portfolio 2010 rev.2
DESCRIPTION
Sunghwan Yoon's architectural portfolio, 2nd revision.TRANSCRIPT
-
SunghwanYoon
-
Qualification Summary
4 years of professional experience
More than 2 winning scheMes in coMpetition every year
excellent it knowledge and experience
In development, architectural and urban design on a wide variety of projects in Korea and US
In professional competition from international master plan to local housing through the profes-sional years
From Rhino, Revit, Maya, Autocad, 3DS MAX to HTML, PHP, C++, MEL
EDucation
M.S. Architecture and Urban Design Columbia University, GSAPP New York 2010
Master of Architecture Hanyang University, HGSA Seoul 2006
B.S. in Architectural Engineering Hanyang University, Seoul Seoul 2003
German / English / Chinese major Myung Duk Foreign Language High School Seoul 1996
rEcEnt EVEntS / comPEtition / awarD
3rd Prize (Honorable mention) 45th Shinkenchiku competition Shinkenchiku, Japan Aug. 2010
Best Portfolio Design Honor Award for Excellence in Design Columbia Univ., New York May. 2010
Best Annual Studio Project Lucille Smyser Lowenfish Memorial Prizes Columbia Univ., New York May. 2010
Catskills Foodshed Research Group With Prof. Richard Plunz ,Urban Design Lab and Open Space Institute
Columbia Univ., New York Mar. 2010
After Bigness symposium committee With Prof. Mojdeh Baratloo Columbia Univ., New York Nov. 2009
Celebration of Cities competition Second Mention Prize with Song E Han UIA Nov. 2009
Exhibition of Small Sound, Open Space Commissioned design and build Maronie Theater, Seoul Jun. 2005
maJor ProfESSional ExPEriEncE
Kunwon Architects - Intermediate Designer - Best Designer Award in 2006, 2007, 2008
Seoul 2006-2009
Song do d-17, d-18 Block - 1,200 units of housing development
- Coordinate and design master plan and build-ing scheme with international developer as second chief designer pursing LEED certified high end housing complex
Gale international, Inchon Nov. 2008Under construction
Suwon Sk-View competition- 2,400 units of housing development
- SD proposal of master plan and building scheme for competition
- Coordinate with media artist
Gale international, Inchon Nov. 2008Under construction
complex nAVi - 1,000 units of housing development
- SD proposal of master plan and building scheme to be commissioned by international developer, and DD after commission
Al Reem Island Dev, Abu Dhabi Jul. 2008Under construction
Sunghwan Yoon395 Riverside Dr. APT 1E, NY, 10025
(718) 578-0499, [email protected]
-
gAte office of cheong wA dAe - Gate of Korean president office complex
- SD and DD for 859 m2 of green office, meet-ing room, public gallery and check-in facility with symbolic meaning and eco-engineering as a gate office of Korean president office campus
Office of the president, Kor Gov. Jun. 2008Completed in Jul. 2009
high one Ski ReSoRt - First prize of Turn-key competition
- SD and competition design for ski resort com-plex with 45 km of ski slope, hotel and casino. Consortium with Daewoo Construction and DMP architects.
Gangwon development corp Dec. 2007Completed in Nov. 2008
pAn gyo centRAl BuSineSS diStRict - First Prize of PF competition
- Project Financing competition for 1,216,000 m2 of mixed use master plan
- Consortium with Lotte Construction, Lotte Shopping, Kookmin Bank, Jungrim Archi-tects, La Guada Row Architects
Songnam, Gyeong-gi do Sep. 2007Under construction
fiRSt town - First Prize of international competition
- 7,000 initial housing units and master plan for a city of new alternative administrative capital of Korea
MACCA,Chungnam Oct. 2006Under construction
pAn gyo houSing - First Prize of competition
- Korean Housing Corporations high-end public housing competition
Songnam, Gyeong-gi do May. 2006Under construction
hAnul Architecture - Internship Seoul 2005
PArKer DurAnt internAtionAl - Internship Minneapolis, MN 2004
ProfESSional rEfErEncE
Prof. Richard Plunz Director of Urban Design in GSAPP, Columbia University
[email protected] +1 212 854 6440
Earl Jackson Associate Director in SOM [email protected] +1 212 298 9539
Angela Chen-Mai Soong Partner in Archipelagos,Adjunct Assistant Professor in GSAPP, Columbia University
[email protected] +1 917 656 9738
PErSonal rEfErEncE
Brad Kingsley [email protected] +1 347 416-3665
Joshua Turner [email protected] +1 917 751 2161
Chirag M. Patel [email protected] +1 863 529-3817
-
FirSt townfor macca, yEongi gun, chungnam, KorEa
Jun.2006 - oct. 2006 international competition, first Prize/ master plan design with Kyung ran Kim/ landscape design with Kyung ran Kim/ housing & unit type designoct. 2006 - dec. 2006 Schemetic Design/ community complex design/ coordinate meeting and presentation Jul. 2007 - dec. 2012 under construction
-
Professional work, 2006
-
Professional work, 2006
Ecological lanDuSE
Approximately 30% of overall site area is preserved with the original vegetation intact, which is over twice that of the 11.37% requirement. Old farmland, hills, and valleys survive here and there, placed freely in between artificial structures that will accommodate new lifestyle. These are seen as quilt pat-terns, and suggest how man-made structures should be arranged in the site. This is not to simply pre-serve old natural resources, but to make them as structural components for the new urban framework.
