power sector reforms workshop 11-12 nov-2010
DESCRIPTION
Power Sector Reforms Workshop 11-12 NOV-2010. FESCO JURISDICTION. F E S C O P R O F I L E. CATEGORYWISE PROPORTION OF CONSUMERS as on 30-9-2010 (NUMBERS). TOTAL (2,899,675). CONSUMPTION MIX 2009-10. Fig in MLN Units. TOTAL (8317). PROGRESSIVE T&D LOSSES TREND. % Loss. - PowerPoint PPT PresentationTRANSCRIPT
-
Power Sector Reforms Workshop 11-12 NOV-2010
-
FESCO JURISDICTION
-
FESCO
PROFILE
Sheet1
CATEGORY WISE CONSUMERS IN DISCOs
Annex "A"
DISCOsDOMESTICCOMMERCIALINDUSTRIALT/WELLSOTHERSTOTAL
LESCO1687235361860487423419717292133763
GEPCO153699422030638529307803451826954
FESCO1569139237792333982098510521862366
IESCO11641312114959246509117441391707
MEPCO1886943286963286343404811512237739
PESCO + TESCO1729723231141229142684214572012077
HESCO903184213480193342034814981157844
QESCO27447668045232816096209361154
TOTAL107518251831082203125188387918512983604
SPECULATED MAXIMUM MONTHLY REQUIREMENT
OF FRP BOXES OF ALL DISCOs
Total Installed MetersDamaged / Removed (Monthly)Repaired & Fit for PC Cover Installation
Actual FESCO Data186236610657 0.57% of Total4345 0.255% of Total
Based upon FESCOs data speculated for all DISCOs129836047429633115
Sr.#AppointmentNo of OfficersVehicle AvailableEssential Requirement
1Deputy Manager (P&D)613
2Deputy Manager (O&M)211
3Deputy Manager (MM)4-2
4Deputy Manager (Marketing)1-1
5Deputy Manager (TRW/PCC Plant)1-1
6Deputy Manager (Internal Audit)2-1
7Deputy Manager (MIS)4-2
8Director (Finance Office2-1
9WAPDA Hospital311
Total25313
Sheet2
FINANCIAL IMPLICATIONS OF HUMAN RESOURCE
Sr #Name of PostNo of PostsPay & AllowanceTotal Amount for a month (3x10)Total Annual Expenditure
Basic PayH/RC/ACash Med AllowSpl: Relief AllowSPL PayTotal Pay (4-9)
aInjection moulding operators (BPS-5)32745609.75320305400-4382.7513148.25157779
bUltra Sonic Machine Operator32410533.25170305400-3820.2511460.75137529
cHelper (BPS-5)102100465.75170305400303471.7534717.5416610
dChiller Operator (BPS-7)12220492.75170305400-3588.753588.7543065
eForman Fabrication (BPS-14-16)13100688.5320305400-4814.54814.557774
fForman Testing (BPS-16)13805843320305400505724572468688
gDriver (BPS-7)12220492.75170305400-3588.753588.7543065
hSecurity Guard (BPS-3)41980438.75170305400230352414095169152
IJunior Engineer (PBS-17)162101291.5340250809-8091.58091.597098
Total1190760
Yearly production of FRP Box=S/Phase204000
=3/Phase36000
TOTAL240000
Labor Cost of 1 FRP Box=S/PhaseRs. 3.81
=3/PhaseRs. 11.43
FINANCIAL CHARGES
1Total Capital costRs. 38.00 Million
2Financial cost @ 8% per annumRs. 3.04 Million
3Annual production24000 FRP Boxes
4Finanicial cost per FRP BoxRs. 12.66
(I) Single Phase meterRs. 11.01
(ii) Three Phase meterRs. 22.2
Monthly BillingProgressive BillingRecovery V/S TargetGovt ArrearsMonthly LossesReceivablesTheft of MaterialCases Decided on Feb 03Checking of Meterstheft of Material Feb 2003
Progressive LossesNew ConnectionBalance of MetersMeter RepairedDisciplinary CasesAssessment PrivateTheft of materialDetection & FIRsOpen KatcheryDisciplinary Cases
TransformersLT Work ordersHT Work ordersVillage ElectrificationERO PendingDetail of AccidentsDamaged TransformerRunning DefaultersCash FlowLosses 7/2001
Sheet3
MOHTHLY PROGRESS REPORT IN RESPECT OF AUDIT
1.Audit Paras
Sr.NONo. of objectionOpening balance as on 1-2-2003Received during the month 2/2003Settled/deleted during the month 2/2003DG AUDIT requested for spot verification of Audit Paras
1Draft Paras53691230
2Advance Paras1022013*0
* 9 Advance Paras converted into Draft Paras
4 Advance Paras- settled
IINon- Accountal of Material
The figure of Non-accountal of material was Rs.235.56 Million during 1999.
However, it has declined to Rs.135.64 Million at end of 02/2003.
POSITION OF DEFFERED / DEAD DEFAULTERS /
RUNNING DEFAULTERS AMOUNT
Deffered AmountDead Defaulters Amount
Dec-9863.13153.72
Feb-0330.31119.97
STATUS OF TUBEWELL CONNECTION
Sr. #Connection Installed During March, 2003Connections Installed Upto 31-03-2003No of Pending Applications
RipeUn-Ripe
128493148308
FESCO BILLING AND PAYMENT TREND
PERIODBILLINGPAYMENT%AGE PAYMENT
GovtPvtTotalGovtPvtTotalGovtPvtTotal
Dec-981001.27931.78932.9544.37858.68402.954.499.194.1
1998-19991996.614852.616849.21943.314780.616723.997.399.599.3
1999-20002409.817121.619531.43019.917057.620077.4125.399.6102.8
2000-20012209.819977.222187.02616.319942.522558.8118.499.8101.7
2001-20021993.722310.024303.82088.322226.924315.2104.799.6100.0
7/02-02/031378.917082.518461.41270.217091.818362.092.1100.199.5
DETAIL OF CASES RECEIVED FROM MINISTER OF WATER & POWER
A) CASES RECEIVED FROM MINISTER OF WATER & POWER
Sr #NameDesignationRequestAction TakenRemarks
1Abdul KhaliqLS-ITransfer to DG Khan Div.Case referred to Wapda House on 14-01-2003Recommended
2Abdul RehmanASSARe-Instatement in ServiceInformation send to Wapda House on 14-01-2003Not Recommended
3Ghulam YasinM.RTransfer to Rajana S/Div.Case referred to Wapda House on 02-04-2003Not Recommended
4Muhammad AshrafALMTransfer to T.T.Sing Divn.Case referred to Wapda House on 02-04-2003Not Recommended
5Shafqat HussainAcctt AssttTransfer to T.T.Sing Divn.Case referred to Wapda House on 02-04-2003Not Recommended
6Imtiaz AhmadLS-IITransfer to MianwaliCase referred to Wapda House on 02-04-2003Not Recommended
7Mr. ShamsherLM-IIRe-Instatement in ServiceReply sent on 02-04-2003Not Recommended
B) CASES RECEIVED FROM WAPDA HOUSE
Sr #NameDesignationRequestAction TakenRemarks
1Najeeb Ahmad KhanXENTransfer to FaisalabadCase referred to Wapda House
2Aamil SiddiquiXENTransfer to SargodhaAction completedComplied
3Muhammad RashidSDOTransfer out of PunjabAction completedPosted to Faisalabd now serving in Baghtanwala
4Muhammad AfzalSDOTransfer to Kamalia RuralAction completedPosting request later dropped
5Ghulam FarooqSDOTransfer to Kamalia CityAction completedPosting request later dropped
6Rana ZafarM.RTransfer to SammundriAction completedComplied
7SanaullahMS-IITransfer to Issa KhelAction completedComplied
8Gul NawazASSATransfer to MianwalAction completedComplied
9Amin UllahN/QTransfer to MianwalAction completedComplied
10Muhammad ImranALMTransfer to FaisalabadAction completedComplied
11Tanveer AhmadM.RTransfer to Darya KhanAction completedComplied
12M. Muhammad AliH/ClerkTransfer to MianwalAction completedComplied
13Azmat HussainTracerTransfer to Bahawal NagarCase referred to Wapda House on 24-03-2003Recommended
14Barkat AliDriverTransfer to MultanCase referred to Wapda House on 24-03-2003Recommended
15Muhammad YaqoobLS-ITransfer to SammundriCase referred to Wapda House on 09-01-2003Not Recommended
16Shabbir ShahASSATransfer to H.B.ShahCase referred to Wapda House on 10-03-2003Not Recommended
SYSTEM IMPROVEMENT PLAN
Description1998-991999-002000-012001-20022002 to -03/2003
ProposedCompletedProposedCompletedProposedCompletedProposedCompletedProposedCompleted
11 KV New Feeder8513910516142614
11 KV Reconductoring4256639798
New/Augmentation Transformers103/6707/57207/135228/149218/141169/110215/140158/102228/149123/80
New L.T Line87.7574.66176.67175185147.55183.3134.75195102
Replacement of Defective Meters53532761908765814195960971
Area Jurisdiction (Dist: Faisalabad, Jhang, Chiniot, Bhakar, T.T.Sing, Mianwali, Khushab, Sargodha )44,247 Sq KM
1AREA OF RESPOSIBILITY (FAISALABAD, SARGODHA, KHUSHAB, MIANWALI, BHAKKAR, JHANG, T.T. SINGH)
Customers2,899,675
1No of Grid Stations (132 KV 54) (66KV 26)(Pvt 13)93
66 KV
132 KV
No of Power Transformers164
Power TFS Installed Capacity (MVA)3,543
Max. Demand Recorded 2009-10 (MW) (24-5-2010 at 20pm) Average Demand in May 2010 was 1668 MW2,298
Transmission Lines (132kv : 1540.75 and 66kv : 1296 KM)2836.75 Km
HT Line (11KV) Km (768 HT Feeder)35698 Km
LT Line (400/230 Volts) Km23617 Km
No. of Distribution T/Fs ( 4999.827 MVA)78,231
Ops Circles(4), Ops Div(21), Ops S/Div(115)140
P.D. Const(1), Const Div (3), Const S/Div (11), ELR S/Div (4)19
P.D (GSC) (1), Const Div(1), Const S/Div(3), T&I/Civil S/Div (2)7
GSO Circle (1) Divn (05) Sub Divn (10)16
4Manpower (Officers 332) (Staff 16906)17,23817238
5Vehicles 719 (Including 112 Motorcycles)831
Total Assets as on 30.06.2010 ( Rs MLN )57,412
6
7
-
