    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS As per Govt. guidelines CISF is providing Security and FireAs per Govt. guidelines CISF is providing Security and Fire

    cover to the Industrial Units/Undertakings. CISF came incover to the Industrial Units/Undertakings. CISF came in

    existence in the year 1959.existence in the year 1959.

    The present total strength of CISF as on date is 1,03,000.The present total strength of CISF as on date is 1,03,000.

    CISF is providing Security cover to the 271 IndustrialCISF is providing Security cover to the 271 IndustrialUndertakings in the Government Sector including FireUndertakings in the Government Sector including Fire

    protection to 77 establishments across the length and breadth ofprotection to 77 establishments across the length and breadth of

    the Country.the Country.

    On formation of Power Projects request is made to CISF HQs.,On formation of Power Projects request is made to CISF HQs.,New Delhi giving brief details about the Project, its surrounding,New Delhi giving brief details about the Project, its surrounding,

    likely number of personnel at the Project, projecting thelikely number of personnel at the Project, projecting the

    requirement of CISF Security/Fire Wing personnel etc.requirement of CISF Security/Fire Wing personnel etc.

    CISF HQs., will communicate the Project to deposit the fee forCISF HQs., will communicate the Project to deposit the fee for

    carrying out Survey of the Project.carrying out Survey of the Project.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    2/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS The Survey Board fee is decided by MHA.The Survey Board fee is decided by MHA.

    Project have to deposit the Survey Board fee to the CISF HQSProject have to deposit the Survey Board fee to the CISF HQS

    based on the number of persons deployed in there Project.based on the number of persons deployed in there Project.

    oo 30,000/- for Undertaking / Establishments having30,000/- for Undertaking / Establishments havingemployees strength below 1000.employees strength below 1000.

    oo Rs. 40,000/- for Undertaking / Establishments havingRs. 40,000/- for Undertaking / Establishments having

    employees strength between 1000 and 1999.employees strength between 1000 and 1999.

    oo Rs. 50,000/- for Undertaking/ Establishments havingRs. 50,000/- for Undertaking/ Establishments having

    employees strength 2000 and more.employees strength 2000 and more.

    After receiving the Survey Fee, Survey Boards are constitutedAfter receiving the Survey Fee, Survey Boards are constituted

    by CISF authorities. Presiding Officer and Members of Surveyby CISF authorities. Presiding Officer and Members of Survey

    Boards are very experienced CISF Officers.Boards are very experienced CISF Officers.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    3/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Local Management Representatives are associated to theseLocal Management Representatives are associated to these

    Survey Boards for better understanding the requirement of theSurvey Boards for better understanding the requirement of the

    project as well as assessing the requirement of the CISFproject as well as assessing the requirement of the CISF

    authorities.authorities.

    Joint Survey Boards carryout the Survey of the Project toJoint Survey Boards carryout the Survey of the Project to

    assess threat/risk analysis of the Plant/Project and various otherassess threat/risk analysis of the Plant/Project and various other

    requirements of CISF in the Project, e.g.requirements of CISF in the Project, e.g.

    oo ManpowerManpower

    oo Arms & AmmunitionArms & Ammunition

    oo TransportTransport oo EquipmentEquipment

    oo AccommodationAccommodation

    oo Facilities etc.Facilities etc.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    4/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Joint Survey Board will submit its report to the Head of theJoint Survey Board will submit its report to the Head of the

    Project/Station for their study and according approval forProject/Station for their study and according approval for

    financial implications both for recurring and non-recurringfinancial implications both for recurring and non-recurring

    expenditure on deployment of CISF on Induction basis. Headexpenditure on deployment of CISF on Induction basis. Head

    of the Project/Plant will accept the recommendations of theof the Project/Plant will accept the recommendations of the

    survey Board and then Report is forwarded to CISF HQs. alongsurvey Board and then Report is forwarded to CISF HQs. alongwith prescribed Requisition Form signed by the Project Headwith prescribed Requisition Form signed by the Project Head

    agreeing for the expenditure and facilities as per CISF Termsagreeing for the expenditure and facilities as per CISF Terms

    and Condition.and Condition.

    Recurring ExpenditureRecurring

    Expenditure :: Pay & Allowances for 1 YearPay & Allowances for 1 Year

    Govt. contribution towards ration expenses incurred by the memberGovt. contribution towards ration expenses incurred by the member

    of the CISF in Mess.of the CISF in Mess.

    Annual replacement of clothing & equipment.Annual replacement of clothing & equipment.

    T.A.T.A.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    5/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Recurring ExpenditureRecurring

    Expenditure ::

    ContingencyContingency

    AmmunitionAmmunition

    Pension contribution @ 12% of the maximum of the pay scale.Pension contribution @ 12% of the maximum of the pay scale.