BaSic lanDuSEtErrain analySiS: nEutral uSE
tErrain analySiS : naturE uSE
-
for macca (multifunctional administrative city construction agency)SEJong city, chungnam, KorEa
Jun 2006 - oct 2006 international competition/ master plan design with Kyung ran Kim/ landscape design with Kyung ran Kim/ housing & unit type designoct 2006 - dec 2006 Schematic Design/ community complex design/ coordinate meeting and presentation Jul 2007 - dec 2012 under construction
-
firSt town
-
for macca (multifunctional administrative city construction agency)SEJong city, chungnam, KorEa
Jun.2006 - oct. 2006 international competition/ master plan design with Kyung ran Kim/ landscape design with Kyung ran Kim/ housing & unit type designoct. 2006 - dec. 2006 Schemetic Design/ community complex design/ coordinate meeting and presentation Jul. 2007 - dec. 2012 under construction
aB
c
-
firSt town
-
for macca (multifunctional administrative city construction agency)SEJong city, chungnam, KorEa
Jun.2006 - oct. 2006 international competition/ master plan design with Kyung ran Kim/ landscape design with Kyung ran Kim/ housing & unit type designoct. 2006 - dec. 2006 Schemetic Design/ community complex design/ coordinate meeting and presentation Jul. 2007 - dec. 2012 under construction
-
This project proposes a comprehensive ap-proach to water supply, flood mitigation and economic development in the context of Mum-bais current land and housing shortage by pro-viding a model where hydrological operations provide the formal logic for new development potentials. The eastern waterfront becomes the testing ground for patterns of development that confront the formal relationship between land, water and building typology.
After an in depth examination of Mumbai through the lens of water and its operation on the shape of the city, the project calls into question the relationship between hydrological operations and urban form at varying scales, both formally, socially and economically. These conditions reveal the tensions at play between water supply and access, flooding and drainage and ecology and development.
academic work, 2010
-
KinnE fEllowShiP StuDiolucillE SmySEr lowEnfiSh mEmorial PrizEDharuKhana, mumBai, inDia
JAn 2010 fiElD triP to mumBai JAn 2010 - mAy. 2010 / rhino scrips programming / landscape drawing/ master plan drawing + Brad Kingsley, Joshua turner/ Diagrams and rendering + Joshua turner, chirag Patel
hYdro-logic
-
july 15
th
july 1st
june 15th
june 10th
june 5
th
june
1st ea
ster
n tr
ack
of m
onso
on
western
track o
f mon
soon
32%
33%
20%
cyclone
drought
flood
seasonal migration of shipbrea
king workers
academic work, 2010
KinnE fEllowShiP StuDiolucillE SmySEr lowEnfiSh mEmorial PrizEDharuKhana, mumBai, inDia
JAn 2010 fiElD triP to mumBai JAn 2010 - mAy 2010 / rhino scrips programming / landscape drawing/ master plan drawing + Brad Kingsley, Joshua turner/ Diagrams and rendering + Joshua turner, chirag Patel
hYdro-logic
235 MGD
235 MGD
108 MGD
90 MGD
100 MGD
140 MGD
UpperVaitarna
ModakSagar
Tansa
Bhatsa
122.36m
128.63m
603.50m
163.15m
80.42m
139.17m
Vihar
LAKES OUTSIDE OF MAHARASHTRA
LAKES IN MAHARASHTRA
26 resourvoirs
Tulsi
4 MGD
Mumbai Faces Acute Water Shortage (07 July 2009 )BBC news
http://en.wikipedia.org/wiki/Tulsi_LakeWikipedia
http://theory.tifr.res.in/bombay/amenities/water/Mumbai Source
hyDrologic aS lanD rEclamationThis project proposes a comprehensive approach to water supply, flood mitigation and economic development in the context of Mumbais current land and housing shortage by providing a model where hydrological opera-tions provide the formal logic for new development potentials. The eastern waterfront becomes the testing ground for patterns of development that confront the formal relationship between land, water and building typology. After an in depth examination of Mumbai through the lens of water and its operation on the shape of the city, the project calls into question the relation-ship between hydrological operations and urban form at varying scales, both formally, socially and economically. These conditions reveal the tensions at play between water supply and access, flooding and drainage and ecology and development.
