portfolio 2006-2015

105
2006-2014

Upload: ji-qu

Post on 21-Jul-2016

215 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Portfolio 2006-2015

2006-2014

Page 2: Portfolio 2006-2015
Page 3: Portfolio 2006-2015

We should strive for an architecture that conveys its meaning with such force that it doesn’t even require physical realization. It may only exist in the realm of imagery, as drawing, photo, or movie, but it is capable of delivering more authentic spatial experience than any built form. Its function should be to tell a story about its social and cultural context.

Our world is digitalizing. At the same time, our perception of space is demanding more on the emotionality and ethereality rather than rationalism and realism. Architecture should response to such transition.

Architecture has long been limited by the drive to realize its visions in the physical world. In this inveterate norm, diagrams exist only as the tools of zoning and circulation; plans and sections are relegated to the demands of construction documents, and renderings are forced to be simulations of material quality.

We should liberate architecture from the built environment. Architecture is everything spatially evocative. We should consider diagrams as scenarios of tactics instead of descriptors of strategy. We should treat plans and sections as grand set pieces in the procession of story instead of virtual space generators. We should emphasize atmosphere and mood in our renderings, not material particularities.

If building construction is just one mode of architectural representation, then we must absorb knowledge from all disciplines and proficiency in all skills so that we have the flexibility to express our work in a multitude of ways. By doing so, architecture is allowed to be blurry and not specific, descriptive instead of prescriptive, fluid instead of determined, distinctive instead of generic. Through this, architecture becomes desirable.

ARCHITECTURE MANIFESTO

Page 4: Portfolio 2006-2015

CONTENTS

Page 5: Portfolio 2006-2015

PROJECT 01

PROJECT 02

PROJECT 03

PROJECT 04

PROJECT 05

PROJECT 06

PROJECT 07

WINTER 2013

SPRING 2012

SPRING 2011

FALL 2011

FALL 2012

FALL 2013

SPRING 2013

2006 - 2013

2006 - PRESENT

SANTA MONICA STEEL HOUSE DESIGN STUDIO 4

18

34

48

58

66

74

80

90

MID-WEST HORIZON PERSERVATION SOCIETY

THE BIKER COMMUNITY

PARKLAND AIRCRAFT INSTRUCTIONAL FACILITY

THE MONU-FRASTRUCTURE OF GOWANUS CANAL

CULVER CITY MASS-HOUSING DEVELOPMENT

FRANKLIN POINT MASTERPLAN + ARCHITECTURE

APPENDIX

RESUME

Page 6: Portfolio 2006-2015

Third Year Graduate Level Studio Individual Work

Prof. Hitoshi AbeDec 2013 - Mar 2014

Westwood, Los Angeles, CA, USA

THE INFORMALITY

Page 7: Portfolio 2006-2015
Page 8: Portfolio 2006-2015

ROOF

TRUSS

3RD AND MEZZANINE

GROUND

BASEMENT

ENVELOPE

RESE

ARCH

LAB

MArc

h 2MA

rch 1

- The architecture program for students without undergrad background in architecture- Encouraged to work for tenants in OMNI- Faculty provide lecture/workshop to OMNI

- The architecture program for students with undergrad background in architecture- Studio topics could be provided by joint venture between faculty and OMNI enterprises- Faculty / graduated students are encouraged to start up at OMNI

- creatives, technologists, entrepreneurs, freelancers, and startups who need architecture school connections(tools/books/professional consults).- Lecture series: Inviting people with architecture/technology related background to share their knowledges- OMNI workshops: short term workshop open to students and omni tenants- MINI Camp: for coworkers to have fun together!

KEY INFORNATION

Students: 200Faculty: 35

Office Tenants: 15

CONCEPT OF EACH ELEMSNTS

CURRICULUM

AUD OMNIAUD IDEASAUD BASE

MArch 1 Achitecture Professional OrientedMArch 2 Achitecture Experiment Oriented

8

Page 9: Portfolio 2006-2015

ROOF

TRUSS

3RD AND MEZZANINE

GROUND

BASEMENT

ENVELOPE

RESE

ARCH

LAB

MArc

h 2MA

rch 1

- The architecture program for students without undergrad background in architecture- Encouraged to work for tenants in OMNI- Faculty provide lecture/workshop to OMNI

- The architecture program for students with undergrad background in architecture- Studio topics could be provided by joint venture between faculty and OMNI enterprises- Faculty / graduated students are encouraged to start up at OMNI

- creatives, technologists, entrepreneurs, freelancers, and startups who need architecture school connections(tools/books/professional consults).- Lecture series: Inviting people with architecture/technology related background to share their knowledges- OMNI workshops: short term workshop open to students and omni tenants- MINI Camp: for coworkers to have fun together!

KEY INFORNATION

Students: 200Faculty: 35

Office Tenants: 15

CONCEPT OF EACH ELEMSNTS

CURRICULUM

AUD OMNIAUD IDEASAUD BASE

MArch 1 Achitecture Professional OrientedMArch 2 Achitecture Experiment Oriented

9

Page 10: Portfolio 2006-2015

This studio is directed by the AUD Dean Hitoshi and considered as a proposal incubator for the future department building which will be built in the coming future. Different from other academic project, this studio is based on pragmatic issus and conditions, with programing considered as the central design driven. The first half of the project is only focusing on programing, not only in terms of adjacencies, but also with considering programmatic innovation. This proposal is aimming at marrying academic with practices by bring in a leasing/corworking office as incubators to the school environment. Under such condition, students are no longer study architecture in vacumn areas, at the same time design entrepreneur could find their demanding physical and intellectual resources from the school.

