pool€¦ · pool oak park and river forest high school program verification design update...

18
SEPTEMBER 15, 2015 POOL OAK PARK AND RIVER FOREST HIGH SCHOOL PROGRAM VERIFICATION Design Update September 24, 2015

Upload: others

Post on 27-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

1

SEPTEMBER 15, 2015

POOL OAK PARK AND RIVER FOREST HIGH SCHOOL

PROGRAM VERIFICATIONDesign Update September 24, 2015

Page 2: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

2 3

4

18

6

24

30

OAK PARK AND RIVER FOREST HIG

EXECUTIVE SUMMARY

SITE ANALYSIS

STAKEHOLDERS

OPERATIONS | SECURITY 8

ADAPTIVE P.E. 9

PHYSICAL EDUCATION 10

ATHLETICS 11

TRANSPORTATION 12

TECHNOLOGY 13

TOPS | WEST SUBURBAN 14

STUDENT ATHLETES 15

PARK DISTRICT 16

PROGRAM BUILDING PROGRAM 26

LOWER LEVEL PLAN 27

GROUND LEVEL PLAN 28

UPPER LEVEL PLAN 29

DIAGRAMS POOL 32

POOL SUPPORT 34

P.E. LOCKER ROOMS 36

ATHLETIC LOCKER ROOMS 37

FAMILY CHANGING 38

ALUMNI ROOM | CONCESSIONS 39

40 POOL EQUIPMENT LIST

Page 3: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

20 21

SSSSSTTTTTAAAAAAAAAADDDDDDDDDDDDDIIIIIIUUUUUUUUUUUMMMMMSSSSSTTTTTAAAAAAAAADDDDDDDDDDDIIIIIIUUUUUUUUUUUMMMMM

LAKKKEEEE LAKKEEEE

SSSTTTRRREEEEEETTTT SSSTTTRRREEEEEETTTT

FFFIIIEEELLLDDDSSSFFFIIIEEELLLDDDSS

BBBBAAAAALLLLLLLLL FFFFIIEEEELLLLDDDDDSSSSBBBBAAAAALLLLLLL FFFIIEEEELLLDDDDSSSS

TTTTTTTTEEEEEENNNNNNNNNNNNNNNNIIIISSSSSSSSS CCCCCCCCCCOOOOOOOOOOOOUUUUUUUUUURRRRRRRRRTTTTTTTTTTTSSSSSSSSSSTTTTTTEEEEEENNNNNNNNNNNNNNNNNIIIISSSSSSSSS CCCCCCCCOOOOOOOOOOOOUUUUUUUUUURRRRRRRRRRTTTTTTTTTSSSSSSSSSS

Page 4: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

22SITE ANALYSIS

R7 ZONING

NO

RT

H

45’ HEIGHT LIMITATION (55’ WITH ADDITIONAL SETBACK)

20’ FRONT YARD SETBACK

25’/20% REAR YARD SETBACK

10’ SIDE SETBACK

45% LOT COVERAGE

(11

) P

AR

KIN

G S

TA

LL

S

SC

OV

ILL

E A

VE

NU

E

LAKE STREET

PE

DE

ST

RIA

N M

AL

L

ALLEY

RIGHT TURN ONLY

DR

OP

OF

F L

AN

E

RIGHT TURN ONLY

GATE

GATE

BRIDGE

ABOVE

CHURCH

STADIUM

EXISTING BUILDING

Page 5: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

22 23

The proposed aquatics center runs parallel with Lake Street with an east-west building orientation to optimize energy efficiency. The alley between the existing building and parking garage could remain to preserve the existing underground utilities and allow vehicular access between the existing building and the pool addition for buses, ambulances and other school support vehicles. A second floor pedestrian bridge could span over the service drive which would provide Student access to the new facility. This bridge would align with a new interior corridor to be constructed in the existing building between the East Pool/Weight Room and the South Gym. Security gates would be installed at the east and west ends of the alley to control access. At the east end of the site, a drop off lane could be created along the addition entrance. Scoville Avenue would provide one-way access travelling south and terminate with a right turn only on Lake Street. At the west end of the site, (10) parking stalls and (1) ADA parking stall could be created to support the school’s passenger buses, vans and security vehicles. Parking stalls could be screened from Lake Avenue with the building or landscaping elements. The building could step from the south to the north to open up views of the east Church and west Stadium from Lake Street. Opportunities for views into the facility from Lake Street can be explored to allow the community to see the activity taking place inside the facility.