watEr SuPPly to mumBaiMumbais history of growth and development was enabled by the process of land reclamation, slowly filling in the low-lying wetlands between coastal islands and setting a precedent for the cities relationship between water and land. This process established the foundation for urban form in the city and determined the resulting urban spatial structure as major infrastructural routes were orga-nized around the relationship between reclaimed land and the location of original islands. Because the harbor no longer drains as it once did, these areas of low lying reclaimed land are particularly prone to intense flooding during monsoonal rains. Our proposed intervention positions itself on once reclaimed land between two of Mumbais original costal islands, at the convergence of major, yet under-utilized, rail and warehouse infrastructure and under-utilized coastal land owned by the Mumbai Port Trust and the Indian Navy.
economicS, Society and wAteR
-
SEVEn iSlanDSmangroVES / muDflat / SaltPan
These conflicts will only continue to worsen as the demand for new development comes into conflict with the implications of climate change and sea level rise. At the current rate Mumbai is experiencing a 100 year storm event every eight years, and recent studies show that climate change will affect the tim-ing and intensity of the yearly monsoon. The effect of such inconsistent water supply were apparent during the severe flooding in June of 2005 and the more recent drought of 2009 which required the city of Mumbai to cut water supply by 30 percent over and above the existing 1.4 million people cur-rently without access to daily water supply.
FLOODHAZARD
MANGROVES
MUDFLAT
ORIGINALISLAND
1867 1908 2009
SALT PANS
MANGROVE
MUDFLATS
1867 1908 2009
SALT PANS
MANGROVE
MUDFLATS
1867 1908 2009
SALT PANS
MANGROVE
MUDFLATS
Mumbai's flood is geographical as well as histori-cal and social problem. Original seven island map of Mumbai shows that its flood is the result of reclamation. To control flood and use rainwater / seawater at the same time, tracking water runoffs in designated site was necessary. This simple geo-metrical analysis matches recent flood situation.
100M
100ft
0.1mile
100M
100ft
0.1mile
run-off ScriPt (BEforE)
100M
100ft
0.1mile
100M
100ft
0.1mile
run-off ScriPt (aftEr)
100M
100ft
0.1mile
100M
100ft
0.1mile
run-off anD intErVEntion
wAteR Run-off ScRipt
-
feRRy teRminAl + deSAlinAtion fAcility
Anchoring the eastern node of the multi-modal corridor is the ferry terminal which establishes the connection to Navi Mumbai and its existing north-south transportation infrastructure and further opens the site for development. This infrastructure will be fully integrated with a new solar powered desalination plant recalling the Indian tradition of combining water infrastructure with public open space, such as the baudi step wells found through-out western India. The desalination plant is pow-ered by solar salt ponds, which, when combined with biosaline agricultural production remediate brackish water from the desalination process and create a grid of open space serving as a public plaza for entry into the site.