AUD FUTURE CAMPUS

10

Page 11: Portfolio 2006-2015

OMNI

IDEAS

Atrium

Atrium

BASE

Central Share

Bring in View

Bring in People

Academic

11

Page 12: Portfolio 2006-2015

3d print

laser cut

AUD OMNI (faculty office included)9800

small office

96sf

faculty office130

faculty office130

conference rm300sf

small office

96sf

meeting280

office90

office100

office100

small office

96sf

Gallery

1200

meeting rm100sf

kitchen/food stand380

large office200sf

large office200sf

faculty office130

faculty office130 storage

100

lecture rm1400sf

storage70

department office200

meeting rm120sf

faculty office130

faculty office130

faculty office130

LOBBY

omni workshop900sf

- 0'-28"- 0'-28"

0'-0"

dean office200

shop2000

small office

96sf

DN

DN 3 STEPS

DN

UPUP

UP

UP

DN

3%

DN DN

UP

DN

40'-0

"38

'-0"

24'-0" 28'-0" 28'-0" 28'-0" 24'-0" 36'-0"

ROOF EDGE

40'-0

"36

'-0"

36'-0

"

N

GROUND LEVELSCALE: 1’= 3/64”

168'-0"

190'

-0"

The word informality in this project means unprescripted activities and creativity in programing. Driven under a real project, the studio focus more on program and circulations rather than any other issues. The first 5 weeks program study set down the tone of the design phase. Informality is interpreted as a casulity between interior and exterior in this project. In a way the roof terrace is the main gesture to realize such intension. The sloped roof both indroduce the exterior (from the south end) and bring in the public (in the north end). The corridor spaces are folded rather than the shortest distance between destinations: for the purpose of imbeding programs into circulations rather then a purely function drive passways system.

INFORMALITY

12

Page 13: Portfolio 2006-2015

3d print

laser cut

AUD OMNI (faculty office included)9800

small office

96sf

faculty office130

faculty office130

conference rm300sf

small office

96sf

meeting280

office90

office100

office100

small office

96sf

Gallery

1200

meeting rm100sf

kitchen/food stand380

large office200sf

large office200sf

faculty office130

faculty office130 storage

100

lecture rm1400sf

storage70

department office200

meeting rm120sf

faculty office130

faculty office130

faculty office130

LOBBY

omni workshop900sf

- 0'-28"- 0'-28"

0'-0"

dean office200

shop2000

small office

96sf

DN

DN 3 STEPS

DN

UPUP

UP

UP

DN

3%

DN DN

UP

DN

40'-0

"38

'-0"

24'-0" 28'-0" 28'-0" 28'-0" 24'-0" 36'-0"

ROOF EDGE

40'-0

"36

'-0"

36'-0

"

N

GROUND LEVELSCALE: 1’= 3/64”

168'-0"

190'

-0"

material rack

CNC router270

working bench

chin saw

shop7200

CNC router270

CNC router300

shop office 150

lecture platform / critique space

robot space (small)650

central computer850

custodial300

IToffice450

resource rm450

department storage / archive 1500

mechanical3600

operation space operation space

loading dock

table saw

sending machine bansaw

lockers/tool

staff support (copy print)1000

UP

UP

UPUP

36'-0

"40

'-0"

36'-0"24'-0"28'-0"28'-0"28'-0"24'-0"

38'-0

"36

'-0"

40'-0

"

N

BASEMENT LEVELSCALE: 1’= 3/64”

168'-0"

190'

-0"

AUD BASE10000

studio lounge / multi-purpose

pin-up space

DN

UP

DN DN

UP UP

40'-0

"36

'-0"

38'-0

"

24'-0" 28'-0" 28'-0"

168'-0"

28'-0" 24'-0" 36'-0"

40'-0

"36

'-0"

N

3RD LEVELSCALE: 1’= 3/64”

190'

-0"

AUD BASE5000

DN DN

36'-0"24'-0"28'-0"28'-0"28'-0"24'-0"

38'-0

"36

'-0"

40'-0

"36

'-0"

40'-0

"

N

MAZZENINE LEVELSCALE: 1’= 3/64”

168'-0"

190'

-0"

print160

AUD IDEAS5400

library1650

seminar rm800

lecture rm1000

class rm1000

class rm1000

seminar rm1000

lecture rm (large)1400

DN

DN

UP

UP UP

DNDN

DN

UP

40'-0

"36

'-0"

36'-0"24'-0"28'-0"28'-0"28'-0"24'-0"

38'-0

"36

'-0"

40'-0

"

N

2ND LEVELSCALE: 1’= 3/64”

168'-0"

190'

-0"

13

Page 14: Portfolio 2006-2015

14

Page 15: Portfolio 2006-2015

As the major program creative thought in this project, the AUD OMNI as a incubator plays a role of bridging up academic world and professional world. In that sense, students could benefit from office renters/ start upers by embibing their professional cutting edge thoughs while renters could taking use of the school resources both in terms of tools and intellegence.

