major-No standing
water around the guy
anchors
Major-Condition of
groundings of the guys
(Tower)
Painting &
Galvanization
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OKOK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
Tower guys and anchors
-
8/2/2019 PM Check ListsTP
5/40
Fixing and condition of
the climbing ladders and
safety rail/wire
Fixing and condition of
the rest/working
platforms
Condition of tower
painting or galvanization
(value in micron meter /
Alco meter)
Aviation Lamp
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OKOK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
Painting & Galvanization
-
8/2/2019 PM Check ListsTP
6/40
Condition and fixing of
the aviation lamp(s) and
fittings along with wire
(Repair and replacement)
Condition and fixing of
Solar switch (Repair or
replace)
Major-Condition and
fixing of cable and Alarm
module / card (Repair and
replacement)
Lightning
protection
REPLACE OK OK
OK OK NOK
NA NA NA
OK OK OK
OK OK OK
REPLACE OK OK
OK OK NOK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
REPAIR OK OK
REPAIR OK OKOK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
Aviation lamp
-
8/2/2019 PM Check ListsTP
7/40
Condition and fixing
of lightning arrestors
Major-Condition & fixing
of grounding of the
lightning arrestors
(measuring)
BTSNumber of BTS
Cabinets
OK OK 1
OK OK 1
OK OK NA
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 2
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
OK OK 1
Lightning protection
-
8/2/2019 PM Check ListsTP
8/40
Major-Condition of
cover, doors, hinges and
locks (lubricate if
required)
Condition of
cabinet caskets
No evidence of
water leaks
Tightness of
connectors
(7/16, SMB),
hand check.
Major-All plug-in
units and
dummy panels
fixed, screws
present andtightened
OK OK OK OK OK
OK OK OK OK OK
NA NA NA NA NA
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OKOK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
INDOOR AND OUTDOOR BTS CABINE
-
8/2/2019 PM Check ListsTP
9/40
Major-Doors
ground straps fixed
properly
Major-All plug-in
units are working
(visual check,
lights, alarms)
Cleaneless of
cabinet, also
no leftovers
inside
Major-Condition
of fans (no
strange noise)
Major-
Condition of
HEX units
Major-Access
to the cabinets
is free
OK OK OK OK OK OK
OK OK OK OK OK OK
NA NA NA NA NA NA
OK OK OK NA NA OK
OK OK OK NA NA OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK NA NA OK
OK OK OK NA NA OK
OK OK OK NA NA OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OKOK OK OK NA NA OK
OK OK OK NA NA OK
OK OK OK NA NA OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
TELE'S INTERNAL CHECK
-
8/2/2019 PM Check ListsTP
10/40
Condition and
cleaneless of
cabinets (also
painting)
Major-Access
to the tower is
free without
obstructions
(vegetation,etc.)
RECTFIERNo of Rectifier
Cabinets
Condition of
cover, doors,
hinges and
locks (lubricate
if required)
Condition of
cabinet
caskets
OK OK 1 OK OK
OK OK 1 OK OK
NA NA 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 2 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 2 OK OK
