portfolio

15
ADAM JURCZAK portfolio

Upload: adam-jurczak

Post on 24-Mar-2016

214 views

Category:

Documents


0 download

DESCRIPTION

A sample of a few works completed during my studies at IIT.

TRANSCRIPT

Page 1: Portfolio

ADAM JURCZAKportfolio

Page 2: Portfolio
Page 3: Portfolio

3

AD

AM

JURC

ZAK

CONTENTS

Chinatown Chicago Fire Station 4Northerly Island Pavilion 8Chicago Pre-Fab Modular Housing 10

Page 4: Portfolio

A fire station design allowing emergency vehicles toeasily access Archer Ave. and Wentworth Ave. whennecessary. The unique angles of the site translate intothe living and working spaces.

+ =

+ =

street accessibility from site parking determined by turning radius site + program

program abstracted program & proportion possible_configurations

PRO

GRA

MSI

TE

Chicago Chinatown Fire Station

Page 5: Portfolio

A

A

B

B

A

A

B

B

SECO

ND

FLO

OR

GRO

UN

D F

LOO

R

FALL 2008

AD

AM

JURC

ZAK

5

Page 6: Portfolio

nort

hwes

tel

evat

ion

sout

hwes

tel

evat

ion

sout

heas

tel

evat

ion

tran

sver

sese

ctio

n B

long

itudn

alse

ctio

n A

nort

heas

tel

evat

ion

Chicago Chinatown Fire Station

Page 7: Portfolio

VER

TICA

L W

ALL

SEC

TIO

N

AD

AM

JURC

ZAK

FALL 2008

7

Page 8: Portfolio

nort

hel

evat

ion

sout

hel

evat

ion

east

elev

atio

nw

est

elev

atio

n

A pavilion for Northerly Island whichencompasses the landscape whilecreating a space for reception andgathering, a space for exhibits, and aspace for lectures and presentations.

look

ing

nort

h at

the

pavi

lion

Northerly Island Pavilion

Page 9: Portfolio

9

shor

tse

ctio

nlo

ngse

ctio

ngr

ound

�oo

r

FALL 2009

AD

AM

JURC

ZAK

Page 10: Portfolio

A study of prefabricated modular homes for low income families of theWashington Park community. Specifically exploring the programmaticvariations of 12’ and 16’ wide units. The projects goal was to develop asite that would be family-friendly and exploit the oversized parkways

Chicago Pre-Fab Modular Housing

Page 11: Portfolio

Gathering AreaParkField

Flower GardenBasketball CourtPicnic AreaPlayground

exis

ting

cond

ition

s

solu

tion

SPRING 2010

AD

AM

JURC

ZAK

view

look

ing

sout

h do

wn

the

site

11

Page 12: Portfolio

Chicago Pre-Fab Modular Housing - 12ft Unit

fron

t ele

vatio

n of

the

12ft

uni

tWith these small homes it was critical to minimizethe circulation spaces in order to maximize the livingspaces. The 12' unit uses the fold back stair whichcentralizes vertical circulation and allowing easyaccess to the other spaces of the home. The secondfloor shifts forward four feet, creating to equalbedrooms for the two children. The third floor shiftsback two feet, dividing spaces for a master bedroomand a study.

Bathroom

Bedroom

Study

Living Room

Kitchen

Circulation

stud

y di

agra

ms

Page 13: Portfolio

a1

b1 b2

a1

b1 b2

a1

b1 b2

�oor

pla

ns

SPRING 2010

ecaps gnivil eht fo weiv

noitces gnol AD

AM

JURC

ZAK

13

Page 14: Portfolio

Chicago Pre-Fab Modular Housing - 16ft Unit

fron

t ele

vatio

n of

the

16ft

uni

t

Bathroom

Bedroom

Study

Living Room

Kitchen

Circulation

The 16’ unit being wider allowed for the use ofstraight stairs that were pushed aside. This moveagain minimizes circulation spaces and forms theliving spaces for a family of four. No shifts neededto occur in the plans as the stairs allowed for equallydivided bedrooms on the second floor as well as amaster bedroom for the parents on the top floor.

stud

y di

agra

ms

Page 15: Portfolio

t

a1

b1 b2

a1

b1 b2

a1

b1 b2

�oor

pla

ns

SPRING 2010

ecaps gnivil eht fo weiv

noitces gnol AD

AM

JURC

ZAK

15