Action Item 9Organizational Chart, Who does what
NSIDC DAAC will supply PoDAG with an organizational chart (in FTEs by
function) by the next PoDAG meeting.
PoDAG 21: Action Item 9 Organization Structure
Some notes on following material
• You may recall that NSIDC has been undergoing re-organization. The following chart reports the current status on NSIDC organizational change. Matrixed approach 3 service groups (Info Technology, Info
Services, Archive Services)
PoDAG 21: Action Item 9 Organization Structure
NSIDC’s latest reporting structure diagram
PoDAG 21: Action Item 9 Organization Structure
Who does what in the DAAC
• The DAAC organizational Structure mirrors NSIDC.• The DAAC is 65% of the data center and DAAC staff
are imbedded throughout NSIDC.• In addition to acquiring direct services from the
Service Groups, the DAAC has project management staff
• Tables and charts presented below are derived data covering the period July 2002 through June 2003 (the CU fiscal year)
PoDAG 21: Action Item 9 Organization Structure
Who Works at the DAAC?
• All staff part of the NSIDC staffing matrix (the DAAC is 65% of the Center)
• Senior Management DAAC Manager, DAAC Scientist, DAAC Senior Engineer/Deputy DAAC
Manager• Program/Project Leads
MODIS, AMSR, GLAS, Heritage Data • Technical Staff from Service Groups
Scientific/Application Programmers, Operations, Systems Administration Administration, Communications/Writers, User Services and Outreach
TFOR Recommended Organizational Structure
DirectorNSIDC / WDC
ArchiveManagementServices Mgr
Technical Services Mgr
Information Services Mgr
Lead/SeniorScientist
Deputy Director(Dr. Clark Judy)
• HR• Finance• Office Admin
• Data Analysis (Programmers)
• System & Sustaining Eng.
• System Admin
• Security
• USO
• Writers/ Web
• Library
• Outreach
• Graphics
• Data
Operations
• Archive
Adminstration
DAACDAAC Dir.
Raytheon Grp.
ARCSS
NOAA
AGDC,ADCC
FGDC
• Scientists
• Postdocs
• Grad Students
PoDAG 21: Action Item 9 Organization Structure
Approximate FTE % by Function or Project
17%
1%1%2%
2%
2%
5%
14%
19%
3%
7%
2%
6%
8%
7%4%
AMSR
AVHRR
CLP
DSE
ECHO
EDG
GLAS
MGMT
MODIS
PM
S ADMIN
SECURITY
INFO PROD
USERS
HERITAGE
WEB
PoDAG 21: Action Item 9 Organization Structure
Staff Roster
Name GPFunct Grp
Average FTE
Barry, Roger ADM M 0.21
Brekke, Cindy ADM M 0.29
Green, Linda ADM M 0.60
Kohlerschmidt, Daryl ADM M 1.00
Takamura, Les ADM M 0.91
Weaver, Ron ADM M 1.00
Casey, Amy COM PM 0.73
Cheshire COM SIP 0.08
Geiger Wooten, Nancy COM U 0.92
Meshek, Mike COM WEB 0.90
Schmidt, Laurie COM SIP 0.90
Scott, Michon COM SIP 1.00
Unger, Marikje COM U 0.69
Name GPFunct Grp
Average FTE
Webster, Keri COM G 0.04
Welsh, Robin COM SIP 0.07
Wolfe, Jason COM MOD 0.83
Yohe, Lyne COM A 0.46
Hofman, Pat USO U 0.42
Mullins, Teresa USO U 0.63
Ballagh, Lisa OPS MOD 0.96
Duerr, Ruth OPS A 1.00
Maurer, John OPS A 1.00
Paserba, Amanda OPS G 1.00
Schumacher, Heidi OPS MOD 1.00
Wygant, Mike OPS V 1.00
Bohlander, Jennifer PGM SIP 0.35
Brodzik, Mary Jo PGM A 0.58
Haran, Terry PGM MOD 0.88
Knowles, Ken PGM V 0.94
M = managementPM = passive microwaveSIP = special information productsU = user supportWEB = DAAC web productsG = GLASMOD = MODISA = AMSRV = validation
PoDAG 21: Action Item 9 Organization Structure
Staff Roster, Continued
Name GPFunct Grp
Average FTE
Raup, Bruce PGM MOD 0.08
Savoie, Matt PGM A 0.21
Smith, Jeff PGM A 0.75
Armstrong, Richard SCI PM 0.21
Parsons, Mark SCI CLP 0.43
Painter, Tom SCI CLP 0.17
Scambos, Ted SCI AVHRR 0.29
Scharfen, Greg SCI MOD 0.29
Stroeve, Julienne SCI PM 0.46
Zhang, Tingjun SCI V 0.29
Fowler, Cathy SYS MOD 1.00
Gentsch, Karen SYS ECHO 1.00
Groth, Jeff SYS SA 1.00
Kaminski, Marilyn SYS MOD 0.60
Marquis, Melinda SYS A 1.00
Pitre, Rick SYS MOD 1.00
Priestley, Tom SYS SA 1.00
Soja, Julie SYS EDG 0.90
Name GPFunct Grp
Average FTE
Stowe, Mike SYS SEC 1.00
Swick, Ross SYS DSE 0.94
Troisi, Vince SYS M 1.00
Wang, I-Pin SYS A 0.92
Young, Doug SYS SA 0.97
Zaffino, Paul SYS WEB 0.89