TOTAL (2,899,675)CATEGORYWISE PROPORTION OF CONSUMERSas on 30-9-2010(NUMBERS)
Chart1
1760738
243023
31931
21390
1205
Sheet1
DOM (2522906)252290687
COM (301652)30165210
IND (39791)397911
BULK(195)1950
T/WELL (33672)336721
OTHERS (1459)14590
2899675100
Sheet1
Sheet2
Sheet3
-
CONSUMPTION MIX2009-10TOTAL (8317)Fig in MLN Units
Chart1
2950
324
2866
689
17
Sheet1
DOM (3691)369144
COM (472)4726
IND (2852)285234
BULK ( 247)2473
T/WELL (1041)104113
OTHERS (14)140
8317
Sheet1
Sheet2
Sheet3
-
PROGRESSIVE T&D LOSSES TRENDNEPRA Target 2008-09 : 11.23%NEPRA Target 2009-10 : 11.03%NAPRA Target 2010-11 : 10.83%% Loss
Chart4
13.4
12
11.8
11.2
10.4
PROGRESSIVE LOSS
YEARS
%AGE LOSS
Sheet1
98-9961419
99-00110696
00-0180602
01-0274917
02-0388492
03-04100000
Sheet1
0
0
0
0
0
0
Sheet2
BILLINGPAYMENT03-0413.912.0
98-99168491672404-0513.111.8
99-00195312007705-0612.511.2
00-01221832255906-0711.510.4
01-02243042431507-0811.110.1
02-03277362765208-0910.99.9
09-1010.99.7
9.3
9.1
Sheet2
00
00
00
00
00
YEARS
Sheet3
-
NEPRA Annual target 2010-11 : 10.83%
PAGE 7
PROGRESSIVE LINE LOSSES
JULY 2009- SEP: 2009 VS JULY 2010- SEP: 2010
CIRCLE(UNITS IN MILLION)%AGET
A
RECEIVEDBILLEDLOSTLOSSINCR
7/097/107/097/107/097/107/097/10&G
TOTOTOTOTOTOTOTODECE
09/0909/1009/0909/1009/0909/1009/0909/10T
1ST FSD916.5943.5844.4883.972.159.57.96.3-1.67.5
2ND FSD494.6507.6447.1464.747.543.09.68.5-1.19.0
JHANG713.1683.3615.1585.098.198.313.714.40.713.5
SARG677.3686.4601.4619.576.066.911.29.7-1.511.4
TOT 11KV2801.52820.82507.92553.1293.6267.710.59.5-1.010.2
132 KV2864.22865.62801.52820.862.744.82.21.6-0.6
TOTAL2864.22865.62507.92553.1356.3312.512.410.9-1.512.4
-
FESCO BILLING AND PAYMENT TRENDBILLINGPAYMENTRS:MLNYears
Chart3
1684916724
1953120077
2218322559
2430424315
2773627652
YEARS
Sheet1
98-9961419
99-00110696
00-0180602
01-0274917
02-0388492
03-04100000
Sheet1
0
0
0
0
0
0
Sheet2
BILLINGPAYMENT
02-032773627652
03-043105530453
04-053180531743
05-063496034818
06-073869538526
07-084468644261
08-095200450482
09-106353761656
Sheet2
Sheet3
-
Outstanding Subsidy Rs. 2686.07MLNWith subsidy payment %age : 106%
PAGE 1
1ANALYSIS OF MONTHLY BILLING AND COLLECTION ( CIRCLE WISE)
FOR MARCH 2001(Rs Millions)
CIRCLEMonthBILLINGCOLLECTION% COLLECTION OF BILLING
GOVTPRIVATETOTALGOVTPRIVATETOTALGOVTPRIVATETOTAL
IST FSDMAR. 200023.28464.35487.6317.31460.90478.2174.3699.2698.07
MAR.200126.09558.29584.3820.21562.49582.7077.46100.7599.71
2ND FSDMAR. 20007.03269.83276.865.75265.29271.0481.7998.3297.90
MAR.20018.35322.39330.746.88318.02324.9082.4098.6498.23
JHANGMAR. 200032.66253.09285.7535.74239.70275.44109.4394.7196.39
MAR.200128.53308.53337.0620.79312.52333.3172.87101.2998.89
SARGODHAMAR. 2000116.85203.32320.1790.66203.98294.6477.59100.3292.03
MAR.200180.50230.03310.5394.13232.59326.72116.93101.11105.21
COMPANYMAR. 2000179.821190.591370.41149.461169.871319.3383.1298.2696.27
MAR.2001143.471419.241562.71142.011425.621567.6398.98100.45100.31
PAGE 2
PROGRESSIVE BILLING AND COLLECTION
UP TO SEP- 2010(Rs Millions)
CIRCLEPERIODBILLINGPAYMENT% PAYMENT
GOVPVTTOTALGOVPVTTOTALGOVPVTTOTAL
IST FSDUpto 09/09193.695887.326081.01159.715447.775607.4882.4692.5392.21
Upto 09/10245.878183.248429.11168.547915.298083.8368.5596.7395.90
2ND FSDUpto 09/0952.143134.023186.1643.122880.442923.5682.7091.9191.76
Upto 09/1067.294334.634401.9252.574187.324239.8978.1296.6096.32
JHANGUpto 09/09149.193537.293686.48121.462970.943092.4081.4183.9983.88
Upto 09/10197.394881.475078.86129.794398.864528.6565.7590.1189.17
SARGODHAUpto 09/09563.143479.124042.26502.013170.403672.4189.1491.1390.85
Upto 09/10724.554955.605680.15615.744667.645283.3884.9894.1993.01
FESCOUpto 09/09958.1616037.7516995.91826.3014469.5515295.8586.2490.2290.00
Upto 09/101235.1022354.9423590.04966.6421169.1122135.7578.2694.7093.84
% INC/DEC28.9039.3938.8016.9846.3044.72-9.254.964.26
%AGE INC/DEC28.9039.3938.8016.9846.3044.72
1388.3922822.1824210.571247.122677.6723924.7789.823464588599.366800191798.8195238691
PAGE 3
3 RECOVERY VS TARGET FOR JUL TO MARCH 2001
(Rs Millions)
PeriodDescriptionGovtPrivateTOTAL
Target192.001281.971473.97
MARCHAchievement142.011425.621567.63
2001Excess/Shortfall-49.99143.6593.66
% age Recovery73.964111.21106.35
JULY 2000Target1938.9814236.9316175.91
TOAchievement1640.9114573.3616214.27
MARCH 2001Excess/Shortfall-298.07336.4338.36
% age Recovery84.63102.36100.24
`
PAGE 4
4ANALYSIS OF RECEIVABLES MARCH 2001 VS MARCH 2000
(Rs Millions)
CIRCLEMONTHRECEIVEABLES
GOVTPRIVATETOTAL
IST FSDMARCH-2000233.51153.68387.19
MARCH-2001184.95161.6346.55
2ND FSDMARCH-20005.83106.74112.57
MARCH-200121.32133.23154.55
JHANGMARCH-2000361.3148.65509.95
MARCH-200197.6153.82251.42
SARGODHAMARCH-2000736.34115.63851.97
MARCH-2001163.36128.06291.42
COMPANYMARCH-20001336.98524.701861.68
MARCH-2001467.23576.711043.94
PAGE 5
5GOVERNMENT DEPTT DUES
(ARREAR MORE THAN ONE MILLION)
S. NoNAME OF DEPARTMENTReceivablesLPSReceivablesLPS
June 2000June 2000March 2001March 2001
1PUNJAB POLICE DEPT4.300.208.430.17
2PUNJAB JAIL3.050.172.730.12
3PUNJAB HEALTH & WELFARE17.550.6624.720.31
4PUBLIC HEALTH14.550.2533.170.22
5WASA FAISALABAD76.782.15174.141.52
6MUNICIPAL CORPORATION SARGODHA12.740.1829.030.14
7MUNICIPAL CORPORATION FSD31.220.34
8MUNICIPAL COMMITTEES:2.61+.6+3.8.02+.01+.045.74
Jaranwala 2.56, Jhang 1.12 , Mianwali 2.065.740.127.020.070.117
9RAILWAY6.000.397.030.25
10AGRICULTURE UNIVERSITY FSD58.170.3954.670.18
11PAK TELECOMMUNICATION3.460.202.220.08
12CHIEF ENGINEER CHASHMA4.730.011.080.00
13ATOMIC ENERGY COMMISSION6.676.334.100.24
14GM GRID SYSTEM OPERATION1.170.020.050.01
15IRRIGATION AND POWER PUNJAB1.460.181.060.37
16ARMY23.490.6523.860.41
17PAF36.052.3135.241.18
18PUNJAB Dy COMMISSIONERS1.370.061.860.05
19PUNJAB SCARP104.112.878.700.69
20OTHERS5.821.0616.920.59
TOTAL387.2118.19467.256.95
PAGE 6
6MONTHLY LINE LOSSES - MARCH 2001 VS MARCH 2000 (CIRCLE WISE)
(Rs Millions)
CIRCLEMONTHLY (UNITS IN MILLION)UNITS LOST%AGE LOSSES%AGETARGET
RECEIVEDBILLEDUNBILLED (Million)INC/DEC
MAR 2000MAR 2001MAR 2000MAR 2001MAR 2000MAR 2001MAR 2000MAR 2001MAR 2001
1ST FSD135.3156.25114.23135.721.0720.5515.5713.2-2.4214.8
2ND FSD85.7393.8768.5778.9817.1614.8920.0215.9-4.1518.0
JHANG121.24127.1488.8997.2732.3529.8726.6823.5-3.1924.3
SARGODHA110.89105.1687.5385.2923.3619.8721.0718.9-2.1720.4
FESCO453.16482.42359.22397.2493.9485.1820.7317.7-3.0719.4
PAGE 7
7PROGRESSIVE LINE LOSSES
JUL 2000-MARCH 2001 VS JUL 99-MARCH 2000 (CIRCLE WISE)
CIRCLEPROGRESSIVE (UNITS IN MILLION)UNITS LOST%AGE LOSSES%AGETARGET
RECEIVEDBILLEDUNBILLED (Million)INC/DEC
JUL 99 TOJUL2000 TOJUL 99 TOJUL2000 TOJUL 99 TOJUL2000 TOJUL 99 TOJUL2000 TO
MAR 2000MAR 2001MAR 2000MAR 2001MAR 2000MAR 2001MAR 2000MAR 2001
1ST FSD1392.471499.371279.271393.20113.20106.178.17.1-1.07.3
2ND FSD871.34892.28755.02787.94116.32104.3413.311.7-1.712.0
JHANG1162.281173.18963.401018.64198.88154.5417.113.2-3.914.4
SARGODHA1070.821049.66948.91937.83121.91111.8311.410.7-0.710.6
COMPANY4496.914614.493946.604137.61550.31476.8812.210.3-1.910.8
PAGE 16
16DISTRIBUTION OF POWER ( DOP )
( a )HT Work Orders
COMPANYPERIODTARGET(Km)Work Orders ApprovedWork Orders IssuedWork Orders Completed
NoKmNoKmNoKm
FESCOMar 2001_______
July 2000_312.823312.823311.736
to
Mar 2001
Rs. 4.46 MLNRS: 5.63 MLN
( b )LT Work Orders
17 LENGTH OF HT/LT LINES ADDED AND TRANSFORMERS INSTALLED
COMPANYPERIODTARGET(Km)Work Orders ApprovedWork Orders IssuedWork Orders CompletedJUL 2000-MAR 2001
COMPANYPeriodHT Lines (Kms)LT Lines (Kms)Transformers installed
FESCOMar 2001_2929252550100200400630Total
kvakvakvakvakvakva
FESCODuring1.7547.2251584__18
July 2000_176 ( Rs. 30.35 MLN)176 ( Rs. 30.35 MLN)176 ( Rs. 32.60 MLN)MAR 2001
toJUL 200024.96861.5962377319__134
Mar 2001to
MAR 2001
Sheet15
15PROBLEMS AND SUGGESTIONS
1
2
3
4
5
6
7
8
9
10
11
12
PAGE 14
14TRANSFORMERS REPAIRED BY FESCO
JUL 2000 - MAR 2001
DESCRIPTIONCAPACITY OF TRANSFORMERSTOTAL
630 KVA200KVA100KVA50KVA25KVAOTHERSNO(KVA) Added
UP TO LAST MONTH11601161351305950046945
FESCO WORKSHOPCURRENT MONTH13429126544015
TOTAL12631201641426555450960
RECLAMATION WORKSHOPUP TO LAST MONTH
SHALIMAR/NOWSHERACURRENT MONTH
TOTAL
UP TO LAST MONTH
PRIVATE WORKSHOPCURRENT MONTH
TOTAL
PAGE 13
13DETECTION ,CONSUMERS CHECKED ,
BILLS SERVED, PAID AND FIRs LODGED.
