Daily Report of NCT Back-up Project
March 19, 2011
ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT
STATUS: Hopefully today will get new Dredger.
WORK DONE: New pipe line installation completed.
PBL got the permission of Dredging from CPA.
WORK TOBE DONE IN COMING DAYS: Hopefully dredge filling will commence
from tomorrow.
ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 002: PVD DRIVING
STATUS: PVD Installation on progress.
WORK DONE: p to !"th #arch"$!!% total PVD point & !'()$ Nos.
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION
STATUS: Production on !'th #arch"$!!*+(,$ Nos
WORK DONE:
WORK TOBE DONE IN COMING DAYS-
ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 004a: RAILWAY RELOCATION
STATUS: Administratie Permission on Progress.
WORK DONE:
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE:
!
7/27/2019 Pm Report.18th Marcht
http://slidepdf.com/reader/full/pm-report18th-marcht 2/3
Daily Report of NCT Back-up Project
March 19, 2011
ISSUE NUMBER 004b: ELECTRIC HT LINE RELOCATION
STATUS: Drawing approal and Administratie permission on progress.
WORK DONE:
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 004: WASA RELOCATION
STATUS: Administratie permission on progress.
WORK DONE: /e0uired pipes for relocation gathered on site.
Pipe sample has sent to B12 for 2est.
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 00!: ELECTRICAL WORK ON THE NCT PRO"ECT
STATUS:
WORK DONE:
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 00#: DRAIN WORK
STATUS: Drain wor3 on progress in 4oth side 5western and south side6
Drain wor3 may 4e stopped due to indecision of alignment of property line.
WORK DONE:
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE:
"
7/27/2019 Pm Report.18th Marcht
http://slidepdf.com/reader/full/pm-report18th-marcht 3/3
Daily Report of NCT Back-up Project
March 19, 2011
ISSUE NUMBER 00$: COMMENTS FROM BRTC% BUET&CPA
!)th #arch B/2C% B12 team isited to the site- Prof.Dr.Iasin
Prof.Dr.7hariful.
8e su4mit seeral issues to B/2C team and they proided their decision-
!6 8e informed them that in purpose of 7urcharge material% we want to use ($$ mm
sand at 4ottom and soil% de4ris material for remaining 99$$mm.But they are not agree
a4out the matter.
"6 2hey are also disagreeing with our plan% where we wanted to preloading at a small
portion. 2hey clearly said% preloading will 4e for a segment at a time.
+6 A4out Interloc3ing Bloc3% we appeal to consider a correction factor as per British
7tandard. 2hey note the matter and said that soon they will notify us.
96 At the case of Drainage pipe 2est% they informed us that% re0uired strength did notfound.
ISSUES NUMBER 00': RCC D(a)*a+, P)-,
STATUS: Production of Drainage pipe on progress.
WORK DONE:
WORK TOBE DONE IN COMING DAYS:
ACTION NEEDED FROM HEAD OFFICE: 2o accelerate production of /CC Drainage
pipe% we need more mould 5!$$$mm : +$$mm dia.6
+