OK OK 1 OK OKOK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OK OK 1 OK OK
OUTDOOR
OMMUNICATION
-
8/2/2019 PM Check ListsTP
11/40
No evidence
of water leaks
Major-All
plug-in units
are working
(visual check,
lights)
Cleaneless of
cabinet, also no
leftovers inside
Condition of fans (no
strange noise)
Condition of air
filter
Major-Rectifier
alarms
OK OK OK NA NA OK
OK OK OK OK OK OK
OK OK OK NA NA OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
RECTI
-
8/2/2019 PM Check ListsTP
12/40
Check phase
loads
Voltage and
current
calibration
between rectifier
module andcontroller card
Condition of
groundingsType of Rectifier Modules
Number of
Rectifier Modules
installed
OK OK ELTEK 3
OK OK POWER ONE 3
OK OK POWER ONE 2
32a OK ELTEK 4
27A OK DELTA 3
OK OK ELTEK 4
OK OK POWER ONE 3
OK OK ELTEK 3
24A OK POWERONE 2
35A OK DELTA/ELTEK 3+2
23A OK DELTA 3
OK OK DELTA 3
OK OK POWER ONE 3
OK OK POWER ONE 4
OK OK ELTEK 4
OK OK POWER ONE 5
OK OK ELTEK 3
OK OK POWER ONE 2
OK OK DELTA+POWER ONE 3+2
OK OK DELTA 331A OK DELTA 3
38A OK ELTEK 3
23A OK POWERONE 2
OK OK POWER ONE 5
OK OK POWER ONE 6
OK OK ELTEK 6
IER CABINET'S INTERNAL CHECK,
-
8/2/2019 PM Check ListsTP
13/40
Number of
Rectifier Modules
Faulty and fixing if
available
Number of
Surge Arresters
Faulty and if
available
Condition and
fixing of MCU /
Display Module
(In case of fault
LVLD and LVBDwill not operate)
BackPlane
Slots Faulty
Out of 8
(Visual check
only)
Nuetral-Ground AC
Volt(Value to be
measured)
0 4 OK OK OK
0 0 OK OK OK
0 0 OK OK OK
0 0 OK OK OK
1 0 OK OK OK
0 0 OK OK OK
0 0 OK OK OK
0 2 OK OK OK
0 0 OK OK OK
1 0 OK OK OK
0 0 OK OK OK
0 OK OK OK OK
1 OK OK OK OK
1 OK OK OK OK
0 2 OK OK OK
0 0 OK OK OK
0 2 OK OK OK
0 0 NOK OK OK
0 0 OK OK OK
0 0 OK OK OK0 0 OK OK OK
0 3 OK OK OK
2 0 OK OK OK
0 OK OK OK OK
1 OK OK OK OK
0 OK OK OK OK
-
8/2/2019 PM Check ListsTP
14/40
GSM
ANTENNAMajor-Fixing and condition
of all cables
Condition of all
cable groundings
Condition of all
cable sealing
(grounding kits,
connectors)
All cables are
labelled
OK OK OK OK
OK OK OK OK
NA NA NA NA
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OKOK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
ANTENNAS AND ANTENNA LINES
-
8/2/2019 PM Check ListsTP
15/40
There is no any new
obstruction in front of the
GSM antenna (also not new
building construction site)
All connectors
are properly
waterproofed
CABLES
LADDERS
Fixing and
condition of cable
covers
OK OK OK
OK OK OK
NA NA OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OKOK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
HECKOUTDOOR
DUCTS AN
-
8/2/2019 PM Check ListsTP
16/40
Condition of all
cable groundings
Condition of all
cable sealings
(grounding kits,
connectors)
GROUNDING
SYSTEM
Condition and fixing
of all outdoor
grounding bar(s)
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OKOK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
ABLE LADDERS, CABLE
COVERS, CABLES ANDOUTD
-
8/2/2019 PM Check ListsTP
17/40
Condition and fixing of
all grounding cables
Condition and
fixing of all
earthing strips
(corrosion, etc.)
Condition of all
grounding
connections
(corrosion, etc.)
