PMS: A Decision Making Tool for Management at All Levels
Steve Varnedoe, PEChief Engineer, Operations
NCDOT
![Page 2: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/2.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management • A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 3: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/3.jpg)
NCDOT Overview• North Carolina DOT is divided into 14
Divisions and 100 counties• Diverse geography poses different
challenges in the eastern and western halves of the state
![Page 4: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/4.jpg)
Since the Highway Trust Fund was enacted:Since the Highway Trust Fund was enacted:
1989• 76,808 road miles• 127,809 paved lane miles• 16,104 miles of unpaved
roads• 16,900 structures
• 61.1 M sf bridge deck area
1989• 76,808 road miles• 127,809 paved lane miles• 16,104 miles of unpaved
roads• 16,900 structures
• 61.1 M sf bridge deck area
2005• 79,009 road miles• 160,609 paved lane miles• 5,536 miles of unpaved
roads• 17,848 structures• 79.8 M sf bridge deck area
2005• 79,009 road miles• 160,609 paved lane miles• 5,536 miles of unpaved
roads• 17,848 structures• 79.8 M sf bridge deck area
North Carolina State Highway SystemNorth Carolina State Highway System
Highway System Overview
![Page 5: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/5.jpg)
Highway System Overview
Highway System Usage(Vehicle Miles Traveled)
Gro
wth
0%5%
10%15%20%
25%30%35%
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
Vehicle Miles Traveled Paved Lane Miles
![Page 6: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/6.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management• A New PMS • Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 7: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/7.jpg)
NCDOT’s New Vision is to...Play a key role in the Improvement of North Carolina’s logistics system by:• Establishing statewide standards for mobility/asset
condition/safety/program delivery - highly visible to stakeholders
• Adopting a systems operations management focus for the statewide tier network regarding travel reliability and safety
• Implementing system preservation programs to expand the infrastructure service life
• Increasing efficiency and operations performance through organization management
• Basing transportation funding on desired outcome consistent with Statewide Transportation Plan
![Page 8: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/8.jpg)
NCDOT’s New Vision is to...
Cooperate Extensively with Stakeholders for addressing their needs and securing funding for addressing local mobility challenges (support local option funding)
Promote a Statewide Logistics Plan that will:• Target investment of logistics systems with statewide
significance• Seek opportunities for private, public partnerships• Leverage interagency leadership to mitigate conflicting
cultures and priorities
![Page 9: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/9.jpg)
Long-Range Statewide Transportation Plan
• Purpose– Offers Policy Guidance
& Strategic Direction for NCDOT
– Federally Mandated
– Inventory of 25-year Transportation Needs for all modes
– Forecast of Available Revenues
– Opportunity to Solicit Public & Stakeholder Interest
– Outlines Long-term Transportation Investment Priorities
– Blueprint for Asset Management
![Page 10: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/10.jpg)
Long Range Statewide Transportation Plan
• Only meets 2/3 of all projected needs and underscores the need for investment flexibility (based on 2001 data - update underway)– Must optimize limited resources– Recognize differences in regions and usage patterns
• NCDOT is shifting focus toward System Preservation
and Systems Operations and Management
![Page 11: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/11.jpg)
Long Range Statewide Transportation Plan
• Statewide Tier- Facilities such as Interstates and major Primary Highways. The 5,400 miles of designated Strategic Highway Corridors, which include existing and proposed interstates, account for only 7% of the State's Highway System, but carry nearly half of the traffic
• Regional Tier - Minor US and NC designated highways which make up the rest of the primary system. (approx. 9,400 miles)
• Subregional Tier - Generally Secondary Roads system (approx. 64,200 miles)
System Tiers
![Page 12: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/12.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management• A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 13: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/13.jpg)
Performance Based Management
• Move NCDOT from a reactive organization to an outcome based organization
• Clearly define mission and expectations for NCDOT and its employees
• Operational priorities consistent with Strategic Plan• Use appropriate LOS measures for each tier as defined
by the Strategic Plan• Provide accessible tools (PMS/MMS etc) to monitor
progress and outcomes• Management flexibility with accountability
![Page 14: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/14.jpg)
Performance Based ManagementKey Focus Areas
• Transportation Safety: Improve the safety on the transportation network by reducing serious and fatal crashes
• Program Delivery: Deliver highway projects on schedule and within budget.
• Mobility: Address congestion through transportation systemmanagement initiatives, and provide a reliable and efficient transportation system.
• Infrastructure Health: Preserve the investment in the state’s transportation infrastructure.
