power and gas - siemens - energy · pdf filesiemens core components (e.g. sgt6-8000h gas...
TRANSCRIPT
Siemens.com
Power and Gas Division
Unrestricted Siemens AG 2014 All rights reserved.
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 2 Power and Gas
Power and Gas Division
Key figures for FY 2014
Key figures for FY 2014
New Orders* 14"0
Revenue* 12"7
Division Profit* 2"2
(in billions of )
Employees* 41,525
* Incl. Service
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 3 Power and Gas
Power and Gas Division
Organizational structure as of October 1st, 2014
Div
isio
n
Busin
ess
Units
Bu
sin
ess F
ield
s
* Combined heat and power ** Integrated gasification combined cycle
Turbo compressors for
- Oil & Gas
- Industrial applications
Compressor packages incl. drives
Gas turbines
from 100 to
400 MW
Electrical
generators from
25 up to
2,235 MVA
Fuel gasifiers
Industrial gas
Turbines from
5 to 50 MW
Aero derivative
gas turbines
from 4 to
64 MW
Steam turbines
from 45 kW to
1,900 MW
Steam turbines
for industrial
applications &
power
generation
50 HZ and
60 HZ Gas
turbine power
plant solutions
CHP*
IGCC**
Repowering
Integrated solar
combined cycle
HRSG
Instrumentation and Electrical
(PG IE)
Compressors
(PG CP)
Large Gas
Turbines,
Generators
(PG GT)
Distributed
Generation
(PG DG)
Steam Turbines
(PG SU)
Energy Solutions
(PG ES)
Control
solutions
Electrical
solutions
Energy
management
solutions
Solutions for
distributed and
hybrid power
generation
Power and Gas
CEO Willi Meixner
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 4 Power and Gas
Fort Payne (US)
Power and Gas locations
underline our global footprint
Energy Solutions
Instrumentation & Electrical
Gas Turbines /
Generators
Compression
Houston (US)
Singapore (SG)
Vadodara (IN)
Huludao (CN)
Tokyo (JP)
Perm (RU)
Locations
Steam Turbines
Jundiai (BR)
Orlando (US)
Bandung (ID) Cilegon (ID)
Dammam (SA)** New Delhi (IN) Dubai (AE)
Charlottesville (US) Charlotte (US) Alpharetta (US)
Jupiter (US)
Bangalore (IN)
Gurgaon (IN)
** Under construction
Montreal (CA) Indianapolis (US) Mt. Vernon (US)
Seoul (KR) Nanjing (CN)
Shanghai (CN)
Duisburg*
Offenbach*
Leipzig*
Frankenthal* Karlsruhe*
Erfurt* Freiberg*
Berlin*
Gorlitz*
Nuremberg* Erlangen*
* GER
Essen*
Mulheim*
Elblag (PL)
St. Petersburg (RU)
Finspong (SE)
Lincoln (UK)
Hengelo (NL) Brno (CZ)
Newcastle (UK)
Budapest (HU) Vienna (AT)
Trollhaettan (SE)
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 5 Power and Gas
Power and Gas Division
BU Large Gas Turbines, Generators (PG GT)
Gas turbines
(100 MW to 400 MW)
Generators
(25 MVA to 2,235 MVA)
Fuel gasifiers
(Syngas output from 50,000 Nm3/h
to 210,000 Nm3/h)
System integration
SGT-8000H gas turbine series
Low investment costs per kW
Low lifecycle costs
High reliability and availability
Fast start-up and high operational flexibility
High efficiency: > 60 % in combined cycle
operation
Proven rotor design,
free radial thermal
expansion and
central tensioner
Evolutionary 3D compressor blading
Four-stage turbine
Improved combustion
system for ultra-low NOx
High load cycling
capacity through improved
blade-cooling system
Innovation highlight Portfolio
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 6 Power and Gas
BU Large Gas Turbines, Generators (PG GT)
Reference: SGT6-8000H
Brownfield re-powering project
Converting a conventional power plant into a modern, efficient
combined-cycle power plant
Market requirements
3SGT6-8000H, in combined-cycle multi-shaft configuration
Generator type SGen6-2000H
Total power output > 1260 MW net
Plant efficiency > 60.0 % net
Solution
One third less fuel consumption per megawatt-hour compared to the
site's previous plant
Fuel cost savings of nearly $1 billion over the turbines entire lifecycle
by upgrading the power plants
Customer benefit
Customer: Florida Power &
Light
Location: Cape Canaveral
Florida U.S.A.