Daniels, Kate USO A 0.92
Holm, Michelle USO M 1.00
Machado, Alex USO V 0.75
McLean, Brad USO MOD 1.00
Scott, Donna USO G 1.00
Sheffield, Betsy USO U 0.75
CLP = Cold Lands ProcessesECHO = EOS metadata Clearing HouseSA = systems administrationEDG = EOS data gatewaySEC = security coordination
PoDAG 21: Action Item 9 Organization Structure
Approximate FTE % by Resource or Functional Groups
APPROXIMATE FTE PERCENTS BY SERVICE/RESOURCE GROUPS
ADMIN10%
COM16%
OPS14%
PMGR9%
SCI5%
SYS + ENG30%
USO16%
ADMIN
COM
OPS
PMGR
SCI
SYS + ENG
USO
CU-FY02 (July to June), ~42 FTE
PoDAG 21: Action Item 9 Organization Structure
Quick View: FY2002 actual staffing levels
Data ADM COM OPS PGM SCISYS ENG USO Grand Total
Sum of Jul-02 4.85 5.75 6 4.35 2.65 12.7 6.5 42.8
Sum of Aug-02 4.75 6.5 6 4.35 2.75 12.9 6.5 43.75
Sum of Sep-02 4 7.25 6 3.85 1.8 12.9 6.5 42.3
Sum of Oct-02 4 7.5 6 3.85 1.8 13.45 6.5 43.1
Sum of Nov-02 4 6.8 6 3.45 1.85 13.45 6.5 42.05
Sum of Dec-02 4 6.8 6 3.45 1.75 13.45 6.5 41.95
Sum of Jan-03 4 6.8 6 2.95 1.75 13.45 6.75 41.7
Sum of Feb-03 3.5 6.3 5.9 3.5 1.45 12.91 6.75 40.31
Sum of Mar-03 3.5 6.3 5.9 4 1.7 13.15 6.75 41.3
Sum of Apr-03 3.5 6.3 5.9 4.25 2.2 13.3 6.75 42.2
Sum of May-03 3.5 6.8 5.9 3.75 3.2 13.4 5.75 42.3
Sum of Jun-03 4.5 6.3 5.9 3.75 2.7 13.6 5.75 42.5
TOTALS 4.0 6.6 6.0 3.8 2.1 13.2 6.5 42.2
(Add 6 FTE for Raytheon EMD contractor staff)
PoDAG 21: Action Item 9 Organization Structure
DAAC FTE by Month CU-FY02
DAAC FTE, CU-FY02
38
39
40
41
42
43
44
45
Jul-02 Aug-02 Sep-02 Oct-02 Nov-02 Dec-02 Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03
DATE
FT
E
PoDAG 21: Action Item 9 Organization Structure
How we will organize our work under the new contract
• WBS categories: Management Infrastructure User Support Engineering Science Operations
o We have several BOES under Science operations, see following slides
We have transitioned to a new Contract, as of July 1, 2003. Descriptions that follow are organized by the new contract Basis of Estimate (BOE) categories, which are part of our new work breakdown structure (WBS)
PoDAG 21: Action Item 9 Organization Structure
Science Operations WBS categories
• Passive Microwave Special Sensor Microwave Imager (DMSP) Scanning Multichannel Microwave Radiometer (NIMBUS 7) Electrically Scanning Microwave Radiometer (NIMBUS
• AMSR-E (AQUA), • AMSR (ADEOS II)
• VIS/IR Moderate Resolution Advanced Very High Resolution Radiometer (NOAA series) NOAA-
NASA Pathfinder• MODIS (TERRA, AQUA) Snow and Ice Products• Geoscience Laser Altimeter System, L0, L1A, L1B, L2+
• ACTIVE Microwave RAMP, limited distribution, Version 2 products Digital Elevation Model Products
(Those in red are ECS supported data collections)
PoDAG 21: Action Item 9 Organization Structure
Science Operations (continued)
• IN SITU Data see our on-line data catalog (for example) Historical Arctic Rawindsonde Time Series
• VALIDATION Campaign data sets
o Cold Land Processes Experiment Instrument
o AMSR-E validation data setso GLASo MODIS
PoDAG 21: Action Item 9 Organization Structure
Science Operations (continued)
• Special Information Projects DAAC Annual
o Published 5 annual volumes to date DAAC Alliance Web site
PoDAG 21: Action Item 9 Organization Structure
Science Operations (continued)
• Special Science Projects GLIMS
o DAAC hosts metadata database for GLIMS projecto (GLIMS follow-on just funded as a REASON CAN)
AMSR-E EASE Gridded Brightness Temperatureso Planning continuation of this data series, should
funding be unavailable from other sources
PoDAG 21: Action Item 9 Organization Structure
Science Operations (continued)
• DAAC Website Content General User Web Content State of the Cryosphere (SOTC) Catalog-Metadata
PoDAG 21: Action Item 9 Organization Structure
Science Operations (continued)
• Long Term Archival Off-site Data Repository Data Management Policies published for
internal use Continued (low level) discussions with NOAA,
especially NGDC Working with NOAA CLASS on CLASS