Project Management Session 6

Scheduling Resources

Page 2: PM Session 6

2

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Session Outcomes

• Following the session the delegates should have a basic understanding of the typical resource scheduling problems for time as well as resources constrained projects. In addition the delegate should be able to show how free slack can be used to effect resource leveling.

Page 3: PM Session 6

3

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Preamble

Page 4: PM Session 6

4

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

The Resource Problem

• After staff and other resources have been allocated the project manager still need to answer the following questions:– Will the resources be adequate and available when needed;– Will outside contractors have to be used;– Will unforeseen resource dependencies exist – will there be

a new critical path;– How much flexibility do we have in using resources;– Are original deadlines realistic.

Page 5: PM Session 6

5

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

The Resource Problem

• Resources and Priorities:– Project sequencing and scheduling deals poorly with

resource availability and utilization;– Project network times are not a schedule until resources

have been assigned:• The implicit assumption is that resources will be

available in the required amounts when needed;• Adding new projects requires making realistic judgments

of resource availability and project durations;• Resources may be adequate but demand can vary –

then resource leveling or smoothing is required; or • Resources may not be adequate to meet peak resource

requirements, the late start date of certain activities will have to be delayed and project duration be increased – this is referred to as resource constrained scheduling.

Page 6: PM Session 6

6

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Types of Project Constraints

• Technical or Logic Constraints:– Constraints related to the networked sequence in which

project activities must occur – example, dig trenches, pour cement, then lay bricks for walls…

• Physical Constraints:– Activities that cannot occur in parallel or are affected by

contractual or environmental conditions – ship renovation, one person allowed in confined space…

• Resource Constraints:– The absence, shortage, or unique interrelationship and

interaction characteristics of resources that require a particular sequencing of project activities- example, normally you have 3 people to do three activities in parallel, but because you only have one person you have to schedule them in series – NB!! Resource dependency takes priority but cannot violate technical dependencies.

Page 7: PM Session 6

7

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Constraint Examples

Page 8: PM Session 6

8

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Kinds of Resource Constraints

• People;

• Materials;

• Equipment;

• Working Capital.

Page 9: PM Session 6

9

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Classification of A Scheduling Problem

• Classification of Problem:– Using a priority matrix will help determine if the project is

time or resource constrained;• Time Constrained Project:

– A project that must be completed by an imposed date;• Time is fixed, resources are flexible: additional

resources are required to ensure project meets schedule

• Resource Constrained Project:– A project in which the level of resources available cannot be

exceeded:• Resources are fixed, time is flexible: inadequate

resources will delay the project.

Page 10: PM Session 6

10

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Resource Allocation Methods

• Resource allocation is based on the following assumptions:– Splitting activities is not allowed—once an activity is start, it

is carried to completion;– Level of resource used for an activity cannot be changed;– Activities with the most slack pose the least risk;– Reduction of flexibility does not increase risk;– The nature of an activity (easy, complex) doesn’t increase

risk.

Page 11: PM Session 6

11

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Resource Allocation Methods

• Time-Constrained Projects:

– Projects that must be completed by an imposed date;

– Require the use of leveling techniques that focus on balancing or smoothing resource demand by using positive slack (delaying noncritical activities) to manage resource utilization over the duration of the project with the following result:

• Peak resource demands are reduced;

• Resource demand over the life of the project are reduced;

• Fluctuation in resource demand is minimized.

Page 12: PM Session 6

12

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Botanical Garden

1

2

3

4

5

Page 13: PM Session 6

13

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Botanical Garden

Page 14: PM Session 6

14

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Botanical Garden

1

2

3

4

5

Page 15: PM Session 6

15

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Botanical Garden

1

2

3

4

5

Using the slack of irrigation to start 3 days late

Page 16: PM Session 6

16

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Botanical Garden

1

2

3

4

5

Using the slack of fence and walls to start 3 days late

Page 17: PM Session 6

17

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Botanical Garden

Page 18: PM Session 6

18

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Resource Allocation Methods

• Resource Demand Leveling Techniques for Time-Constrained Projects:

– Advantages:

• Peak resource demands are reduced;

• Resources demand over the life of the project are reduced;

• Fluctuation in resource demand is minimized;

– Disadvantages:

• Loss of flexibility that occurs from reducing slack;

• Increases in the criticality of all activities.

Page 19: PM Session 6

19

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Resource Allocation Methods

• Resource-Constrained Projects:– Projects that involve resources that are limited in quantity or

by their availability’– Scheduling of activities requires the use of heuristics (rules-

of-thumb) that focus on:• Minimum slack;• Smallest (least) duration;• Lowest activity identification number.

– The parallel method is used to apply heuristics:• An iterative process that starts at the first time period of

the project and schedules period-by-period any activities scheduled to start using the three priority rules.

Page 20: PM Session 6

20

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Resource Allocation Methods

Page 21: PM Session 6

21

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

The Impacts of Resource-Constrained Scheduling

• Reduces delay but reduces flexibility;• Increases criticality of events;• Increases scheduling complexity;• May make traditional critical path no

longer meaningful;• Can break sequence of events;• May cause parallel activities to become

sequential and critical activities with slack to become noncritical.b

Page 22: PM Session 6

22

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

• CPM includes a way of relating the project schedule to the level of physical resources allocated to the project;

• This allows the project manager to trade time for cost, or vice versa;

• In CPM, two activity times and two costs are specified, if appropriate for each activity.

Resource Management

Page 23: PM Session 6

23

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

• The first time/cost combination is called normal, and the second set is referred to as crash;

• Normal assumes time and resources in normal conditions – although there is a “technical” way to calculate it;

• Crash result from an attempt to expedite the activity by the application of additional resources.

Resource Management

Page 24: PM Session 6

24

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

• Careful planning is critical when attempting to expedite (crash) a project;

• Expediting tends to create problems, and the solution to one problem often creates several more problems that require solutions.

Resource Management

Page 25: PM Session 6

25

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces

Sch

edu

ling

Res

ou

rces • Another way to expedite a project

is known as “fast-tracking”;“fast-tracking”;

• Mostly construction Mostly construction but term also used on other projects;

• It refers to overlapping the overlapping the design and build phasesdesign and build phases of a project;

• Because design is usually completed before construction starts, overlapping the two activities will result in shortening the project duration;

• Could however also lead to increased number of change orders, and therefore increased cost and loss of time – however generally feasible.

Resource Management