    Leave salary contribution @ 11% o Pay, DA & ADA.Leave salary contribution @ 11% o Pay, DA & ADA.

    Overhead expenditure @ 12% for the cost of HQ as supervisionOverhead expenditure @ 12% for the cost of HQ as supervision

    charges.charges.

    Non-Recurring ExpenditureNon-Recurring

    Expenditure ::

    Initial issue of clothing & equipment.Initial issue of clothing & equipment.

    Arms & Ammunition.Arms & Ammunition.

    Cost of the Vehicles for use of CISF contingent are not included theCost of the Vehicles for use of CISF contingent are not included the

    expenditures as the same is required to be provided by theexpenditures as the same is required to be provided by the

    Management.Management.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    6/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS CISF HQs. analysis's the Report forwarded by the Survey BoardCISF HQs. analysis's the Report forwarded by the Survey Board

    to assess the recommendations forwarded by the Survey Boardto assess the recommendations forwarded by the Survey Board

    for assessing the requirement of strength, expenditure, facilitiesfor assessing the requirement of strength, expenditure, facilities

    and in case there are any observations to the report, it is onceand in case there are any observations to the report, it is once

    again sent to the Survey Board to rectify the observations andagain sent to the Survey Board to rectify the observations and

    resubmission to the CISF HQs.resubmission to the CISF HQs. On receipt of the Survey Board, CISF HQs. forward the reportOn receipt of the Survey Board, CISF HQs. forward the report

    along with its recommendations to the MHA for creations of thealong with its recommendations to the MHA for creations of the

    requisite posts for the project.requisite posts for the project.

    Only MHA has got the authority for creation and deletion of theOnly MHA has got the authority for creation and deletion of the

    Post , accordingly all Survey Board Reports along with thePost , accordingly all Survey Board Reports along with the

    recommendations of the CISF HQs., reports are sent to therecommendations of the CISF HQs., reports are sent to the

    MHA for creation/deletion of posts.MHA for creation/deletion of posts.

    MHA in consultations with MOF, sanctions the creations of theMHA in consultations with MOF, sanctions the creations of the

    post.post.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    7/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Accordingly, on receipt of Govt. sanction, the CISF HQs issuesAccordingly, on receipt of Govt. sanction, the CISF HQs issues

    the Posting Orders of fore for deployment of CISF personnel tothe Posting Orders of fore for deployment of CISF personnel to

    the Project.the Project.

    Before deployment of CISF seeks facilities along with readinessBefore deployment of CISF seeks facilities along with readinessof accommodation facilities.of accommodation facilities.

    Depositing of an amount equal to three months average monthlyDepositing of an amount equal to three months average monthly

    billing for the CISF induction as, Security Deposit. (It is workedbilling for the CISF induction as, Security Deposit. (It is worked

    out at Rs. 40,200/- per head presently).out at Rs. 40,200/- per head presently).

    Accommodation (Family & Single) - preferably be of planned inAccommodation (Family & Single) - preferably be of planned in

    a cluster separate from the other neighborhoods meant for thea cluster separate from the other neighborhoods meant for the

    staff of the Projects/ Station :staff of the Projects/ Station :

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    8/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Accommodation is to be provided in TownshipAccommodation is to be provided in Township ::

    a) Supervisory Officers (Asst. Commandants & Above) - 100 %a) Supervisory Officers (Asst. Commandants & Above) - 100 %

    b) Inspectors, SI, ASI, Constables, Followersb) Inspectors, SI, ASI, Constables, Followers - 45%- 45%

    c) Head Constables (including drivers)c) Head Constables (including drivers) - 85%- 85%

    Family Accommodation (on the following scales):Family Accommodation (on the following scales):

    AA 385 Sq Ft385 Sq Ft Constables/FollowersConstables/Followers

    BB

    600 Sq Ft600 Sq Ft

    ASI/HCASI/HC

    CC 900 Sq Ft900 Sq Ft AC/Inspectors/SIAC/Inspectors/SI

    D 1500 Sq FtD 1500 Sq Ft DIG/Commandants/DCDIG/Commandants/DC

    (+ 200 Sq Ft Servant Room and WC)(+ 200 Sq Ft Servant Room and WC)

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    9/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Barrack (Single) Accommodation :Barrack (Single) Accommodation :

    a) 55% For Inspectors, SIs, ASIs, Constables and followersa) 55% For Inspectors, SIs, ASIs, Constables and followers

    (b) 15% For Head Constables including Drivers(b) 15% For Head Constables including Drivers

    (Bachelor accommodation may be planned within a total(Bachelor accommodation may be planned within a total

    area not exceeding 15 Sq Mtrs. per person. This willarea not exceeding 15 Sq Mtrs. per person. This will

    cover barracks, toilets, dinning hall, kitchen stores,cover barracks, toilets, dinning hall, kitchen stores,

    reading and recreation room and a few small stalls forreading and recreation room and a few small stalls for

    barbers, cobbler and washer man).barbers, cobbler and washer man).