PROGRAM

15

Page 16: Portfolio 2006-2015

One important though about the roof gesture is exhibition. Architecture school has been so latent in the current campus that the quality of display has been highly underestimated. Based on the essensce of architecture major, what students making in the school should be displayed to the whole campus. The three roof terraces leading from the couryard to the building inside plays such a role to bring in views and attentions from the campus to the school. They are not only displaying platfroms but also working areas reaching to studios: why not work in a open semi-exterior spaces rather then your tiny little table?

TERRACING

OUTDOOR WORKING+DISPLAY PLATFORM

IDEAS STUDIO

BASE STUDIO

AUDITORIUM/LOBBY

OMNI OFFICE + FACULTY

MODEL SHOP ROBOT SPACE

16

Page 17: Portfolio 2006-2015

OUTDOOR WORKING+DISPLAY PLATFORM

IDEAS STUDIO

BASE STUDIO

AUDITORIUM/LOBBY

OMNI OFFICE + FACULTY

MODEL SHOP ROBOT SPACE

MEZZANINE FLOOR PROFILE

3RD FLOOR PROFILE

2ND FLOOR PROFILE

17

Page 18: Portfolio 2006-2015

As another major topic disscussed in the studio, the corridor has been studied and classified into groups: based on the relationship between adjacent programs. One important question is how to embib programs and informal activities into this circulation driven functional spaces. The zig-zag of passways shown in the floor plans is driven under the intension of making width as response to crowd volume. To be more clearified. wider corridor means possiblities of social and communicating, while narrowr corridor means passing. In that way, the building was populated under the rule of corridor.

CORRIDOR

18

Page 19: Portfolio 2006-2015

19

Page 20: Portfolio 2006-2015

20

Page 21: Portfolio 2006-2015

Second Year Graduate Level Studio Teamwork, Partner: Gaelan Finney-dayProf. Stewart HicksJan 2012 - Jun 2012Chicago, IL , USA

THE MIDWEST HORIZON PRESERVATION SOCIETY

21

Page 22: Portfolio 2006-2015

This is a post-modern studio. More specifically, the studio is aimed to explore the significance of architecture (as a response to the international style generic buildings whose individual identities is getting more and more blurry) based on study of Étienne-Louis Boullée’s monumental architecture work and Robert Venturi’s definition of symbol and icon. There are several assignments (such as study of iconic from, ‘miniature photography’ and telling stories about spaces by using the form and photo studied previously)prepared for the finale architecture design project- the mid-west museum in a generic site in Chicago.

WHEN BOULLEE MARRIES VENTURI

22

Page 23: Portfolio 2006-2015

23

Page 24: Portfolio 2006-2015

Entry points are unnapparent and restrict full views of the interior until arrival at the star-shaped atrium. From there, populated towers rise up and frame the sky. Views of the exterior are available only at the two highest of the five peaks, the other three afford different vantage points of the interior. For the bulk of inhabitants, this arcology restricts focus to within, only the most privileged maintain awareness of an outside world.

STORY #1 THE ‘CANDY MOUNTAIN’

24

Page 25: Portfolio 2006-2015

CUBIC ACCORDIAN

FLATTER PILLAR

CUT THUMB

CHEESWEET

STEP MOUND

SPACECHIP

ANGLEBEAST

A LETTER

FLEA FLOAT

PROPPED BUBBLE

DOWNTOWN

SUPERNOVO

25

Page 26: Portfolio 2006-2015

As the dawn crept over the horizon, a sense of their surroundings took form. Before them lay an immeasurable spread intermittently perforated by pockets of green. To the north, something metallic glimmered behind the lifting fog. Each stood knee-deep in a densely knit mound of mossy grass. Beneath them, the ground was a circular oasis of rich, black earth in an otherwise barren, rocky landscape.

Their pale skin began to darken in the rising sun. Their muscles, weak and tired, began to flex beneath their filmy clothing. Their eyes brightened as addresses, errands, and all manner of imperatives began to take shape in their minds. Thoughts of confusion were replaced by needs, objectives, and hunger. One of the men in a business suit looked at his watch and coughed impatiently. All at once, they unstuck their feet from the dirt and dispersed.

STORY #2 THE ‘BLOOM’

26

Page 27: Portfolio 2006-2015

27

Page 28: Portfolio 2006-2015

This is a wonderful morning as usual, though not as usual as that a century before. People are still trapped by the post-century flood. That is why those gigantic monuments are standing there, and no longer served as monument only. Yes, they are sparse oasis in the desert. Yes, it is Cenataph de Torin, though it only existed on paper in 18th century France. Yes, people are building there life and home there! Trees are spring up out from brick gaps; Tenements are built upon terraces; those stages for pilgrims are now served as everyday used trails. People at the age are forced to go back to primitive, but they never know primitive could be so harmonious. Maybe, instead of the end of the world, this is an opening for another world.