MONTHNO OF CASESUNIT BILLEDAMOUNT BILLEDRECOVERDFIRs
Fig in Millions KWHFig in Millions Rs.Fig in Millions Rs.LODGED
JUL 200034945.1118.998.419
AUG 200026253.9314.207.7124
SEP 200029893.6512.187.6319
OCT 200031133.3513.409.435
NOV 200023132.829.825.3613
DEC 200020681.977.716.235
JAN 200119532.279.347.913
FEB 200117701.987.294.853
MAR 200122422.097.586.193
PAGE12
12DISCIPLINARY CASES DECIDED
MARCH 2001
SRDETAILGRADE
NO:181711-161-10TOTAL
1.Cases pending ending Feb 200111449277341
2.Fresh cases added during MAR 2001112375100
3Cases decided during MAR 2001043286122
4.PUNISHMENTS AWARDED
a.Exonerated00516
b.Censured00155267
c.With Holding promotion/Incr0262432
d.Recovery of loss from pay.00213
e.Demotion00112
f.Compulsory Retirement00044
g.Removal from service.01113
h.Dismissal from service.01001
5.Cases pending ending Mar 200121140266319
PAGE11
11 COMPLAINTS RECEIVED AND DISPOSED OF
MONTHCOMPLAINTSCOMPLAINTSCOMPLAINTSTOTAL
RECEIVEDDISPOSED OFOUT STANDING
JUL 2000183051804026518305
AUG 20003131229740157231312
SEP 20001976818309145919768
OCT 2000177621708168117762
NOV 2000155281533719115528
DEC 2000141941388331114194
JAN 2001134671335111613467
FEB 20011180910618119111809
MAR 2001119311126266911931
TOTAL154076153407669154076
PAGE 10
10METER REPAIRED BY M&T AND MANUFACTURERS/SUPPLIERS
DEFECTIVE METERS HELD -MARCH 2001
1SINGLE PHASE5062
2THREE PHASE1045
3MDI38
METER REPAIRED BY
MONTHM&T CIRCLEMANUFACTURES/SUPPLIERS
S/PHASE3/PHASEMDITOTALS/PHASE3/PHASEMDITOTAL
JUL 200044773322948380000
AUG 200054093223457650000
SEP 2000500918725522185000850
OCT 20005144269345447459380497
NOV 20004531402274960003030
DEC 2000413128322443619092501934
JAN 2001614032241650352000520
FEB 2001534033321569497100971
MAR 200144173981648310000
TOTAL44598284824947695470963304802
PAGE 9
9 STOCK BALANCE OF METERS (2000-2001)
DescriptionRECEIVEDCONSUMPTIONBALANCE
DuringUp toDURINGIN STORE
MAR 2001MAR 2001THE MONTHUP TO 31 Mar. 2001
Single Phase Meter75001590001300039483
Three Phase Meter01200043310625
PVC02199.4200.3859.0
page 8
8 PROGRESS OF NEW CONNECTIONS FOR THE MONTH
MARCH 2001
CategoryTargetPROPORTIONATEACHIEVEMENTPENDING
Target
(2000-2001)up to Mar 2001Mar 2001up to Mar 2001RipeOthers
DOMESTIC7476956077501349160164211266
COMMERCIAL134011005184882522181581
INDUSTRIAL5424075946059228
T.WELLS2232167457624259566
OTHERS0001401
GRAND TOTAL9094468208597758510217813642
-
KEY PERFORMANCE INDICATORS2009-10
Sheet1
OPERATION/KPI (KEY PERFORMANCE INDICATOR)
TARGET AND ACHIEVEMENT
PERFORMANCE PARAMETERSTargetRemarks
Key performance indicatorsFY 2009-10Result Achieved 2009-10
A. Operational and commercial performance
ALine losses11.03%10.90%Target Achieved
ICollection ratio97% without subsidy97.04%Target Achieved
AT&C losses
ITransformer failure Ratio5% Total installed MVA2.71`%Target Achieved
IILine failure ratio below 3 minutes per 100 km circuit110`71.49`Target Achieved
IIILine failure ratio above 3 minutes per 100 km circuit8.243.76`Target not achieved
ivDefective meter- 7-12 as % of total1.00%0.57`%Target Achieved
B. Financial performance
iCash in transit (monthly average)8.50%8.66`%Target almost achieved
iO&M expanses Rs./Kwh0.55990.548Target Achieved
C. Capital expenditure project implementation
iCapitalization (completion of A-90 form)58%44.94`%Target not achieved
Capital expenses
iiTransmission and grid station (STG)98%94.18`%Target Achieved
iiiDistribution of power98%100`%Target Achieved
ivEnergy loss reduction program (ELR)98%112.7`%Target Achieved
vRural electrification (RE)98%102.5`%Target Achieved
D. Customer relations management
iNew connections85%80.15`%Target not achieved
iiCustomer facilitation85%80`%Target not achieved
iiiEfficiency of supply complaints resolution85%100`%Target Achieved
ivEfficiency of billing complaints resolution85%99.88`%Target Achieved
E. Human Resources Management
iOfficers strength occupancy ratio80%79.73`%Target almost achieved
iiStaff strength occupancy ratio80%87.99`%Target Achieved
iiiResolution of disciplinary cases50%95.03`%Target Achieved
ivSettlement of audit paras3%2.54`%Target not achieved
vPercentage of officers trained during the year.80%97.25`%Target Achieved
viPercentage of staff trained during the year80%63`%Target not achieved
F. Employee safety
iNo. of accidents-fatal3638Target almost achieved
iiNo. of accidents non-fatal21.610Target Achieved
Sheet2
Sheet3
-
Sheet1
OPERATION/KPI (KEY PERFORMANCE INDICATOR)
TARGET AND ACHIEVEMENT
PERFORMANCE PARAMETERSTargetRemarks
Key performance indicatorsFY 2009-10Result Achieved 2009-10
A. Operational and commercial performance
iLine losses11.03%10.90%Target Achieved
iiCollection ratio97% without subsidy97.04%Target Achieved
AT&C losses
iiiTransformer failure Ratio5% Total installed MVA2.71`%Target Achieved
ivLine failure ratio below 3 minutes per 100 km circuit110`71.49`Target Achieved
vLine failure ratio above 3 minutes per 100 km circuit8.243.76`Target not achieved
viDefective meter- 7-12 as % of total1.00%0.57`%Target Achieved
B. Financial performance
iCash in transit (monthly average)8.50%8.66`%Target almost achieved
iO&M expanses Rs./Kwh0.55990.548Target Achieved
C. Capital expenditure project implementation
iCapitalization (completion of A-90 form)58%44.94`%Target not achieved
Capital expenses
iTransmission and grid station (STG)98%98.18`%Target Achieved
iiDistribution of power98%100`%Target Achieved
iiiEnergy loss reduction program (ELR)98%112.7`%Target Achieved
ivRural electrification (RE)98%102.5`%Target Achieved
D. Customer relations management
iNew connections85%80.15`%Target not achieved
iiCustomer facilitation85%80`%Target not achieved
iiiEfficiency of supply complaints resolution85%100`%Target Achieved
ivEfficiency of billing complaints resolution85%99.88`%Target Achieved
E. Human Resources Management
iOfficers strength occupancy ratio80%79.73`%Target almost achieved
iiStaff strength occupancy ratio80%87.99`%Target Achieved
iiiResolution of disciplinary cases50%95.03`%Target Achieved
ivSettlement of audit paras3%2.54`%Target not achieved
vPercentage of officers trained during the year.80%97.25`%Target Achieved
viPercentage of staff trained during the year80%63`%Target not achieved
F. Employee safety
iNo. of accidents-fatal3638Target almost achieved
iiNo. of accidents non-fatal21.610Target Achieved
Sheet2
Sheet3
-
Ministry of Water & PowerEvaluated DISCOs Performance against Targets on 27-9-2010 and commented as under vide MoW&P letter no. P-II-2/24/88 dt 4-10-2010The Company met all NEPRA Targets except for recovery. It came out at the top of all the Companies. Its performance was good.
Its performance under the contract was also better than all the companies with 66.25 weighted score at the scale of 100.
-
PROGRESS ON THE PERFORMANCE PARAMETERS AS PER CONTRACT FOR THE YEAR 2010-11 QUARTER ENDING 09/2010
Sheet1
PROGRESS ON THE PERFORMANCE PARAMETERS AS PER
CONTRACT FOR THE YEAR 2010-11 QUARTER ENDING 09/2010
PERFORMANCE PARAMETERST a r g e tLast year performance for the quarter ending 09/2009RemarksSCORE
Key performance indicatorsWeight basisFY 2010-11Proportionate Target for the Quarter Ending 09/2010Target achieved at the end of Quarter Ending 09/2010
A. Operational and commercial performance-50%
iLine losses15%10.83%12.30%10.90%12.40`%Target achieved7.5
iiCollection ratio25%96% without subsidy90.40%93.84`%90%Outstanding subsidy is Rs.2686.07millions.18.75
AT&C losses
iiiTransformer failure Ratio2%5% Total Installed MVA8.23`%6%4.57`%Proportionate target achieved however failure ratio is higher than the previous year due to heavy rain and flood clamity in this year0.5
ivLine failure ratio below 3 minutes per 100 km circuit2%110`132.84`137`87.92`Target almost achieved however target figure is high as compare to previous year due to change in the time duration of outage as per NEPRA rule from below 20 min to 03 minutes0
vLine failure ratio above 3 minutes per 100 km circuit2%44'62.16`31.24`88.65`Target achieved2
viDefective meter- 7-12 Months as % of total4%1%1.46`%0.82`%1.13`%Total defective meters having age 7-12 months is 395 as compare to 1827 in the previous year3
B. Financial performance -08%
iCash in transit (monthly average)3%7.82%7.9`%10.18`%10.75`%Out of total cash in transit Rs.811millions NADRA share is Rs. 491 millions which deposited in AL Habib Bank instead of MCB. CPPA requested to open account in MCB.
iiO&M expanses Rs./Kwh5%0.6720.576`0576`0.558`O&M expenses within limit
C. Capital expenditure project implementation 15%
iCapitalization (completion of A-90 form)5%58%57.66`%54.91`%40.08`%Target almost achieved.
Capital expenses
iiTransmission and grid station (STG)5%98%57.43`%29.31`%66.97`%Work is in progress booking will be made in Oct & Nov target will be achieved comfortablly
iiiDistribution of power (DOP)2%98%90`%54.64`%45.24`%do
ivEnergy loss reduction program (ELR)2%98%90%98.47`%90.50`%Target achieved
vRural electrification (RE)1%98%68.64`%35.16`%59.08`%Target not achieved due to non allocation of budget in time
D. Customer relations management 5%
iNew connections1%85%70%61.64`%67.43`%Target not achieved due to ban on new connections which lifted in Aug-2010.However 19025 connections installed upto Sep-2010
iiCustomer facilitation1%85%85%85`%85%Target achieved.
iiiEfficiency of supply complaints resolution1%85%85%100%96%66619 Complaint of failure of supply restored
ivEfficiency of billing complaints resolution2%85%85%99.9`%97%Target achieved. 27401 billing complaints resolved
E. Human Resources Management 12%
iOfficers strength occupancy ratio2%80%79%79.62`%86.51`%Target achieved
iiStaff strength occupancy ratio2%80%80.33`%90.39`%86.1`%do
iiiResolution of disciplinary cases1%50%60%72.36`%82.88`%Target achieved. However figure is less due to adoption of E&D rules in this year. Steps are required in E&D rules to finalize the case which required time.
ivSettlement of audit paras1%3%3%0.95`%2.8`%Record of 22 No Audit Para prduced to DG Audit verification awaited. 5 No Draft Para settled and put up for approval from PAC. 13 No Audit Para's record partially verified
vPercentage of officers trained during the year.3%80%80%100%89`%Target achieved
viPercentage of staff trained during the year3%80%81.6`%65%75`%Target not achieved because field employees could not spare for training due to restoration of supply in the flooded area and continuous rainfall in this year.
F. Employee safety - 10%
iNo. of accidents-fatal6%--34i) Lineman slipped from the pole ii) Recevieved shocked from punctured not visible 11KV cable on the pole top iii) Shock received during live cable jointing on the pole to reduce mishap insulated bucket crains are required whose expenditure is approximate
iiNo. of accidents non-fatal4%--44
Total No: of KPIs25
No of KPIs of which target achievd15
No of KPIs of which target is almost at par2
No of KPIs of which target not achieved8
Sheet2
Sheet3
-
Sheet1
PROGRESS ON THE PERFORMANCE PARAMETERS AS PER
CONTRACT FOR THE YEAR 2010-11 QUARTER ENDING 09/2010
PERFORMANCE PARAMETERST a r g e tLast year performance for the quarter ending 09/2009RemarksSCORE
Key performance indicatorsWeight basisFY 2010-11Proportionate Target for the Quarter Ending 09/2010Target achieved at the end of Quarter Ending 09/2010
A. Operational and commercial performance-50%
iLine losses15%10.83%12.30%10.90%12.40`%Target achieved
iiCollection ratio25%96% without subsidy90.40%93.84`%90%Outstanding subsidy is Rs.2686.07millions.
