polk tpo october 13, 2011
DESCRIPTION
Florida Department of Transportation & Florida Turnpike Enterprise Draft Tentative 2012/13 – 2016/17 Work Program. Polk TPO October 13, 2011. Overview. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/1.jpg)
Florida Department of Florida Department of Transportation & Florida Transportation & Florida
Turnpike EnterpriseTurnpike EnterpriseDraft Tentative 2012/13 – Draft Tentative 2012/13 –
2016/172016/17Work ProgramWork Program
Florida Department of Florida Department of Transportation & Florida Transportation & Florida
Turnpike EnterpriseTurnpike EnterpriseDraft Tentative 2012/13 – Draft Tentative 2012/13 –
2016/172016/17Work ProgramWork Program
Polk TPOOctober 13, 2011
![Page 2: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/2.jpg)
OverviewOverview Annually the FDOT prepares a Draft Tentative
Work Program that contains numerous transportation related projects, which are intended to maintain and enhance the state’s transportation system, e.g., Aviation, Rail, Traffic Signal, Safety, Resurfacing, Road Projects, Bike/Ped and Transit projects.
FDOT requests transportation priorities from MPOs/TPOs for funding consideration in the development of its Draft Tentative Work Program.
The 2011 Priority Transportation Projects adopted by the TPO in June is the source for many of the new projects contained in the Draft Tentative Work Program.
Draft Tentative Work Program
![Page 3: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/3.jpg)
OverviewOverview The TPO’s Priority Projects include:
– Road Priorities
– Congestion Management Set-Aside
– Congestion Management Projects
– Transit Projects
– Transportation Enhancement
– Regional Multi-Use Trail Projects
Draft Tentative Work Program
![Page 4: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/4.jpg)
OverviewOverview
Draft Tentative Work Program
In most instances the TPO’s Adopted Transportation Plans are the source for many of the candidate priority projects.
– Long Range Transportation Plan
– Transit Development Plan
– Congestion Management Plan
– Annual Review of FDOT Resurfacing Projects
TPO staff also coordinates with FDOT and local governments in the development of the project lists.
![Page 5: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/5.jpg)
Road PrioritiesRoad Priorities
Draft Tentative Work Program
![Page 6: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/6.jpg)
SIS ProjectsSIS Projects
Draft Tentative Work Program
![Page 7: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/7.jpg)
Road ProjectsRoad Projects
![Page 8: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/8.jpg)
Congestion Management Congestion Management PrioritiesPriorities
![Page 9: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/9.jpg)
Enhancement & Trail Enhancement & Trail PrioritiesPriorities
Draft Tentative Work Program
![Page 10: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/10.jpg)
Multi-Use Trail, Enhancement & Multi-Use Trail, Enhancement & CMP ProjectsCMP Projects
![Page 11: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/11.jpg)
TRIP & CIGPTRIP & CIGP
Draft Tentative Work Program
![Page 12: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/12.jpg)
Transit ProjectsTransit Projects
Include candidate transit capital and operating assistance for the Lakeland Area Mass Transit District (LAMTD) and Winter Haven Area Transit (WHAT).
The 2008 – 2017 Consolidated Transit Development Plan (TDP) is the source for these projects.
Draft Tentative Work Program
![Page 13: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/13.jpg)
Transit ProjectsTransit Projects
Draft Tentative Work Program
![Page 14: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/14.jpg)
Other Work Program Other Work Program Highlights Highlights
Safety Projects– 11 Projects FY 2012/13 – 2013/14– $4.6M
Resurfacing Projects– Portions of SR 60, 33, US 98, US 92 and US 17/98– FY 2014/15
SR 37 Bridge (Mulberry)– $7M in FY 2011/12
6th Street Streetscape (Haines City)– Advanced to FY 2014/15 from 2015/16
Waring Road at Dranefield Road– Deleted due to drainage and utility issues
Draft Tentative Work Program
![Page 15: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/15.jpg)
SummarySummary
Draft Tentative Work Program
Majority of the TPO’s Priority Projects are programmed.
Several projects were advanced.
Continued strong investment in the SIS.
$4.6M in Safety Projects.
$20M in Resurfacing Projects.
Draft Tentative Work Program.
![Page 16: Polk TPO October 13, 2011](https://reader036.vdocument.in/reader036/viewer/2022062519/56815292550346895dc0b659/html5/thumbnails/16.jpg)
Draft Tentative Work Program
RecommendationRecommendation The TPO’s Citizens’ and Technical Advisory Committees
recommend that the TPO Board endorse the Draft Tentative Work Program as being consistent with the TPO’s 2011 Priority Transportation Projects (including the Turnpike Enterprise Tentative Projects). (FM# 4106662) Advance SR 542 ROW Phase from FY 2016/17; (FM# 4310921) Advance the CST for SR 37 Sidewalk from FY 2014/15 to
FY 2013/14; (FM# 4299351) Do not delete the PE phase for Waring Road/Dranefield
Rd Intersection; SR 563 Extension (N-S Route) – Surcharging vs. bridging this project. (FM# 4310911) US 98 Sidewalk Limits need to be changed to match the
project request – Winthrop Ave. to Fredericksburg Ave. Prior to deleting projects from the Draft Tentative Work Program, FDOT
is requested to coordinate with the TPO and local governments affected by the project.