STORY #3 CENATAPH DE TORIN

28

Page 29: Portfolio 2006-2015

29

Page 30: Portfolio 2006-2015

The increasing loss of horizontal identity led to the formation of the Midwest horizon preservation society, dedicated to collecting and maintaining the fading horizons of the region. Their assertionswere simple: without distinguished horizon, all concepts of exteriorspace were without basis.The loss of distinction between up and down would inevitably damage the human psyche and all but destroy the overarching regional identity. Road trips would lose their romance, cowboys would ride off into the fog, and sextants wouldgo obsolete. It became the preservation society’s mission to create a last bastion where horizons remained pristine and untouched.

STORY #4.1 THE PILGRIMAGE

30

Page 31: Portfolio 2006-2015

31

Page 32: Portfolio 2006-2015

32

Page 33: Portfolio 2006-2015

We were losing our horizons. Perhaps it was the low hanging smog, or an untreated myopic epidemic, but the skylines that so defined the Midwest since the beginning of time had begun to lose their distinction. The earth and heaven were no longer discrete; their division had been replaced by a slow, foggy gradation. Gone was the thin film separating the yellow prairie from the vast blue sky, gone were the silo-studded silhouettes contouring the edges of vision, and gone too were the iconic cityscapes that reached jaggedly upward like a glistening underbite.

STORY #4.2 HORIZON CRISIS

33

Page 34: Portfolio 2006-2015

34

Page 35: Portfolio 2006-2015

The enormous mountain-tower that was their refuge provided both a landmark against the abstract panorama and a lookout for any signs of a reemerging horizon. High above, when the smog would thin or break, the gentle curvature of earth was still visible, and the monks at the highest peaks would focus their telescopes and camera obscura on the phenomena and project it downward on the mountain for all to see

and feel. And in this way, the horizon repository became the storage place of lost skylines, cityscapes, vistas, scenes and panoramas; a catalog of divisions, distinctions, splits, and separations between above and below; a rehabilitation center for those whose loss of exterior spatial reference had taken its toll, and an outpost searching the distance for signs of the horizon’s return.

STORY #4.3 AT THE TOP OF ‘MOUNTAIN’

35

Page 36: Portfolio 2006-2015

Second Year Graduate Level Studio Individual Work

Prof. Ben RefuerzoDec2012 - Mar 2013

Santa Monica,CA, USA

HOUSE OF STEEL

36

Page 37: Portfolio 2006-2015

37

Page 38: Portfolio 2006-2015

38

Page 39: Portfolio 2006-2015

The Steel House Studio of UCLA has a history of 10 years. This is a construction-oriented studio, which means other than a strong architectrual design scheme required, a comprehensive understanding of construction should also be indivated. The final product is a set of design document including architecture and structure.

My shceme is based on a response to the 20th century steel static, and saying that other than the post-lintel mode, steel has the potential to describe surfaces. The project is about a folding spatial manupulation plus an exploration of the specific steel stactic attached on it.

NOVELTY OF STEEL

39

Page 40: Portfolio 2006-2015

40

Page 41: Portfolio 2006-2015

41

Page 42: Portfolio 2006-2015

42

Page 43: Portfolio 2006-2015

43

Page 44: Portfolio 2006-2015

44

Page 45: Portfolio 2006-2015

45

Page 46: Portfolio 2006-2015

46

Page 47: Portfolio 2006-2015

47

Page 48: Portfolio 2006-2015

48

Page 49: Portfolio 2006-2015

Samper already provided us with tectonic paradign about architectural envelpe in 19th century. Skin is an important part of architecture as structure is. In this project, a study of zinc panel system is processed as the vehicle for building envelope. By taking use of metal’s thermal property, hot water pipe is embeded underneath, and as a optional way for hot water supply.

ENVELOPE

49

Page 50: Portfolio 2006-2015

50

Page 51: Portfolio 2006-2015

Frist Year Graduate Level Studio Individual WorkProf. Roger HubeliJan 2011 - Jun 2011Elk Grove Village, Chicago, IL, USA

THE BIKER'S COMMUNITY

51

Page 52: Portfolio 2006-2015

This project is just for arguing the potential significant of the conventional warehouse which is widely considered as “faceless architecture”. The project starts from research of one perticular architectural material for its ‘myth’, which is fiber reinforced plastic for my group. The final product is a sculpture expressing the meaning of this material.

This is a difficult task because compared to materials such as concrete and brick, FRP is never a traditional architectural material. There is not any established myth about this material in mind, so it is necessary for us to create one. By taking use of its positive performance of strength and weight, FRP can free spaces from wall or grid structure, which has been strongly defined by masonry and concrete columns. In the spatial paradigm defined by plastic, there is no longer concept of wall or ground, and any boundaries can be erased.

FIBER-REINFORCED PLASTIC

MASONRY FRAME BLUR

52

Page 53: Portfolio 2006-2015

53

Page 54: Portfolio 2006-2015

54

Page 55: Portfolio 2006-2015

The increasing loss of horizontal identity led to the formation of the Midwest horizon preservation society, dedicated to collecting and maintaining the fading horizons of the region. Their assertionswere simple: without distinguished horizon, all concepts of exteriorspace were without basis.The loss of distinction between up and down would inevitably damage the human psyche and all but destroy the overarching regional identity. Road trips would lose their romance, cowboys would ride off into the fog, and sextants wouldgo obsolete. It became the preservation society’s mission to create a last bastion where horizons remained pristine and untouched.