AT&C losses
iiiTransformer failure Ratio2%5% Total Installed MVA8.23`%6%4.57`%Proportionate target achieved however failure ratio is higher than the previous year due to heavy rain and flood clamity in this year
ivLine failure ratio below 3 minutes per 100 km circuit2%110`132.84`137`87.92`Target almost achieved however target figure is high as compare to previous year due to change in the time duration of outage as per NEPRA rule from below 20 min to 03 minutes
vLine failure ratio above 3 minutes per 100 km circuit2%44'62.16`31.24`88.65`Target achieved
viDefective meter- 7-12 as % of total4%1%1.46`%0.82`%1.13`%Total defective meters having age 7-12 months is 395 as compare to 1827 in the previous year
B. Financial performance -08%
iCash in transit (monthly average)3%7.82%7.9`%10.18`%10.75`%Out of total cash in transit Rs.811millions NADRA share is Rs. 491 millions which deposited in AL Habib Bank instead of MCB. CPPA requested to open account in Bank Al-Habib0
iiO&M expanses Rs./Kwh5%0.6720.576`0576`0.558`O&M expenses within limit5
C. Capital expenditure project implementation 15%1.25
iCapitalization (completion of A-90 form)5%58%57.66`%54.91`%40.08`%Target almost achieved.
Capital expenses
iiTransmission and grid station (STG)5%98%57.43`%29.31`%66.97`%Work is in progress booking will be made in Oct & Nov target will be achieved comfortablly0
iiiDistribution of power (DOP)2%98%90`%54.64`%45.24`%do0
ivEnergy loss reduction program (ELR)2%98%90%98.47`%90.50`%Target achieved1.5
vRural electrification (RE)1%98%68.64`%35.16`%59.08`%Target not achieved due to non allocation of budget in time0
D. Customer relations management 5%
iNew connections1%85%70%61.64`%67.43`%Target not achieved due to ban on new connections which lifted in Aug-2010.However 19025 connections installed upto Sep-2010
iiCustomer facilitation1%85%85%85`%85%Target achieved.
iiiEfficiency of supply complaints resolution1%85%85%100%96%66619 Complaint of failure of supply restored
ivEfficiency of billing complaints resolution2%85%85%99.9`%97%Target achieved. 27401 billing complaints resolved
E. Human Resources Management 12%
iOfficers strength occupancy ratio2%80%79%79.62`%86.51`%Target achieved
iiStaff strength occupancy ratio2%80%80.33`%90.39`%86.1`%do
iiiResolution of disciplinary cases1%50%60%72.36`%82.88`%Target achieved. However figure is less due to adoption of E&D rules in this year. Steps are required in E&D rules to finalize the case which required time.
ivSettlement of audit paras1%3%3%0.95`%2.8`%Record of 22 No Audit Para prduced to DG Audit verification awaited. 5 No Draft Para settled and put up for approval from PAC. 13 No Audit Para's record partially verified
vPercentage of officers trained during the year.3%80%80%100%89`%Target achieved
viPercentage of staff trained during the year3%80%81.6`%65%75`%Target not achieved because field employees could not spare for training due to restoration of supply in the flooded area and continuous rainfall in this year.
F. Employee safety - 10%
iNo. of accidents-fatal6%--34i) Lineman slipped from the pole ii) Recevieved shocked from punctured not visible 11KV cable on the pole top iii) Shock received during live cable jointing on the pole to reduce mishap insulated bucket crains are required whose expenditure is approximate
iiNo. of accidents non-fatal4%--44
Total No: of KPIs25
No of KPIs of which target achievd15
No of KPIs of which target is almost at par2
No of KPIs of which target not achieved8
Sheet2
Sheet3
-
Sheet1
PROGRESS ON THE PERFORMANCE PARAMETERS AS PER
CONTRACT FOR THE YEAR 2010-11 QUARTER ENDING 09/2010
PERFORMANCE PARAMETERST a r g e tLast year performance for the quarter ending 09/2009RemarksSCORES
Key performance indicatorsWeight basisFY 2010-11Proportionate Target for the Quarter Ending 09/2010Target achieved at the end of Quarter Ending 09/2010
A. Operational and commercial performance-50%
iLine losses15%10.83%12.30%10.90%12.40`%Target achieved
iiCollection ratio25%96% without subsidy90.40%93.84`%90%Outstanding subsidy is Rs.2686.07millions.
AT&C losses
iiiTransformer failure Ratio2%5% Total Installed MVA8.23`%6%4.57`%Proportionate target achieved however failure ratio is higher than the previous year due to heavy rain and flood clamity in this year
ivLine failure ratio below 3 minutes per 100 km circuit2%110`132.84`137`87.92`Target almost achieved however target figure is high as compare to previous year due to change in the time duration of outage as per NEPRA rule from below 20 min to 03 minutes
vLine failure ratio above 3 minutes per 100 km circuit2%44'62.16`31.24`88.65`Target achieved
viDefective meter- 7-12 as % of total4%1%1.46`%0.82`%1.13`%Total defective meters having age 7-12 months is 395 as compare to 1827 in the previous year
B. Financial performance -08%
iCash in transit (monthly average)3%7.82%7.9`%10.18`%10.75`%Out of total cash in transit Rs.811millions NADRA share is Rs. 491 millions which deposited in AL Habib Bank instead of MCB. CPPA requested to open account in MCB.
iiO&M expanses Rs./Kwh5%0.6720.576`0576`0.558`O&M expenses within limit
C. Capital expenditure project implementation 15%
iCapitalization (completion of A-90 form)5%58%57.66`%54.91`%40.08`%Target almost achieved.
Capital expenses
iiTransmission and grid station (STG)5%98%57.43`%29.31`%66.97`%Work is in progress booking will be made in Oct & Nov target will be achieved comfortablly
iiiDistribution of power (DOP)2%98%90`%54.64`%45.24`%do
ivEnergy loss reduction program (ELR)2%98%90%98.47`%90.50`%Target achieved
vRural electrification (RE)1%98%68.64`%35.16`%59.08`%Target not achieved due to non allocation of budget in time
D. Customer relations management 5%
iNew connections1%85%70%61.64`%67.43`%Target not achieved due to ban on new connections which lifted in Aug-2010.However 19025 connections installed upto Sep-20100
iiCustomer facilitation1%85%85%85`%85%Target achieved.1
iiiEfficiency of supply complaints resolution1%85%85%100%96%66619 Complaint of failure of supply restored1
ivEfficiency of billing complaints resolution2%85%85%99.9`%97%Target achieved. 27401 billing complaints resolved2
E. Human Resources Management 12%
iOfficers strength occupancy ratio2%80%79%79.62`%86.51`%Target achieved2
iiStaff strength occupancy ratio2%80%80.33`%90.39`%86.1`%do2
iiiResolution of disciplinary cases1%50%60%72.36`%82.88`%Target achieved. However figure is less due to adoption of E&D rules in this year1
ivSettlement of audit paras1%3%3%0.95`%2.8`%Record of 22 No Audit Para prduced to DG Audit verification awaited. 5 No Draft Para settled and put up for approval from PAC. 13 No Audit Para's record partially verified0
vPercentage of officers trained during the year.3%80%80%100%89`%Target achieved3
viPercentage of staff trained during the year3%80%81.6`%65%75`%Target not achieved because field employees could not spare for training due to restoration of supply in the flooded area and continuous rainfall in this year.
F. Employee safety - 10%
iNo. of accidents-fatal6%--34i) Lineman slipped from the pole ii) Recevieved shocked from punctured not visible 11KV cable on the pole top iii) Shock received during live cable jointing on the pole to reduce mishap insulated bucket crains are required whose expenditure is approximate
iiNo. of accidents non-fatal4%--44
Total No: of KPIs25
No of KPIs of which target achievd15
No of KPIs of which target is almost at par2
No of KPIs of which target not achieved8
Sheet2
Sheet3
-
TOTAL SCORE : 100SCORE GAINED: 54.25
Sheet1
PROGRESS ON THE PERFORMANCE PARAMETERS AS PER
CONTRACT FOR THE YEAR 2010-11 QUARTER ENDING 09/2010
PERFORMANCE PARAMETERST a r g e tLast year performance for the quarter ending 09/2009RemarksSCORES
Key performance indicatorsWeight basisFY 2010-11Proportionate Target for the Quarter Ending 09/2010Target achieved at the end of Quarter Ending 09/2010
A. Operational and commercial performance-50%
iLine losses15%10.83%12.30%10.90%12.40`%Target achieved
iiCollection ratio25%96% without subsidy90.40%93.84`%90%Outstanding subsidy is Rs.2686.07millions.
AT&C losses
iiiTransformer failure Ratio2%5% Total Installed MVA8.23`%6%4.57`%Proportionate target achieved however failure ratio is higher than the previous year due to heavy rain and flood clamity in this year
ivLine failure ratio below 3 minutes per 100 km circuit2%110`132.84`137`87.92`Target almost achieved however target figure is high as compare to previous year due to change in the time duration of outage as per NEPRA rule from below 20 min to 03 minutes
vLine failure ratio above 3 minutes per 100 km circuit2%44'62.16`31.24`88.65`Target achieved
viDefective meter- 7-12 as % of total4%1%1.46`%0.82`%1.13`%Total defective meters having age 7-12 months is 395 as compare to 1827 in the previous year
B. Financial performance -08%
iCash in transit (monthly average)3%7.82%7.9`%10.18`%10.75`%Out of total cash in transit Rs.811millions NADRA share is Rs. 491 millions which deposited in AL Habib Bank instead of MCB. CPPA requested to open account in MCB.
iiO&M expanses Rs./Kwh5%0.6720.576`0576`0.558`O&M expenses within limit
C. Capital expenditure project implementation 15%
iCapitalization (completion of A-90 form)5%58%57.66`%54.91`%40.08`%Target almost achieved.
Capital expenses
iiTransmission and grid station (STG)5%98%57.43`%29.31`%66.97`%Work is in progress booking will be made in Oct & Nov target will be achieved comfortablly
iiiDistribution of power (DOP)2%98%90`%54.64`%45.24`%do
ivEnergy loss reduction program (ELR)2%98%90%98.47`%90.50`%Target achieved
vRural electrification (RE)1%98%68.64`%35.16`%59.08`%Target not achieved due to non allocation of budget in time
D. Customer relations management 5%
iNew connections1%85%70%61.64`%67.43`%Target not achieved due to ban on new connections which lifted in Aug-2010.However 19025 connections installed upto Sep-2010
iiCustomer facilitation1%85%85%85`%85%Target achieved.
iiiEfficiency of supply complaints resolution1%85%85%100%96%66619 Complaint of failure of supply restored
ivEfficiency of billing complaints resolution2%85%85%99.9`%97%Target achieved. 27401 billing complaints resolved
E. Human Resources Management 12%
iOfficers strength occupancy ratio2%80%79%79.62`%86.51`%Target achieved
iiStaff strength occupancy ratio2%80%80.33`%90.39`%86.1`%do
iiiResolution of disciplinary cases1%50%60%72.36`%82.88`%Target achieved. However figure is less due to adoption of E&D rules in this year. Steps are required in E&D rules to finalize the case which required time.