PROPOSED LOCATION OF BRIDGE

CONNECTION TO EXISTING BUILDING

LOWER LEVEL

UPPER LEVEL

GROUND LEVEL

Page 6: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOLPOOL PROGRAM VERIFICATION

SEPTEMBER 15, 201526 27

1

3

4

5

5

5

7

6

LAYOUT OF SPACES :

1 ELEVATOR, FREIGHT2 ACCESS CORRIDOR3 STAIRS4 POOL FILTRATION ROOM5 CHEMICAL STORAGE6 SURGE TANK7 MECHANICAL ROOM : BOILER/CHILLERERER/C/CHIHILLLLERER

N

LOWER LEVEL

DASHED LINE REPRESENTS EXTENT OF POOL DECK ABOVE

2

Page 7: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

28

1

2

3

4

5

6

7

8

9

3 4

PROGRAM

N

GROUND LEVEL

27

23

30

3

4 67

1 3

2

2 8

9

12 13

14

15

17

16

16

12 13

18 19

20

21

10 11

22

28

29

31

24

LAYOUT OF SPACES :

1 ELEVATOR, PASSENGER2 ACCESS CORRIDOR3 STAIRS4 SCOREKEEPER5 COACHES OFFICE6 DRYLAND7 FAMILY CHANGING/ALL GENDER8 MAIN ENTRANCE LOBBY / SECURITY9 TOWEL DISTRIBUTION ROOM 10 TOWEL STORAGE ROOM 11 LAUNDRY ROOM 12 ATHLETE TOILETS13 P.E. TOILETS14 CUSTODIAL ROOM 15 P.E. MENS LOCKER ROOM16 P.E. SHOWERS17 P.E. WOMENS LOCKER ROOM18 ATHLETIC SHOWERS19 ATHLETIC TOILETS20 ATHLETICS MENS LOCKER ROOM21 ATHLETICS WOMENS LOCKER ROOM22 B & G STORAGE23 ATHLETIC STORAGE24 COMMUNITY STORAGE25 COACHES MENS LOCKER ROOM26 COACHES WOMENS LOCKER ROOM27 FUTURE 3M DIVING BOARD28 ELECTRICAL SERVICE ROOM29 IDF | AV ROOM 30 ELEVATOR, FREIGHT31 SCOREKEEPER STORAGE32 DRYLAND STORAGE33 COMPETITION STARTING BLOCKS34 AQUATICS DIRECTOR 35 ATHLETE SEATING36 ADA LIFT37 TRANSFER WALL AND RAMPS38 1M DIVING BOARD39 THERAPY STAIR40 CONNECTING BRIDGE ABOVE

35

1 2

5

36

36

37

25 26 34

18 19

24

24

32

33

38

38

14

40

39

Page 8: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOLPOOL PROGRAM VERIFICATION

SEPTEMBER 15, 201528 29

N

UPPER LEVEL

10

3

4

9

2

13

5

78

11

14

9

LAYOUT OF SPACES :

1 ELEVATOR2 ELEVATOR, FREIGHT3 STAIR4 SPECTATOR SEATING - PERMANENT TIERED5 CONNECTING BRIDGE TO BUILDING6 EDUCATIONAL ROOF GARDEN7 CONCESSIONS8 CONCESSIONS STORAGE9 MECHANICAL ROOM : AHU10 COOLING TOWER11 ALUMNI ROOM 12 PUBLIC TOILETS13 SPECTATOR SEATING - RETRACTABLE14 ACCESS CORRIDOR15 P.E. STORAGE 16 CUSTODIAL ROOM

6

12

13

15

16

Page 9: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

32DIAGRAMS

POOL

COMPETITION | DIVING | WARMUP(9) 25 YARD COMPETITION LANES, WARM UP LANES, SHALLOW ADAPTIVE P.E.