DIRTRIBUTION CENTER

55

Page 56: Portfolio 2006-2015

56

Page 57: Portfolio 2006-2015

In the building system, Fiber Reinforced Plastic is majorly used as the cladding material. The building system can be divided into four layers. There are two layers of FRP cladding system between which the structure steel frame sandwiched. The external panels are prefabricated and adjustable; the inner surface is for rain proof and thermal purpose. Thus, the utilization of FRP is maximized in its expressing aspect instead of structural aspect, which is part of the myth I found of this certain material.

STRUCTURE

57

Page 58: Portfolio 2006-2015

step=0.018count 1= 25count 2=5count 3=25

step=0.018count 1= 25count 2=2count 3=15

step=0.025count 1= 10count 2=5count 3=10

step=0.025count 1= 40count 2=0count 3=0

step=0.018count 1= 40count 2=5count 3=0

58

Page 59: Portfolio 2006-2015

In this project, modularity is an embedded idea with tectonic. There should be two aspects of the concept of modularity. One is prefabricated duplicability; the other is changeability. Based on this concept, the dynamic panel system is applied to the building structure as the building envelope. Each panel are in the same size and they position is adjustable via rotation. The envelope is dynamic and changes its form according to the bike track system.

MODULARITY

59

Page 60: Portfolio 2006-2015

BIKE TRAFFIC BIKE TRAFFIC

CAR TRAFFIC BIKE STATION

TRUCK TRAFFIC WORKING AREA

As described before, the aim for this project is to develop a new warehouse building typology. Presented in program and plan, this new type of warehouse is mainly comprised of working and traffic program.

For the working area, there are assembling lines, truck docks and storage racks. For the bike traffic part, there are track and bicycle station. There two parts of program collaborate soundly without interference with each other.

HYBRID

60

Page 61: Portfolio 2006-2015

1. WATER POOL2. PARKING LOT3. BIKE TRACK

1. SMALL ITEM STORAGE2. LARGE ITEM STORAGE3. CNVEYOR BELT4. QUALITY CONTROL STATION5. OUTGOING DOCKS

6. INCOMING DOCKS2. BICYCLE STATION3. PACKING AREA4. OFFICE AREA5. PARKING LOT

ROOF PLAN

FLOOR PLAN

61

Page 62: Portfolio 2006-2015

Based on study Kenneth Frampton’s tectonic, another important part of this project is about study the wall section of the designed warehouse. Since the warehouse building type has homogeneous structural components, it is a good opportunity to study the way it tectonic through wall section. The wall details drawing shows how the movable panel work with steel frames..

TECTONIC

62

Page 63: Portfolio 2006-2015

As a community for bikers, the warehouse context provides them a new sports context; as a warehouse for works, the bike community program injects vigor to the monotonous working flout.

CONTEXT

63

Page 64: Portfolio 2006-2015

Second Year Graduate Level Studio Individual Work

Prof: Camden GreenleeAug 2011 - Dec 2011

Champaign, IL, USA

PARKLAND AIRCRAFT INSTRUCTIONAL FACILITY

64

Page 65: Portfolio 2006-2015

65

Page 66: Portfolio 2006-2015

The Parkland Community College Air-frame and Power Plant Instructional Facility (APIF) provides aircraft hangar space, classroom, and metal- and electronics shop facilities together with the required offices for administrative support staff at Willard Airport in Champaign, Illinois. With the new facility the community college responds to the recent increase of demand for highly trained aircraft mechanical engineers and maintenance personnel in the aviation industry. Additional justification for the construction of the new instructional facility stems from an increase of interest and enrollment of foreign students who seek opportunities to be instructed in the maintenance and repair of predominantly U.S.-manufactured aircraft in their home countries.

AIRCRAFT INSTRUCTIONAL FACILITY

66

Page 67: Portfolio 2006-2015

The concept is a practical and straightforward response to the site and program requirement, which is to ‘wrap up’ all the programs by using continuous frame structure and finally organize them into separated parts. The concept developing diagram shows the responses to site in different stages.

WRAPPING

67

Page 68: Portfolio 2006-2015

Energy efficiency is one big part of this project. The design of the building envelope should take into consideration of the UA value. Total UA value should be calculated by the sum up the products of area and resistance. There is standard value looked up from chart and calculate level according to the design. A comparison should be made at last and leading the next step of HVAC design.

ENVELOPE

68

Page 69: Portfolio 2006-2015

69

Page 70: Portfolio 2006-2015

Thermal calculation and design of HVAC system is one of the big portions of this integrated design project. For the first stage, the UA value of building envelope system has to be calculated. Then it follows the choosing of HVAC system. Finally a specific duct system for ventilation and cooling & heating proposal has to be given.

-The building hvac system is basically consisted of a central all- air vav system and a central all-water fan coil system.

-Main-system: The all-air vav system serves the hanger and shops, of which the area is comparatively larger. vav system can offer a high degree of temperature control while keeps a moderate cost. This system mostly serves the internal spaces.

-Secondary system: The all-water fan coil system serves the offices and classrooms, which mainly locate in the second floor with a comparatively smaller area. This system saves much more area of ducts and makes it possible to control temperature of individual rooms separately.

ARCHITECTURE EQUIPMENT

HVAC SYSTEM CHOOSING

70

Page 71: Portfolio 2006-2015

-This zoning diagram only shows the biggest picture of zoning idea, which means zones can be increased if higher thermal condition wanted be achieved.

