 Daily Report of NCT Back-up Pro ject  March 19, 201 1 ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT STATUS:  Hopefully today will get new Dredger. WORK DONE: New pipe line installation completed.  PBL got the permission of Dredging from CPA. WORK TOBE DONE IN COMING DAYS: Hopefully dredge filling will commence from tomorrow. ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 002: PVD DRIVING STATUS:  PVD Installation on progress. WORK DONE: p to !" th  #arch"$!!% total PVD point & !'()$ Nos. WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION STATUS:  Production on !' th  #arch"$!!*+(,$ Nos WORK DONE: WORK TOBE DONE IN COMING DAYS- ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 004a: RAILWAY RELOCATION STATUS:  Administratie Permission on Progress. WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: !

Upload: mahibul-hasan

Post on 13-Apr-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

7/27/2019 Pm Report.18th Marcht

http://slidepdf.com/reader/full/pm-report18th-marcht 1/3

 Daily Report of NCT Back-up Project 

 March 19, 2011

ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT

STATUS: Hopefully today will get new Dredger.

WORK DONE: New pipe line installation completed.

  PBL got the permission of Dredging from CPA.

WORK TOBE DONE IN COMING DAYS: Hopefully dredge filling will commence

from tomorrow.

ACTION NEEDED FROM HEAD OFFICE: 

ISSUE NUMBER 002: PVD DRIVING

STATUS: PVD Installation on progress.

WORK DONE: p to !"th #arch"$!!% total PVD point & !'()$ Nos.

WORK TOBE DONE IN COMING DAYS: 

ACTION NEEDED FROM HEAD OFFICE: 

ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION

STATUS: Production on !'th #arch"$!!*+(,$ Nos

WORK DONE: 

WORK TOBE DONE IN COMING DAYS-

ACTION NEEDED FROM HEAD OFFICE: 

ISSUE NUMBER 004a: RAILWAY RELOCATION

STATUS: Administratie Permission on Progress.

WORK DONE: 

WORK TOBE DONE IN COMING DAYS: 

ACTION NEEDED FROM HEAD OFFICE: 

!

7/27/2019 Pm Report.18th Marcht

http://slidepdf.com/reader/full/pm-report18th-marcht 2/3

 Daily Report of NCT Back-up Project 

 March 19, 2011

ISSUE NUMBER 004b: ELECTRIC HT LINE RELOCATION

STATUS: Drawing approal and Administratie permission on progress.

WORK DONE: 

WORK TOBE DONE IN COMING DAYS: 

ACTION NEEDED FROM HEAD OFFICE: 

ISSUE NUMBER 004: WASA RELOCATION

STATUS: Administratie permission on progress.

WORK DONE: /e0uired pipes for relocation gathered on site.

  Pipe sample has sent to B12 for 2est.

WORK TOBE DONE IN COMING DAYS: 

ACTION NEEDED FROM HEAD OFFICE: 

ISSUE NUMBER 00!: ELECTRICAL WORK ON THE NCT PRO"ECT

STATUS:

WORK DONE:

WORK TOBE DONE IN COMING DAYS:

ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00#: DRAIN WORK 

STATUS: Drain wor3 on progress in 4oth side 5western and south side6

  Drain wor3 may 4e stopped due to indecision of alignment of property line.

WORK DONE: 

WORK TOBE DONE IN COMING DAYS: 

ACTION NEEDED FROM HEAD OFFICE:

"

7/27/2019 Pm Report.18th Marcht

http://slidepdf.com/reader/full/pm-report18th-marcht 3/3

 Daily Report of NCT Back-up Project 

 March 19, 2011

ISSUE NUMBER 00$: COMMENTS FROM BRTC% BUET&CPA

!)th #arch B/2C% B12 team isited to the site- Prof.Dr.Iasin

  Prof.Dr.7hariful.

8e su4mit seeral issues to B/2C team and they proided their decision-

!6 8e informed them that in purpose of 7urcharge material% we want to use ($$ mm

sand at 4ottom and soil% de4ris material for remaining 99$$mm.But they are not agree

a4out the matter.

"6 2hey are also disagreeing with our plan% where we wanted to preloading at a small

 portion. 2hey clearly said% preloading will 4e for a segment at a time.

+6 A4out Interloc3ing Bloc3% we appeal to consider a correction factor as per British

7tandard. 2hey note the matter and said that soon they will notify us.

96 At the case of Drainage pipe 2est% they informed us that% re0uired strength did notfound.

ISSUES NUMBER 00': RCC D(a)*a+, P)-,

STATUS: Production of Drainage pipe on progress.

WORK DONE: 

WORK TOBE DONE IN COMING DAYS: 

ACTION NEEDED FROM HEAD OFFICE: 2o accelerate production of /CC Drainage

 pipe% we need more mould 5!$$$mm : +$$mm dia.6

+