power point uhs

Upload: sunil4184

Post on 30-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Power Point Uhs

    1/19

    Unit Hanger Solutions was developed in Europe and the UnitedStates by a team of management Consultants with decades ofexperience in the garment industry, by combining the benefitsof lean manufacturing, UPS and overhead conveyors to takegarment factories from clutter and chaos TO SPEED AND

    EFFICIENCY

    1

  • 8/14/2019 Power Point Uhs

    2/19

    From todays presentation, you canunderstand

    HOWUHS delivers quality and efficiency?

    WHAT can be achieved by UHS

    WHYyou need Unit Hanger Solutions?

    WHO ALL CAN BENEFIT

    2

  • 8/14/2019 Power Point Uhs

    3/19

    3

    EASY SLIDE SURFACE FOR MANUAL PUSHING

  • 8/14/2019 Power Point Uhs

    4/19

  • 8/14/2019 Power Point Uhs

    5/19

    5

    GET THE QUALITY EDGE FOR YOUR COMPANY

    UHS gives you relief from rework and quality issues.

    REWORKS ARE DUETO:

    BUNDLE SYSTEM UHS UNIT PRODUCTION

    1 Shade difference PARTS are bundled togetherand kept on the table. Only asmall part is visible and shadedifferences are not visible .

    Garment parts are hanged and easilyvisible to operators, supervisors andQC, and shade difference, loosestitches and puckering are noticed &immediate action taken.

    2 Loose stitches

    3 Puckering

    4 Stains on the garments Garments are bundled andcrushed and easy to catchstains.

    Minimum handling and no crushing ofgarment parts. Freshness of fabric ismaintained.

    5 Smell contamination Sweat and dirt are picked upfrom operators and helpers. Nopossibility for free air to passthru garment parts.

    Contaminations are removed asHanged parts are exposed to air andlight.

    6 Size variations and others Only mass verification at theend of the line possible.

    Possibility for Easy verification atevery station avoids size variationand other quality issues.

    7 Early identification throughput

    Throughput time is too long.Defects are noticed only whenthe full garment is finished.By the time the issue is

    noticed ; many parts arestitched necessitating rework

    In UHS the throughput time is veryshort and hence quality issues in fullyfinished garments are highlighted,well in time

  • 8/14/2019 Power Point Uhs

    6/19

    Sewing machine operator performs various tasks. Some of thework like sewing add value to the garment, other works likehandling does not add value to the garment. The key toimproving productivity is to eliminate NON VALUE ADDINGworks and by making the PRODUCTION FLOW SMOOTH.

    6

    mally the operator performance, can be classified as bel

  • 8/14/2019 Power Point Uhs

    7/19

    7

  • 8/14/2019 Power Point Uhs

    8/19

    If we assume the highlighted benefits give us an extra20% sewing time. That is equal to

    480 - 384 = 96 + 20% =115.2 (an extra 19.2minutes)

    ssume: In a bundle or similar system

    hat is this worth in money?

    You are making a garment that sells for USD 5

    A mfg overhead cost of 25% of the selling price.

    A net profit of 5% (25 cents)

    On a garment production line making 1,000 garments perday.Introducing Unit Hanger Solutions yields a 20%

    improvement

    8

  • 8/14/2019 Power Point Uhs

    9/19

    Method Pro/Day Sale ValueUSD

    Overhead

    Profit Profit/1000Garments

    Bundle 1,000 5,000 25% 5% USD 250

    UHSAdditional

    Production

    200 1,000 Nil 30% USD 300

    Therefore : additional profit per day USD 300

    ADDITIONAL PROFIT PER YEAR AT 300 DAYS = USD 90,000

    9

    APART FROM THIS THERE ARE BENEFITS FROM REDUCTION OFSEVERAL HELPERS ON LINE AND BENEFITS DUE TO IMPROVED QUALIT

  • 8/14/2019 Power Point Uhs

    10/19

    PLEASE REMEMBER,

    BAD HANDLING ADDS COSTCOSTTO THEPRODUCT BUT NOTHING TO THE VALUE.

