pm format viom

4
PM Report Site Name: Date BTS Type : Zone : Basic Details Sl.No Description 1 Entry to Site 2 Security Availability 3 Site Premises cleanliness 4 Tenancy with Operator 5 DG Reading(HRS) & EB Reading(KWH) & AC Load 6 Signage Verification 7 Aviation lamps working & LA Pole verticality 8 Door, Lock & Stopper Operation 9 Fire fighting Eqpt. 10 All lights inside the shelter 11 Rain protection 12 Cleanliness of equipment room Air conditioner & Powers Utilities Sl.No Description 1 AC Cooling effect 2 Auto / Manual mode Controller 3 Room Temperature 4 PMU functioning 5 Auto / Manual mode functioning of PMU 6 DG Functioning and Condition 7 Electricity meter functinality 8 Current reading & Voltage reading 10 Battery bank Make & capacity 11 Cell voltage (after discharging the battery 1/2 hour) 12 Visual inspection of Battery bank & Power plant 13 No of Rectifier & Functioning 14 LVD setting done(LVD1/LVD2) VSWR MEASUREMENT Sl Nos Cable / VSWR 1 Tx/Rx A = 2 Tx/Rx B = 3 Tx/Rx C = EXTERNAL POWER ALARMS Seq No. Alarm Seq No. 1 EB Power Fail 5 2 Rectifier Fail 6 3 Battery Discharged 7 4 High Room Temperature 8 PUNCH POINTS: TATA VIOM Tech Name : Tech Name :

Upload: manojsingh474

Post on 06-Nov-2015

217 views

Category:

Documents


3 download

DESCRIPTION

Pm Format Viom

TRANSCRIPT

Sheet1PM ReportSite Name:DateInfra Site Name :-BTS Type :Infra Site ID:-Zone :Infra Provider :- Basic DetailsSl.NoDescriptionRemarks / Values1Entry to Site2Security Availability3Site Premises cleanliness4Tenancy with Operator5DG Reading(HRS) & EB Reading(KWH) & AC Load6Signage Verification7Aviation lamps working & LA Pole verticality8Door, Lock & Stopper Operation9Fire fighting Eqpt.10All lights inside the shelter11Rain protection12Cleanliness of equipment roomAir conditioner & Powers UtilitiesSl.NoDescriptionRemarks / Values1AC Cooling effect2Auto / Manual mode Controller3Room Temperature4PMU functioning5Auto / Manual mode functioning of PMU6DG Functioning and Condition7Electricity meter functinality8Current reading & Voltage reading10Battery bank Make & capacity11Cell voltage (after discharging the battery 1/2 hour)12Visual inspection of Battery bank & Power plant13No of Rectifier & Functioning14LVD setting done(LVD1/LVD2)VSWR MEASUREMENTSl NosCable / VSWRCable / VSWR1 Tx/Rx A = Rx A =2 Tx/Rx B = Rx B =3 Tx/Rx C = Rx C = EXTERNAL POWER ALARMSSeq No.AlarmSeq No.Alarm1EB Power Fail5Aircon 1 Failure2Rectifier Fail6Shelter Door Open3Battery Discharged7DG Auto Start Failed4High Room Temperature8Fire AlarmPUNCH POINTS:

TATAVIOMTech Name : Tech Name :FLE Name : CI Name :

Sheet2

Sheet3