traDitional watEr infraStructurE aS PuBlic intErfacE
hyDro-logic
PuBlic SPacE
SEawatEr intaKE
aQuifEr rEchargE DrainagE
watEr loSt to EVaPoration
BioSalinE haloPhytESrEmEDiatE BracKiSh watEr
Solar PonDS PowEr DESalination Plant
DESalination Plant
-
Salt Pan in Dry SEaSon
Salt Pan in monSoon SEaSon
wEt & Dry oPEration: low tiDE
-1M
+1M
+2M
+3M
+4M
+4M
+4M
+4M
+4M
+4M
+2M
+2M
MULTIMODAL HUB
+2M
+2M
+1M
+1M
+1M
-1M
+1M
+2M
+3M
+4M
+4M
+4M
+4M
+4M
+4M
+2M
+2M
MULTIMODAL HUB
+2M
+2M
+1M
+1M
+1M
wEt & Dry oPEration: high tiDE
lanDScaPE moDEl BaSED on run-off ScriPt
pRoductiVe lAndScApe
DEconStructing thE EDgE: The project proposes to convert, slowly over time, the existing hard edge sea wall which currently traps runoff and damages mangrove habitats, to a soft edge interface between land and water. This strategy allows the tidal and seasonal hydraulic flows to impact the form of the edge, creating a new boundary between land and water and enabling the functionality of the site year round.
The edge capitalizes on both rainwater runoff (water-in) and tidal flows (water-out), enabling both flood mitigation and productive landscape elements respectively. chEx-mix urBaniSm
Ferry terminal
Desalination Plant
Multi-modal Hub
Shuttle using existing railroad Government investment
Government investment
Real Estate Development
Productive Landscape
Real Estate Development
Aordable Housing
Industry
Flood Control
AttractorEnvironment
1. Desalination Plant / ferry terminal 2. real estate Development3. Productive landscape4. affordable housing
JAn 2010 fiElD triP to mumBai JAn 2010 - mAy 2010 / rhino scrips programming / landscape drawing/ master plan drawing + Brad Kingsley, Joshua turner/ Diagrams and rendering + Joshua turner, chirag Patel
KinnE fEllowShiP StuDiolucillE SmySEr lowEnfiSh mEmorial PrizEDharuKhana, mumBai, inDia
-
hydRo typology
fSi(far) DiStriBution
6.00 FSI44% LOT COVERAGE
productive
20
retention
5
5
productive
retention
1.33 FSI25% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
public
3
3
productive aqua
BAR + TOWER TYPE
SITE AND SERVICE CLUSTER TYPE
SITE AND SERVICE HYBRID TYPE
SITE AND SERVICE LINEAR TYPE
6.00 FSI44% LOT COVERAGE
productive
20
retention
5
5
productive
retention
1.33 FSI25% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
public
3
3
productive aqua
BAR + TOWER TYPE
SITE AND SERVICE CLUSTER TYPE
SITE AND SERVICE HYBRID TYPE
SITE AND SERVICE LINEAR TYPE
6.00 FSI44% LOT COVERAGE
productive
20
retention
5
5
productive
retention
1.33 FSI25% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
public
3
3
productive aqua
BAR + TOWER TYPE
SITE AND SERVICE CLUSTER TYPE
SITE AND SERVICE HYBRID TYPE
SITE AND SERVICE LINEAR TYPE
6.00 FSI44% LOT COVERAGE
productive
20
retention
5
5
productive
retention
1.33 FSI25% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
2.00 FSI75% LOT COVERAGE
public
3
3
productive aqua
BAR + TOWER TYPE
SITE AND SERVICE CLUSTER TYPE
SITE AND SERVICE HYBRID TYPE
SITE AND SERVICE LINEAR TYPE
grEywatEr harVESting
SITE AND SERVICES_FLOW
BAR_DIRECTION
TOWER_RETENTION
CLUSTER TYPE CLUSTER TYPE
SITE AND SERVICES_FLOW
BAR_DIRECTION
TOWER_RETENTION
CLUSTER TYPE CLUSTER TYPESitE anD SErVicES
hyDro-logic
ProDuctiVE lanDScaPE+tyPology anD faBricShybrid zone biosaline zone tidal zone
houSing
hybrid zone biosaline zone tidal zone
faBricS
hybrid zone biosaline zone tidal zone
hyBriD zonE
BioSainE zonE
tiDalzonE
We propose a reconfiguration of the waters edge and a reindustrializa-tion of the site which can capitalize on the existing rail and warehouse infrastructure and provide economic incentive to the Mumbai Port Trust to open the land for integrated residential and commercial development. The resulting urban form is creating by confluence between daily tidal
flows (water-in) and modified storm water runoff patterns (water-out), creating a wet system from which all further development is generated. Additionally, multiple building and housing typologies are created, each re-sponding formally to the hydrological functions generated by the relation-ship between water and socio-economic conditions.