Condition of
earthing pits
Measurement of site
grounding system
(periodically depending on
site classification)
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OKOK OK OK OK ok
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OR GROUNDING SYSTEM CHECK (Would report only in case of Outstandi
-
8/2/2019 PM Check ListsTP
18/40
Corrision
checkALARMS
Rectifier Minor
{7401}
Rectifier
major{7402}
Ac power
fuilure
{7403}
Low
battery
voltage
{7404}
Distribution
breaker / HEX
fan {7405}
OK OK OK OK OK OK
OK OK OK OK OK OK
OK NA NA NA NA NA
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK NOK NOK NOK NOK NOK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
g) E
-
8/2/2019 PM Check ListsTP
19/40
Battery Alarm
{7406}
Genset
runnging
{7407}
OB-light
{7408}
Low fuel
{7409}
Gem Active
{7410}High temp {7411}
OK OK OK OK NA OK
OK OK NOK NOK NA OK
NA NA NA NA NA NA
OK OK OK OK NA OK
OK OK OK OK NA OK
OK OK NOK NOK NA OK
NOK OK OK NOK OK NOK
OK OK OK OK NA OK
OK OK OK OK NOK OK
OK OK OK OK NA OK
OK OK OK OK ok OK
OK OK OK OK NA OK
OK OK OK OK NA OK
NA OK OK OK NA NA
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK NA OK
OK OK NOK NOK OK OKOK OK OK OK NA OK
OK OK OK OK NA OK
OK OK OK OK ok OK
OK OK OK OK NA OK
OK NA OK OK NA NA
NA OK OK OK NA NA
ternal Alarm Test
-
8/2/2019 PM Check ListsTP
20/40
Battery CheckBattery
physical
condition
Battery
Health
testing
(Identify the
life in Moha)
Identify &
Replace the
problematic
cell
Battery breakers turned
on
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK GLO
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OKOK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK GLO
OK OK OK GLO
-
8/2/2019 PM Check ListsTP
21/40
Battery
connections and
cable routing
check
Battery bank
Brand
No. of battery
banks
Battery back-up
test
Check the voltage
at terminals
OK NARADA 2 OK OK
OK POWER SAFE 2 OK OK
OK NARADA 4 OK OK
OK NARADA 2 OK OK
OK POWERSAFE 2 OK OK
OK POWER SAFE 2 OK OK
OK POWER SAFE 2 OK OK
OK NARADA 1 OK OK
OK POWERSAFE 2 OK OK
OK WERSAFE/NARA 2+1 OK OK
OK POWERSAFE 2 OK OK
OK POWERSAFE 2 OK OK
OK BSB 2 OK OK
OK GLO GLO GLO OK
OK HAZE 2 AFTER 10 MIN 47.5V OK
OK GLO SITE 0 OK OK
OK NARADA 2 OK OK
OK POWER SAFE 2 OK OK
OK SB+POWER SAF 2+1 OK OK
OK BSB 1 OK OKOK POWERSAFE 2 OK OK
OK NARADA 2 OK OK
OK WERSAFE/NARA 2 OK OK
OK RADA+POWERS 2 OK OK
GLO GLO GLO GLO OK
GLO GLO GLO GLO OK
Battery Check
-
8/2/2019 PM Check ListsTP
22/40
Battery
connections
greasing
Condition and
location of
temperature
sensor
Conduites of each
cellMW Check
ODU (Physical
health check)
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK NOK OK
OK OK OK OKOK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
Ra
-
8/2/2019 PM Check ListsTP
23/40
IDU (Physical
health check)
Receiving Level
(RSL)Visual Inspection
Side arm sport for
1.2m & 1.8m
Firmly
Tightened
Antenna
Assembly.
OK -38 OK OK OK
OK -39 OK OK OK
OK -38 OK OK OK
OK 39 OK OK OK
OK 37 OK OK OK
OK -40 OK OK OK
OK -39 OK OK OK
OK 40.5 OK OK OK
OK 40 OK OK OK
OK 37 OK OK OK
OK NA NA NA NA
OK -39 OK OK OK
OK -39 OK OK OK
OK -39 OK OK OK
OK 37.14 OK OK OK
OK 39 OK OK OK
OK 39 OK OK OK
OK 35 OK OK OK
OK 37 OK OK OK
OK 36 OK OK OKOK 37 OK OK OK
OK 39 OK OK OK
OK 40 OK OK OK
OK -39 OK OK OK
OK -38 OK OK OK
OK -37 OK OK OK
io Antenna
-
8/2/2019 PM Check ListsTP
24/40
Rust Visual
Are all nut-bolts
Firmly
Tightened?
Rust
IF Firmly
connected to
the earth bar?
IF Firmly
connected to
the ODU?
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
NA NA NA NA OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
Bracket
-
8/2/2019 PM Check ListsTP
25/40
IF cable Water
proof
arrangement.
IF Cable proper
tieup
IF cable
connector
Traffic cable
connector
Alarm cable
connector
Service Channel
Cable to DDF
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
Cable
-
8/2/2019 PM Check ListsTP
26/40
DDF
Power
supply
cable and
connector
Circuit
Breakers
Installed as per
Equipment
Standards.
