    ANSWER KEY

    COURSE: MBA SEMEMSTER 3

    PAPER CODE: PM0011 BOOK ID: B1237

    PAPER NAME: Project Planning & Scheduling

    Q.No.

    Question Statement1 marks question (question 1 to 20)

    CorrectOption

    SectionNumber

    PageNumber

    1 Project planning is an element of project

    management focused on ________________

    of tasks and resource assignments.

    a. detailed scheduling

    b. Reduced costs

    c Validity limitations

    d. Environmental Impact

    a 1.2

    2 A degree of change and ___________ is

    inherent in engineering and industry, and it

    should be expected that a plan will change.

    a.Environment

    b. Road Map

    c.Location

    d.Uncertainty

    a 1.2

    3A project plan starts with a project requirements

    document and _____________ both of which are

    prepared during the project initiation process

    B 1.2

  • 7/28/2019 PM0011-MQP

    2/15

    Page 2 of15

    a. Grid test

    b. Scope definition

    b. Scope definition

    d. Execution

    4

    As per the project management fraternity,

    project management can be dissected into

    _____________ and 5 process groups.

    a. 9 knowledge area

    b. 6 knowledge area

    c. 10 knowledge area

    d. 4 knowledge area

    a 2.2

    5

    The major parts of a project management plan

    are lifecycle selected, _________________

    plan and configuration management

    a. Risk Management

    b. Change Management

    c. Finance Management

    d. Personnel Management

    b 2.3.1

    6Project plan is like a guide to the projectfrom ___________ to closing

    a. Subsidiary plans

    b. Whom

    c. Initiation

    d. funding

    c 23.1

  • 7/28/2019 PM0011-MQP

    3/15

    Page 3 of15

    7

    The ___________________ is a detailed

    listing of the deliverables and tasks forbuilding the product or delivering the service.

    a. Functional Aspect

    b. Base Function

    c. Division Bases

    d. Work Breakdown structure

    d 3.1

    8

    The balance between detail and __________

    -------will ultimately determine the successful

    use of the WBS

    a. applied information

    b. Collective Information

    c. Unrelated Cost Elements

    d. Validation Process

    a 3.2

    9 When the WBS is structured to support

    _______________, project teams can quickly

    review bids to determine where they may vary

    from plan

    a. Baseline estimate

    b. Contract packages

    c. Mapping exercises

    d. Non-flexible elements

    b 3.4

    10 The WBS is a _____________ hierarchy of the

    scope of work, and is embodied in a numberingstructure that provides a system for organizing

    b 43

  • 7/28/2019 PM0011-MQP

    4/15

    Page 4 of15

    the scope in a logical manner.

    a. Firm oriented

    b. Product-oriented

    c. Locationoriented

    d. Market-Oriented

    11 It is usual for organizations to use a formal

    project management methodology in which a

    _______________ document is prepared.

    a. Project Initiation

    b. Project Differentiation

    c. Project Audit

    d. Stakeholder

    a 4.3

    12 ____________ is one of the most common

    reasons projects run over budget and deliver

    late

    a. Human resources

    b. Legal implications

    c. System facility

    d. Scope Cree

    d 43

    13 ___________this estimating technique uses

    information from previous similar projects to

    calculate the duration.

    a. Expert Judgment

    b. Analogous estimating

    c. Parametric estimating

    a 5.4.2

  • 7/28/2019 PM0011-MQP

    5/15

    Page 5 of15

    d. Program evaluation and Review Technique

    14 _______________is the information about

    schedule milestones, activities and their

    characteristics, assumptions made and

    constraints.

    a. Project Schedule

    b. Schedule Baseline

    c. Schedule Data

    d. Project Document Updated

    c 5.5

    15 While scheduling the project, we have studied

    different methods to analyze the activities and

    to _________ the flow of activities

    a. Structure

    b.Resource

    c.Network

    d. Cost

    a 6.9

    16 PERT uses ____________ activities

    a. Parallel

    b. Series

    c. Sequential

    d. Random

    a 6.2

    17_________________uses an algorithm to

    calculate project schedule.

    a. Microsoft

    a 7.6

  • 7/28/2019 PM0011-MQP

    6/15

    Page 6 of15

    b. Activity Planning

    c. Resource Levelling

    d. Control phases

    18 As the scope and extent of project increases,

    the CPA process becomes___________

    a. Simplex

    b. Complex

    c .Duplex

    d. Linear

    b 7.9

    19 _____________ is about forecasting actions

    related to the nine knowledge areas.