-
JAn 2010 fiElD triP to mumBai JAn 2010 - mAy 2010 / rhino scrips programming / landscape drawing/ master plan drawing + Brad Kingsley, Joshua turner/ Diagrams and rendering + Joshua turner, chirag Patel
KinnE fEllowShiP StuDiolucillE SmySEr lowEnfiSh mEmorial PrizEDharuKhana, mumBai, inDia
-1M
+1M
+2M
+3M
+4M
+4M
+4M
+4M
+4M
+4M
+2M
+2M
FERRY TERMINALMULTIMODAL HUB
+2M
+2M
+1M
+1M
+1M
DESALINATION PLANT
PRODUCTIVE LANDSCAPE
-
Professional work, 2007
-
high oneSki reSortturn-KEy (DESign BuilD) comPEtition, gangwon-Do, KorEa
dec. 2007 turn Key competition, first Prize/ reports and documents/ Presentation material/ resort housing & unit type designnoV. 2008 construction completed
-
high onE SKi rESort
-
turn-KEy (DESign BuilD) comPEtition, gangwon-Do, KorEa
dec. 2007 turn Key competition, first Prize/ reports and documents/ Presentation material/ resort housing & unit type designnoV. 2008 construction completed
-
Professional work, 2008
-
Suwon Sk houSinginVitED comPEtition for SK conStruction- Suwon, KorEa
Housing development project for 1,200 units in one of Seoul's peripheral city, Suwon. The site was SK chemical's oil refinery plant, The main issue was management between real estate and phasing through the time of remedia-tion.
Jun.2008 - noV. 2008 competition Design/ master plan design / master plan drawing/ landscape design, drawing with one landscape. co./ housing type and unit development
/ interactive media design in coordination with tobi (former interactive media designer at mVrDV)
-
Suwon SK houSing
tyPical Plan
toweR type i
loBBy Plan
-
inVitED comPEtition for SK conStruction- Suwon, KorEa
Jun 2008 - noV 2008 competition Design/ master plan design / master plan drawing/ landscape design, drawing with one landscape. co./ housing type and unit development/ interactive media design in coordination with tobi
tyPical Plan tyPical Plan
toweR type 2 toweR type 3
loBBy Plan loBBy Plan
-
Suwon SK houSing
community fAcility
1f Plan
1f Plan
ElEVation
ElEVation
-
inVitED comPEtition for SK conStruction- Suwon, KorEa
Jun 2008 - noV 2008 competition Design/ master plan design / master plan drawing/ landscape design, drawing with one landscape. co./ housing type and unit development
/ interactive media design in coordination with tobi (former interactive media designer at mVrDV)
1f Plan
ElEVation
-
Suwon SK houSing
-
inVitED comPEtition for SK conStruction- Suwon, KorEa
Jun 2008 - noV 2008 competition Design/ master plan design / master plan drawing/ landscape design, drawing with one landscape. co./ housing type and unit development
/ interactive media design in coordination with tobi (former interactive media designer at mVrDV)
-
Professional work, 2007
-
daejeon ktX StationDaEJEon rEnaiSSancE intErnational comPEtitionJun.2008 - noV. 2008 competition Design/ Develope concept and development strategy with in-Sun hahm/ master plan drawing / landscape design
-
PRT is a system of small vehicles under independent or semi-independent automatic control, running on fixed guideways. The idea attempts to address a number of perceived weaknesses of public mass transit including fixed time-tabling, limited routes, and sharing travel space with unrelated travelers.
Airplane runway needs stright enough to take off with high speed, and curve to rotate with low speed. That is why airplane runway is formed. With its character of transportation, railroad, road and airplane runway is formed. PRT is very similar to airplane with its way of speeding up, down and rotating.
Personal rapidtransit
connectionFAST and SMALLER
is needed
then how pRt based city should be formed?
Ktx (Korea train express) Station areaFor vast area of under-utilized high speed rail-way station area. government wants to develop big volumes of programs, such as convention center, shopping mall and exhibition, are divided.
