poplin - kohlerresources.kohler.com/plumbing/kohlerapac/pdf/poplin... · 2019. 2. 22. ·...

5
INSTALLATION INSTRUCTIONS K-99666T-0/K-99666T-CS1/K-99666T-B16 POPLIN MIRRORS BEFORE YOU BEGIN BEFORE YOU BEGIN ! ! ! ! ! ! Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences. Follow the sections that pertain to your particular installation . This will help you avoid costly mistakes. In addition to proper installation, read all operating and safety instructions. All information in these instructions is based upon the latest product information available at the time of publication. Kohler China Ltd. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. These instructions contain important care, cleaning, and warranty information- Obey all electrical regulations in force at the time of installation. The mirror K-99666T-0/K-99666T-CS1adopts natural wood with high quality. With further processing, its harmful gas emission is less than 1.5mg/L. The mirror K-99666T-B16 adopts stainless steel and PVD. Mirrored cabinets are very heavy and should not be lifted or installed by just one person. please leave instructions for the consumer. Warning! Risk of personal injury and product damage. ! ! ! ! ! ! - K-99666T-0/K-99666T-CS1 1.5mg/L K-99666T-B16 PVD SAFETY WARNINGS Kohler products are precision engineered and should give continued superior and safe performance, provided: 1.They are installed, commissioned, operated and maintained in accordance with the recommendations given in this Manual. 2.Periodic attention is given, as necessary, to maintain the product in good functional order. Recommended guidelines are given in the section. Carefully inspect the new fixture for any signs of damage. When installing Kohler Products, manufacturers guidelines for power tool safety should be followed. MAINTENANCE 1. 2. ORDERING INFORMATION This installation covers the following products in the POPLIN range: POPLIN Mirror ......................................K-99666T-0(White) POPLIN Mirror......................K-99666T-CS1(Claret Suede) POPLIN Mirror ......................K-99666T-B16(Galaxy Black) ...............................................K-99666T-0( ) .......................................K-99666T-CS1( ) .......................................K-99666T-B16( ) -1- KOHLER CHINA INVESTMENT CO., LTD NO.158, JIANG CHANG SAN ROAD, JING'AN DISTRICT, SHANGHAI, PRC POST CODE: 200436 ( ) 158 200436 © © Copyright Kohler China Investment Co., Ltd. 2016 2016 1295860-T01-B

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POPLIN - KOHLERresources.kohler.com/plumbing/kohlerapac/pdf/poplin... · 2019. 2. 22. · -2-ROUGHING-IN UNIT : mm K-99666T-0/K-99666T-CS1 K-99666T-B16 Reference Value Kohler reserves

INSTALLATION INSTRUCTIONS

K-99666T-0/K-99666T-CS1/K-99666T-B16

POPLIN

MIRRORS

BEFORE YOU BEGINBEFORE YOU BEGIN

Please read these instructions carefully to familiarizeyourself with the required tools, materials, and installationsequences. Follow the sections that pertain to yourparticular installation . This will help you avoid costlymistakes. In addition to proper installation, read alloperating and safety instructions.All information in these instructions is based upon thelatest product information available at the time ofpublication. Kohler China Ltd. reserves the right to makechanges in product characteristics, packaging, oravailability at any time without notice.These instructions contain important care, cleaning, andwarranty information-

Obey all electrical regulations in force at the time ofinstallation.The mirror K-99666T-0/K-99666T-CS1adopts naturalwood with high quality. With further processing, its harmfulgas emission is less than 1.5mg/L.The mirror K-99666T-B16 adopts stainless steel and PVD.

Mirrored cabinets are very heavy and shouldnot be lifted or installed by just one person.

please leave instructions for theconsumer.

Warning! Risk of personal injury and productdamage.

-

K-99666T-0/K-99666T-CS11.5mg/L

K-99666T-B16 PVD

SAFETY WARNINGS

Kohler products are precision engineered and should givecontinued superior and safe performance, provided:

1.They are installed, commissioned, operated and maintainedin accordance with the recommendations given in thisManual.