CAPACITY: - AREA OF WATER IS 12,755 SF - MAX OCCUPANTS = 255 - POOL PERIMETER > 300 LF, REQUIRES (2) ACCESSIBLE MEANS OF ENTRY

MATERIALS: - HORIZONTAL SURFACES - 1X1 CERAMIC TILE - VERTICAL SURFACES - 1X1 CERAMIC TILE - HAND HOLD - CERAMIC TILE - WATERLINE - 1X1 CERAMIC TILE - LANE MARKERS - BLACK 1X1 CERAMIC TILE - WALL TARGETS - BLACK 2X2 CERAMIC TILE - DIVE TARGETS - BLACK 2X2 CERAMIC TILE

- SAFETY LANE LINE - BLACK 2X2 CERAMIC TILE- BULKHEAD - STAINLESS STEEL OR FIBERGLASS

- DIVING STANDS - ALUMINUM

CONSIDERATIONS: - MYRTHA POOL SYSTEM - LIGHTING - LED OR FLUORESCENT - LIGHTING - DIRECT OR INDIRECT - (9) LANES FOR COMPETITION - MOVABLE OR MOTORIZED BULKHEAD - (2) 1M DIVING BOARDS + STANDS - (1) 3M DIVING BOARD + STAND - FUTURE - STARTING BLOCK/TIMING SYSTEM CAPABILITIES AT BULKHEAD - ADA ACCESS - POOL LIFTS AND TRANSFER WALL - DIVING RIGGING SYSTEM - DIVING SPARGING SYSTEM - DIVING WATER AGITATION - AUDIO-VIDEO SYSTEM W/ POOL DECK AND SPECTATOR MONITORS - CAMERA AND DVR SYSTEM FOR DIVING AND SWIMMING - LED SCOREBOARD AT SOUTHWEST CORNER FACING SPECTATORS - OBSERVATION WINDOW AT FILTRATION ROOM - TIMER DISPLAYS INTEGRATED WITH BUILDING - UNDERWATER CAMERAS OR SPEAKERS

(21) 25 YARD PRACTICE CROSS LANES, SHALLOW ADAPTIVE P.E.

P.E

1

1

STARTING BLOCKS

STARTIN

G B

LOCKS

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ADAPTIVE P.E.

1M

1M

1M

1M

3MFUTURE

2

34

56

7

8

9

6’ WIDE MOVABLE BULKHEAD

6’ WIDE MOVABLE BULKHEAD

75’ (25 YARD)

75’

(25 YARD)

1 2 3 4

17 18 19 20 21

75’ (25 YARD)

ADAPTIVE P.E.

Page 10: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

32 33

(12) 25 YARD PRACTICE CROSS LANES, (4) SHALLOW PRACTICE LANES (3) WATER POLO COURTS, SHALLOW ADAPTIVE PE

COMMUNITY USE WATER POLO PRACTICE | ADAPTIVE P.E.

50M WATER POLO COMPETITION

1

STARTING BLOCKS

2 3 4 5 6 7 8 9 10 11 12

ADAPTIVE P.E.

1M

1M 1M

45’ 45’ 45’

1M

1M

1M 1M

1M

82’ NFHSA

57’ NFHSA

6’ WIDE MOVABLE BULKHEAD

6’ WIDE MOVABLE BULKHEAD

6’ WIDE MOVABLE BULKHEAD

6’ WIDE MOVABLE BULKHEAD

STAR

TIN

G B

LOC

KS

164’-1/2”

1 2 3 4

12

34

56

7

8

9

(9) 50 METER LANES

Page 11: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

34DIAGRAMS

POOL DECKSTARTING BLOCK GUTTER:

STEP PARAPET

PROVIDES A VISUAL REFERENCE POINT ABOVE THE WATER LEVEL.

USED ON TURNING ENDS OF RACE COURSE.

IDEAL FOR POOLS WITH BULKHEADS

“FAST” BECAUSE OF OVERFLOW DESIGN.

ACCOMMODATES ANY POOL SHAPE.

DECK LEVEL DESIGN ALLOWS EASIER ACCESS.

PROVIDES A VISUAL REFERENCE POINT ABOVE THE WATER LEVEL.