ivSettlement of audit paras1%3%3%0.95`%2.8`%Record of 22 No Audit Para prduced to DG Audit verification awaited. 5 No Draft Para settled and put up for approval from PAC. 13 No Audit Para's record partially verified
vPercentage of officers trained during the year.3%80%80%100%89`%Target achieved
viPercentage of staff trained during the year3%80%81.6`%65%75`%Target not achieved because field employees could not spare for training due to restoration of supply in the flooded area and continuous rainfall in this year.0.75
F. Employee safety - 10%
iNo. of accidents-fatal6%--34i) Lineman slipped from the pole ii) Recevieved shocked from punctured not visible 11KV cable on the pole top iii) Shock received during live cable jointing on the pole to reduce mishap insulated bucket crains are required whose expenditure is approximate2
iiNo. of accidents non-fatal4%--44
Total No: of KPIs25
No of KPIs of which target achievd15
No of KPIs of which target is almost at par2
No of KPIs of which target not achieved8
Sheet2
Sheet3
-
Progress of ProjectsRs MLN
Sheet1
WORK PLAN FOR INSTALLATION OF CAPACITORS AT 132 GRID STATIONS
Sr #Description2006-07
JulyAugSepOctNovDecJanFebMarAprMayJun
1Preparation of Tender Documents
2Floating of Tenders
3Evaluation & Award of Contract
4Civil Works
5Receipt of Delivery of Material
6Installation & Erection
7Testing & Commissioning
CASH PLAN FOR INSTALLATION OF CAPACITORS AT 132 KV GRID STATIONS
Rs In Millions
Technical DirectorChief Executive OfficerDescription2006-07
FESCO, FaisalabadFESCO, FaisalabadJul-06Aug-06Sep-06Oct-06Nov-06Dec-06Jan-07Feb-07Mar-07Apr-07May-07Jun-07Total
Procurement, Installation & Ommissioning42.502.5045.00
1FESCO WILL PROCURE 05 SETS OF CAPACITORS OF 132KV GRID STATIONS
2APPROXIMATE COST OF CAPACITORS IS RS. 42.50 MLN
3CIVIL WORKS APPROXIMATE COST IS RS. 2.50 MLN
Technical DirectorChief Executive Officer
FESCO, FaisalabadFESCO, Faisalabad
Sheet2
Sheet3
PROJECTAllocation 2009-10Allocation 2010-11Propotionate Budget Jul-Sep 2010Expenditure Jul-Sep 2010Variance w.r.t Proportionate Budget
Inc / dec
DOP4493007548-27
ELR5803208072-8
STG10001500375109-266
ADB3253859647-49
TOTAL23542505626276-350
Expenditure2195
-
STG Works Performance (2010-11) Physical
Sheet1
DESCRIPTIONWorks Completed 2009-10TOTAL WORKS PlannedWORKS COMPLETED UP TO 09/2010WORKS IN HANDACTIVITY NOT YET STARTED
Grid Stations
New25122
CONVERSION2-2-
AUGMENTATION1613148
EXTENSION (T/Bays)23-3-
EXTENSION (L/Bays)14-31
T/ Lines (KM)2 N0 (12.9 KM)11 Works (260.63 KM)03 Works (14.81 KM)03 Works (106 KM)05 Work (139.8KM)
T/ Lines (KM) (Deposit Works1 No (4.5KM)03 Works (36.545 KM)02 Works (36.01 KM)01 Works (0.535 KM)-
11KV Capacitor Installation100.8 MVAR98.4 MVAR74.4 MVAR24 MVAR-
Expenditure958 MLNBudget 2010-11 RS 1500 MLN
Sheet2
Sheet3
-
RESTORATION OF SUPPLY INFLOOD HIT AREAS
Sheet1
FAISALABAD ELECTRIC SUPPLY COMPANY LIMITED
CANAL ROAD, ABDULLAHPUR, FAISALABAD
Tel # 041-9220433OFFICE OF THE
Fax # 041-9220616CHIEF EXECUTIVE OFFICER
FESCO, FAISALABAD
Memo No._________/DCCDATE06/9/2010
Managing Director (PEPCO),
WAPDA House, Lahore.
Attn:(DG EM&C) Division PEPCO
Sub:AREAS EFFECTED DUE TO FLOOD
It is submitted for your favour of kind information that, following is the latest status
of area effected due to flood under FESCO
FLOOD STATUS IN RESPECT OF FESCO, Dated 06-09-10
#Name of DivisionNo. of Feeders EffectedLoad (MW) EffectedAbbadies EffectedAbbadies RestoredExpenditure RS MLN
1Jhang811.331531534.70
2Sultan Bahoo841601600.02
3Bhakkar7490891.40
4Sargodha - 33 (partially)370700.32
5Joharabad1 (partially)1220.00
6Mianwali4 (partially)424240.77
FESCO TOTAL31 (Partially)354994987.2
Engr. ABRAR AHMAD
Dy. MANAGER DCC
FESCO, Faisalabad
CC:
Dy. Manager PRO FESCO, Faisalabad for information.
Sheet2
Sheet3
MBD002BE3F5.doc
-
FINANCIAL PERFORMANCE JUL-NOV 2010
Perf. Indicator
Performance Indicators:
SYSTEM AUGMENTATION PROGRAM
Rs. In Million
ProjectAllocation 2009-10Proportionate Budget 07/09-02/10Expenditure 07/09-02/10Variance Proportionate Inc.Dec.
DOP321.000214.000201.02712.973
ELR400.000266.667501.705(235.038)
STG500.000333.333534.732(201.399)
ADB*285.000190.0009.182180.818
Total1,506.0001,004.0001,246.646(242.646)
CapacitorsExpenditure Rs.167.864 Million
* Power Distribution Enhancement Investment Programme
Physical Progress
SYSTEM AUGMENTATION PROGRAM
(Physical Progress)
PROJECTSr. No.ITEM OF WORKUNITPHYSICAL TARGETS FIXED FOR THE YEAR 2009-10Proportionate Target upto 02/2010Progress upto 02/2010
D.O.P123456
I.New Service ConnectionNo.144,48096,32073,122
IIHT ProposalNo.15107
IIILT ProposalNo.185123159
IVNew HT LinesKm.251769.761
VNew LT LinesKm.251723.096
VINew TransformersNo.503360
E.L.RI.HT ProposalsNo.20138
IILT ProposalsNo.550367413
IIINew HT LinesKm1006722.642
IVHT Recond:Km1258354.616
VNew LT LinesKm15010067.216
VILT Recond:Km1006753.388
VIINew TransformersNo.255170155
Financials
FESCO Financial Performance
ItemsUnitsActual 07/10-09/10
Energy SalesMkWh2,553
Average Sale RateRs.10.87
SalesRs. MLN27,753.417
Revenue 19,368.545
Tariff Differential 8,384,963
PPPRs. MLN16,188.316
Cost of Electricity Sold
Gross ProfitRs. MLN11,565.101
O & M ExpensesRs. MLN1,567.395
Financial ExpensesRs. MLN6.582
DepreciationRs. MLN309.000
Operating ProfitRs. MLN9,681.833
Other incomeRs. MLN363.401
Amortization of Deferred CreditRs. MLN116.914
Net Profit (Before Tax)Rs. MLN10,162.439
-
REVIEW OF PERFORMANCE CONTRACT There are 25 Indicators in the Contract, which must be reduced to main Indicators; Losses, Recovery, Tripping, Project Completion etc
These Targets be simplified to be operative at low level (Sub Divisional Level)
Following essentials be ensured;
MoW&P support for stoppage of political interventions MoW&P support for timely notification of tariffs Constitution of BOD Committee Manpower Training Infrastructure is not adequate
-
Grid Station
NEW
05
S#
Name of Grid Station
Budget Allocation
1.
132KV G/S 103/R.B
307.50-Million
2.
132KV G/S Kamal Pur
U/P
3.
132KV G/S Bhera
U/P
4.
132KV G/S Kot Shakir
5.
132KV G/S Millat Road
CONVERSION (66KV TO 132KV G/S)
02
S#
Name of Grid Station
Budget Allocation
1.
132KV G/S Bhowana
U/P
160.00-Million
2.
132KV G/S Barana
U/P
AUGMENTATION
13
S#
Name of Grid Station
Budget Allocation
1.
132KV G/S N/Wala Road with 40MVA
U/P
481.60-Million
2.
132KV G/S Sargodha City with 40MVA
3.
132KV G/S Sargodha-II with 40MVA
U/P
4.
132KV G/S Mianwali with 40MVA
5.
132KV G/S Kamalia with 40MVA
U/P
6.
132KV G/S Muridwala with 40MVA
7.
132KV G/S Chiniot Road Fsd with 40MVA
8.
132KV G/S Gojra with 40MVA
9.
132KV G/S Head Faqerian with 20/26MVA
10.
132KV G/S Piplan with 20/26MVA
U/P
11.
132KV G/S Shah Pur Saddar with 20/26MVA
12.
132KV G/S Khurrianwala with 20/26MVA
13.
132KV G/S Shorkot City with 20/26MVA
-
EXTENSION T/F BAY
03
S#
Name of Grid Station
Budget Allocation
1.
66KV G/S Chashma
U/P
41.40-Million
2.
66KV G/S Fazil
U/P
3.
66KV G/S Hyderabad Thall
U/P
EXTENSION L/BAY
04
S#
Name of Grid Station
Budget Allocation
1.
132KV G/S Jhang Road (03-No. L/Bays)
U/P
14.50-Million
2.
132KV G/S Bhamb (01-No. L/Bay)
REPLACEMENT OF BUS BAR
02
S#
Name of Grid Station
Budget Allocation
1.
132KV G/S Jhang Road Faisalabad
12.20-Million
2.
132KV G/S OTP Faisalabad
-
TRANSMISSION LINES
11
S#
Name of Grid Station
Budget Allocation
1.
132KV F/F Kamal Pur (6.38-KM)
431.60-Million
2.
132KV F/F 103/R.B (7.93-KM)
3.
132KV F/F Bhera Industrial (15.32-KV)
4.
132KV T/Line Bhamb Kot Shakir (23-KM)
5.
132KV F/F Millat Road Fsd. (0.5-KM)
6.
132KV T/Line Jhang Rd. Bhowana (40-KM)
U/P
7.
132KV T/Line Lalian Barana (22-KM)
U/P
8.
132KV D/C T/Line Piplan Bhakkar (94-KM)
9.
132KV SDT T/Line N/Abad Shahkot (44-KM)
U/P
10.
Re-conductoring 132KV Samundri Rd. Jhang Road (07-KM)
11.
Re-conductoring 220KV N/Abad New N/Abad (0.5-KM)
CIVIL WORKS
06
45.4-Million
OTHERS
6.00-Million
Total Budget
= 1500-Million
-
TRANSMISSION LINE (DEPOSIT WORK)
03
S#
Name of Grid Station
1.
132KV F/F Flying Cement Factory
(31.51-KM)
2.
Re-routing of 66KV Mianwali Piplan
(4.50-KM)
3.
Re-routing of 132KV N/Abad GTPS
(0.535-KV)
U/P
INSTALLATION OF 11KV CAPACITORS (98-4MVAR)
17
S#
Name of Grid Station
1.
132KV G/S 126/S.B
(T-1)
4.8 MVAR
2.
132KV G/S Khanuana
(T-1)
7.2 MVAR
3.
132KV G/S Khanuana
(T-2)
4.8 MVAR
U/P
4.
132KV G/S Shorkot
(T-1)
7.2 MVAR
5.
132KV G/S Shorkot
(T-2)
4.8 MVAR
U/P
6.
132KV G/S Kirana
(T-2)
7.2 MVAR
7.
66KV G/S Ahmed Pur Sial
(T-1)
4.8 MVAR
8.
66KV G/S Ahmed Pur Sial
(T-2)
4.8 MVAR
9.
66KV G/S Pathan Kot
(T-1)
4.8 MVAR
10.
66KV G/S 18-Hazari
(T-2)
4.8 MVAR
11.
132KVG/S Chutiana
(T-2)
4.8 MVAR
12.
132KV G/S Bandala
(T-2)
7.2 MVAR
13.
132KV G/S Jauharabad
(T-2)
7.2 MVAR
14.
132KV G/S Bhakkar
(T-3)
4.8 MVAR
15.
132KV G/S Shah Pur
(T-1)
7.2 MVAR
U/P
16.
66KV G/S Hyderabad
(T-1)
2.4 MVAR
U/P
17.
66KV G/S Trug
(T-1)
4.8 MVAR
U/P
-
POWER DISTRIBUTION ENHANCEMENT INVESTMENT PROGRAM TRANCHE-I, INVESTMENT PROJECT PROCUREMENT PROGRESS
Annex-III A
POWER DISTRIBUTION ENHANCEMENT INVESTMENT PROGRAM
TRANCHE-I, INVESTMENT PROJECT
FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)
PROCUREMENT PROGRESS
October, 2010
Total QuantitiesEstimated Costs US$MTendered CostsStatus of Progress goods procuredRemarks
Package NameDescriptionQuantities DeliveredPayments Released%age AchievementStatus of goods installed
PhysicalFinancial
12345678=(6/3)X1009=(7/5)X1001011
Package - 1132KV Power Transformers9.3513
Lot - IPower Transformers 31.5/40 MVA5 Nos.US$ 2265500---10%010%Nilcontract terminated by BOD FESCO
Lot - IIPower Transformers 20/26 MVA7 Nos.PKR. 241,500,0007 Nos.100%100%100%14%
Package - 2Circuit Breakers and Capacitors7.4499
Lot - I132 KV SF6 Gas Circuit Breaker65 Nos.Euro-1094925------00NilMaterial underway
Lot - II132 KV CTs125 Nos.Euro-313339.4 + PKR.2814000---10%010%NilInspection will be carried out at the end of November,2010
132 KV PTs9 Nos.Nil
Lot - III132 KV Line Isolaters20 Nos.Euro 388900------00NilMaterial underway
132 KV Bus Isolaters54 Nos.NilMaterial underway
Lot - IVLt Breakers for Transformers387 Nos.US$ 2861084---10%010%NilMaterial underway
Sectionlizers345 Nos.NilInspection will be carried out at the end of mid December,2010
Voltage Regulators16 Nos.Nil
Lot - V11Kv 450KVAR Capacitor Bank, Rack & Contactor2166 SetsUS$ 1715472 + PKR 162450002166 Sets10%0%10%NilFull Delivery expected during October 2010.
