w w w. t r a n s p o r t a t i o n . o h i o . g o v1 January 18, 2017
Ohio Department of Transportation
John R. Kasich, Governor Jerry Wray, Director
HAM-75-12.60 PID 82288Parts 1 & 2
Shepherd Ave & I-75
Shepherd Ave & I-75
Shepherd Ave& I-75
Vision Way & I-75
Vision Way & I-75
Vision Way & I-75
Glendale- Milford & I-75
Glendale- Milford & I-75
Glendale- Milford & I-75
Glendale- Milford & I-75
Aesthetics•Towers
•Decorative Railing
•Lighting
• Grading for Landscape
•Community LOGOS
Aesthetics Conceptual
Aesthetics Conceptual
Aesthetics Conceptual
Logos in plan
Village of Evendale LOGO in plan
Village of Evendale New LOGO
BUILDING DEMO
BUILDING DEMO
•Previous DEMO Project
BUILDING DEMO
• Previous DEMO Project
•TOPO/ Plan Set was not updated
BUILDING DEMO
• Previous DEMO Project
•TOPO/ Plan Set was not updated
• Plans show buildings with “ X “
BUILDING DEMO
• Previous DEMO Project
•TOPO/ Plan Set was not updated
• Plans show buildings with “ X “
• 3 Parcels requiring demo
BUILDING DEMO• Previous DEMO Project
•TOPO/ Plan Set was not updated
• Plans show buildings with “ X “
• 3 Parcels requiring demo
• Parcels 345 , 334 & 18
BUILDING DEMO• Previous DEMO Project
• TOPO/ Plan Set was not updated
• Plans show buildings with “ X “
• 3 Parcels requiring demo
• Parcels 345 , 334 & 18
• 5 structures on 3 Parcels
BUILDING DEMO
• Previous DEMO Project
• TOPO/ Plan Set was not updated
• Plans show buildings with “ X “
• 3 Parcels requiring demo
• Parcels 345 , 334 & 18
• 5 structures on 3 Parcels
• Sheet 1459/1775
BUILDING DEMO
1400 Shepherd
1410 Shepherd
105 Shepherd
105 Shepherd & 104 Catherine Ave
800 Shepherd
800 Shepherd
I-75 MAINLINE PAVEMENT
75 PAVEMENT
Cement Stabilization
75 PAVEMENT
Cement Stabilization
SHALL BE PERFORMEDNO EXCEPTIONS
75 PAVEMENT
Cement Stabilization- It is part of the structural number
75 PAVEMENT
Cement Stabilization- It is part of the structural number
Asphalt Base Course is REDUCED.
Very Integral Part of this Project.
GECOORDINATION
IS
Critical
GE
Why is coordination CRITICAL ?
GE
1) 10,000 employees (daily)
GE1) 10,000 employees daily
2) GE has Secure Areas - DOD
GE1) 10,000 employees daily
2) GE has Secure Areas
3) Temporary fence - install by GE.
GE1) 10,000 employees daily
2) GE has Secure Areas
3) Temporary fence - install by GE.
4) Gate access concerns
GE1) 10,000 employees daily
2) GE has Secure Areas
3) Temporary fence - install by GE.
4) Gate access concerns
5) GE receives material deliveries
GE1) 10,000 employees daily
2) GE has Secure Areas
3) Temporary fence - install by GE.
4) Gate access concerns
5) GE receives material deliveries
6) GE Ships finished products
GE1) 10,000 employees daily
2) GE has Secure Areas
3) Temporary fence - install by GE.
4) Gate access concerns
5) GE receives material deliveries
6) GE Ships finished products
7) GE Expansion – ($60-70 Million/year)
Sheet 62 of 1775
GECoordination is Critical
Future Work &
Maintenance of Traffic
MAINTAINING TRAFFIC
DURING CONSTRUCTION
8 PhasesPlus Prephase 1
Neumann Way - GEBasically All Phases
Mainline 75- Majority
NB – Phase 4 & 5
SB – Phases 7 & 8
PrePhase 1 and Phase 1 & 2Shepherd
Phase 1 & 2Glendale Milford
Phase 3, 4 & 5
Phase 4 & 5
Phase 5, 6 & 7 Shepherd Bridge
Phase 7
Phase 8 Neumann Way
REVISIONS
Field Office Type C, APP
DRAFT FORM
SS -80675 Mainline Surface -
Asphalt Concrete with Joint Density for Multi-lane Highways.
Signal PolesColor – BLACK
except – Shepherd & ManghamODOT Standard
Signals Proprietary EquipEvendale
removing Vision Way and Ramp Z
(Lincoln Heights)
Revised sheets
Barrier End Anchors & TreatmentsCorrect QTY.
Revisions -not related to Prebids.-Field Office Type C, APP- SS806 Asphalt Joint Density-Signal Proprietary Equip – Vision/Ramp Z- Signal poles- color :
-All Black except Mangham & Shepherd- Barrier end anchors & Treatments (Update)
Additions:
1) PN 128- Unauthorized Lane Use
1) PN 128- Unauthorized Lane Use
2) Supplemental Specs 902
- Conduit Inspection Equipment
1) PN 128- Unauthorized Lane Use
2) Supplemental Specs 902
3) Monitoring Wells Adjusted to Grade
1) PN 128- Unauthorized Lane Use
2) Supplemental Specs 902
3) Monitoring Wells Adjusted to Grade
4) 614 Thermo Markings for Winter
1) PN 128- Unauthorized Lane Use
2) Supplemental Specs 902
3) Monitoring Wells Adjusted to Grade
4) 614 Thermo Markings for Winter
5) Mill/Fill qty for Mangham Drive
- Vision Way South (restore Detour)
6) Utility Duct Banks – 3 locations
1) PN 128- Unauthorized Lane Use
2) Supplemental Specs 902
3) Monitoring Wells Adjusted to Grade
4) 614 Thermo Markings for Winter
5) Mill/Fill qty for Mangham Drive
- Vision Way South (restore Detour)
6) 3 Utility Ducts for GE’s future use
Any Questions??