4 Rajasthan Case I
Oct-095 Bihar Case I
3 Maharashtra Case I
1 Gujarat Case I
Case I2 Haryana
Foot notes:-
*Adani Power PPA with
GUVNL
**
Total
***
M/s.KSK Mahanadi Power
Company Ltd.
Kamalang Thermal Power
Project, Orissa (for PTC
India Ltd ‐ GMR Project)
6 Karnataka Case 1
**** Adani Power
Therefore, longterm PPA contracted capacity for Stage 1 is 1445 MW.
#JSW ENERGY Ratnagiri
Power Plant
Seller/Project Name Procurer
Adani Enterprises Ltd. Mundra Phase I and IIAryan Coal Benefaciaries Pvt. Ltd. Kasaipalli Korba
district Chhattisgarh
Adani Power Pvt. Ltd. Mundra Phase IIIEssar Power Ltd. Khajurda village at Khambalia
taluka in Jamnagar
M/s.KSK Mahanadi Power Company Ltd.
Shapoorji Pallonji Energy Gujarat Pvt. Ltd.
M/s.Essar Power Gujarat Ltd. Salaya II
Mundra TPS, Phase‐IV, Gujarat ‐ Adani Power Ltd.
Kamalang Thermal Power Project, Orissa - PTC India
Ltd ‐ GMR Project
Adani Power Tiroda Power Project (Phase 1 and Phase
2)
JSW Energy (Ratnagiri) Limited (JSWERL)
M/s Lanco Mahanadi Power Project Ltd. Now
Lanco Vidarbha Thermal Power Ltd
Adani Power - Tiroda Power project Phase I and III
India Bulls Amravati Power Project (Phase II)
GMR EMCO Warora Power Plant Phase 1
Adani Power - Kawai Thermal Power Project, Rajasthan
Rajasthan State Electricity Board Jaipur
Vidyut Vitran Nigam Ltd, Ajmer Vidyut
Vitran Nigam Ltd, Jodhpur Vidyut Vitran
Nigam Ltd.
ESSAR (Tori) - Thermal Power Project Bihar State Electricity Board
Maharashtra State electricity Distribution
Co. Ltd (MAHADISCOM)
Maharashtra State electricity Distribution
Co. Ltd (MAHADISCOM)
Haryana Power Purchase Centre UHBVNL
and DHBVNL
Gujarat Urja Vikas Nigam Ltd.
Gujarat Urja Vikas Nigam Ltd.
PTC-Thermal Powertech JV (Phase 1) Power plant at
Painapuram, Krishnapatnam district AP.
PTC-East Coast Energy JV, Power Plant at Kakarapalli
village, Santhabommali, AP
PTC-Nagarjuna Construction Company JV Sompeta in
Srikakulam district of Andhra Pradesh,
PTC-Monnet Power JV Power Plant at Angul, Orissa
PTC- Meenakshi Power JV, Coastal thermal Power
Project Thamminapatnam near Krishnapatnam in
Nellore district, Andhra Pradesh.
JSW Energy’s Toranagallu Thermal Power Station in
Bellary district of Karnataka (JSWEL-SBU II )
Long term PPA for 1,000 MW entered with
GUVNL Agreement for merchant sale
of up to 221 MW of surplus power entered
with AEL
PPA Details:
1010 MW - GUVNL
450 MW - Goa
270 MW - CSEB
1730 MW
PPA Details:
263 MW to Govt of Orissa – cost plus
300 MW tied up with UHBVNL and DHBVNL
POWER COMPANY OF
KARNATAKA LTD.
Stage 1 : signed PPA of 1320 MW with MAHADISCOM
from Tiroda Phase 1 and 2
Stage 2 : Signed PPA of 1200 MW of Tiroda Phase 3
with MAHADISCOM and an additional 125 MW from
Tiroda Phase 1
Therefore, longterm PPA contracted capacity for Stage 1 is 1445 MW.
Long-term PPA with Maharashtra State Electricity
Distribution Company Limited (“MSEDCL”) for 300
MW;
Long‐term PPA with Adani Enterprises Limited (“AEL”)
for 270 MW of net capacity out of 300 MW
Long term PPA of 600 MW with Karnataka under
process.
Balance power to JSWPTC through short term PPA.
Capacity in PPA
(MW) Fuel Type Levelized tariff (Rs/kwh)
