Page 1: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Pool Schedule Delay

Page 2: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Pool DelaysPool phase began as scheduled on June 1st. Removal of plaster revealed concrete

degradation of the shell.Walls have deteriorated in multiple areas.Rebar inside the walls have rusted.Existing wall has been determined to be

unfit.N0 indication of this condition was evident

prior to removal of the plaster coat.

Page 3: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

FindingsRe-plastering began our final phase of

renovations.Project was proceeding on schedule with best

efforts put forth to re-open July 1st. Structural Engineer, Soil testing agency, and Pool

Builder were consulted for opinions and recommendations.

Although this delay is unavoidable, we are working diligently to finalize the change in scope and deliver an exceptional amenity for our residents and guests.

Page 4: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

About GuniteA mixture of cement, sand, and water applied

through a pressure hose, producing a dense hard layer of concrete .

It is mixed on site and sprayed into a form creating a pool shell.

Gunite provides structural stability and is the base to which plaster is applied.

Page 5: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Deteriorated wall section

Page 6: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Rusted rebar inside wall

Page 7: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Degraded shell section

Page 8: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Water intrusion through wall

Page 9: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Water seeping through wall

Page 10: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Next StepsConstruction plans are now being developed.Permit for constructing new pool is required.Other renovation work is near completion.Build new pool.Reopen indoor pool as soon as possible.

Page 11: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Completed Renovation Work

Page 12: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Completed Work Cont.

Page 13: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Completed Work Cont.

Page 14: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have

Completed Work Cont.

Page 15: Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have