powering the future

35
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 powering the powering the future future powering the future powering the future USERID PASSWORD N Nuclear P Power P Projection P Program CLIENT CODE

Upload: obert

Post on 13-Jan-2016

33 views

Category:

Documents


0 download

DESCRIPTION

3. NP. N uclear P ower P rojection P rogram. powering the future. USERID. PASSWORD. CLIENT CODE. 09JUN03. Current Capacity. Status. 100%. 100%. 99%. -Home -Status *All Plants *Outages *Partial Power *Restarted *Full Power -Analysis *Next Ref Out *Past Perform - PowerPoint PPT Presentation

TRANSCRIPT

PowerPoint PresentationHGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
powering the future
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
ECAR Beaver Valley 1 821 100% n/a n/a Full Power 09/18/04 – 35 days
ECAR Beaver Valley 2 831 72% n/a 06/10/03 Derate – Maint 09/06/03 – 28 days
ECAR Cook 1 1000 100% n/a n/a Full Power 10/19/03 – 40 days
ECAR Cook 2 1060 0% 06/20/03 06/23/03 Refueling Outage 11/05/05 – 36 days
ECAR Davis-Besse 882 0% 08/16/03 08/20/03 Regulatory Outg TBD
ECAR Fermi 1089 100% n/a n/a Full Power 10/23/04 – 35 days
ECAR Palisades 730 100% n/a n/a Full Power 10/02/04 – 36 days
ECAR Perry 1235 100% n/a n/a Full Power 03/12/05 – 36 days
ERCOT Comanche Peak 1 1150 100% n/a n/a Full Power 03/20/04 – 35 days
ERCOT Comanche Peak 2 1150 99% n/a n/a Uprate pending 09/20/03 – 35 days
ERCOT South Texas 1 1251 0% 07/31/03 08/04/03 Refueling/Forced TBD
ERCOT South Texas 2 1251 100% n/a n/a Full Power 03/20/04 – 28 days
FRCC Crystal River 834 100% n/a n/a Full Power 09/27/03 – 45 days
FRCC St. Lucie 1 839 100% n/a n/a Full Power 03/06/04 – 35 days
09JUN03
Region Plant (MDC) Power Restart Full Power Condition Refueling
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
NERC MWe Current Expected Expected Plant Next
Region Plant (MDC) Power Restart Full Power Condition Refueling
ECAR Cook 2 1060 0% 06/20/03 06/23/03 Refueling Outage 11/05/05 – 36 days
ECAR Davis-Besse 882 0% 08/16/03 08/20/03 Regulatory Outage TBD – 24M cycle
ERCOT South Texas 1 1251 0% 07/31/03 08/04/03 Refueling/Forced TBD – 18M cycle
MAPP Cooper 764 0% 07/05/03 07/09/03 Forced 10/02/04 – 42 days
SERC Oconee 3 846 0% 06/16/03 06/20/03 Refueling 10/09/04 – 75 days
SERC Sequoyah 1 1125 0% 06/17/03 06/20/03 Refueling 09/25/04 – 20 days
SERC Surry 1 810 0% 06/17/03 06/20/03 Refueling 10/16/04 – 35 days
WECC Columbia 1107 0% 06/20/03 06/24/03 Refueling 03/05/05 – 36 day
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
NERC MWe Current Expected Expected Plant Next
Region Plant (MDC) Power Restart Full Power Condition Refueling
ECAR Beaver Valley 2 831 72% n/a 06/10/03 Derate - Maint 09/06/03 – 28 days
ERCOT Comanche Peak 2 1150 99% n/a 10/29/03 Uprate pending TBD – 18M cycle
FRCC St. Lucie 2 839 11% n/a 06/13/03 Power Ascension 11/13/04 – 28 days
MAIN Clinton 1022 93% n/a 02/28/04 Uprate pending 02/03/04 – 21 days
MAIN Dresden 2 850 99% n/a 11/24/03 Uprate pending 11/04/04 – 16 days
MAIN Dresden 3 850 99% n/a 12/19/04 Uprate pending 11/29/04 – 16 days
MAIN Quad Cities 1 855 98% n/a 11/17/04 Uprate pending 10/23/04 – 21 days
MAIN Quad Cities 2 855 85% n/a 06/11/03 Derate – Maint 02/14/04 – 22 days
MAPP Duane Arnold 555.5 94% n/a 10/06/04 Uprate pending 09/03/04 – 29 days
SERC Brunswick 1 872 94% n/a 04/07/04 Uprate pending 03/06/04 – 28 days
SERC Brunswick 2 811 92% n/a 04/07/05 Uprate pending 03/08/05 – 26 days
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
NERC MWe Current Expected Outage Next
Region Plant (MDC) Power Full Power Start Length Type Refueling
FRCC St. Lucie 2 839 11% 06/13/03 04/21/03 49 days Refueling 11/13/04 – 28 days
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
NERC MWe Current Prev Avg Days Reason Next
Region Plant (MDC) Power Power Lvl Derated for Derate Refueling
MAAC Peach Bottom 3 1093 100% 95% 1 Maintenance 09/22/03 – 16 days
MAAC Salem 2 1092 100% 98% 1 Maintenance 09/27/03 – 35 days
MAAC Susquehanna 1 1125 100% 74% 3 Maintenance 02/28/04 – 42 days
MAIN Braidwood 1 1161 100% 95% 1 Maintenance 09/18/04 – 24 days
SPP Waterford 1075 100% 95% 1 Maintenance 10/11/03 – 30 days