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    10/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Office AccommodationOffice Accommodation

    The norms and guidelines laid down by BPE forThe norms and guidelines laid down by BPE for

    Administrative Office will be apply for working out theAdministrative Office will be apply for working out the

    required provisions of office accommodation for CISFrequired provisions of office accommodation for CISF

    personnel.personnel.

    Armoury & Stores :Armoury & Stores :

    Provision for Armoury and stores may be made at a rate ofProvision for Armoury and stores may be made at a rate of

    46.5 Sq. Mtrs. Per 100 Jawans.46.5 Sq. Mtrs. Per 100 Jawans.

    Guard Room :Guard Room :

    With a plinth area of 25 Sq Mtrs. For 5 persons may beWith a plinth area of 25 Sq Mtrs. For 5 persons may be

    provided in each Armoury and store.provided in each Armoury and store.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    11/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS The scale of transport and drivers is as under :The scale of transport and drivers is as under :

    a) DIG/Commandanta) DIG/Commandant - 1 Car with Driver- 1 Car with Driver

    b) AC/DCb) AC/DC - 1 Jeep with Driver- 1 Jeep with Driver

    c) Inspectorc) Inspector - 1 Motor Cycle without- 1 Motor Cycle without

    Driver]Driver]

    d) One Pick-up for strengthd) One Pick-up for strength - 1 with 3 drivers for 3 shifts- 1 with 3 drivers for 3 shifts

    upto 125upto 125

    e) Motorcycle for DR dutiese) Motorcycle for DR duties - 2 Drivers- 2 Drivers

    f) Jeep for patrolling squad dutyf) Jeep for patrolling squad duty - 3 Drivers per Jeep- 3 Drivers per Jeep

    (1 Driver per(1 Driver per

    shift)shift)

    g) 1 HTV for a unit of 125-400g) 1 HTV for a unit of 125-400 - 3 Drivers per vehicles Add- 3 Drivers per vehicles Add

    strengthstrength HTV for every 200HTV for every 200

    additional strength.additional strength.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    12/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Internal Security Duty Pattern :Internal Security Duty Pattern :

    Incase of delay in Govt. sanction for creation ofIncase of delay in Govt. sanction for creation of

    Post on the basis of Survey Board Report andPost on the basis of Survey Board Report and

    recommendations of the CISF HQs. Project may, sendrecommendations of the CISF HQs. Project may, send

    request for immediate deployment of COISF securityrequest for immediate deployment of COISF security

    personnel on IS Duty pattern.personnel on IS Duty pattern.

    CISF HQs on the basis of pending decision ofCISF HQs on the basis of pending decision of

    MHA for creation of posts, may recommend MHA forMHA for creation of posts, may recommend MHA forsanctioning the deployment of CISF Security personnelsanctioning the deployment of CISF Security personnel

    on IS Duty pattern.on IS Duty pattern.

    MHA in consultation with the MOF issues sanctionMHA in consultation with the MOF issues sanction

    for deployment of CISF personnel on IS Duty pattern tofor deployment of CISF personnel on IS Duty pattern toproject.project.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    13/49

    CISF SECURITY AT NTPC POWERCISF SECURITY AT NTPC POWER

    PROJECTS/STATIONSPROJECTS/STATIONS Internal Security Duty Pattern :Internal Security Duty Pattern :

    On the receipt of the Govt. Sanction, CISF HQsOn the receipt of the Govt. Sanction, CISF HQs

    issues the Releasing orders for the Force to report theissues the Releasing orders for the Force to report the

    Project for IS Duty pattern.Project for IS Duty pattern.

    However, CISF HQs will direct the Project toHowever, CISF HQs will direct the Project to

    confirm in writing about the infrastructure required to beconfirm in writing about the infrastructure required to be

    provided for the Force personnel and depositing of anprovided for the Force personnel and depositing of an

    amount equal to three months average monthly billing foramount equal to three months average monthly billing forthe CISF induction as, Security Deposit. (It is worked outthe CISF induction as, Security Deposit. (It is worked out

    at Rs. 40,200/- per head presently).at Rs. 40,200/- per head presently).