DaEJEon rEnaiSSancE intErnational comPEtition Jun.2008 - noV. 2008 competition Design/ Develope concept and development strategy with in-Sun hahm/ master plan drawing / landscape design
DaEJEon Ktx Station
Morph
ologic
al resem
blance
Functio
nal rese
mblance
?can
guara
ntee
Typolo
gy :
-
Morph
ologic
al resem
blance
Functio
nal rese
mblance
?can
guara
ntee
Typolo
gy :
-
DaEJEon Ktx Station
-
DaEJEon rEnaiSSancE intErnational comPEtition Jun.2008 - noV. 2008 competition Design/ Develope concept and development strategy with in-Sun hahm/ master plan drawing / landscape design
ACTI
VITY
SYS
TEM
Des
pite
of
the
vagu
e di
ffere
nce
amon
g vi
sito
rs, D
aeje
on c
itize
ns, a
nd r
esid
ents
of
old
cent
ral
urba
n di
stric
t, ea
ch h
old
diffe
rent
typ
e of
Act
ivity
Pat
tern
s. A
ctiv
e pa
rtic
ipat
ion
is c
alle
d fo
rth
roug
h th
e pr
ovis
ion
of v
ario
us k
inds
of s
pace
, pro
gram
, and
eve
nts
upon
dat
a an
alyz
ing
each
activ
ity a
nd it
s flo
w.
-
urBan DESign StuDio - SunSEt ParK, BrooKlyn, ny Aug.2009 - noV. 2009 / Planning, master plan drawing / landscape design + come megane/ landscape drawing/ Diagrams and rendering + Brad Kingsley, nidhi Bhatnagar, come megane, monica Pinjani
academic work, 2009
Socio-hYdrologY
-
bush terminal landll peirsenvironmental restoration program
bush terminal building (rear)state superfund site
empire electric companystate superfund site
kings county worksstate superfund site
Socio-hYdrologYBrooklYn, nY
academic work, 2009
Post industrial city is a city that succeeded to transform its heritage into new potentialities. Ten years ago in Brooklyn, Williamsburg started to become an extension of Manhattan by convert-ing industrial sites. Following subway lines and other access ways, the developers now look at the mostly under utilized manufacturing building around the Gowanus canal as the next step of the process. The direction of this growth towards south set the scene of a confrontation between these developments and the will of the city to maintain the light industry in some of the same areas (North Sunset Park, Red Hook). If these disputed lots represent the potential of NYC for flexibility, a tabula rasa operation converting them into luxury condominiums represents its one way dry up.
SunSEt ParK arEa
2002-Residendial zone Brooklyn Heights
2010-Condos along Gowanus Canal
2008-Condos in Atlantic Yards
Manufacturing zone in Brooklyn
Natural Shoreline of Brooklyn
Gowanus CanalDevelopment
FlushingTunnel
Increasein Pumps?
New development
ECOLOGICAL IMPACT HISTORY OF POLLUTION
HISTORY OF LANDUSEMONOFUNCTIONAL CITY
2002-Residendial zone Brooklyn Heights
2010-Condos along Gowanus Canal
2008-Condos in Atlantic Yards
Manufacturing zone in Brooklyn
Natural Shoreline of Brooklyn
Gowanus CanalDevelopment
FlushingTunnel
Increasein Pumps?