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Region Plant (MDC) Start End Duration Cycle Start End Duration
SPP ANO 1 836 03/27/04 04/23/04 28 days 18M 10/05/02 11/12/02 39 days
SPP ANO 2 858 09/06/03 10/03/03 28 days 18M 04/13/02 05/04/02 22 days
ECAR Beaver Valley 1 821 09/18/04 10/22/04 35 days 18M 03/08/03 04/29/03 53 days
ECAR Beaver Valley 2 831 09/06/03 10/03/03 28 days 18M 02/04/02 02/27/02 24 days
MAIN Braidwood 1 1161 09/18/04 10/11/04 24 days 18M 04/15/03 05/01/03 17 days
MAIN Braidwood 2 1154 10/14/03 10/29/03 16 days 18M 04/20/02 05/12/02 23 days
SERC Browns Ferry 2 1118 02/26/05 03/17/05 20 days 24M 02/25/03 03/15/03 19 days
SERC Browns Ferry 3 1118 03/27/04 04/16/04 21 days 24M 03/27/02 04/09/02 14 days
SERC Brunswick 1 872 03/06/04 04/02/04 28 days 24M 03/02/02 03/29/02 28 days
SERC Brunswick 2 811 03/05/05 04/01/05 28 days 24M 03/08/03 04/02/03 26 days
MAIN Byron 1 1163 09/23/03 10/07/03 15 days 18M 03/12/02 03/29/02 18 days
MAIN Byron 2 1131 04/10/04 05/01/04 22 days 18M 09/17/02 10/07/02 21 days
MAIN Callaway 1125 04/10/04 05/14/04 35 days 18M 10/23/02 11/25/02 34 days
MAAC Calvert Cliffs 1 825 03/13/04 04/29/04 48 days 24M 02/16/02 06/18/02 123 days
MAAC Calvert Cliffs 2 835 02/12/05 03/31/05 48 days 24M 02/15/03 04/21/03 66 days
SERC Catawba 1 1129 11/08/03 12/05/03 28 days 18M 04/27/02 05/17/02 21 days
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
NERC MWe Capacity Factor Refueling Durations Other
Region Plant (MDC) 03 02 01 00 03 02 01 00 Major Outages
(YTD) (YTD)
ECAR Beaver Valley 1 836 62% 96% 83% 82% 53 0 38 55
ECAR Beaver Valley 2 831 99% 90% 98% 86% 0 24 0 33
ECAR Cook 1 1000 66% 87% 88% 1.5% 0 37 0 0 00 – Reg Outage
ECAR Cook 2 1060 58% 82% 86% 51% 39 41 0 0 00 – Reg Outage
ECAR Davis-Besse 882 0% 13% 99% 86% 0 30 0 48 02/03-Reg Outage
ECAR Fermi 1089 71% 97% 88% 84% 42 0 36 52
ECAR Palisades 730 77% 91% 34% 84% 35 0 41 0 01 – Reg Outage
ECAR Perry 1235 61% 92% 72% 94% 55 0 35 0
ECAR TOTAL 7648 62% 82% 82% 71%
ERCOT Comanche Peak 1 1150 93% 81% 88% 100% 0 52 30 0
ERCOT Comanche Peak 2 1150 91% 88% 100% 89% 0 36 0 36
ERCOT South Texas 1 1251 47% 98% 93% 78% 20 0 21 75 03 – Rx leak
00 – SG Replace
ERCOT South Texas 2 1251 58% 76% 86% 96% 0 65 27 0 03 – Turbine vib
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
w/o RO w/o RO Factors
ECAR Beaver Valley 1 836 80% 93% 85% 94% 3 3 4 3
ECAR Beaver Valley 2 831 90% 98% 97% 97% 3 3 4 3
ECAR Cook 1 1000 71% 80% 96% 96% 3 2 2 2
ECAR Cook 2 1060 77% 89% 95% 95% 3 2 2 2
ECAR Davis-Besse 882 35% 35% 96% 96% 5 5 4 3 Reg Outage
ECAR Fermi 1089 86% 97% 88% 97% 2 3 3 2
ECAR Palisades 730 88% 97% 87% 96% 4 4 4 4
ECAR Perry 1235 79% 93% 95% 95% 3 4 4 3
ERCOT Comanche Peak 1 1150 95% 95% 86% 95% 2 1 1 2
ERCOT Comanche Peak 2 1150 84% 93% 97% 97% 2 1 1 2
ERCOT South Texas 1 1251 62% 95% 97% 97% 2 2 2 2 RPV leak
ERCOT South Texas 2 1251 78% 78% 87% 94% 2 2 2 2
-Home
-Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Analysis
Status
Current Conditions
Current Capacity
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
1.0 Executive Summary
The purpose of this paper is to update previous HGP topical reviews and to discuss the current overall environment of commercial high level waste (spent fuel) in the U.S., including a brief history of high-level waste, current options for storage and disposal, and individual U.S. commercial operating nuclear plant spent fuel storage capacity.
Significant developments since the last report include the activities related to the approval progress of the Yucca Mountain site as the nation’s high-level waste repository. To date, the DOE Secretary delivered his recommendation of the Yucca Mountain site to the President. Subsequently, the pools
Prepared – June 6, 2002
4.0 Current Programs
4.4 Spent Fuel Trans-Shipment
6.0 Appendices
Printer Friendly
FWG lead
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Corporate Office:
HGP, Inc.
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Current Conditions
Current Capacity
Analysis
Status
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
Thank You for using
Nuclear Power Projection Program
www.HGP-Inc.com
HGP, Inc. 8 Pelham Rd. Greenville, SC 29615 864-370-0213 www.HGP-Inc.com
powering the future
powering the future