Date: 2013
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 7 Power and Gas
Power and Gas Division
Business Unit Distributed Generation (PG DG)
Industrial gas turbines
(5 MW to 50 MW)
Aero derivative gas turbines*
(4 MW to 64 MW)
Dry Low Emission (DLE) Combustion System
Customer Benefits:
Achieve legislative and permit requirements for
low NOx (mostly
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 8 Power and Gas
Business Unit Distributed Generation
Reference: SGT-750
Customer: Industriekraftwerk
Greifswald GmbH
Location: Lubmin,
Germany
Date: 2013
Market requirements
Nord Stream offshore pipeline connects Russia with Central
Europe to deliver natural gas from the natural gas fields in Siberia
At Portovaya, Russia, the gas is compressed to enable it to flow
through the Baltic Sea, upon landfall pressure and temperature
drop
In Lubmin, the gas is further expanded, and when expanded,
the gas cools
Gas needs to be heated for further transport
Solution
A SGT-750 gas turbine for cogeneration (38 MWe, 47 MWth)
Automation and control for the landfall station
Customer benefit
Cogeneration solution: Heat from the GT warms up the gas, while
the electric power generated by the turbine is fed into the grid
Highest efficiency: Total efficiency of ~ 90 %
Short start-up times: From 0 to full load in 10 minutes
Highest availability due to low maintenance requirements
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 9 Power and Gas
Power and Gas Division
Business Unit Steam Turbines (PG SU)
Steam turbines
(45 kW to 1900 MW)
Small steam turbines
(45 kW to 250 MW)
Large steam turbines
(90 MW to 1900 MW)
Enhanced Platform Design
Higher steam parameter
High reliability
Reduced start-up time
Faster load changes
Improved efficiency
Long life cycle increased life time
Innovation highlight Portfolio
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 10 Power and Gas
Business Unit Steam Turbines
Reference: SST5-6000
Customer: Shenergy/ SEC
Wai Gao Qiao III
Location: China
Date: 2008
Highest efficiency requirement
CAPEX-driven customer
Joint manufacturing by Siemens and SEC
Market requirements
SST5-6000 steam turbine package consisting of:
SST5-6000 Steam turbine and generator, partly by SEC
SCon-6000 Condenser and auxiliary by SEC
under Siemens license
Solution
State-of-the-art plant in China 46% efficiency world record
Max. proven power output: 1,112 MW
Experienced design
Low maintenance costs due to long maintenance intervals
Customer benefit
Asian Power
Plant of the
Year
February, 2015
Unrestricted Siemens AG 2015 All rights reserved.
Page 11 Power and Gas
Power and Gas Division
Business Unit Compressors (PG CP)
Turbo compressors for oil & gas and industrial
applications
Compressor trains
Compressor automation
Innovation highlight Portfolio
Innovation highlight
Customer Benefits:
Best-in-class efficiency through use of well
proven flow components
Maximum cost savings through standardization
Short delivery time
Highest flexibility to meet individual project
requirements
Integrated smart protection system
Siemens offering:
Extension of existing compressor portfolio to
achieve the same efficiency as customized
integrally geared turbo compressor
Up to 400,000 m/h air intake
Siemens standardized integrally geared turbo
compressor for air separation:
Introduction of a highly standardized compressor
series STC-GC (165400)
Pre-engineered for main air applications
Extended range of integrally geared compressors
comprises approx. 80 % pre-engineered
components whilst 20 % are customized