New development
ECOLOGICAL IMPACT HISTORY OF POLLUTION
HISTORY OF LANDUSEMONOFUNCTIONAL CITY
hiStory of Pollution
hiStory of lanDuSE
Ecological imPact
mono-functional city
-
urBan DESign StuDioSunSEt ParK, BrooKlyn, ny
Aug.2009 - noV. 2009 / Planning, master plan drawing / landscape design + come megane/ landscape drawing/ Diagrams and rendering + Brad Kingsley, nidhi Bhatnagar, come megane, monica Pinjani
Pay PEr fluSh
filtEring ParK
MANUFACTURINGINDUSTRIAL
MANUFACTURINGINDUSTRIAL
MANUFA CTURIN
G
MANUFA CTURIN
G
MANUFACTURING
OWNER
ROOF
TOP
DEVEL
OPME
NT
INDUSTRIAL
RESIDENTIAL
GOWANUSDEVELOPMENT
ATLANTIC YARDDEVELOPMENT
changing LANDUSE
EnvironmEntal JusticE
macro conDitional ScEnario conditional scenario
ECO PARK
CSOs
NEW DEVELOPMENTwith DIVERSITY
CSOs
ADDENDUM
CSOs
FILTRATION CORE
CSOs
Rooftop Business Available Open Space Rooftop Retention Public Retention
micro conDitional ScEnario
conditional scenario
ECO PARK
CSOs
NEW DEVELOPMENTwith DIVERSITY
CSOs
ADDENDUM
CSOs
FILTRATION CORE
CSOs
Rooftop Business Available Open Space Rooftop Retention Public Retention
-
MANUFACTURINGINDUSTRIAL
MANUFACTURINGINDUSTRIAL
MANUFA CTURIN
G
MANUFA CTURIN
G
MANUFACTURING
OWNER
ROOF
TOP
DEVEL
OPME
NT
INDUSTRIAL
RESIDENTIAL
GOWANUSDEVELOPMENT
ATLANTIC YARDDEVELOPMENT
changing LANDUSE
Urban Diversity
Rooftop typology
- lESS than 30 unitS of houSing- PriVatE ownED By manufacturing ownEr
- BEtwEEn 30 unitS anD 60 unitS - rEnt to PriVatE DEVEloPEr / community
- BEtwEEn 30 unitS anD 60 unitS - rEnt to PriVatE DEVEloPEr / goVErnmEnt / community
$$$
BIO SW
ALE
50%
OF
GREE
N ROO
F
CHAN
NEL T
O
NEIGH
BOR
RETE
NTIO
N
RENT TO PRIVATE DEVELOPER
/GOVERNMENT+ HOTEL+ COMMERCIAL
MANUFACTURING
OWNERS BUSINESS
PERM
EABL
E PAR
KING
PUBL
IC SP
ACE
$$
$$
GREEN ROOF
STORMWATER
$$
$$
STORMWATER
STORMWATER
STORMWATER
ACCES
S
ACCES
SMANUFACTURING
OWNERS BUSINESS
$$$
GREEN ROOF
$$$$$$$$
ACCES
S
$$$$$$$$
ACCES
S
COMM
ERCIAL
/ HOT
EL
ACCES
S
$$$
BIO SW
ALE
50%
OF
GREE
N ROO
F
CHAN
NEL T
O
NEIGH
BOR
RETE
NTIO
N
RENT TO PRIVATE DEVELOPER
/GOVERNMENT+ HOTEL+ COMMERCIAL
MANUFACTURING
OWNERS BUSINESS
PERM
EABL
E PAR
KING
PUBL
IC SP
ACE
$$
$$
GREEN ROOF
STORMWATER
$$
$$
STORMWATER
STORMWATER
STORMWATER
ACCES
S
ACCES
SMANUFACTURING
OWNERS BUSINESS
$$$
GREEN ROOF
$$$$$$$$
ACCES
S
$$$$$$$$
ACCES
S
COMM
ERCIAL
/ HOT
EL
ACCES
S
$$$
BIO SW
ALE
50%
OF
GREE
N ROO
F
CHAN
NEL T
O
NEIGH
BOR
RETE
NTIO
N
RENT TO PRIVATE DEVELOPER
/GOVERNMENT+ HOTEL+ COMMERCIAL
MANUFACTURING
OWNERS BUSINESS
PERM
EABL
E PAR
KING
PUBL
IC SP
ACE
$$
$$
GREEN ROOF
STORMWATER
$$
$$
STORMWATER
STORMWATER
STORMWATER
ACCES
S
ACCES
SMANUFACTURING
OWNERS BUSINESS
$$$
GREEN ROOF
$$$$$$$$
ACCES
S
$$$$$$$$
ACCES
S
COMM
ERCIAL
/ HOT
EL
ACCES
S
SmAll lARge x-lARge
macro conDitional ScEnario
Socio-hyDrology
-
urBan DESign StuDioSunSEt ParK, BrooKlyn, ny
Aug.2009 - noV. 2009 / Planning, master plan drawing / landscape design + come megane/ landscape drawing/ Diagrams and rendering + Brad Kingsley, nidhi Bhatnagar, come megane, monica Pinjani
whEn it rainSRooftop BuSineSS
-
Socio-hyDrology
available rooftop
available rooftop 2
parking lot
park
possible housing
bioswale
possible mass housing
possible housing 2
possible green roof
-
available rooftop
available rooftop 2
parking lot
park
possible housing
bioswale
possible mass housing
possible housing 2
possible green roof
AVAILABLE ROOFTOP
AVAILABLE ROOFTOP 2
PARKING LOT
PARK
POSSIBLE HOUSING
BIOSWALE
POSSIBLE MASS HOUSING
POSSIBLE HOUSING 2
POSSIBLE GREEN ROOF
Messed-up plan not a maStEr Plan
urBan DESign StuDioSunSEt ParK, BrooKlyn, ny
Aug.2009 - noV. 2009 / Planning, master plan drawing / landscape design + come megane/ landscape drawing/ Diagrams and rendering + Brad Kingsley, nidhi Bhatnagar, come megane, monica Pinjani
-
mAR.2006 - dec. 2006 thesis Director - Prof. hyun Seo, hanyang university
-
automoBileFactorY urBan automoBilE factorygraDuation worK hgSa, 2006
academic work, 2006
-
=DesignProcessproduct = machine= process = elevation = function = kinetic Art = commercial
Boxed Spiral automobile production line fit to ur-ban context.