Lot - VI132 KV Lightning Arrestor21 Nos.Euro 23940------00NilMaterial underway
11 KV Lightning Arrestor21 Nos.NilMaterial underway
Package - 2-A11 KV Auto Reclosers58 Nos.0.1159under discussion
Package - 3Control & Relay Panels2.5111
Lot - IControl Panels CP 308 Nos.US$ 91268 + PKR 7404491------00NilMaterial underway
Control Panels CP 507 Nos.NilMaterial underway
Relay Panels RP 38 Nos.NilMaterial underway
Relay Panels RP 47 Nos.NilMaterial underway
Lot - II11 Kv Incoming Panels 25KA, 2500 Amp.22 Nos.PKR. 18038500022 Nos.10%9110%37%100% material delivered
11 Kv Incoming Panels 40KA, 3600 Amp.5 Nos.5 Nos.0Nil
11 Kv Bus Coupler 25 KA, 2500 Amp.7 Nos.7 Nos.0Nil
11 Kv Outgoing Panel 25KA, 630 Amp.148 Nos.148 Nos.8134%
Lot - IIIDifferential Relay Numarical 5 Amp 110 Volt D.C10 Nos.US$ 85880 + PKR 20000------00NilMaterial underway
Numarical Impedance Relay 220 Volt D.C. 5 Amp.5 Nos.NilMaterial underway
Numarical Impedance Relay 110 Volt D.C. 5 Amp.5 Nos.NilMaterial underway
Numarical Over Current Relay 110 Volt D.C. 5 Amp.20 Nos.NilMaterial underway
Package - 4Grid Station Equipment0.4213
Lot - I132 KV Beam9 Nos.PKR 4539400------00Nilmaterial rejected by inspectors, waiting for inspection call
132KV Column15 Nos.Nil
11KV Structure7 Nos.Nil
Earth Masts2 Nos.Nil
Earth Platform23 Nos.Nil
Lot - IIConnectors, Cartiges, Moulds, Pipes & Earth Wire Assembly
Lot - III11 Kv Post Insulators, Disk Insulators, Single & Double Groove PG Connector & Earthing Rod
Package - 5Conductors and Cables0.3954
Lot - IControl & Power Cables , Alu. Conductors and Copper Grouding Conductor
Lot - II11 Kv Outdoor Termination Kit 1000 MCM S/Core115 SetsPKR 2365202------00Case for approval of drawings with the office of Chief Engineer (D&S) NTDC, Lahore.
11 Kv Outdoor Termination Kit 4/0 AWG 3/Core60 Set
11 Kv Indoor Termination Kit 1000 MCM S/Core115 Set
11 Kv Indoor Termination Kit 4/0 AWG 3/Core60 Set
Package - 5-ACables and Conductors0.3621PKR 32325672------Material under inspection
Package - 8Modernization Equipment0.8377
Lot - IStatic Meters Single-Phase16259 Nos.US$ 495844.50100%10%100%10%71%
Static Meters Three-Phase2322 Nos.9.50%
Package - 9Civil works4 Lots0.46PKR 39.021 MNoa issued contract will be signed at the end of November 2010.
DISBURSEMENT ENDING JUNE 2010: US$ 5.297 M
UPTO DATE DISBURSEMENT: US$ 8.133 M
-
Annex-III A
POWER DISTRIBUTION ENHANCEMENT INVESTMENT PROGRAM
TRANCHE-I, INVESTMENT PROJECT
FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)
PROCUREMENT PROGRESS
October, 2010
Total QuantitiesEstimated Costs US$MTendered CostsStatus of Progress goods procuredRemarks
Package NameDescriptionQuantities DeliveredPayments Released%age AchievementStatus of goods installed
PhysicalFinancial
12345678=(6/3)X1009=(7/5)X1001011
Package - 1132KV Power Transformers9.3513
Lot - IPower Transformers 31.5/40 MVA5 Nos.US$ 2265500---10%010%Nilcontract terminated by BOD FESCO
Lot - IIPower Transformers 20/26 MVA7 Nos.PKR. 241,500,0007 Nos.100%100%100%14%
Package - 2Circuit Breakers and Capacitors7.4499
Lot - I132 KV SF6 Gas Circuit Breaker65 Nos.Euro-1094925------00NilMaterial underway
Lot - II132 KV CTs125 Nos.Euro-313339.4 + PKR.2814000---10%010%NilInspection will be carried out at the end of November,2010
132 KV PTs9 Nos.Nil
Lot - III132 KV Line Isolaters20 Nos.Euro 388900------00NilMaterial underway
132 KV Bus Isolaters54 Nos.NilMaterial underway
Lot - IVLt Breakers for Transformers387 Nos.US$ 2861084---10%010%NilMaterial underway
Sectionlizers345 Nos.NilInspection will be carried out at the end of mid December,2010
Voltage Regulators16 Nos.Nil
Lot - V11Kv 450KVAR Capacitor Bank, Rack & Contactor2166 SetsUS$ 1715472 + PKR 162450002166 Sets10%0%10%NilFull Delivery expected during October 2010.
Lot - VI132 KV Lightning Arrestor21 Nos.Euro 23940------00NilMaterial underway
11 KV Lightning Arrestor21 Nos.NilMaterial underway
Package - 2-A11 KV Auto Reclosers58 Nos.0.1159under discussion
Package - 3Control & Relay Panels2.5111
Lot - IControl Panels CP 308 Nos.US$ 91268 + PKR 7404491------00NilMaterial underway
Control Panels CP 507 Nos.NilMaterial underway
Relay Panels RP 38 Nos.NilMaterial underway
Relay Panels RP 47 Nos.NilMaterial underway
Lot - II11 Kv Incoming Panels 25KA, 2500 Amp.22 Nos.PKR. 18038500022 Nos.10%9110%37%100% material delivered
11 Kv Incoming Panels 40KA, 3600 Amp.5 Nos.5 Nos.0Nil
11 Kv Bus Coupler 25 KA, 2500 Amp.7 Nos.7 Nos.0Nil
11 Kv Outgoing Panel 25KA, 630 Amp.148 Nos.148 Nos.8134%
Lot - IIIDifferential Relay Numarical 5 Amp 110 Volt D.C10 Nos.US$ 85880 + PKR 20000------00NilMaterial underway
Numarical Impedance Relay 220 Volt D.C. 5 Amp.5 Nos.NilMaterial underway
Numarical Impedance Relay 110 Volt D.C. 5 Amp.5 Nos.NilMaterial underway
Numarical Over Current Relay 110 Volt D.C. 5 Amp.20 Nos.NilMaterial underway
Package - 4Grid Station Equipment0.4213
Lot - I132 KV Beam9 Nos.PKR 4539400------00Nilmaterial rejected by inspectors, waiting for inspection call
132KV Column15 Nos.Nil
11KV Structure7 Nos.Nil
Earth Masts2 Nos.Nil
Earth Platform23 Nos.Nil
Lot - IIConnectors, Cartiges, Moulds, Pipes & Earth Wire Assembly
Lot - III11 Kv Post Insulators, Disk Insulators, Single & Double Groove PG Connector & Earthing Rod
Package - 5Conductors and Cables0.3954
Lot - IControl & Power Cables , Alu. Conductors and Copper Grouding Conductor
Lot - II11 Kv Outdoor Termination Kit 1000 MCM S/Core115 SetsPKR 2365202------00Case for approval of drawings with the office of Chief Engineer (D&S) NTDC, Lahore.
11 Kv Outdoor Termination Kit 4/0 AWG 3/Core60 Set
11 Kv Indoor Termination Kit 1000 MCM S/Core115 Set
11 Kv Indoor Termination Kit 4/0 AWG 3/Core60 Set
Package - 5-ACables and Conductors0.3621PKR 32325672------Material under inspection
Package - 8Modernization Equipment0.8377
Lot - IStatic Meters Single-Phase16259 Nos.US$ 495844.50100%10%100%10%71%
Static Meters Three-Phase2322 Nos.9.50%
Package - 9Civil works4 Lots0.46PKR 39.021 MNoa issued contract will be signed at the end of November 2010.
DISBURSEMENT ENDING JUNE 2010: US$ 5.297 M
UPTO DATE DISBURSEMENT: US$ 8.133 M
-
Annex-III A
POWER DISTRIBUTION ENHANCEMENT INVESTMENT PROGRAM
TRANCHE-I, INVESTMENT PROJECT
FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)
PROCUREMENT PROGRESS
October, 2010
Total QuantitiesEstimated Costs US$MTendered CostsStatus of Progress goods procuredRemarks
Package NameDescriptionQuantities DeliveredPayments Released%age AchievementStatus of goods installed
PhysicalFinancial
12345678=(6/3)X1009=(7/5)X1001011
Package - 1132KV Power Transformers9.3513
Lot - IPower Transformers 31.5/40 MVA5 Nos.US$ 2265500---10%010%Nilcontract terminated by BOD FESCO
Lot - IIPower Transformers 20/26 MVA7 Nos.PKR. 241,500,0007 Nos.100%100%100%14%
Package - 2Circuit Breakers and Capacitors7.4499
Lot - I132 KV SF6 Gas Circuit Breaker65 Nos.Euro-1094925------00NilMaterial underway
Lot - II132 KV CTs125 Nos.Euro-313339.4 + PKR.2814000---10%010%NilInspection will be carried out at the end of November,2010
132 KV PTs9 Nos.Nil
Lot - III132 KV Line Isolaters20 Nos.Euro 388900------00NilMaterial underway
132 KV Bus Isolaters54 Nos.NilMaterial underway
Lot - IVLt Breakers for Transformers387 Nos.US$ 2861084---10%010%NilMaterial underway
Sectionlizers345 Nos.NilInspection will be carried out at the end of mid December,2010
Voltage Regulators16 Nos.Nil
Lot - V11Kv 450KVAR Capacitor Bank, Rack & Contactor2166 SetsUS$ 1715472 + PKR 162450002166 Sets10%0%10%NilFull Delivery expected during October 2010.
Lot - VI132 KV Lightning Arrestor21 Nos.Euro 23940------00NilMaterial underway
11 KV Lightning Arrestor21 Nos.NilMaterial underway
Package - 2-A11 KV Auto Reclosers58 Nos.0.1159under discussion
Package - 3Control & Relay Panels2.5111
Lot - IControl Panels CP 308 Nos.US$ 91268 + PKR 7404491------00NilMaterial underway
Control Panels CP 507 Nos.NilMaterial underway
Relay Panels RP 38 Nos.NilMaterial underway
Relay Panels RP 47 Nos.NilMaterial underway
Lot - II11 Kv Incoming Panels 25KA, 2500 Amp.22 Nos.PKR. 18038500022 Nos.10%9110%37%100% material delivered
11 Kv Incoming Panels 40KA, 3600 Amp.5 Nos.5 Nos.0Nil
11 Kv Bus Coupler 25 KA, 2500 Amp.7 Nos.7 Nos.0Nil
11 Kv Outgoing Panel 25KA, 630 Amp.148 Nos.148 Nos.8134%
Lot - IIIDifferential Relay Numarical 5 Amp 110 Volt D.C10 Nos.US$ 85880 + PKR 20000------00NilMaterial underway
Numarical Impedance Relay 220 Volt D.C. 5 Amp.5 Nos.NilMaterial underway
Numarical Impedance Relay 110 Volt D.C. 5 Amp.5 Nos.NilMaterial underway
Numarical Over Current Relay 110 Volt D.C. 5 Amp.20 Nos.NilMaterial underway
Package - 4Grid Station Equipment0.4213
Lot - I132 KV Beam9 Nos.PKR 4539400------00Nilmaterial rejected by inspectors, waiting for inspection call
132KV Column15 Nos.Nil
11KV Structure7 Nos.Nil
Earth Masts2 Nos.Nil
Earth Platform23 Nos.Nil
Lot - IIConnectors, Cartiges, Moulds, Pipes & Earth Wire Assembly
Lot - III11 Kv Post Insulators, Disk Insulators, Single & Double Groove PG Connector & Earthing Rod
Package - 5Conductors and Cables0.3954
Lot - IControl & Power Cables , Alu. Conductors and Copper Grouding Conductor
Lot - II11 Kv Outdoor Termination Kit 1000 MCM S/Core115 SetsPKR 2365202------00Case for approval of drawings with the office of Chief Engineer (D&S) NTDC, Lahore.