2.Periodic attention is given, as necessary, to maintain theproduct in good functional order. Recommended guidelinesare given in the section.

Carefully inspect the new fixture for any signs of damage.When installing Kohler Products, manufacturers guidelines forpower tool safety should be followed.

MAINTENANCE

1.

2.

ORDERING INFORMATION

This installation covers the following products in the POPLIN

range:

POPLIN Mirror ......................................K-99666T-0(White)

POPLIN Mirror......................K-99666T-CS1(Claret Suede)

POPLIN Mirror ......................K-99666T-B16(Galaxy Black)

...............................................K-99666T-0( )

.......................................K-99666T-CS1( )

.......................................K-99666T-B16( )

-1-

KOHLER CHINA INVESTMENT CO., LTD NO.158, JIANG CHANG SAN ROAD,JING'AN DISTRICT, SHANGHAI, PRC POST CODE: 200436

( ) 158 200436

©

©

Copyright Kohler China Investment Co., Ltd. 2016

20161295860-T01-B

Page 2: POPLIN - KOHLERresources.kohler.com/plumbing/kohlerapac/pdf/poplin... · 2019. 2. 22. · -2-ROUGHING-IN UNIT : mm K-99666T-0/K-99666T-CS1 K-99666T-B16 Reference Value Kohler reserves

-2-

ROUGHING-IN

UNIT : mm

K-99666T-0/K-99666T-CS1 K-99666T-B16

Reference Value

Kohler reserves the right to change marked dimensions without prior notice.

900

9035

35

750

Hanger of Wall Mirror Body Mirror Body

610

760

Mirror Glass

Mirror Glass

VERTICAL/HORIZONTAL INSTALLATION(For K-99666T-0/K-99666T-CS1)VERTICAL/HORIZONTAL INSTALLATION(For K-99666T-0/K-99666T-CS1)

/( )K-99666T-0/K-99666T-CS1

1.

a. 375mm

b.

a. 450mm

b.

1. Preparing the wall

Vertical Installation:

a. Measure and mark 375mm center width.

b. Mark mirror frame.

Horizontal Installation:

a. Measure and mark 450mm center width.

b. Mark mirror frame.

Horizontal Installation Vertical Installation

Wall Line

Wall Line

35

35

105

105

Wall Wall

750

620

Metal Bracket of Wall

Balance Buckle

29

4228

610

760900

20 28

1295860-T01-B

Page 3: POPLIN - KOHLERresources.kohler.com/plumbing/kohlerapac/pdf/poplin... · 2019. 2. 22. · -2-ROUGHING-IN UNIT : mm K-99666T-0/K-99666T-CS1 K-99666T-B16 Reference Value Kohler reserves

-3-

2. 105mm

35mm

35mm

105mm

2. For Vertical Installation: Mark holes 105mm below the top

frame line and 35mm away from the left and right lines.

For horizontal installation: Mark holes 35mm below the top

frame line and 105mm away from the left and right lines.

3.3. Drill holes for fixing hanged bracket and insert wall plugs

and self-tapping screws into the wall at the marked place.

Horizontal Installation

Horizontal Installation

Horizontal Hanging Mirror

Vertical Installation

Vertical Installation

Vertical Hanging Mirror

Wall

Wall

Wall

Wall Line

35

105

Plastic Wall Plug

Plastic Wall Plug

Plastic Wall Plug

Screw

Screw

Screw

4.4. Align the screw hole on the mirror with the installed screw

on the wall.Interlock to fix the mirror.

1295857Hanger of Wall

1295857Hanger of Wall

Wall

Wall Line 35

105

Plastic Wall Plug

Screw

1295860-T01-B

Page 4: POPLIN - KOHLERresources.kohler.com/plumbing/kohlerapac/pdf/poplin... · 2019. 2. 22. · -2-ROUGHING-IN UNIT : mm K-99666T-0/K-99666T-CS1 K-99666T-B16 Reference Value Kohler reserves

-4-

VERTICAL/HORIZONTAL INSTALLATION(For K-99666T-B16)VERTICAL/HORIZONTAL INSTALLATION(For K-99666T-B16)

/( )K-99666T-B16

1.

a. : 375mm

: 450mm

b.