4km minimum length of one full production line is about 4 kilometer.
4 simplified Processes for future Auto-mobile Production
4 Processes
automoBilE factory
-
= ProDuction Process we dont have enough space in city, do we?SlopeSIm a Automobile
Factory.
I make cars, and I want to show
people what I do.
Ah-Ha, you are making my car!
urBan automoBilE factorygraDuation worK for hgSa, 2006
mAR.2006 - dec. 2006 thesis Director - Prof. hyun Seo, hanyang university
-
moRe flooR, SAme technology? After the development of modern structure technology, just stacking up seems enough. It makes same architecture, and every building is just a com-bination of walls and slabs eventhough they all have different use, aim and function.
automoBilE factory
-
ARchitectuRe iS moRe thAn SlABS And wAllS. Ms.Urbans complaints made Mr.Architecture worried so much, and its solutions are on architects hands. Sloped production line needs flat place to work, and way to carry components.
urBan automoBilE factorygraDuation worK for hgSa, 2006
mAR.2006 - dec. 2006 thesis Director - Prof. hyun Seo, hanyang university
-
hAnginglift
From body shop to assembly shop, to overcome non-linear ramp and to get a space for bottom work, hanging lift is used.
lift & conVeyeR
Heavy material is moved to press shop , and after pressed, moved to body shopby lift.
pAint Shop ASSemBly Shop
pReSS Shop Body Shop
automoBilE factory
-
peRSpectiVe eleVAtion also can show how the building works.
urBan automoBilE factorygraDuation worK for hgSa, 2006
mAR.2006 - dec. 2006 thesis Director - Prof. hyun Seo, hanyang university
-
Personal work, 2010
citY oF houSing, houSing oF citYcEntral glaSS intErnational comPEtition, ShinKEnchiKuSa, JaPanJun.2010 - Aug. 2010 / masterplan and landscape design/ unit design + Seohong min
-
Housing is infrastructure. The fundamental problem of housing as infrastructure is that it regulates a fixed lifestyle, making adaptation to environmental changes difficult. If housing can support a contem-porary heterogeneous lifestyle, it can play a monumental role in the realization of the sustainable City.
mASteR plAn250 PEoPlE x 41 corES = 10,250 PEoPlE
lanD arEa : 151,600 m2 / far: 316 % / max hEight: 35m
We believe City is not an aggregate of spaces categorized by definitive functions, but a continuum where private and public daily life can coexist. This proposal rehabilitates housing as infrastructure by 1) creating a series of overlapping conditions that blur the boundaries between public and private fields, 2) deconstructing the unit of Family, as we understand as housing, and 3) redefining the notion of private space.
-
city of houSing, houSing of city
plAn27 roomS + 35 roomS = 52 roomSfloor arEa: 2,695 m2
-
cEntral glaSS intErnational comPEtition, ShinKEnchiKuSa, JaPan
Jun.2010 - Aug. 2010 / masterplan and landscape design/ unit design + Seohong min
-
city of houSing, houSing of city
-
cEntral glaSS intErnational comPEtition, ShinKEnchiKuSa, JaPan
Jun.2010 - Aug. 2010 / masterplan and landscape design/ unit design + Seohong min
Public Facility
RAINWATE
R COLLECTO
R
LIVING FIE
LD
DINING FIE
LD
KITCHEN
LIBRARY
Pond
-
SunghwAnyoon
6174567805579
ISBN 978-0-557-61745-690000