    a. Planning

    b. Quality

    c .Policies

    a 8.1

    20 ____________process is used to

    mathematically assess the effect of the risks

    identified for the project

    a. Risk register

    b. Organizational assets

    c. Quantitative risk analysis

    d .Expert judgment

    c 8.3.3.2

    2 Mark Question (Question No.21 to 31)

  • 7/28/2019 PM0011-MQP

    7/15

    Page 7 of15

    21State whether following statement true or false

    1.The last thing a project manager wants is constantdemonstrations and disruptions while the project isbeing carried out

    2. The best way to carry on project is to ignoredisruptions

    a. 1T, 2F

    b. 1F, 2F

    c. 1F, 2T

    d. 1T, 2T

    a.1T 2F 1.3

    22 Which among the following need not be consideredas environmental aspects for carrying out project insome part of the world

    a. Tornado or Typhoon Seasonsb. Political Systemc. Rainy seasonsd. Radioactive materials

    b 1.3

    23 State whether following statement true or false

    1. The Six process groups are based on Demings

    cycle, considering a project as a solution to a given

    problem

    2. As per the cycle, these are four steps to a problem

    solving process.

    a. 1T, 2F

    b. 1F, 2T

    c. 1F, 2F

    d. 1T, 2T

    b.1F 2T 2.2

  • 7/28/2019 PM0011-MQP

    8/15

    Page 8 of15

    24 State whether following statement true orfalse

    1. Planning process group collects informationfrom various constituent processes up to thedegree of completion and confidence.

    2. As per PMI, there are 20 processes in theplanning process group, which is half of the totalproject management processes

    a, 1T, 2F

    b. 1F, 2Tc. 1T, 2Tc. 1T, 2T

    a. 1T 2F2.2

    25 State whether statement true or false

    To maximize the structure whendeveloping the WBS:1. It must be cost effective to use2. End users should be able to easilymemorize the WBS

    a. 1F, 2Fb. 1T, 2Tc. 1F, 2T

    d. 1T, 2T

    c.1F 2T3.2

    26 State whether statement true or false1. Performance measurement is an

    integral part of preparing revised costforecasts

    a.1T 2F 3.4

  • 7/28/2019 PM0011-MQP

    9/15

    Page 9 of15

    2. The usefulness of WBS in costreporting is its inconsistent presentationof cost data

    a. 1T, 2Fb. 1T, 2Tc. 1F, 2Td. 1F, 2F

    27 State whether following statementtrue or false

    1. Planning must identify desiredperformance and technology levels

    2. Planning must be based on the pastestimates of the eventual cost,schedule, and scope of work

    a. 1F, 2Tb. 1T, 2Fc. 1F, 2Fd. 1T, 2T

    b.1T 2F 4.2

    28 State Whether Statement is True or False

    Selection of project activities:

    1. This is the process of decomposing theproject into individual task, which are not tobe performed for project progress to itsobjectives and is an important step formeeting project scope.

    b.1F 2T 5.3.1

  • 7/28/2019 PM0011-MQP

    10/15

    Page 10 of15

    2. These activities act as a basis forestimating, scheduling, executing andmonitoring and controlling the project work.

    a.1T 2Fb.1F 2Tc.1T 2Td.1F 2F

    29 Estimates can be made of how long the workwould take if things go better than expectedand conversely, if things go worse thanexpected. These are called the____________ and_____________conditions

    a. Most likely time and Pessimistic timeb. Optimistic and Pessimisticc .Most likely time and Optimisticd. Trial & Error

    b 6.2

    30 Critical Path Analysis flow diagrams are very good forpresenting mutually dependent factors whose timings

    __________ or ____________

    a. Overlap or separateb. Divide or separatec .Overlap or Coincided. Separate or Coincide c 7.2

  • 7/28/2019 PM0011-MQP

    11/15

    Page 11 of15

    31 State whether the following statement true or

    false

    The major outputs of the quality planning

    process are:

    1 .Quality metrics: This tool is used to

    specifically describe the project characteristics

    and how it would be measures in quality

    processes.

