PM Report Site Name: Date Site ID : Zone : Basic Details Sl.No Description OK/NO/NA 1 Entry to Site 2 Security availability 3 Verify site registers & log books and update 4 Site Premises cleanliness 5 Any other issues 6 Tenancy with Operator 7 DG Reading(HRS) 8 EB Reading(KWH) Infra Utilities Sl.No Description OK/NO/NA 1 Signage Verification 2 Aviation lamps working 3 LA Pole verticality 4 LA & supply cabling (physical look) 5 Door, Lock & Stopper Operation 6 Room Temperature & Humidity 7 AC functioning 8 Fire fighting Eqpt. 9 All lights inside the shelter 10 Functinality of all external alarms from the site 11 Rain protection 12 Cleanliness of equipment room 13 Any other issues Air conditioner & Powers Utilities Sl.No Description OK/NO/NA 1 Cooling effect 2 Auto / Manual mode Controller 3 Room Temperature 4 Visual inspection of AC cabling 5 PMU functioning 6 Auto / Manual mode functioning of PMU 7 Visual inspection of AC cabling 8 Earth pits properly maintained 9 Earth to Neutral Voltage (Measured value) 10 EB Power and DG Power (Measured Value) 11 DG Functioning and Condition 12 Electricity meter functinality 13 Power plant internal alarms 14 Current reading 15 Voltage reading

Upload: manojsingh474

Post on 05-Feb-2016

3 views

Category:

Documents


0 download

DESCRIPTION

PM Format

TRANSCRIPT

Page 1: PM Format

PM ReportSite Name: Date Infra Site Name :-

Site ID : Infra Site ID:-

Zone : Infra Provider :-

Basic DetailsSl.No Description OK/NO/NA Remarks / Values

1 Entry to Site

2 Security availability

3 Verify site registers & log books and update

4 Site Premises cleanliness

5 Any other issues

6 Tenancy with Operator

7 DG Reading(HRS)

8 EB Reading(KWH)

Infra UtilitiesSl.No Description OK/NO/NA Remarks / Values

1 Signage Verification

2 Aviation lamps working

3 LA Pole verticality

4 LA & supply cabling (physical look)

5 Door, Lock & Stopper Operation

6 Room Temperature & Humidity

7 AC functioning

8 Fire fighting Eqpt.

9 All lights inside the shelter

10 Functinality of all external alarms from the site

11 Rain protection

12 Cleanliness of equipment room

13 Any other issues

Air conditioner & Powers Utilities

Sl.No Description OK/NO/NA Remarks / Values

1 Cooling effect

2 Auto / Manual mode Controller

3 Room Temperature

4 Visual inspection of AC cabling

5 PMU functioning

6 Auto / Manual mode functioning of PMU

7 Visual inspection of AC cabling

8 Earth pits properly maintained

9 Earth to Neutral Voltage (Measured value)

10 EB Power and DG Power (Measured Value)

11 DG Functioning and Condition

12 Electricity meter functinality

13 Power plant internal alarms

14 Current reading

15 Voltage reading

Page 2: PM Format

16 Battery bank capacity

17 Cell voltage (after discharging the battery 1/2 hour)

18 Visual inspection of Battery bank & Power plant

19 Check each rectifier Functioning

20 LVD setting done(LVD1/LVD2)

21 Any other issues

BTSSl.No Description OK/NO/NA Remarks / Values

1 BTS Configuration

2 Check for input voltage

3 Check for Alarms

4 Check for LED status

5 Cabinet door locking

6 Environment Alarm extension

7 Visual inspection

8 Check for dust, if required clean the filter

9 Cleanliness of DDF

10 RF Antenna & its pole Physical check

11 RF Cabling physical look

12 Any other issues

13 BTS Fondation Measurement

14 Hardware discrepancy

Microwave RadiosSl.No Description OK/NO/NA Remarks / Values

1 TX Protection(1+0/1+1/ring)

2 Hop on NMS

3 Cascading Hop Detail

4 TTSL MUX Dropping Port

5 Check for input voltage

6 Check for Alarms

7 Performance Monitor

8 Check the logs

9 Check for alarm extension if applicable

10 Check for node visibility on NMS

11 Check for patch code connection

12 Cleanliness of DDF

13 Whether DDF data updated ?

14 Check for dust, if required clean the filter

15 MW Antenna & its pole Physical check

16 Labelling done(pole/cable)

17 MW Cabling physical look

18 Receive level issue

19 Any other issues

Far End ID- Designed - Tx Power Rx level Achieved Rx LevelCurrent-Tx Power +22.5, Rx level-40.6dbm

Page 3: PM Format

VSWR MEASUREMENT

Sl Nos Cable VSWR FREQUENCY(mhz)

1 Tx/Rx A

2 Rx A

3 Tx/Rx B

4 Rx B

5 Tx/Rx C

6 Rx C

EXTERNAL POWER ALARMS

Seq No. Alarm Status Loop

1 Power Plant Major alarm

2 EB Power Fail

3 AC power failure alarm

4 DG Running

5 Rectifier fail

6 Battery Discharged

7 Aircon 1 Failure

8 Aircon 2 Failure

9 Fire System abnormal

10 Dg fails to start

11 Door open

12 High temp

PUNCH POINTS:

Tech Name : Signature

FLE Name : Signature

Page 4: PM Format

Current-Tx Power +22.5, Rx level-40.6dbm