Power Boat Project DDP Honors. Team B Period 2. Sketches are complete Thumbnail and Annotated. Mock-ups have been fabricated and tested. Decision Matrix is complete Selecting an Approach. CAD Models are being finished. Center of Gravity has been calculated. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Power Boat Project DDP Honors

Power Boat ProjectPower Boat ProjectDDP HonorsDDP Honors

Team BTeam BPeriod 2Period 2

Page 2: Power Boat Project DDP Honors

Sketches are completeSketches are completeThumbnail and AnnotatedThumbnail and Annotated

Page 3: Power Boat Project DDP Honors

Mock-ups have been fabricated and Mock-ups have been fabricated and testedtested

Page 4: Power Boat Project DDP Honors

Decision Matrix is completeDecision Matrix is completeSelecting an ApproachSelecting an Approach

Page 5: Power Boat Project DDP Honors

CAD Models are being CAD Models are being finishedfinished

Page 6: Power Boat Project DDP Honors

Center of Gravity has been calculatedCenter of Gravity has been calculated

Page 7: Power Boat Project DDP Honors

Hulls have been 3D printedHulls have been 3D printed(Rapid prototyping)(Rapid prototyping)

Page 8: Power Boat Project DDP Honors

Decks, Cabins, and Power parts Decks, Cabins, and Power parts are currently being assembled.are currently being assembled.

I invite you down to watch any of the following:I invite you down to watch any of the following:

• Team PowerPoints and Time TrialsTeam PowerPoints and Time TrialsTuesday 6/5/12 - Periods 6, 7, and 8 – Room 154Tuesday 6/5/12 - Periods 6, 7, and 8 – Room 154

• Race DayRace DayFriday 6/8/12 - Periods 6, 7, and 8 – Room 154Friday 6/8/12 - Periods 6, 7, and 8 – Room 154