11 Kv Outdoor Termination Kit 4/0 AWG 3/Core60 Set
11 Kv Indoor Termination Kit 1000 MCM S/Core115 Set
11 Kv Indoor Termination Kit 4/0 AWG 3/Core60 Set
Package - 5-ACables and Conductors0.3621PKR 32325672------Material under inspection
Package - 8Modernization Equipment0.8377
Lot - IStatic Meters Single-Phase16259 Nos.US$ 495844.50100%10%100%10%71%
Static Meters Three-Phase2322 Nos.9.50%
Package - 9Civil works4 Lots0.46PKR 39.021 MNoa issued contract will be signed at the end of November 2010.
DISBURSEMENT ENDING JUNE 2010: US$ 5.297 M
UPTO DATE DISBURSEMENT: US$ 8.133 M
-
STATUS OF PROCUREMENT PLAN OF GSC MATERIAL FOR YEAR 2010-11
GSO Material 2010 (2)
STATUS OF PROCUREMENT PLAN OF GSO MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345678
1i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.2, Type-A44040Material under Pre-shipment inspection
2ii. Optical Probes for item No.1 (i) above22020
3i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.5, Type-B20020002000
4ii. Optical Probes for item No.2 (i) above55050
5Fresh Transform Oil20000200002000000
GSC Material 2010
STATUS OF PROCUREMENT PLAN OF GSC MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345679
111KV Incoming Panel for 40MVA Power Transformer99090Delivery upto 15.11.10
212101010010200Delivery upto 27.11.10
313851035102011400
4Double Groove PG Connector for 95mm2 Copper Conductor4653959503550
5Mould for cartridge type C763060
615KV XLPE Cable S/Core 1000MCM16132200Material Received
7Battery Charger 110 Volt D.C.86060Delivery upto 02.01.11
811KV Incoming Panel 25KA13100170Delivery upto 18.02.11
9132KV ZM-1 Towers581528805330Delivery upto 25.01.11
10Stub for 132KV Towers ZM-116416401640
11Earth Wire 9mm22821817.734194Case file sent to C.E. (Design) NTDC for Evaluation (194 Km)
12Relay Panel RP-0415120013Case file sent to C.E. (Design) NTDC for Evaluation
13132KV Line Isolators13110014
14132KV Potential Transformer211812160Delivery upto 15.04.11
15132KV T/F C.T. 100:200/5,5,5 A52400500
16132KV Earth Mast76006cancelled due to higher rates
17132KV Bus Isolator34270024Case file sent to C.E. (Design) NTDC for Evaluation
1811KV Lightening Arrestor36270039
19Lynx Conductor1017 Km956 Km58 Km529 Km0Delivery upto 05.01.11
20120102120120File received back from Chief Engineer (Design) NTDC on 28.10.2010 under process
21Earthing Plate Form47380018
22Earth Wire Tension Assembly with Clamp112920098
23Single Suspension Fitting for Lynx29372751003040
24Stock Bridge Damper for Lynx67236285006715
25Mid Span Joint for Lynx487457120480
26Repair Sleeves for Lynx307287190200
27Mid Span Joint for Earth Wire15715060157
28132/11.5 KV, 20/26 MVA Power Transformers32003Case file sent to C.E. (Design) NTDC for Evaluation
29132KV Circuit Breaker SF-624207017
30132KV Line C.Ts.1200-600/5,5,5A33274029
3111KV Bus Coupler Panel55005File received back from Chief Engineer (Design) NTDC on 02.11.2010 under process
3211KV Outgoing Panel 25KA54380035
33A.C./D.C. Auxiliary Panel76007
34ALU: Pipe 4-meter Length 63mm dia42330042Case file sent to C.E. (Design) NTDC for Evaluation
3570156185005015
3613295114550013295
37Earth Wire Tension Assembly with Clamp112920014
38Cartridge Type A181014605090505
393-Meter Extension for ZM-156460056
406-Meter Extension for ZM-115146015
41132KV ZM-30 Tower Complete (with Stubs)47400047
423-Meter Extension for ZM-3013100013
43132KV ZM-60 Tower Complete (with Stubs)50460050Case file sent to C.E. (Design) NTDC for Evaluation
443-Meter Extension for ZM-6012110012
45220KV Tower Type EA with Accessories50005
462-Meter Leg Ext for EA Tower40004
474-Meter Leg Ext for EA Tower1200012
488-Meter Leg Ext for EA Tower40004
49Disc Insulator 80-KN35573318885327015000
50Disc Insulator 100-KN25450189002545
51Rail Conductor184.595.5790176
52Single Tension Fitting for Lynx95487600786File received back from Chief Engineer (Design) NTDC on 01.11.2010 under process
53Single Tension Fitting for Rail4021984120399
54Single Suspension Fitting for Rail6543906340181
55Mid Span Joint for Rail613793046
56Repair Sleeves for Rail452530037
57Tension Fitting for Earth Wire13511970135
58Suspension Fitting for Earth Wire7256721060400
59Stock Bridge Damper for Earth Wire15921459001000
60110 Volt Led Acid Station Battery (150A.H.)76006Procurement under process
61Termination Kit (Indoor) 3-C 4/AWG1126800112
62Termination Kit (Outdoor) 3-C 4/AWG98560098
63Termination Kit (Indoor) 500MCM600000600
64Termination Kit (Indoor) 500MCM660000660
65Termination Kit (Indoor) 500MCM23119200631
66Termination Kit (Indoor) 500MCM22218300622
-
GSO Material 2010 (2)
STATUS OF PROCUREMENT PLAN OF GSO MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345678
1i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.2, Type-A44040Material under Pre-shipment inspection
2ii. Optical Probes for item No.1 (i) above22020
3i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.5, Type-B20020002000
4ii. Optical Probes for item No.2 (i) above55050
5Fresh Transform Oil20000200002000000
GSC Material 2010
STATUS OF PROCUREMENT PLAN OF GSC MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345679
111KV Incoming Panel for 40MVA Power Transformer99090Delivery upto 15.11.10
212101010010200Delivery upto 27.11.10
313851035102011400
4Double Groove PG Connector for 95mm2 Copper Conductor4653959503550
5Mould for cartridge type C763060
615KV XLPE Cable S/Core 1000MCM16132200Material Received
7Battery Charger 110 Volt D.C.86060Delivery upto 02.01.11
811KV Incoming Panel 25KA13100170Delivery upto 18.02.11
9132KV ZM-1 Towers581528805330Delivery upto 25.01.11
10Stub for 132KV Towers ZM-116416401640
11Earth Wire 9mm22821817.734194Case file sent to C.E. (Design) NTDC for Evaluation (194 Km)
12Relay Panel RP-0415120013Case file sent to C.E. (Design) NTDC for Evaluation
13132KV Line Isolators13110014
14132KV Potential Transformer211812160Delivery upto 15.04.11
15132KV T/F C.T. 100:200/5,5,5 A52400500
16132KV Earth Mast76006cancelled due to higher rates
17132KV Bus Isolator34270024Case file sent to C.E. (Design) NTDC for Evaluation
1811KV Lightening Arrestor36270039
19Lynx Conductor1017 Km956 Km58 Km529 Km0Delivery upto 05.01.11
20120102120120File received back from Chief Engineer (Design) NTDC on 28.10.2010 under process
21Earthing Plate Form47380018
22Earth Wire Tension Assembly with Clamp112920098
23Single Suspension Fitting for Lynx29372751003040
24Stock Bridge Damper for Lynx67236285006715
25Mid Span Joint for Lynx487457120480
26Repair Sleeves for Lynx307287190200
27Mid Span Joint for Earth Wire15715060157
28132/11.5 KV, 20/26 MVA Power Transformers32003Case file sent to C.E. (Design) NTDC for Evaluation
29132KV Circuit Breaker SF-624207017
30132KV Line C.Ts.1200-600/5,5,5A33274029
3111KV Bus Coupler Panel55005File received back from Chief Engineer (Design) NTDC on 02.11.2010 under process
3211KV Outgoing Panel 25KA54380035
33A.C./D.C. Auxiliary Panel76007
34ALU: Pipe 4-meter Length 63mm dia42330042Case file sent to C.E. (Design) NTDC for Evaluation
3570156185005015
3613295114550013295
37Earth Wire Tension Assembly with Clamp112920014
38Cartridge Type A181014605090505
393-Meter Extension for ZM-156460056
406-Meter Extension for ZM-115146015
41132KV ZM-30 Tower Complete (with Stubs)47400047
423-Meter Extension for ZM-3013100013
43132KV ZM-60 Tower Complete (with Stubs)50460050Case file sent to C.E. (Design) NTDC for Evaluation
443-Meter Extension for ZM-6012110012
45220KV Tower Type EA with Accessories50005
462-Meter Leg Ext for EA Tower40004
474-Meter Leg Ext for EA Tower1200012
488-Meter Leg Ext for EA Tower40004
49Disc Insulator 80-KN35573318885327015000
50Disc Insulator 100-KN25450189002545
51Rail Conductor184.595.5790176
52Single Tension Fitting for Lynx95487600786File received back from Chief Engineer (Design) NTDC on 01.11.2010 under process
53Single Tension Fitting for Rail4021984120399
54Single Suspension Fitting for Rail6543906340181
55Mid Span Joint for Rail613793046
56Repair Sleeves for Rail452530037
57Tension Fitting for Earth Wire13511970135
58Suspension Fitting for Earth Wire7256721060400
59Stock Bridge Damper for Earth Wire15921459001000
60110 Volt Led Acid Station Battery (150A.H.)76006Procurement under process
61Termination Kit (Indoor) 3-C 4/AWG1126800112
62Termination Kit (Outdoor) 3-C 4/AWG98560098
63Termination Kit (Indoor) 500MCM600000600
64Termination Kit (Indoor) 500MCM660000660
65Termination Kit (Indoor) 500MCM23119200631
66Termination Kit (Indoor) 500MCM22218300622
-
GSO Material 2010 (2)
STATUS OF PROCUREMENT PLAN OF GSO MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345678
1i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.2, Type-A44040Material under Pre-shipment inspection
2ii. Optical Probes for item No.1 (i) above22020
3i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.5, Type-B20020002000
4ii. Optical Probes for item No.2 (i) above55050
5Fresh Transform Oil20000200002000000
GSC Material 2010
STATUS OF PROCUREMENT PLAN OF GSC MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345679
111KV Incoming Panel for 40MVA Power Transformer99090Delivery upto 15.11.10
212101010010200Delivery upto 27.11.10
313851035102011400
4Double Groove PG Connector for 95mm2 Copper Conductor4653959503550
5Mould for cartridge type C763060
615KV XLPE Cable S/Core 1000MCM16132200Material Received
7Battery Charger 110 Volt D.C.86060Delivery upto 02.01.11
811KV Incoming Panel 25KA13100170Delivery upto 18.02.11
9132KV ZM-1 Towers581528805330Delivery upto 25.01.11
10Stub for 132KV Towers ZM-116416401640
11Earth Wire 9mm22821817.734194Case file sent to C.E. (Design) NTDC for Evaluation (194 Km)
12Relay Panel RP-0415120013Case file sent to C.E. (Design) NTDC for Evaluation
13132KV Line Isolators13110014
14132KV Potential Transformer211812160Delivery upto 15.04.11
15132KV T/F C.T. 100:200/5,5,5 A52400500
16132KV Earth Mast76006cancelled due to higher rates