    It comes straight off your bottom line!

    WHY WASTE MONEY?

    10

  • 8/14/2019 Power Point Uhs

    11/19

    Summary of benefits:

    Pick up work - eliminated

    Prepare work - eliminated

    Administration - reduced

    Stains & cleaning - reduced

    Pressing - reduced

    Operator fatigue - reduced

    Momentum -increased!

    Easy identification of bottle neck

    11

  • 8/14/2019 Power Point Uhs

    12/19

    Additionalbenefits:

    ow work in progress leading to fast throughput

    Faster introduction of new styles

    ower costing = better sales opportunities

    Improved management control

    Improved quality and quality

    control

    Timely deliveries

    12

    Relieves managerial pressure by transferring responsibilityto the operators

    reduced rejections and improved quality

  • 8/14/2019 Power Point Uhs

    13/19

    UltimateBenefits:

    Additional Garments at no extra cost =Improved profitability

    Improved quality control = Increased customerconfidence

    Quicker throughput = Easier to meetdelivery targets

    13

  • 8/14/2019 Power Point Uhs

    14/19

    Why Unit HangerSolutions?Totally flexible layout

    Maintenance free

    Quick installation (1-2 days) per production line.

    Layout proposals provided

    System Training

    On going technical support

    Upgrade possibilities:

    a) Re configuration of system

    b) Real time data collection

    14

  • 8/14/2019 Power Point Uhs

    15/19

    Preparation&Assembly Line

    Make label

    Neck v shape tack &

    stay stitch

    Sleeve hem F/L

    Join shoulder

    Top stitch shoulder

    Neck rib att neck

    Loading station

    Neck rib att neck

    Neck top stitch

    B/Neck pip attB/Neck pip closed w/ label

    B/Neck pip closed w/ label

    Sleeve attach

    Sleeve attach

    Sleeve attachSide seam attach

    Side seam attach

    Side seam attach

    Bottom hemming

    Sleeve hem F/L

    Bottom hemming

    Unloading station

    15

  • 8/14/2019 Power Point Uhs

    16/19

    shape Lay-out with Loading & Unloading at same si

    16

  • 8/14/2019 Power Point Uhs

    17/19

    FINDING BOTTLE NECK BECOMES EASIER.

    IMMEDIATE REMEDY IN CONTRAST TO THEBUNDLE SYSTEM.

    BUNDLE SYSTEM TRACKS THE BOTTLENECKAFTER RUNNING OUT OF THE LINE, LEADING

    TO OVERTIME AND WASTAGE.

    17

  • 8/14/2019 Power Point Uhs

    18/19

    USERS OF UHS

    18

    -Sivakasi

    - Bangalore

    - Chennai

    - Chennai

    - Hyderabad

    - Hyderabad

    - Chennai

    - Chennai

    - Chennai

    -Karur

    -Tirupur

    -Bangalore

    -BOTTOMS

    -SHIRTS

    - WORKS WEAR

    - SHIRTS

    - POLOS

    - JEANS

    - LADIES WEAR

    - SHIRTS

    - SHIRTS

    - MADEUPS

    -KNITS

    -SHIRTS

    SFA

    INTEGRA

    PAN HORUS

    UNITEX

    SURYAVANSHI

    SURYAKIRAN

    MAGNUM CLOTHING

    SREEKUMAR TEXIND

    CORPORATION

    SHRI GURU APPARELS PVT. LTD

    ASIAN FABRICS

    S.P. APPARELS

    GIRISH EXPORTS

  • 8/14/2019 Power Point Uhs

    19/19

    SOLD & SERVICED IN INDIA BY

    SRIRAM INDUSTRIES

    Chennai Bangalore Tirupur Bombay Delhi Karur

    For Enquieries Contact : [email protected]