Port Handling
Capacity / Challenges
1
PORT QASIM AUTHORITY
11th January-2016
PQA’s Overview
2
• Port Qasim functions under PQA Act, 1973 on
landlord concept with an attached industrial estate
(13,700 acres)
• 08 dedicated state-of-the art Terminals on
BOT/BOO through Private Sector
• IOCB-PSM & Marginal Wharves (public Sector)
• Catering over 40% seaborne cargo
PQA’s Overview
3
• PQA contributes substantial revenue to national
exchequer
• 45 Km Main Navigational Channel & Alternate
Channel have immense opportunities for future port
development
• 2-3 LNG Terminals can be accommodated
• Direct access to road & railway network
Notified Limits
E
INDUSTRIAL
COMPLEX
OPERATIONAL COMPLEX Bundal
& Buddo
Pak Steel
Karachi Port
D B
A
c
4
5
Port Operational Complex
6
1st QICT
6
Grain &
Fertilizer 2nd QICT
Marginal Wharf
FWQ-LCT
IOCB
EVTL
EETPL-
LNG
SSGC
- LPG
FOTCO
PIBT
Coal
PQEPCL
Power Plant
Pak Steel
Port Operational Complex
7
Terminal Basis
Capacity million tonnes Cost
(million) Year of
Operation Annual Utilized
2014-15
Iron Ore & Coal Berth (IOCB) Public
Sector
3.0 0.89 Rs. 415 1980
Marginal Wharf 6-7 2.57 Rs.1362 1981
Fauji Oil Terminal (FOTCO)
Private
Sector
BOT/BOO
9.0 8.15 US$ 97 1995
Qasim International Container
Terminal (QICT)
0.850
TEUs
0.54 US$ 100 1997
Liquid Chemical Terminal (EVTL)
LPG
4.0 1.28 US$ 76 1998
SSGC LPG Terminal 2.0 0.01 US$ 50 2007
Liquid Cargo Terminal (LCT) 4.0 2.05 US$ 25 2009
Grain & Fertilizer Terminal(FAP) 4.0 2.09 US$ 135 2010
2nd Container Terminal 1.175
TEUs
0.43 US$ 300 2011
EETPL LNG Terminal 3.0 0.31 US$ 120 2015
Cargo Handling
8
2012-13 2013-14 2014-2015
Imports(MT) 17.754 18.076 19.282
Exports(MT) 7.047 7.699 7.836
Total(MT) 24.801 25.775 30.013
0
5
10
15
20
25
30
35Milliontonnes
No. of Ships 1055 1072 1281
• 4 LNG ASD compatible Tugs on 2 years lease term
at a cost of US$ 25M. FBR levied duty US$ 15M
• USAID provided LNG Consultants to PQA
• Training of Pilots for LNG operation at Siport,
Madrid
• SOPs as per best industry practice
• Successfully handled 17 LNG Carriers with
capacity up to 151,000 cubic meters
PQA Contribution for LNG Project
9
• Engro LNG Terminal requires compliance of SIGTTO &
PIANC as per Pakistan LNG Policy, 2011
• Limited width and draught requires 5-6 hours
suspension of other traffic during the passage of LNG
carriers to meet the mandatory safety and security
requirements
• Increase of LNGCs during current year, will delay
Container & Bulk Carriers
• PQA major revenue depends on QICT, delay in berthing
of container ships could result in revenue loss /
litigation 10
Port Handling - Capacity / Challenges
• 3 passing bays urgently required in main
navigational channel
• Dredging for deepening & widening may
accommodate Q-Flex LNG Vessels according to
SIGTTO Guidelines
• Pak Merchant Marine Policy may be implemented to
ensure parity with regional ports
11
Port Handling - Capacity / Challenges
Existing Navigation Channel
Length - 45 km Width - 200 m Draught - 13 m
Proposed Widening Width - 250 m Draught - 14 m
12
Deepening, Straightening & Widening
of existing Navigation Channel
Commissioning of altrnate Channel
Commissioning of alternate Channel to manage two way traffic
Length - 20 km Width - 250 m Draught - 14m
Assessed Value
Insurance (1%)
Landing Charges
(1%) Total Value CD @ 20% ST 17%
Income Tax
5.5%
Total Duty/Taxes
US Dollar Pak Rupees
30.020 0.300 0.303 3,231 646 659 249 1,554
Duty/Taxes on 04 ASD LNG Tugs
13
Rs. 258 million will be allowed as duty drawback
after 2 years of leasing period
(Figures in million)
14
“Thank you for PQA's valued assistance with the recent transit simulations at Siport21, Madrid. Qatar Gas would like to convey its deep appreciation of Capt. Nouman Hassan and his team for their commendable skill, leadership and support while defining procedures for the safe navigation and transit of our chartered Q Flex vessels. The good progress made at Siport was only possible with PQA's and your help and deeply appreciated"
Comments of Chief Operating Officer, Commercial and Shipping
Qatar Gas
15
Allotment Zone Wise
DESCRIPTION NWIZ
(acres)
EIZ
(acres)
SWIZ
(acres)
LOW
LYING
NWIZ
(acres)
LOW
LYING
EIZ
(acres)
LOW
LYING
SWIZ
(acres)
Total Area 2950 8300 1000 415 1520 140
Reserved for
Services /
ROW
904 2661 94 - - 10
Area Available
for Allotment
2046 5639 906 415 1520 130
Allotted Area 1959 5341 858 355 1364 25
Allotment
Categories
Commercial
by auction,
Industrial,
Warehouse
and LPG
area
Commercial
by auction,
Industrial and
Warehouse
Commercial
by auction,
Industrial,
and
Warehouse
16
SIGTTO
Society of International Gas Tanker and Terminal
Operators
PIANC
Permanent International Association of Navigation
Congresses
17