HiRadMat Beam Requests Updates
Fiona Harden (on behalf of HiRadMat Team)
30th April 2018
F.Harden
HiRadMat Beam Optics
• Optics have been updated and sent to BE/OP (thanks to C. Hessler).
• Updates to positions along HRM line.
• Necessary tests to be made.
30/04/2018
F.Harden
HRM Optics
30/04/2018
F.Harden
HRM Optics
30/04/2018
300 mm
F.Harden
2018 Beam Requests
HRMT# ProjectBeam Spot Size (mm)
Approx. # Pulses (incl.
alignment)
Min Intensity
(ppb)
Max Intensity
(ppb)
Min Bunches
Max Bunches
Integral Intensity
Anticipated Beam Time
(week)
51 HRM_BTV 0.25, 0.5, 1 200 1E11 1E11 1 288 1.59E15 19
19 BLM2 1 200 5E9 1.2E11 1 288 1.07E15 19
47 ATLASPixRad 0.5, 2 50 1E11 1E11 1 288 1.2E14 19/20
38 FlexMat 0.3, 1.5 300 5E10 1.2E11 1 288 1.18E15 22-23
37 SextSc 1 100 5E09 1.2E11 1 24 1.8E13 27
44 TCDIL-DEEP 0.3 250 1.2E11 1.2E11 1 288 4.4E14 29/30
45 TDIS-TZM 1 150 5E9 1.2E11 1 288 3.28E14 32
tbd PROTAD 0.7 400 1.2E11 1.2E11 1 18 2.52E14 34-36
tbd n-TOF4
(New Optics)2500 1E11 1.2E11 1 36 1.25E16 34-36
tbd BeGrid2 0.25-0.5 50 1.2E11 1.2E11 1 288 2E14 40-41
TOTAL 1.77E16
30/04/2018
F.Harden
HiRadMat Projects 2018
• HRM-BTV commissioning
• HRMT19: BLM2
• HRMT47: ATLASPixRad
• HRMT38: FlexMat
• HRMT37: SextSc
• HRMT44: TCDIL-DEEP
• HRMT45: TDIS-TZM
• HRMT48: PROTAD
• HRMT46: n-ToF
• HRMT43: BeGrid2
30/04/2018
F.Harden
HRM-BTV
• 3 Screens (GlassyC, Ti, Al2O3:CrO2)
• × 3 for statistics
30/04/2018
F.Harden
HRMT19: BLM2
30/04/2018
F.Harden
HRMT38: FlexMat
• Total number of pulses ~350 pulses.
• ~1.2 ×1015 protons.
30/04/2018
F.Harden30/04/2018
F.Harden30/04/2018
F.Harden30/04/2018
F.Harden30/04/2018
F.Harden30/04/2018
F.Harden
HRMT37: SextSc
30/04/2018
F.Harden
HRMT44: TCDIL-DEEP
30/04/2018
F.Harden
HRMT45: TDIS-TZM
30/04/2018
F.Harden
HRMT48: PROTAD
• Important point – pulse length as close to 430 ns.
• Justification: “In the PS the pulse that is impacted onto the AD-Target has a length of ~430 ns. This pulse length is really relevant for the dynamic response of the target as it particularly excites a radial mode.”
30/04/2018
F.Harden
HRMT46: n-ToF
• = 4 mm.
• Pulse period = 22.8 s or
26.4 s (use HRM short
cycle).
• Number of bunches per
pulse not important.
30/04/2018
F.Harden
HRMT43: BeGrid2
30/04/2018
F.Harden
Thanks & Questions
Acknowledgements:
• ARIES is co-funded by the European Union’s Horizon 2020 Research and Innovation programme
under Grant Agreement no. 730871.
• BE/BI, BE/OP, EN/EA, EN/HE, EN/MME, EN/SMM, EN/STI, HSE/RP
23/03/2018
Back-Up Slides
F.Harden
2018 Facility Updates – HRM Optics
• Optics are currently being updated.
• Optics were calculated previously for beam radii of σ = 0.1 – 2 mm.
• At each focal point conditions must satisfy limitations at vacuum window and beam dump window (σ = 0.5 mm). Focal point 2 (table B)
can only have σ < 0.5 mm to satisfy conditions.
• New optics currently under development (σ = 4 mm).
C. Hessler et al. “The Final Beam Line Design
for the HiRadMat Test Facility”, IPAC’10, Kyoto
(2010)
30/04/2018
F.Harden
HRM Optics
30/04/2018
F.Harden
HRM Optics
30/04/2018
300 mm
F.Harden
HRM Optics Distance Info
30/04/2018
• 1 - Exit point of QTLF660504 to start point of table A with respect to an experimental table being installed => 13028.081 mm
• 2 - Exit point of QTLF660504 to end point of table A with respect to an experimental table being installed => 14979.85 mm
• 3 - Exit point of QTLF660504 to start point of table B with respect to an experimental table being installed => 15523.081 mm
• 4 - Exit point of QTLF660504 to end point of table B with respect to an experimental table being installed => 17474.85 mm
• 5 - Exit point of QTLF660504 to start point of table C with respect to an experimental table being installed => 18259.082 mm
• 6 - Exit point of QTLF660504 to end point of table C with respect to an experimental table being installed => 20210.85 mm
• 7 - Exit point of QTLF660504 to the BPKG STARTING POINT on table A => 14072.544 mm
• 8 - Exit point of QTLF660504 to the HRM-BTV screen on table A => 14762 mm
• 9 - Exit point of QTLF660504 to the HRM-BTV screen on table B => 15238.427 mm
• 10 - Exit point of QTLF660504 to the HRM-BTV screen on table C => 17974.402 mm
F.Harden
BTV-BLM-TT66 Line
30/04/2018
F.Harden
HRM facility layout and access
30/04/2018
• Access to HiRadMat• Only without extraction to TCC6 (=TI2 and HRM)
• SPS can continue cycling.
• Since 2014: TT61 is used for placing DAQ equipment only 10 m from the impact centre
• Access coordinated with BE/OP, particularly in view of LHC operation• Often stand-by for access during several days
• Great flexibility by RP and TRANSPORT (HE) is highly appreciated.
F.Harden
Access to V0-V7Muon pits of former WANF
• Exposed to muon beam in forward direction of HiRadMat target area
• Access to be restricted upon RP request
• Access to VO needed about twice a year for intervention by CV
• Skipping installation of full-fletched access control system (SPS)
• Padlocks with manual veto system like in the North Area• Agreed by EN, BE and RP (EDMS 1578411)
• Installed by BE/ICS
• Manual veto held by EN/EA
• Installation completed, operational from 2016
30/04/2018
ISRHiRadMat
V0V6
ISRHiRadMat
V0V6
F.Harden
BA6 safety chains
30/04/2018