PP/57/01
ACTIVITY PLANNING: THE ISSUE
The need for more transparent activity planning, particularly in the area of mobile and platform rigs and well services was stressed. It was suggested that a 12 to 18 month rolling plan, conducted by a third party such as Petrodata or Bassoe, providing data by operator, would assist. It was believed such data were available to each operator and companies should be encouraged to be responsive to contractors’ needs.
Specifically:
For efficient deployment of resources activity plans should be:
Easier to access
Segment specific
Operator specific
More accurate / frequently updated
PP/57/01
Activity Plans: Segmentation
• Seismic
• Mobile Offshore Drilling Units (semis, jack up activity of any kind)
• Well Intervention vessels
• Platform Drilling and Workover Operations (with rotary rig)
• Platform Workover Operations (non rotary work, CTD etc)
• Surveys
• Offshore Construction Subsea (pipelines, manifolds etc)
• Offshore Construction Jackets, Topsides. Major Platform modification
• Platform Production Operations (Operators, maintenance etc)
• Platform Maintenance shutdown
• Inspection Repair and Maintenance vessels
PP/57/01
Activity Plans: Visibility
• 12 month, ideally 18 month, rolling plan
• Min Quarterly, max monthly updates
PP/57/01
Activity Plans: The Prize
• Availability of Resources
• Efficient deployment
• Lower costs
PP/57/01
Activity Plans: Issues
• Access via individual companies or third parties?
• Activity plans per Operator could be a problem?