-HVAC zoning basically based on the following considerations:1.activities2.Schedule3.orientation4.internal heat gains

-Basically Hangar and other programs are separated because of large difference in terms of size and activities (hangar has higher requirement of thermal condition for the equipment maintenance).

-Furthermore, other programs are divides into zones according to space area and utility frequency. The staff and students are also taken into account and different thermostats are provided.

-The mechanic room locates in basement (the mid-top side of building).

-Main duct of the vav system runs through the mid-corridor and branch ducts go to the two wings (short direction). The supply diffusers locate in perimeter side while return diffusers locate in internal side.

-Water pipes which supply hot and cold water of the all-water fan coil system run through the holes on w-sections and internal partition walls. All –water system serves the perimeter spaces which have large glazing area facing outside.

ZONING

DUCTS, PIPES AND MECHANIC ROOM

71

Page 72: Portfolio 2006-2015

For the detail construction, corrugated steel sheet is adopted as major surfacing material. Insulations and water infiltrations are two essential layers which have to wrapping around the transverse section to make sure the building is well proofed.

THE WALL SECTION

72

Page 73: Portfolio 2006-2015

One major feature of this building system is its duplicable frame structure. The oval itself decomposed and recomposed again to form different spaces. The four sections shows the major transition point of the whole structure system.

DUPLICABILITY

73

Page 74: Portfolio 2006-2015

74

Page 75: Portfolio 2006-2015

Third Year Graduate level StudioTeamwork, Partner: Pen HuJan 2013 - Jun 2013Prof: Kevin EricksonNew York, USA

THE MONU-FRASTRUCTURE OF GOWANUS CANNEL

75

Page 76: Portfolio 2006-2015

Rainfall water settled dowm through ground opennings

Collected in the tanks and being treated with puriication

Puriied water used for swmming pool

Used for water-air HVAC

76

Page 77: Portfolio 2006-2015

Rainfall water settled dowm through ground opennings

Collected in the tanks and being treated with puriication

Puriied water used for swmming pool

Used for water-air HVAC

Infrastructures are those urban elements of which the mundane utilization domains all other architectural significances. Pools and drainage water treatments are two typical examples. The first is all about recreation and the latter is totally for purification. Under the condition that the current flood handling capacity of New York City is required to be enhanced and more water treatments are needed, there is a question about how to keep the balance between constructions of additional water plants and preservation of existing open spaces.

NONUMENTAL+MUDANITY

77

Page 78: Portfolio 2006-2015

78

Page 79: Portfolio 2006-2015

79

Page 80: Portfolio 2006-2015

80

Page 81: Portfolio 2006-2015

81

Page 82: Portfolio 2006-2015

Third Year Graduate StudioTeam Work

Partners: Andrew McVeign, Brain Elberti, Pen HuProf: Paul Armstrong

Jan 2013 - Jun 2013Chicago, IL, USA

THE FRANKLIN POINT MASTERPLAN + ARCHITECTURE

82

Page 83: Portfolio 2006-2015

83

Page 84: Portfolio 2006-2015

CONCEPT DIAGRAM

Chicago is one of those cities whose image is firmly asscociated with its signrature skyline. Especially in this case of Chicago, skyline as a aggregation of 19th century technological artifaces, seems means more to the architectrue discourse as a ‘tower-ish’ static. Franklin point is one of those famous open spaces located in the central part of downtowen Chicago. Couple competetions have been held searching for a optimistic proposal for the lot’s occupation. This is a studio focusing right on this topic. The design process runs from masterplan initially to the architecural proposal as well as some detail study of the building components.

CHICAGO SCHOOL STATIC

84

Page 85: Portfolio 2006-2015

CONCEPT DIAGRAM

85

Page 86: Portfolio 2006-2015

PODIUM WALL SECTION

86

Page 87: Portfolio 2006-2015

In this design scheme, concept is based on a continuation of traditional chicago static, in addition attaching contemporary programmatic idea and skyscaper theories to it. Public spaces is intersected in between those 100’ height towers. Beside, facade projections are varying according to the apartments unit types, with based on the market requirement. Podiums are simple stackings with set backs at certain distance, for both public and private utilization.

VERNACULAR & INTERNATIONAL

87

Page 88: Portfolio 2006-2015

88

Page 89: Portfolio 2006-2015

work Samples and Fine arts2006-2015

APPENDIX

89

Page 90: Portfolio 2006-2015

Supera Studio Tech Seminar Team WorkMember: Ji Qu (Leader), Jason Zhang, Xiaoyuan Li, Puyang HouFall 2013

HOTWIRE & FORMS

90

Page 91: Portfolio 2006-2015

Supera Studio Tech SeminarTeam WorkMember:Hao Weng (Leader), Ji Qu, Heyi Li, Yuan ZhouWinter 2013

ANIMATED MOLDING

91

Page 92: Portfolio 2006-2015

WOWWW.. WHAT A NICE ROOF GARDEN. I WILL BE HAPPY EVEN IF I CAN SLEEP HERE EVERYDAY.

rUSSELL! IT IS SO NICE TO MEET YOU AGAIN, WHICH I THOUGHT NEVER COULD BE

SO HAPPY TO HEAR THAT

I KNOW. I REALLY MISS YOU.HOW DO YOU FIND THIS PLACE? HOW IS YOUR FAMILY?