IDEAL ALONGSIDE A PARAPET GUTTER

OPTION A GUTTER:

DECK LEVEL

OPTION B GUTTER:

ROLLOUT WITH HANDHOLD

POOL PROFILE

GUTTER PROFILES16’

20’

16’

18’

14’

45’45’ 51’

170’- 1/2”

24’ 5’

3’-3” VERIFY W/

BULKHEAD DEPTH

4’8’14’

MIN. AREA FOR

14’ DIVING WELL

12’

45’ 45’ 51’ 24’

CAPACITY: - AREA OF POOL DECK IS 8,867 SF - MAX 295 OCCUPANTS

MATERIALS: - FLOORS: 1X1 OR 2X2 CERAMIC TILE - EPOXY GROUT - TRENCH DRAINS: PLASTIC COVER OR STAINLESS STEEL - GUTTER: PLASTIC OR STAINLESS STEEL

CONSIDERATIONS: - 28”-30” WIDE PARAPET FOR STARTING BLOCKS - 14” WIDE PERIMETER GUTTER - LANE REEL STORAGE ON DECK BEHIND DIVING BOARDS - ADA ACCESS: POOL LIFTS AND TRANSFER WALL - THERAPY STAIR

10’ MIN

DRYLANDMATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU - ACCENT WALLS: SOLID SURFACE - FLOORS: POURED EPOXY OR RUBBER SPORTS - CEILING: EXPOSED - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM

DRYLAND

STORAGE

CORRIDOR

6’

CONSIDERATIONS: - HORIZONTAL SLIDING GLASS WALL OR GLASS GARAGE DOOR - DIRECT ACCESS TO CORRIDOR, POOL DECK, STORAGE

Page 12: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

34 35

ATHLETE SEATING

SPECTATOR SEATING

COACHES | SCOREKEEPER

12’

6’

(4) 3-TIER ALUMINUM, DOUBLE

FOOTBOARD BLEACHERS, EACH

21’ LONG W/ TILT ‘N ROLL KIT

CAPACITY: 168 OCCUPANTS

MATERIALS: ALUMINUM

CONSIDERATIONS: DUAL USE AT DRYLAND COLORS OR GRAPHICS ADDITIONAL BENCH STORAGE

CAPACITY: 450 OCCUPANTS

MATERIALS: ALUMINUM OR PLASTIC

CONSIDERATIONS: TIERED PERMANENT SEATING USE CLOSED RETRACTABLE SEATING AS DIVIDER OPERABLE GLASS PARTITION OR STRUCTURAL GLASS GUARD CANTILEVER NORTH DRYLAND OVER ALLEY

SEPARATE FAN UNIT TO SERVE SPACE

POOL DECK BELOW

PERMANENT TIERED SEATING

RETRACTABLE BLEACHERS TO PROVIDE ADDITIONAL DRYLAND TRAINING SPACE

POOL BELOW

POOL DECK

POOL

MATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU - ACCENT WALLS: SOLID SURFACE OR PORCELAIN TILE - FLOORS: POURED EPOXY - CEILING: 2X2 VINYL FACED SAT, EXPOSED AT SCOREKEEPER - TOILET PARTITIONS: SOLID COLOR REINFORCED COMPOSITE - BENCHES: SOLID SURFACE - ADA BENCH: SOLID SURFACE - LOCKERS: SOLID PHENOLIC OR HDPE - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM - CASEWORK: PLASTIC LAMINATE - COUNTERTOPS: SOLID SURFACE - OPERABLE WINDOW FOR SCOREKEEPER

POOL DECK

MEN’S COACHES WOMEN’S COACHES

SCOREKEEPER

COACHES

OFFICE

AQUATICS

OFFICE

CORRIDOR

P.E. STORAGE

COOLING

TOWER

SCO

REK

EEPE

R

STO

RAG

E

IDF/AV

ELECTRICAL

Page 13: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

36DIAGRAMS

P.E. LOCKER ROOMS

CONSIDERATIONS: - (68) 2-TIER 18X18X72 LOCKERS - PADLOCK HASP FOR LOCKS - (32) SHOWER HEADS - (4) WATER CLOSETS/URINALS AND (2) LAVS - (1) DRINKING FOUNTAIN W/ BOTTLE FILL STATION - MARKERBOARD OR TACKBOARD - SUIT SPINNERS, PROVIDE DRAIN - CASEWORK/SHELVING FOR TOWELS - WASHER/DRYER PROVIDED BY OWNER - (1) STAFF MEMBER TO DISTRIBUTE TOWELS/SUITS TO MEN AND WOMEN - TOILET ACCESSORIES BY OWNER - HAND/HAIR DRYERS - SHOWER CURTAINS OR PARTITIONS - CHANGING MIRROR - COMBINATION LAVS OR INDIVIDUAL LAVS - FLOOR DRAINS AT LOCKER ROOM - INDIVIDUAL SHOWER CONTROLS AND MASTER MIXING VALVE - ELECTRIC STRIKE/CARD READER ON DOORS