    2. Quality checklist: This is the tool used to

    list the major quality components which are

    not to be checked and verified in a project.

    a. 1T, 2F

    b. 1F, 2T

    c. 1F, 2F

    d. 1T, 2T

    a.1T 2F 8.2

    4 Mark Question (Question No. 32 to 38)

    32

    Match the following

    Prioritizing strategic options through Strategic OptionGrid which looks at a number of options against thefollowing generic criteria

    Set 1A. Strategic Attractiveness

    B. Financial AttractivenessC. Uncertainty RiskD. Acceptability to Stakeholders

    Set 21. Degree of sensitivity to external and internal shock2. Strength of the factors driving growth andcompetitive pressure3. Future support for the strategy and influence of thekey players4. Determined by the value and cost drivers

    a. A-2, B-4, C-1, D-3b. A-3, B-1, C-4, D-2

    a.A-2, B-4,C-1, D-3

    1.4

  • 7/28/2019 PM0011-MQP

    12/15

    Page 12 of15

    c. A-4, B-2, C-3, D-1d. A-1, B-3, C-2, D-4

    33Match the following

    Set 1

    A. Project Integration ManagementB. Project Scope ManagementC. Project Time ManagementD. Project Cost Management

    Set 2

    1. Relates to the processes which need to beaccomplished to complete the project2. The processes in this knowledge area

    handle project cost3. Amalgamate all the forty two processes ofproject management4. Required to define the work required in aproject

    a. A-4, B-2, C-1, D-3b. A-3, B-4, C-1, D-2c. A-2, B-1, C-4, D-3d. A-1, B-3, C-2, D-4

    b.A-3, B-4,C-1, D-2

    2.2

    34

    Match the following:

    Set 1A. administrative unit basisB. budget account basisC. product basisD. sequential basis

    Set 2

    1. Order in which activities are performed2. Project is divided into distinct components3. Infuses the resource based structure into thework breakdown structure4. Puts organizational elements into the WBS

    a. A-3, B-1, C-4, D-2b. A-2, B-3, C-4, D-1c. A-1, B-4, C-2, D-3

    d. A-4, B-3, C-2, D-1

    d.A-4, B-3,C-2, D-1

    3.7

  • 7/28/2019 PM0011-MQP

    13/15

    Page 13 of15

    35 Match the following:

    Set 1A. Scope

    B. Project ScopeC .Scope StatementD. Statement of Work

    Set 21. Document for Future Decisions2. Summation of all deliverables3. Narrative description of the work4. Products, services and end results

    a. A-2, B-4, C-1, D-3b. A-4, B-2, C-3, D-1

    c. A-3, B-1, C-2, D-4d. A-1, B-3, C-4, D-2

    a.A-2, B-4,C-1, D-3

    .4.4

    36 Match the following

    Set 1a. Project Scheduleb. Schedule Baselinec. Schedule Datad .Project Document Updated

    Set 21. Is the information about schedule milestones,activities and their characteristics, assumptionsmade and constraints2. Some of the project documents which need tobe updated may include List of activities, activitycharacteristics, and risk register.3. This is a version of schedule, approved byproject management team, with the baselinestart and end date of the project.4. This structured document gives us the startand end date of each activity.

    c.A-4, B-3,C-1, D-2

    5.5

  • 7/28/2019 PM0011-MQP

    14/15

    Page 14 of15

    a. A-3, B-4, C-1, D-2b. A-2, B-3, C-4, D-1c. A-4, B-3, C-1, D-2d. A-1, B-4, C-2, D-3

    37 Match the following

    Set 1A .teB. aC. mD. b

    Set 21. Estimated time2. Most likely time3. Pessimistic time4. Optimistic time estimate

    a. A-3, B-4, C-1, D-2b. A-2, B-3, C-4, D-1,c. A-4, B-3, C-1, D-2,d. A-1, B-4, C-2, D-3

    d.A-1, B-4,C-2, D-3

    6.2

    38 Match the followingSet 1A. ActivityB. EventC. Crash-TimeD. Critical Chain

    Set 21. A specific set or a single task required to be doneto ensure the completion of the project2. Represents the amount of time taken to completean activity3. The sequence of both precedence and resource-dependent terminal elements4 .The result of completing one or more activity

    d.A-1, B-4,C-2, D-3

    7.7

  • 7/28/2019 PM0011-MQP

    15/15

    Page 15 of15

    a. A-3, B-4, C-1, D-2b. A-2, B-3, C-4, D-1c. A-4, B-3, C-1, D-2d. A-1, B-4, C-2, D-3