THANKS FOR THE HUD-VASH PROGRAM. YOU KNOW THAT I LEFT HOME AFTER RETURN FROM IRAQ. I DO NOT KNOW HOW TO LIVE AND HAVE NO SKILL TO MAKE A JOB.SO LUCK THAT THEY FOUND ME AND JOIN ME TO THE SUPPORTIVE HOUSING PROGRAM, AND LET ME STUDY BROADCASTING. nOW MY LIFE IS COLORFUL AGAIN !

supplies collected and delivered to night time shelters

i am a homeless before

JUST COMING! WELCOME TO MY HOME! I KNOW IT IS TINY, BUT IT’S WARM

SO WHAT ABOUT YOU JASON? I KNOW YOU HAVE THE SAME SITUATION WITH ME AFTER WAR

MY LIFE IS NOT SO HAPPY. I LFET HOME AS WELL, BUT STILL LIVE ON STREETS. I STAY IN DIFFERENT PLACE EVERYDAY. I COLLECTING TRASHES AND SELLING FOR THE MINIMUM INCOME. AND i AM SO EAGER TO BE SETTLING

SO SORRY ABOUT TAHT...NO WORRIES. THERE SHOULD BE RESAONS WHY WE MET AGAIN. I KONW GOD IS ALWAYS BLESSING ON YOU. THIS WILL BE YOUR FUTURE HOME AS WELL. lET’S GEY OUTSIDE FIRST, AND LET ME SHOW YOU MORE

now we on standing on above the union. this is the place for those trained homeless to join the society agin. here they act their roles as waiters, machinists, or cooks. you cannot imgae how colorful lift it is to have home again, as well as life.

so join us, and let us be brothers again, just like those times we fight on the battle.

i think i will try that. maybe my life could be polished again!

today lets talk about hegiene

WAHT A COZY PALCE!

LIVING ROOM

KITCHEN

STUDY ROOM

BED ROOM

THIS ROOF GARDEN CONNECT US TO THE HOMELESS UNION/TRANSIT HUB. LET ME SHOW YOU HOW WE GET THERE

here is the health-care center. people get first aid here, as well as mental care

wow! so cool the graffity is

i know! here is the gallery. For those who are artists!

here is the training center. they teach homeless basic skills to get involved to society.

fell better today?

OH JASON..THAT’S NOT MY INTEND TO DO SO

so many people are helping us. they design cells for those homeless they are not able to providing home. people collecting supplies during daytime and homless occupied that space during night time can use those.

SCENE 2MEET AGAIN

92

Page 93: Portfolio 2006-2015

WOWWW.. WHAT A NICE ROOF GARDEN. I WILL BE HAPPY EVEN IF I CAN SLEEP HERE EVERYDAY.

rUSSELL! IT IS SO NICE TO MEET YOU AGAIN, WHICH I THOUGHT NEVER COULD BE

SO HAPPY TO HEAR THAT

I KNOW. I REALLY MISS YOU.HOW DO YOU FIND THIS PLACE? HOW IS YOUR FAMILY?

THANKS FOR THE HUD-VASH PROGRAM. YOU KNOW THAT I LEFT HOME AFTER RETURN FROM IRAQ. I DO NOT KNOW HOW TO LIVE AND HAVE NO SKILL TO MAKE A JOB.SO LUCK THAT THEY FOUND ME AND JOIN ME TO THE SUPPORTIVE HOUSING PROGRAM, AND LET ME STUDY BROADCASTING. nOW MY LIFE IS COLORFUL AGAIN !

supplies collected and delivered to night time shelters

i am a homeless before

JUST COMING! WELCOME TO MY HOME! I KNOW IT IS TINY, BUT IT’S WARM

SO WHAT ABOUT YOU JASON? I KNOW YOU HAVE THE SAME SITUATION WITH ME AFTER WAR

MY LIFE IS NOT SO HAPPY. I LFET HOME AS WELL, BUT STILL LIVE ON STREETS. I STAY IN DIFFERENT PLACE EVERYDAY. I COLLECTING TRASHES AND SELLING FOR THE MINIMUM INCOME. AND i AM SO EAGER TO BE SETTLING

SO SORRY ABOUT TAHT...NO WORRIES. THERE SHOULD BE RESAONS WHY WE MET AGAIN. I KONW GOD IS ALWAYS BLESSING ON YOU. THIS WILL BE YOUR FUTURE HOME AS WELL. lET’S GEY OUTSIDE FIRST, AND LET ME SHOW YOU MORE

now we on standing on above the union. this is the place for those trained homeless to join the society agin. here they act their roles as waiters, machinists, or cooks. you cannot imgae how colorful lift it is to have home again, as well as life.

so join us, and let us be brothers again, just like those times we fight on the battle.

i think i will try that. maybe my life could be polished again!

today lets talk about hegiene

WAHT A COZY PALCE!