- MENS LOCKER ROOM = 48 OCCUPANTS PER PE CLASS - WOMENS LOCKER ROOM = 48 OCCUPANTS PER PE CLASS

MATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU - ACCENT WALLS: SOLID SURFACE OR PORCELAIN TILE - WET WALLS: STRUCTURAL GLAZED FACING TILE - FLOORS: POURED EPOXY - CEILING: 2X2 VINYL FACED SAT - TOILET PARTITIONS: SOLID COLOR REINFORCED COMPOSITE - TRENCH DRAINS: STAINLESS STEEL - BENCHES: SOLID SURFACE - ADA BENCH: SOLID SURFACE - LOCKERS: SOLID PHENOLIC OR HDPE - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM

POOL

DECK

CO

RRID

OR

SHOWERS

DRY

ING

WOMEN’S LOCKER ROOM

SHOWERS

MEN’S LOCKER ROOM

DRY

ING

CUSTODIAL

LAUNDRYTOWEL STORAGETOWELS

TOILETS

TOILETSTOILET

TOILETTRANSFER

WALL

THERAPY

STAIR

Page 14: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

36 37

ATHLETIC LOCKER ROOMS

CAPACITY: - MENS LOCKER ROOM = 40 OCCUPANTS - WOMENS LOCKER ROOM = 40 OCCUPANTS

MATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU - ACCENT WALLS: SOLID SURFACE OR PORCELAIN TILE - WET WALLS: STRUCTURAL GLAZED FACING TILE - FLOORS: POURED EPOXY - CEILING: 2X2 VINYL FACED SAT - TOILET PARTITIONS: SOLID COLOR REINFORCED COMPOSITE - TRENCH DRAINS: STAINLESS STEEL - BENCHES: SOLID SURFACE - ADA BENCH: SOLID SURFACE - LOCKERS: SOLID PHENOLIC OR HDPE - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM

CONSIDERATIONS: - (21) 2-TIER 18X18X72 LOCKER - PADLOCK HASPS FOR LOCKS - (10) SHOWER HEADS - (2) WATER CLOSETS/URINALS AND (1) LAV - (1) DRINKING FOUNTAIN W/ BOTTLE FILL STATION - MARKERBOARD OR TACKBOARD - SUIT SPINNERS, PROVIDE DRAIN - TOILET ACCESSORIES BY OWNER - HAND/HAIR DRYERS - SHOWER CURTAINS OR PARTITIONS - CHANGING MIRROR - COMBINATION LAVS OR INDIVIDUAL LAVS - FLOOR DRAINS AT LOCKER ROOM - INDIVIDUAL SHOWER CONTROLS AND MASTER MIXING VALVE - ELECTRIC STRIKE/CARD READER ON DOORS

CO

RRID

OR

SHOWERS

DRYING

WOMEN’S LOCKER ROOM

SHOWERS

DRYINGMEN’S LOCKER ROOM

POOL

DECK

TRANSFER

WALL

THERAPY

STAIR

Page 15: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

38DIAGRAMS

FAMILY CHANGINGCAPACITY: - FAMILY CHANGING A = 8 OCCUPANTS - FAMILY CHANGING B = 8 OCCUPANTS

MATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU - ACCENT WALLS: SOLID SURFACE OR PORCELAIN TILE - WET WALLS: STRUCTURAL GLAZED FACING TILE - FLOORS: POURED EPOXY - CEILING: 2X2 VINYL FACED SAT - BENCHES: SOLID SURFACE - ADA BENCH: SOLID SURFACE - LOCKERS: SOLID PHENOLIC OR HDPE - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM

