Post Point Wastewater Treatment Plant Improvements Project Overview October 2010

Upload: others

Post on 17-Apr-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Post Point Wastewater Treatment Plant Improvements

Post Point Wastewater Treatment Plant Improvements

Project Overview

October 2010

Page 2: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Post Point WWTP Project Site

Page 3: Post Point Wastewater Treatment Plant Improvements

Projected BOD Loading

20,000

25,000

30,000

35,000

40,000

45,000

1998 2003 2008 2013 2018 2023 2028 2033 2038

Plan

t Influen

t BOD Lo

ad (lb/d)

Comp PlanReduced GrowthReduced Growth+Aggressive  ReductionHistorical Max 30‐Day Avg

Estimated Phase 1Completion (Year 2014)

Current WWTPCapacity

Page 4: Post Point Wastewater Treatment Plant Improvements

Average Monthly BOD Loading

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

J M M J S N J M M J S N J M M J S N J M M J S N J M M J S

% of R

ated

 Cap

acity

2006                       2007                      2008                   2009            2010

Page 5: Post Point Wastewater Treatment Plant Improvements

Average Monthly Flow1998-2010

0

2

4

6

8

10

12

14

16

18

20

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Average Mon

thly Plant Flow (m

gd)

Page 6: Post Point Wastewater Treatment Plant Improvements

Basis of DesignParameter Current NPDES

PermitDesign

Design Year --- 2034

Design FlowAverage AnnualMaximum MonthPeak Hour (plant)Blending allowed for peak flowPeak Hour (secondary)

---20 mgd72 mgd

Yes37 mgd

21.7 mgd34.3 mgd72 mgd

Yes40 mgd

Maximum Month Influent BOD 25,530 lb/d 39,800 lb/d

Maximum Month Influent TSS 47,000 lb/d 47,000 lb/d

Temperature Range --- 12-22.5 oC

Effluent BOD 30 mg/L 30 mg/L

Effluent TSS 30 mg/L 30 mg/L

Page 7: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Wetlands

NeighborhoodImpacts

InterpretiveTrail Loop/Public Access

Open Space(passive recreation)

Wildlife Habitat

Poor Soils

BellinghamBay

Page 8: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Page 9: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

CEPT Building

Page 10: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Chemically Enhanced Primary Treatment (CEPT) Building

Page 11: Post Point Wastewater Treatment Plant Improvements

Chemical Storage and Metering

• 2,600 sf Building• PAX, Polymer Storage• Electrical Room

Page 12: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

PEPSModifications

Page 13: Post Point Wastewater Treatment Plant Improvements

Modifications to Primary Effluent Pump Station

Structural Addition

Pump Replacement and Electrical Modifications

Page 14: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

BlowerBuilding

Selector/ AS Basin

Modificationsto Existing ABs

Page 15: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Selector/Activated Sludge Basin 1

Aluminum Covers

Sluice Gates

Page 16: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Blower Building

Page 17: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Oxygen Supply and Standby Power

• 5,800 sf Building• Blower Room• Generator Room• Controls Room• Electrical Room

Page 18: Post Point Wastewater Treatment Plant Improvements

Modifications to Existing Activated Sludge Basins

Remove SurfaceMixers

Aeration Piping

Reroute Large ML Process Piping

Page 19: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Flow Splitter Box

Secondary Clarifier

Page 20: Post Point Wastewater Treatment Plant Improvements

Secondary Clarifier Improvements

Pile Supports

Piping Connections

Addition to Splitter Box

RAS System Modifications

Page 21: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Additional Basin(future)

Page 22: Post Point Wastewater Treatment Plant Improvements

Additional Activated Sludge Basin(Likely Future Phase)

Flow Junction Box

0.84 MgalAeration Basin

Page 23: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Secondary Clarifier

Selector/ AS Basin

BlowerBuilding

CEPT Building

PEPSModifications

Flow Splitter Box

Additional Basin(future)

Page 24: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Yard Piping Layout

Page 25: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Piping Between PEPS and Selector/AS Basin 1

Page 26: Post Point Wastewater Treatment Plant Improvements

Filename.ppt

Secondary Clarifier Piping

Page 27: Post Point Wastewater Treatment Plant Improvements

. 2008 2009 2010 2011 2012 2013 2014

PlanningPreliminary Design Detailed DesignConstructionStartup

Complete construction

Project Schedule

Notification of Selected GC/CM

Complete MACC Negotiations

Begin Pre-Construction

Phase

Begin Construction