Breakers' LabellingIs Updated DDF Plan
available on site?
Correct distance
between GSM
antenna and
microwave dish (if
changes made)
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK NA
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK O
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OKOK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK O
POWER SYSTEM
-
8/2/2019 PM Check ListsTP
27/40
Condition &
Fixing of
weatherproofing
s of all
connectors
Condition & Fixing of OU
groundings
No evidence of
corrosion on
any part of the
steelwork or
fasteners
Major-Visual check & fix
of antena mounting for
any dislocating or loose
clamping
SITE OVER
ALL CHECK
NA OK OK OK
NA OK OK OK
NA OK OK OK
OK OK OK OK
OK OK OK OK
NA OK OK OK
NA OK OK OK
OK NA OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK NA OK OK
OK NA OK OK
OK NA OK OK
OK NA OK OK
OK NA OK OK
OK NA OK OKOK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
OK OK OK OK
Over All MW Check
-
8/2/2019 PM Check ListsTP
28/40
Major-Access to the site is
clear and secure without
obstructions (vegetation,
water, etc.)
Major-No
standing
water on the
site
Major-Condition
and fixing of the
entrance gate (also
lock and hinges,
lubricate ifrequired)
Condition of
site outdoor
lights
Site logbook is on it's
place and properly
kept (clean and filled)
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OKOK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
Site over all Check
-
8/2/2019 PM Check ListsTP
29/40
Guard is present
and employable (if
guarded site)REMARKS/Pending issues
OK
OK OB LIGHT CARD FAULTY.
OK
OK FIER FIGHTING EMPTEY
OK FIER FIGHTING EMPTEY
OK OB LIGHT CARD FAULTY.
OK MCU+ALARM CARD FAULTY.
OK
OK OK
OK COCREATLEWEL DOWN
OK FIRE FIGHTING EMPTEY
OK
OK
OK
OK
OK CIVIL WORK REQUAIRED.
OK
OK MCU FAULTY.
OK
OK CIVIL WORK REQUAIRED.OK FIRE FIGHTING EMPTEY
OK FIRE FIGHTING EMPTEY
OK FIRE FIGHTING EMPTEY
OK
OK
OK
-
8/2/2019 PM Check ListsTP
30/40
ODU (Physical
health check)
1 MSW002 MHUB 6-Apr-12 MAZHAR OK2 MSW014 HUB 6-Apr-12 MAZHAR OK
3 MSHR95 HUB 6-Apr-12 MEHTAB AHMED OK
4 MSHR96 MHUB 6-Apr-12 MEHTAB AHMED OK
5 MAWR32 HUB 7-Apr-12 MAZHAR OK
6 MSPR21 MHUB 7-Apr-12 MEHTAB AHMED OK
7 MSPR31 BTS 7-Apr-12 MEHTAB AHMED OK
8 MMGR58 MHUB 7-Apr-12 SHAHZAD OK
9 MBUW01 MHUB 7-Apr-12 SHAHZAD OK
10 MHR001 HUB 10-Apr-12 MAZHAR OK
11 MMTR81 MHUB 10-Apr-12 MAZHAR OK
12 MSHR98 BTS 10-Apr-12 MEHTAB AHMED OK
13 MBK003 MHUB 10-Apr-12 SHAHZAD OK
14 MBK004 MHUB 10-Apr-12 SHAHZAD OK
S.No Hope ID Date Team NameType
R
-
8/2/2019 PM Check ListsTP
31/40
IDU (Physical health
check)
ODU primary
power supply
Transmitter
Power (TX)
Receiving Level
(RSL)
Configuration
Setting in case
(1+1)
Visual
Inspection
OK OK 18 39 OK OKOK OK 17 -41 OK OK
OK OK 16 35 OK OK
OK OK 23 36 OK OK
OK OK 18 -39 OK OK
OK OK 14 42 OK OK
OK OK 21 39 NA OK
OK OK 18 -39 OK OK
OK OK 17 -39 OK OK
OK OK 19 40.87 OK OK
OK OK 19 -37.38 OK OK
OK OK 18 37 NA OK
OK OK 18 -39 OK OK
OK OK 17 -38 OK OK
dio IDU Through LCT
-
8/2/2019 PM Check ListsTP
32/40
Side arm
sport for
1.2m & 1.8m
Antenna
Labeling
Firmly
Tightened
Antenna
Assembly.