CONSIDERATIONS: - (8) 5-TIER 12X12X12 LOCKERS - PADLOCK HASPS FOR LOCKS OR BUILT-IN LOCKS - SUIT SPINNERS - PROVIDE DRAIN - CASEWORK/SHELVING FOR TOWELS - TOILET ACCESSORIES BY OWNER - HAND/HAIR DRYERS - FLOOR DRAINS IN LOCKER AREA - CHANGING MIRROR - SHOWER CURTAIN OR SHOWER DOOR - CHANGING TABLES IN EACH STATION

FAMILY CHANGING A

CORRIDOR

FAMILY CHANGING B

Page 16: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

OAK PARK AND RIVER FOREST HIGH SCHOOL

POOL PROGRAM VERIFICATIONSEPTEMBER 15, 2015

38 39

ALUMNI ROOM | CONCESSIONS

CAPACITY: - ALUMNI ROOM = 49 OCCUPANTS - CONCESSIONS = 3 OCCUPANTS - MEN’S TOILET = ASSUME 270 OCCUPANTS - WOMENS TOILET = ASSUME 270 OCCUPANTS

ALUMNI ROOM MATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU, STOREFRONT - ACCENT WALLS: SOLID SURFACE OR PORCELAIN TILE - FLOORS: TERRAZZO TILE - CEILING: 2X4 SAT W/ CENTER SCORE - CASEWORK: PLASTIC LAMINATE - COUNTERTOPS: SOLID SURFACE - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM

CONSIDERATIONS: - ALUMNI ROOM: MARKERBOARD/TACKBOARD/SMART BOARD - ALUMNI ROOM: TV, AV SYSTEM - TIE INTO POOL SYSTEM - ALUMNI ROOM: MOVABLE TABLES AND CHAIRS - CONCESSIONS: DETERMINE WHAT WILL BE SOLD - CONCESSIONS: APPLIANCES BY OWNER - TOILET ROOM: (5) WATER CLOSETS/URINALS AND (3) LAVS - TOILET ROOM: ACCESSORIES BY OWNER - (2) DRINKING FOUNTAINS W/ BOTTLE FILL STATION - PROVIDE ACCESS TO EDUCATIONAL GARDEN - GLASS PARTITION AT CORRIDORS

ALUMNI ROOM

POOL BELOW

MECHANICAL - AHU

MENS TOILET

WOMENS TOILET

BRIDGE TO

BUILDING

CONCESSIONS

- WALLS: PORCELAIN TILE - WET WALLS: PORCELAIN TILE - FLOORS: TERRAZZO TILE OR POURED EPOXY - CEILING: 2X2 VINYL FACED SAT - TOILET PARTITIONS: SOLID COLOR REINFORCED COMPOSITE

CONCESSIONS MATERIALS: - WALLS: STRUCTURAL GLAZED FACING TILE OR GROUND FACE CMU, - FLOORS: TERRAZZO TILE - CEILING: 2X2 VINYL FACED - CASEWORK: PLASTIC LAMINATE, WIRE SHELVING - COUNTERTOPS: SOLID SURFACE - DOOR FRAMES: FRP, GALV. HM OR ALUMINUM - DOORS: FRP, GALV HM OR ALUMINUM - OVHD COILING DOOR: STAINLESS STEEL

STORAGECUSTODIAL

10’ MIN

16’

POOL DECK

BELOW

Page 17: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

1

SEPTEMBER 15, 2015

POOL OAK PARK AND RIVER FOREST HIGH SCHOOL

PROGRAM VERIFICATION

Design Update September 24, 2015

Critical Project Milestones 10.2015 Legat Architects to Proceed with Design 02.2016 Complete Schematic Design 05.2016 Complete Design Development 07.2016 Start Demolition of Parking Structure 09.2016 Complete Construction Documents 09.2016 Obtain Village Permits and Approvals 09.2016 Begin Foundations and Site Work 11.2016 Begin Vertical Construction 08.2018 Grand Opening of New Aquatic Center

Page 18: POOL€¦ · pool oak park and river forest high school program verification design update september 24, 2015. oak park and river forest high school pool program verification september

1

SEPTEMBER 15, 2015

POOL OAK PARK AND RIVER FOREST HIGH SCHOOL

PROGRAM VERIFICATIONDesign Update September 24, 2015