17132KV Bus Isolator34270024Case file sent to C.E. (Design) NTDC for Evaluation
1811KV Lightening Arrestor36270039
19Lynx Conductor1017 Km956 Km58 Km529 Km0Delivery upto 05.01.11
20120102120120File received back from Chief Engineer (Design) NTDC on 28.10.2010 under process
21Earthing Plate Form47380018
22Earth Wire Tension Assembly with Clamp112920098
23Single Suspension Fitting for Lynx29372751003040
24Stock Bridge Damper for Lynx67236285006715
25Mid Span Joint for Lynx487457120480
26Repair Sleeves for Lynx307287190200
27Mid Span Joint for Earth Wire15715060157
28132/11.5 KV, 20/26 MVA Power Transformers32003Case file sent to C.E. (Design) NTDC for Evaluation
29132KV Circuit Breaker SF-624207017
30132KV Line C.Ts.1200-600/5,5,5A33274029
3111KV Bus Coupler Panel55005File received back from Chief Engineer (Design) NTDC on 02.11.2010 under process
3211KV Outgoing Panel 25KA54380035
33A.C./D.C. Auxiliary Panel76007
34ALU: Pipe 4-meter Length 63mm dia42330042Case file sent to C.E. (Design) NTDC for Evaluation
3570156185005015
3613295114550013295
37Earth Wire Tension Assembly with Clamp112920014
38Cartridge Type A181014605090505
393-Meter Extension for ZM-156460056
406-Meter Extension for ZM-115146015
41132KV ZM-30 Tower Complete (with Stubs)47400047
423-Meter Extension for ZM-3013100013
43132KV ZM-60 Tower Complete (with Stubs)50460050Case file sent to C.E. (Design) NTDC for Evaluation
443-Meter Extension for ZM-6012110012
45220KV Tower Type EA with Accessories50005
462-Meter Leg Ext for EA Tower40004
474-Meter Leg Ext for EA Tower1200012
488-Meter Leg Ext for EA Tower40004
49Disc Insulator 80-KN35573318885327015000
50Disc Insulator 100-KN25450189002545
51Rail Conductor184.595.5790176
52Single Tension Fitting for Lynx95487600786File received back from Chief Engineer (Design) NTDC on 01.11.2010 under process
53Single Tension Fitting for Rail4021984120399
54Single Suspension Fitting for Rail6543906340181
55Mid Span Joint for Rail613793046
56Repair Sleeves for Rail452530037
57Tension Fitting for Earth Wire13511970135
58Suspension Fitting for Earth Wire7256721060400
59Stock Bridge Damper for Earth Wire15921459001000
60110 Volt Led Acid Station Battery (150A.H.)76006Procurement under process
61Termination Kit (Indoor) 3-C 4/AWG1126800112
62Termination Kit (Outdoor) 3-C 4/AWG98560098
63Termination Kit (Indoor) 500MCM600000600
64Termination Kit (Indoor) 500MCM660000660
65Termination Kit (Indoor) 500MCM23119200631
66Termination Kit (Indoor) 500MCM22218300622
-
GSO Material 2010 (2)
STATUS OF PROCUREMENT PLAN OF GSO MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345678
1i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.2, Type-A44040Material under Pre-shipment inspection
2ii. Optical Probes for item No.1 (i) above22020
3i. Energy Meter 3-Phase 4-wire 110 Volt 5-Amp Accuracy class 0.5, Type-B20020002000
4ii. Optical Probes for item No.2 (i) above55050
5Fresh Transform Oil20000200002000000
GSC Material 2010
STATUS OF PROCUREMENT PLAN OF GSC MATERIAL FOR YEAR 2010-11
Sr. No.Item DescriptionRequriement of Manager (GSC) for the year 2010-11Qty planned for procurement during 2010-11Stock BalanceQty in pipelineProcurement under processRemarks
12345679
111KV Incoming Panel for 40MVA Power Transformer99090Delivery upto 15.11.10
212101010010200Delivery upto 27.11.10
313851035102011400
4Double Groove PG Connector for 95mm2 Copper Conductor4653959503550
5Mould for cartridge type C763060
615KV XLPE Cable S/Core 1000MCM16132200Material Received
7Battery Charger 110 Volt D.C.86060Delivery upto 02.01.11
811KV Incoming Panel 25KA13100170Delivery upto 18.02.11
9132KV ZM-1 Towers581528805330Delivery upto 25.01.11
10Stub for 132KV Towers ZM-116416401640
11Earth Wire 9mm22821817.734194Case file sent to C.E. (Design) NTDC for Evaluation (194 Km)
12Relay Panel RP-0415120013Case file sent to C.E. (Design) NTDC for Evaluation
13132KV Line Isolators13110014
14132KV Potential Transformer211812160Delivery upto 15.04.11
15132KV T/F C.T. 100:200/5,5,5 A52400500
16132KV Earth Mast76006cancelled due to higher rates
17132KV Bus Isolator34270024Case file sent to C.E. (Design) NTDC for Evaluation
1811KV Lightening Arrestor36270039
19Lynx Conductor1017 Km956 Km58 Km529 Km0Delivery upto 05.01.11
20120102120120File received back from Chief Engineer (Design) NTDC on 28.10.2010 under process
21Earthing Plate Form47380018
22Earth Wire Tension Assembly with Clamp112920098
23Single Suspension Fitting for Lynx29372751003040
24Stock Bridge Damper for Lynx67236285006715
25Mid Span Joint for Lynx487457120480
26Repair Sleeves for Lynx307287190200
27Mid Span Joint for Earth Wire15715060157
28132/11.5 KV, 20/26 MVA Power Transformers32003Case file sent to C.E. (Design) NTDC for Evaluation
29132KV Circuit Breaker SF-624207017
30132KV Line C.Ts.1200-600/5,5,5A33274029
3111KV Bus Coupler Panel55005File received back from Chief Engineer (Design) NTDC on 02.11.2010 under process
3211KV Outgoing Panel 25KA54380035
33A.C./D.C. Auxiliary Panel76007
34ALU: Pipe 4-meter Length 63mm dia42330042Case file sent to C.E. (Design) NTDC for Evaluation
3570156185005015
3613295114550013295
37Earth Wire Tension Assembly with Clamp112920014
38Cartridge Type A181014605090505
393-Meter Extension for ZM-156460056
406-Meter Extension for ZM-115146015
41132KV ZM-30 Tower Complete (with Stubs)47400047
423-Meter Extension for ZM-3013100013
43132KV ZM-60 Tower Complete (with Stubs)50460050Case file sent to C.E. (Design) NTDC for Evaluation
443-Meter Extension for ZM-6012110012
45220KV Tower Type EA with Accessories50005
462-Meter Leg Ext for EA Tower40004
474-Meter Leg Ext for EA Tower1200012
488-Meter Leg Ext for EA Tower40004
49Disc Insulator 80-KN35573318885327015000
50Disc Insulator 100-KN25450189002545
51Rail Conductor184.595.5790176
52Single Tension Fitting for Lynx95487600786File received back from Chief Engineer (Design) NTDC on 01.11.2010 under process
53Single Tension Fitting for Rail4021984120399
54Single Suspension Fitting for Rail6543906340181
55Mid Span Joint for Rail613793046
56Repair Sleeves for Rail452530037
57Tension Fitting for Earth Wire13511970135
58Suspension Fitting for Earth Wire7256721060400
59Stock Bridge Damper for Earth Wire15921459001000
60110 Volt Led Acid Station Battery (150A.H.)76006Procurement under process
61Termination Kit (Indoor) 3-C 4/AWG1126800112
62Termination Kit (Outdoor) 3-C 4/AWG98560098
63Termination Kit (Indoor) 500MCM600000600
64Termination Kit (Indoor) 500MCM660000660
65Termination Kit (Indoor) 500MCM23119200631
66Termination Kit (Indoor) 500MCM22218300622
-
Sheet1
1FIRST CIRCLE11MS WAPDA HOSPITAL
Petrol Litre2174Petrol Litre26
Petrol KM17813Petrol KM215
Diesel Litre16151Diesel Litre209
Diesel KM103850Diesel KM1674
12MANAGER AUDIT
2SECOND CIRCLE
Petrol Litre0
Petrol Litre1959Petrol KM0
Petrol KM15958Diesel Litre182
Diesel Litre11124Diesel KM1616
Diesel KM60326
3JHANG CIRCLE13MANAGER (MIS)
Petrol Litre6161Petrol Litre167
Petrol KM46407Petrol KM1635
Diesel Litre23449Diesel Litre343
Diesel KM166138Diesel KM3038
4SARGODHA CIRCLE14DY.MANAGER (RTC)
Petrol Litre1578Petrol Litre42
Petrol KM13119Petrol KM323
Diesel Litre21830Diesel Litre1349
Diesel KM142712Diesel KM7538
5GSO CIRCLE15DY.MANAGER (CIVIL WORKS)
Petrol Litre1107Petrol Litre672
Petrol KM9631Petrol KM5602
Diesel Litre14173Diesel Litre280
Diesel KM78591Diesel KM0
Hours80
6MANAGER (MM)
Petrol Litre555
Petrol KM4712
Diesel Litre16302
Diesel KM60948
Hours398
7HEAD QUARTER FESCO
Petrol Litre3178
Petrol KM27833
Diesel Litre6728
Diesel KM50001
8MANAGER P(C)
Petrol Litre343
Petrol KM2744
Diesel Litre19533
Diesel KM64385
Hours214
9MANAGER (TS)
Petrol Litre244
Petrol KM1952
Diesel Litre2000
Diesel KM17086
10DIRECTOR FINANCE
Petrol Litre228
Petrol KM2289
Diesel Litre547
Diesel KM4379
Sheet1
0
0
0
0
Sheet2
0
0
0
0
Sheet3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
VILLAGE ELECTRIFICATION
PROGRESS UPTO 31-10-2010
Sr #PROGRAMNO OF SCHEMES RECEIVEDFUNDS RECEIVED IN RS: MLNEXECUTED DURING 10/10EXECUTED DURING 7/09- 10/10EXECUTED UPTO 31-10-10UNDER PROGRESSTARGET OF COMPLETION UPTO
02/0403/04
K P P-I (MNA quota)1750926.6001748293161
1K P P-II (PM Directive )38312226.326382744325
PWP-I and II24261631.9412402136290
D.O.P (WAPDA OWN Source)210122.9002100
2K P P & PWP (Distt: Nazim)37542414.815374596167
3TPP (MPA Quota)1158602.201115714548
TOTAL131297924.8014425212823306242301
-
VILLAGE ELECTRIFICATIONPROGRESS UPTO 31.10.2010Rs in MillionPWP-IRs. 142.412 Million received in assignment account from 09.06.2010 to 29.06.2010.PWP-IIRs. 139.577 Million received in assignment account from 09.06.2010 to 24.06.2010. Rs. 52.345 Million funds allocated from 07/2010 to 10/2010 but not received in assignment account.
Sheet1
ProgramTotal Fund AllocatedNo of Schemes ReceivedFunds Received (Rs in Million)Prograssive Completed Upto 31.10.2010Under Progress / Partially CompletedAmount Surrenderd / Lapsed
No.AmountNo.Amount
PWP-1324.064235181.652228170.109711.543142.412
PWP-II1642.94721911451.02519061417.428533.625139.577
PWP (Distt: Nazim)139.773168139.773163132.13757.6360
Total2106.78425941772.4522971719.64629752.804281.989
Sheet2
Sheet3
-
VERIFIED BY DG AUDIT AND FINALY TO BE SETTLED BY PAC Annexure-A
Sheet1
Annexure-B
Annexure-A
(Rs.000,000)Annexure-C
DP No.Total AmountVerifiedOut standing
Aug-011.2230.9640.25Sr No.DRAFT PARA No.
29/20024.4414.3960.045135/2003DP No.Total AmountVerifiedBALANCE
36/20039.542--9.5422141/20018/.20011.2230.9640.259
38/2003119.6362.8156.5320/2001276/200111.3189.2572.061
14/20041.047--1.047493/200129/20024.4413.9330.508
28/20046.38--6.385147/200147/20033.2471.1392.108REASONS OF LESS SETTEMENT OF DPS THEN TARGETS
78/20055.062--5.06212/.20046.3562.9123.444
58/200646.98--46.981111/20042.271--2.271
1215/2006299.97--299.9772/20058.4554.9653.49
1198/2006393.231--393.23176/20054.4811.9152.566
47/20074