1. Preparing the wall

a. For vertical installation: Measure and mark 375mm center

width.

For horizontal installation: Measure and mark 450mm

center width.

b. Mark mirror frame.

Horizontal Installation Vertical Installation

Wall Line

Wall Line

Wall

Wall

2. 58mm

375mm

100mm 7

28mm 375mm 1

58mm

450mm

100mm 7

28mm 450mm 1

2. For vertical installation: Mark line 58mm below the top

frame line and mark hole 375mm away from the left frame

line. Set this hole as the center hole and mark 7 holes at

the interval of 100mm. Mark one hole 28mm above the

bottom frame line and 375mm away from the left frame line.

For horizontal installation: Mark line 58mm below the top

frame line and mark hole 450mm away from the left frame

line. Set this hole as the center hole and mark 7 holes at

the interval of 100mm. Mark one hole 28mm above the

bottom frame line and 450mm away from the left frame line.

450

100 100 100

100 100 100

7 8

7 8

450 28

8

375

288

58

375

3. 8mm3. Drill 8mm holes at the marked hole positions and insert

wall plugs. Fix the metal bracket with self-tapping screw

and balance screw.

1295860-T01-B

Page 5: POPLIN - KOHLERresources.kohler.com/plumbing/kohlerapac/pdf/poplin... · 2019. 2. 22. · -2-ROUGHING-IN UNIT : mm K-99666T-0/K-99666T-CS1 K-99666T-B16 Reference Value Kohler reserves

WARNING! Risk of product damage.

1. Many cleansers contain abrasive and chemical substancewhich is not suitable for cleaning stainless steel, enamel,plating or plastic products. You may use mild cleansers orsoaps to clean the surfaces. Wipe any splashes of cleanersolutions from the surface with clean soft cloth.

2. Maintain ventilation in the bathroom, and separate the dryarea from the damp one if conditions permit. Try to openthe door and windows of the bathroom and maintain goodventilation.

3. Kohler bathroom mirrors are dealt with strict procedures fordamp-proof, whose good damp-proof function ensuresgood performance even in bathroom of huge humidity. Yetdo not splash and pour water directly on the bathroomcabinet. Make sure that the bathroom is not over dampand wipe any splashes from surfaces immediately.

4. Maintenance of mirror frame: Clean and wipe mirror frameregularly, and wipe the condensation vapor with dry andsoft cloth.

5. Ensure that electrical connections for appliances such ashead lamp is insulated ; wipe mirror surface with chamoisregularly to guarantee the persistent excellent performance.

6. If any fixtures caused by abnormal reasons, Kohler Chinacan supply paid replacement for service parts caused byabnormal reasons as shown in the service parts page inthe limited duration of warranty.

1.

2.

3.

4.

5.

6.

USER MAINTENANCEUSER MAINTENANCE

-5-

Horizontal Installation

HorizontalHanging Mirror

Vertical Installation

VerticalHanging Mirror

Wall

Wall

1299456Plastic Wall Plug

7* 8*40mm

1299456Plastic Wall Plug

7* 8*40mm

4. Z Z

90

4. Align the pre-installed Z metal bracket at the mirror back

with the Z metal bracket on the wall. Insert the balance

screw into the clip at the mirror back. Rotate the balance

screw 90 degrees with wrench to lock it.

1299457Metal Bracket of WALL

1299457Metal Bracket of WALL

Mirror

Mirror

1299455Self-Tapping Screws

7*M4*50mm

1299455Self-Tapping Screws

7*M4*50mm

1299623Balance Screw

1299623Balance Screw

Insert balance screw and rotate90 degrees with wrench to lock it.

90

Insert balance screw and rotate90 degrees with wrench to lock it.

90

1295860-T01-B