![Page 15: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/15.jpg)
Performance Based Management
• Infrastructure Health:– Maintenance Condition– Bridge Condition– Pavement Condition
![Page 16: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/16.jpg)
0
10
20
30
40
50
60
70
80
1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006
GoodFairPoor
Primary Pavement Condition
Years 1984 - 2006
Perc
ent
Targets: Statewide Tier: 85% “good”Regional Tier: 80% “good”
![Page 17: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/17.jpg)
0
10
20
30
40
50
60
70
80
1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006
GoodFairPoor
Secondary Pavement Condition
Years 1984 - 2006
Perc
ent
Target: Subregional Tier: 75% “good”
![Page 18: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/18.jpg)
Performance Based Management
P-2Element: Pavement
Asset: Pavement (Structure or Quality)
Activities: Pavement Condition Rating
Condition Indicator: Pavement Condition Survey (PCS) Rating of 80 or lower
Performance Measure: Road Miles that meet Condition Indicator
Statewide Regional Subregional Division CountyPerformance Target B C C NA NAAssessment Method** PCS PCS PCS PCS PCSDoes Assessment Data exist Yes Yes Yes Yes YesDesired level of survey Yes Yes Yes Yes YesDoes Feature Inventory exist Yes Yes Yes Yes YesDesired level of Feature Inventory Yes Yes Yes Yes Yes
** Is inspection of joints and reflective cracking included?
Functional Work Group Worksheet
LOS Description
A
B
LOS Category
F
No more than 5% of road miles meet condition indicator
Road miles meeting condition indicator is between 5% and 15%
Road miles meeting condition indicator is between 15% and 25%
Road miles meeting condition indicator is between 25% and 40%
Greater than 40% of the road miles meet the condition indicator
C
D
Performance Measures
![Page 19: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/19.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management• A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 20: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/20.jpg)
A New PMS for NCDOT
• System “go live” is August 2007. Developed by Agile Assets.
• Project team included SME’s from central office and field• PMS to be integrated with existing management systems
(i.e. MMS - Maintenance Management System)– Statewide, strategic workplans can be created in PMS and
those projects migrated to MMS– Completed projects in MMS can be “promoted” to the
construction history of PMS• PMS access to be available at all levels from county
maintenance offices to central office
![Page 21: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/21.jpg)
A New PMS for NCDOT
• PMS should drive our decision making: data based planning and programming
• PMS should be able to answer those “what-if” scenarios– NCDOT is currently unable to easily evaluate
alternate resource allocation scenarios
• Part of the Transportation Asset Management System vision of NCDOT is to fully integrate our management systems...
![Page 22: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/22.jpg)
Pieces of the Puzzle
Sign/Striping Management System
Pavement Management System (PMS)
Signal/ITS Management System
Bridge Management System (BMS)
Maintenance Management System (MMS)
Financial Management SystemGIS
GIS
GIS
GIS
![Page 23: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/23.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management• A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 24: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/24.jpg)
Network Level Decision Making
• At a network level, PMS will provide the ability to understand the impacts of investment decisions– As changes are made in investment
prioritization, be able to predict impacts to the network and analyze trends
– Accurate data collection allows validation of effectiveness of decisions
![Page 25: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/25.jpg)
Network Level Decision Making
• Create cohesive, statewide workplans• Account for regional variations in climate,
subgrade and materials• Will influence policy decisions • Key input into distribution of funds• Will help achieve performance targets• Assist in communicating needs to senior
management and legislative bodies
![Page 26: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/26.jpg)
Network Level Decision Making
• Determine optimum treatment selection and timing
• Quantify the condition benefits gained from various treatments
• Evaluate materials and techniques for effectiveness
![Page 27: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/27.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management • A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 28: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/28.jpg)
Division Level Decision Making
• Division Engineers to track progress:– Monitor changes in pavement condition – Verify that work performed is consistent with
work planned• Future needs will be based on PMS, and will
be used to update the Statewide Transportation Plan
• Division Engineers will apportion funds to counties based on performance measures
![Page 29: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/29.jpg)
Division Level Decision Making
• Use data from the PMS to communicate needs and progress to MPOs and RPOs
• Monitor use of best practices in program areas in their Division.– Example: Selecting appropriate routes for
pavement preservation projects
![Page 30: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/30.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management • A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 31: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/31.jpg)
Local Decision Making
• District and County Maintenance Engineers will use PMS to identify projects for resurfacing, pavement preservation, maintenance and rehabilitation programs
• PMS will convert needs to work plans– Work plans can be executed and monitored via
MMS– Completed work will be fed back into both
systems
![Page 32: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/32.jpg)
Local Decision Making
• Will also track progress toward performance goals
• In the future, PMS will provide “What if”capabilities at the local level, allowing evaluation of funding decisions on local system performance
![Page 33: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/33.jpg)
Outline of Presentation
• System Overview• NCDOT’s New Vision• Performance Based Management • A New PMS• Network Level Decision Making• Division Level Decision Making• Local Decision Making• Conclusions
![Page 34: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/34.jpg)
Conclusions
• Future planning and programming based on the Statewide Transportation Plan, new PMS, MMS and performance based management rather than a reactive approach
• PMS will provide better tools and more accountability at all levels
![Page 35: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/35.jpg)
Thoughts
• The vision of the PMS in the hands of decision-makers at all levels is a critical component to the success of the Department’s performance based management philosophy
• If we are spending $500+ million per year on pavements, isn’t it worth a 1% one-time investment to develop tools to improve how we use the money?
![Page 36: PMS: A Decision Making Tool for Management at All Levels · PMS: A Decision Making Tool for Management at All Levels Steve Varnedoe, PE Chief Engineer, Operations NCDOT. Outline of](https://reader034.vdocument.in/reader034/viewer/2022051918/600a8ea46b6559132b14da18/html5/thumbnails/36.jpg)
to
North Carolina
Questions?