LIVING ROOM

KITCHEN

STUDY ROOM

BED ROOM

THIS ROOF GARDEN CONNECT US TO THE HOMELESS UNION/TRANSIT HUB. LET ME SHOW YOU HOW WE GET THERE

here is the health-care center. people get first aid here, as well as mental care

wow! so cool the graffity is

i know! here is the gallery. For those who are artists!

here is the training center. they teach homeless basic skills to get involved to society.

fell better today?

OH JASON..THAT’S NOT MY INTEND TO DO SO

so many people are helping us. they design cells for those homeless they are not able to providing home. people collecting supplies during daytime and homless occupied that space during night time can use those.

SCENE 2MEET AGAIN

Final Work for AUD 291 Theory of ProgramIndividual WorkFall 2013

GRAPHIC NOVEL

93

Page 94: Portfolio 2006-2015

94

Page 95: Portfolio 2006-2015

Summer Intern 2014 Jun 2014 - Sep 2014

Team: Joerge De La Cal, Fabian Kremkus,

Tanner Clapham, Ji Qu

NANTONG 3RD CONTSRUCTION GROUP HEADQUARTER PLAN AND DESIGN

95

Page 96: Portfolio 2006-2015

96

Page 97: Portfolio 2006-2015

97

Page 98: Portfolio 2006-2015

Intern ProjectIndividual WorkSummer 2011

Yinchuan, Ningxia, China

Sophomore Studio ProjectIndividual WorkSep 2007- Dec 2008Tongji Campus, Shanghai, China

STUDENT UNION

LONGFENGGE TOWER

98

Page 99: Portfolio 2006-2015

Sophomore Studio ProjectIndividual WorkFeb 2007- Apr 2007Tongji New Village, Shanghai, China

TWISTED HOUSE

Undergrad Thesis ProjectIndividual Work

Feb 2007- Apr 2007Wuyuan, Jiangsu, China

WATER’S TALE WUYUAN TOURSIT CENTER AND LANDSCAPE DESIGN

99

Page 100: Portfolio 2006-2015

First Year Graduate Studio ProjectIndividual WorkSep 2010- Dec 2010Champaign, IL, USA

CELLULAR DWELLING

100

Page 101: Portfolio 2006-2015

Junior Studio ProjectIndividual WorkApr 2008Generic Site

MUSIC SPACE

Third Year Graduate Studio ProjectTeam Work

Aug 2012- Sep 2012Cleveland, Ohio, US

UNDER THE BRIDGE

101

Page 102: Portfolio 2006-2015

Transformers Bumblebee ModelSketchup, Fall 2012

102

Page 103: Portfolio 2006-2015

Meditation ChairFall 2010

Gundam UnicornSketchup + Keyshout, Fall 2011

103

Page 104: Portfolio 2006-2015

University of Illinois at Urbana Champaign

University of California Los Angeles

China North-West Building Design Research Design Institute (Shanghai Department, Shanghai, China)

Federal Architects, Shanghai

Tongji University

China North-West Building Design Research Design Institute (Headquarter, Xi’an, Shanxi, China)

Hopscape Design Studio, 3535 Hayden Ave, Culver City, CA

Sep 2010 - Jun 2013

Sep 2013 - Jun 2015

Aug 2006 - Jun 2010

Mar 2010 - May 2010

Oct 2007 - Feb 2008

Mar 2010 - May 2010

Jun 2011 - Aug 2011

Jan 2014 - Mar 2014

Tongji University

- Master of Architecture, School of Architecture (Quit)

- Master of Architecture, School of Architecture (In Progress)

[email protected](217) 550-20463420 S Sepulveda Blvd#303Los Angeles, CA, 90034

- Bachelar of Fine Art, School of Architecture and Urban Planning

- Design intern: Assistant in the submission of ‘HAISHANGHAI’ project Shanghai Provide alternative schematic design for the ‘Ba River Commercial Street’ Chanban, Xi’an, China

- Design intern: Provide complete design proposal for Tianjin Airport Industrial Park Steeet Furniture project

- Professor Assistent Assistant for opening ceremony for School of Design and Innovation Assistant for Desis Workshop Exhibition

- Design Intern: Provide alternative shematic design for ‘LONGFENGGE’ project Yinchuan, Ningxia, China

- Design Intern: Modeling (Rhino + Sketchup), Design Document Binding (Indesign) and Translation

EDUCATION

JI QURESUME

EXPERIENCE

104

Page 105: Portfolio 2006-2015

University of Illinois at Urbana Champaign

Architecture

Presentation

Rendering

Tongji University

Spring 2012Spring 2011

Fall 2011

Fall 2007Spring 2007

Fall 2006

- Nominated in the ‘Edward C. Earl Prize in Design’ scholarship- Nominated in the ‘Edward C. Earl Prize in Design’ scholarship- Honorable mention in the ‘Edward C. Earl Prize in Design’ scholarship

- Auto CAD- Autodesk Revit- Autodesk Maya- Autodesk Ecotect- Google Sketchup- Rhino

- Adobe Photoshop- Adobe Illustrator- Adobe Indesign- Adobe After Effect

- Key Shot- Lumion- Kerkythea- Cenima 4D

- Senior design was selected into outstanding collection of 2010 graduates- Art work ‘urban eddy’ was chosen for exhibitioni at Shanghai Art Gallery- Work was selected into collection of student work of college entrance examination (sketch section)

AWARDS

COMPUTER SKILL

105