powering of bangladesh- vision 2021
TRANSCRIPT
![Page 1: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/1.jpg)
FOCUS on
Powering Bangladesh’s Future
![Page 2: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/2.jpg)
Investment Requirements Generation & Transmission
PARTICULARS TOTAL VALUE (billion in USD)TRANSMISSION $ 7.53RENEWABLE ENERGY $ 4.5HYDRO & RE $ 0.5DIESEL $ 0.56FURNACE OIL $ 5.89NATURAL GAS $ 7.63IMPORTED COAL $ 12.47DOMESTIC COAL $ 13.92
$7.5
3
$4.5
0
$0.5
0
$0.5
6 $5.8
9
$7.6
3 $12.
47
$13.
92
TOTAL VALUE (billion in USD)
TOTAL VALUE (billion in USD)
![Page 3: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/3.jpg)
The government of Bangladesh has set a target to bring the whole country under
electricity coverage by 2021.
Bangladesh requires multibillion dollar investments in the power sector.
Bangladesh government is increasingly diversifying the sources of investment.
Innovative funds- Export Credit Agency (ECA) financing is one of the big innovative
ways.
Power Infrastructure is the backbone of development for a country.
Key Points
![Page 4: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/4.jpg)
12, 071MW
CURRENT INSTALLED CAPACITY
6, 431MW
Current Average Demand
34,000MW
Projected Energy Demand (2030)
42% Of Electricity
Is supplied by the Private Sector
63%Of Electricity Fuel
Is supplied by Natural Gas
62% Of the Population
Have access to Electricity
Powering Bangladesh’s Future
![Page 5: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/5.jpg)
Present Installed Generation Capacity (MW) as on 01 January, 2017.
Public Sector Installed Generation Capacity (MW) BPDB 4650APSCL 1200EGCB 622
NWPGCL 440RPCL
BPDB-RPCL JV77
149
Subtotal 7138 (54%)Private Sector
IPPs 3025SIPPs (BPDB) 99SIPPs (REB) 25115 YR. Rental 169
3/5 YR. Rental 1869Power Import 600
Subtotal 6,013 (46%) TOTAL 13,151 *
* Including Captive Power Total Installed Capacity (13,151 + 2,200) = 15,351 MW
![Page 6: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/6.jpg)
Present Installed Generation Capacity (MW) as on 01 January, 2017.
MAXIMUM DEMAND SERVED FAR 9,036 MW 30-06-2016
TRANSMISSION LINES (400 kV) 221 Ckt. K.M FY-2016
TRANSMISSION LINES (230 kV) 3185 Ckt. K.M FY-2016
TRANSMISSION LINES (132 kV) 6487 Ckt. K.M FY-2016
GRID SUB-STATION CAPACITY (400/230/132 kV) 520 MVA FY-2016
GRID SUB-STATION CAPACITY (230/132 kV) 9625 MVA FY- 2016
GRID SUB-STATION CAPACITY (132/33 kV) 15,133 MVA FY- 2016
DISTRIBUTION LINES (33 KV & BELOW) (only BPDB)41,919 K.M FY-2016
CONSUMER NUMBER 34,57,178 FY-2016
![Page 7: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/7.jpg)
21.11
8.052.1
4.211.94
62.59
CURRENT FUEL MIX
FURNACE OILDIESELCOALPOWER IMPORTHYDRONATURAL GAS
DIESEL FURNACE OIL LNG IMPORTED COAL IMPORTED POWER DOMESTIC GAS
25.9
17.9
5
12.2
8.1
6.2
2.57
COST OF GENERATION (TK/UNIT)
CURRENT FUEL MIX & COST OF GENERATION (TK/UNIT)
![Page 8: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/8.jpg)
PRIMARY GRID SYSTEM OF BANGLAESH
![Page 9: Powering of bangladesh- Vision 2021](https://reader035.vdocument.in/reader035/viewer/2022062523/58ce85401a28ab210a8b671d/html5/thumbnails/9.jpg)
You can find:Mukhlasur Rahman
THANKS TO ALL
TO SEE THE PRESENTATIO
N