Rust Visual
Are all nut-bolts
Firmly
Tightened?
NA OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
NA OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
Antenna Bra
-
8/2/2019 PM Check ListsTP
33/40
Rust
Is Waterproof in
satisfactory
condition?
IF Firmly
connected to
the earth
bar?
IF Firmly
connected to the
ODU?
IF cable Water
proof
arrangement.
IF Cable
proper tieup
OK OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
ket
-
8/2/2019 PM Check ListsTP
34/40
IF cable
connector
Traffic cable
connector
Alarm cable
connector
Service
Channel
Cable to DDF
Power
supply cable
and
connector
Circuit Breakers
Installed as per
Equipment
Standards.
OK OK OK OK OK OKOK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
OK OK OK OK OK OK
able POWER
-
8/2/2019 PM Check ListsTP
35/40
DDF
Breakers'
Labelling
Is Updated DDF
Plan available on
site?
Correct distance
between GSM antenna
and microwave dish (if
changes made)
Condition & Fixing of
weatherproofings of
all connectors
Condition &
Fixing of OU
groundings
OK OK OK OK OKOK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
OK OK OK OK OK
Over All MW ChecSYSTEM
-
8/2/2019 PM Check ListsTP
36/40
DCN
No evidence of
corrosion on any
part of the
steelwork or
fasteners
Major-Visual check & fix
of antena mounting for
any dislocating or loose
clamping
Is NE visible on NMS?
OK OK OKOK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
OK OK NA
OK OK OK
OK OK OK
-
8/2/2019 PM Check ListsTP
37/40
REMARKS
-
8/2/2019 PM Check ListsTP
38/40
1 Front & Back side of rectifier 1 IDU installation 1
2 Front & Back side of BTS 2 IDU Grounding 2
3 Water seepage 3 IDU Power Connections 3
4 Battery Bank 4 IDU Power Connections 45 Breakaers labeling 5 Arrestors Grounding and waterproofing 5
6 Surge arrestors 6 IF Cable Grounding and waterproofing 6
7 Modules 7 ODU installation 7
8 Air filter 8 ODU Grounding 8
9 Feeder cables grounding 9 Main and SD Antenna mounting 9
10 Antenna Weather proofing (RF Antenna) 10 Wave guide Connection and water proofing 10
11 Any Damages & Settlement on site 11 Side Struts (both ends) 11
12 Ladder & Cable Tray 12 Antenna Height and Separation. 12
13 BTS power DB ( Surge arrestors, Breakers etc) 13 Indoor / Outdoor Labeling. 13
14 All earthing pits 14 DDF Jumper Connections. 14
15 15 DDF Grounding 15
16 16 C-Node 16
17 17 C-Node Grounding 17
18 18 DDF Plan on Site 18
19 19 Link Budget attached on site. 19
20 20 ODU / IF Cable / Waveguide Water Proofing 20
BTS & Rectifier MW
Pictures to be attached ( After / befor
-
8/2/2019 PM Check ListsTP
39/40
S/No. Pic
Sites Entrance Showing sites ID 1 Radiator
Clear picture of log book showing both PM entries 2 Engine
4 Battery
5 Safeties6 Filters
3 AMF
7 ATS
8 Canopy
9 Pad
10 Others
Other Pics
of PM ).
-
8/2/2019 PM Check ListsTP
40/40
Required Veiw
Coolent/Fins
Belt/Wings/
Electrolite/ Terminals/Static Charger/Dynamo
Water/OilOil/ Air/Fuel
Module/Relay
Contectors/Relays / Timers/Inter locking/UVT
Hinges/Door locks/Exhaust way(F/Pipe, Muffler)/ Smoke
Mounts/Pad/Fuel tank/Fuel pipes
Hour Meter/Energy Meter/DP/Main Breaker
Non- Telco