1000 MW Coal Supply Agmt with AEL 2.890
200 MW Washery rejects/coal based2.2498
1000 MW Coal Supply Agmt with AEL 2.3495
1000 MWImported Coal - Indonesia/ South Africa
2.4006
1010 MW Coal (Gujarat Mineral Development Corporation) 2.345
800 MW Imported Coal - Expected from Indonesia/ South Africa2.800
800 MW Imported Coal - Indonesia/ South Africa 2.800
1424 MW Coal supply Agreement with AEL 2.940
300 MW Talcher Mahanadi coal fields 2.860
1320 MW
Captive mines allocated by Ministry of Coal for
generating up to 1,000 MW of power; Coal linkage of
1,180 MW recommended
2.642
300 MWChina National Mineral Company Limited and PT.
Sungai Belati Coal, Indonesia.2.716
680 MWCoal Mines from Chhattisgarh & Coal Linkage
allotment letter is procured2.700
1200 MW (P III) +
125 MW(P I)
• Captive Coal Blocks (800 MW)‐ coal blocks at Lohara
West and Lohara Extension
• South Eastern Coal Fields Limited/Western Coal
Fields Limited (1180 MW)
• Imported Coal Supply FSA for 5 years and Long Term
Coal Linkage (1320 MW)
3.280
450 MW + 750
MW
Domestic Coal (CIL) South Eastern Coal Fields Ltd and
Western Coal Fields Ltd3.260
200 MWCoal India Linkage,Western Coal Fields and South
Eastern Coal fields 2.879
1000 MW +
Additional 200
MW
Domestic Coal (CIL) South Eastern Coal Fields Ltd and
Western Coal Fields Ltd3.2483
450 MWCaptive pit-head coal-fired, Chakla and Ashok Karkata
coal blocks.3.057
430 MWBlended Coal ratio of 3:1 (Indigenous-Coal India Orissa
to imported)3.770
400 MWMCL Coal (Talcher valley coal mines) and imported coal
from Indonesia and others.3.890
400 MW Mahanadi Coalfields and South Eastern Coalfields;
Import about 30% of the coal3.890
150 MWUtkal B2 and Mandakini coal block in Angul, Orissa-
Captive coal blocks of Monnet.3.760
200 MW
Power Tolling Arrangement of 160 MW with PTC
(purchase the coal from the Indonesian coal mines)
Mahanadi Coal Fields Ltd for domestic coal supply.
3.800
600 MW PT Sungai Belati Coal, Indonesia. 3.810
## Adani Power kawai Power Project PPA details:
Long term PPA of 1200 MW
with RRVPNL
Short term PPA of 120
MW
### Essar Tori I Power Project Bihar60% -PPA (inc 450 MW
signed with BSEB) ,
13% –Jharkhand
Government,
ROFR: 12.0% on VC basis to
SEB,
15% –Merchant Power
####
Long term PPA signed with
PTC for phase 1 of
70 % Long term
PTC-Thermal Powertech JV (Phase 1) Power plant at
Painapuram, Krishnapatnam district AP. (Details of
Phase 1 available)
30 % merchant sale
Only 430 MW tied for long term with Karnataka
• PTC-East Coast Energy JV, Power Plant at Kakarapalli
village, Santhabommali, AP
Long term PPA signed with PTC for entire 1320 MW of
Phase 1.
1320 MW of Phase 2 for
merchant sale
• • PTC-Monnet Power JV Power
Plant at Angul, OrissaPPA details
Longterm PPA with GRIDCO Orissa (@ Rs
2.85/unit)250 MW
PTC (Min rate - 2.3 per Kwh + 90% share of incremental
revenue)400 MW
PTC (Min rate - 2.55 per Kwh + 90% share of
incremental revenue)200 MW
Merchant sale in Open Market 200 MW
PTC-Thermal Powertech JV (Phase 1) Power plant at
Painapuram, Krishnapatnam district AP. (Details of
Phase 1 available)
Total Capacity % for Longterm PPAContracted Capacity
for longterm PPA
% for Merchant
Power Sale
(2*330) *2 = 1320 MW 75.75% 1000 MW 24.25%
270 MW 74.07% 200 MW 25.93%
2*660 = 1320 MW 83.26% 1000 MW 16.74%
2*600 = 1200 MW 83.33% 1000 MW 16.67%
3*660 = 1800 MW 96.11% 1730 MW 3.89%
2*660 = 1320 MW60.61%
800 MW 39.39%
2*660 = 1320 MW 60.61% 800 MW 39.39%
3*660 = 1980 MW 71.92% 1424 MW 28.08%
3*350 = 1050 MW *** 28.57% 300 MW 46.38%
P 1 = 2*660 MW
P 2 = 1*660 MW
1980 MW
72.98% ****1445 MW 27.02%
4*300 = 1200 MW 100% # 1200 MW 0%
2*660 = 1320 MW
2*660 = 1320 MW 90.91% 1200 MW 9.09%
2*660 = 1320 MW 90.91% 1200 MW 9.09%
1*300 = 300 MW 66.67% 200 MW 33.33%
2*660 = 1320 MW 90.010% 1200 MW ## 0%
2*600 = 1200 MW 60% 450 MW ### 15%
PPA for balance power to be signed in future (under process)
Phase 1 = 2*660 MW Phase
2 = 1*660 MW
1980 MW
70% 924 MW #### 30%
Phase 1 = 2*660 MW Phase
2 = 2*660 MW
2640 MW
50% 1320 MW • 50%
4 * 660 = 2640 MW 85% 2244 MW 15%
2*525 = 1050 MW 80.95% 850 MW • • 19.05 %
Phase 1 = 1* 600 MW Phase 2
= 1* 300 MW 900
MW
300 *2 = 600 MW 100% 600 MW 0%
PPA details of the given power plant not available.
Merchant Power
Capacity in MW
320 MW
70 MW
221 MW *
200 MW
70 MW **
520 MW
520 MW
556 MW
487 MW
535 MW
0 MW
120 MW
120 MW
100 MW
0 MW
180 MW
PPA for balance power to be signed in future (under process)
396 MW
1320 MW
396 MW
200 MW
0 MW
PPA details of the given power plant not available.