potential route segments - microsoft...regional park lake sammamish state park marymoor park bridle...
TRANSCRIPT
RENTON
MERCERISLAND
NEWCASTLE
ISSAQUAH
FACTORIA
BELLEVUE
KIRKLAND
REDMOND
169
900
900
520
520
202
202
167
405
405
90
90
CougarMountain
Squak MountainState Park
Natural Area
Soaring EagleRegional Park
LakeSammamish
State Park
Marymoor Park
Bridle TrailsState Park
May CreekPark
SewardPark
Coal CreekPark
Warren G.Magnuson Park
DuthieHill Park
RedmondWatershed
Preserve
pse.com/energizeeastside
Project Route Segments, Fall 2013 DRAFT
Route Segments
DCBA
G2G1FE J
K1IH
LK2
NM
ExistingSubstation
Lake Washington
Lake Sammamish
Beaver Lake Park
Tiger Mountain
PotentialSubstation Site
Sammamish
Lakeside
Vernell Westminster
TalbotHill
A
B
C
D
E
F G1
H J
K1
L
M
N
Route options will be configured to go from segment A to segment N and connect with one of the potential substation sites.
G2
K2
LEGEND
Existing substation
Potential substation site
A —N Route segments
Key observation point (KOP)
POTENTIAL ROUTE SEGMENTSFall 2013
Central 2
North 3
North 5
North 6
North 9
North 13
North 10
Central 3
North 1
Central 4
Central 15
Central 12Central 18
Central 19South 14
South 3
South 5
South 7South 12
South 8
South 10South 11
South 6
South 16
South 17
South 15
Central 16
Central 5
I
Community Advisory Group Meeting #4aJune 25, 2014 Locations of Photo Simulation Key Observation PointsNote: Photos taken during spring 2014
Time
Viewing Direction
Structure Type
Date
Address
9:32 AM
North
4/10/2014
4489 137th Ave SE
G2-9
Photo simulations are for discussion purposes only and may change pending public, regulatory and utility review
Existing Conditions
4/10/2014
Conceptual Project
JKOP
SEGMENTCENTRAL 15
Photo simulations are for discussion purposes only and may change pending public, regulatory and utility review
Existing Conditions
J
4/10/2014
Conceptual Project
G2-10
Time
Viewing Direction
Structure Type:
Date
Address
9:32 AM
North
4/10/2014
4489 137th Ave SE
KOPSEGMENTCENTRAL 15