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    14/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES Pre-visit ArrangementPre-visit Arrangement

    1.1. Corporate CentreCorporate Centre

    2.2. At SiteAt Site

    Invitation CardsInvitation Cards1.1. InviteesInvitees

    2.2. Designing of Invitation CardDesigning of Invitation Card

    3.3. DistributionDistribution

    4.4. Personal InvitationPersonal Invitation Travel & Transport ArrangementTravel & Transport Arrangement

    1.1. Corporate CentreCorporate Centre

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    15/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES2.2. At Intermediate PintAt Intermediate Pint

    3.3. Arrangement at Helipad siteArrangement at Helipad site

    4.4. Welcome Arrangement of VIPs at helipadWelcome Arrangement of VIPs at helipad

    5.5. Hospitality Arrangement at HelipadHospitality Arrangement at Helipad6.6. ShadowsShadows

    PublicityPublicity

    1.1. Press AdvertisementPress Advertisement

    2.2. Welcome FolderWelcome Folder

    3.3. Programme SheetProgramme Sheet

    4.4. CompereCompere

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    16/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES5.5. SpeechesSpeeches

    6.6. Press CoveragePress Coverage

    7.7. Doordarshan & Other ChannelsDoordarshan & Other Channels

    8.8. Photography/VideographyPhotography/Videography9.9. ExhibitionExhibition

    10.10. Publicity in the Project areaPublicity in the Project area

    11.11. Media CentreMedia Centre

    Arrangement to be made at the Venue of theArrangement to be made at the Venue of theCeremonyCeremony

    1.1. Tree PlantationTree Plantation

    2.2. Pandal/ShamianaPandal/Shamiana

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    17/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES3.3. For Prime Minister ProgrammeFor Prime Minister Programme

    4.4. Ministers ProgrammeMinisters Programme

    5.5. Stage/RostrumStage/Rostrum

    6.6. Foundation StoneFoundation Stone7.7. Seating Arrangement on StageSeating Arrangement on Stage

    8.8. In case of PMs FunctionIn case of PMs Function

    9.9. In case of other Function with CM/CabinetIn case of other Function with CM/Cabinet

    MinistersMinisters10.10. Actual Ceremony/FunctionActual Ceremony/Function

    11.11. NTPC GeetNTPC Geet

    12.12. National AnthemNational Anthem

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    18/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES13.13. Memento/GiftsMemento/Gifts

    14.14. Security/ArrangementSecurity/Arrangement

    HospitalityHospitality

    1.1. AccommodationAccommodation2.2. House Keeping & Proper Maintenance of GuestHouse Keeping & Proper Maintenance of Guest

    House/Field HostelHouse/Field Hostel

    3.3. CateringCatering

    GeneralGeneral1.1. Control RoomControl Room

    2.2. Project Information to VIPsProject Information to VIPs

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    19/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES3.3. STD/Mobile PhoneSTD/Mobile Phone

    4.4. BinocularsBinoculars

    Identification of Director In-charge for the visitIdentification of Director In-charge for the visit

    from CMDfrom CMD Confirm date of visitConfirm date of visit

    Inform the date of visit to siteInform the date of visit to site

    Following drafts to be prepared for gettingFollowing drafts to be prepared for getting

    clearance from MOPclearance from MOPa)a) Invitation CardInvitation Card

    b)b) Advertisement/PublicityAdvertisement/Publicity

    c)c) Matter for the Plaque/BackdropMatter for the Plaque/Backdrop

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    20/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUESd)d) BrochureBrochure

    Exhibition at the siteExhibition at the site

    Names of VIPs attending the function/names to beNames of VIPs attending the function/names to be

    put on Invitation Card-to confirm from MOPput on Invitation Card-to confirm from MOP Compere to be arranged and script for compere toCompere to be arranged and script for compere to

    be finalizedbe finalized

    List of Media persons (from Delhi, State CapitalList of Media persons (from Delhi, State Capital

    and Local) to be finalizedand Local) to be finalized Draft Minute-to-Minute Programme to be preparedDraft Minute-to-Minute Programme to be prepared

    and submitted to MOPand submitted to MOP

    List of VIPs to be directly invited by MOPs letterList of VIPs to be directly invited by MOPs letter

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    21/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES Invitation letter to all VIPs from CMDInvitation letter to all VIPs from CMD

    List of InviteesList of Invitees

    Distribution of Cards and letters at CorporateDistribution of Cards and letters at Corporate

    Centre/to Project/SiteCentre/to Project/Site CMD/Directors to invite VIPs by telephone. This hasCMD/Directors to invite VIPs by telephone. This has

    to be arranged by the co-ordinatorto be arranged by the co-ordinator

    Delivery of MOPs letter to the Union Ministers/MPsDelivery of MOPs letter to the Union Ministers/MPs

    in Delhiin Delhi Confirmation from VIPs who will attend theConfirmation from VIPs who will attend the

    functionfunction

    Draft seating arrangement on the Dais to beDraft seating arrangement on the Dais to be

    prepared, in consultation with PMO/MOPprepared, in consultation with PMO/MOP

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    22/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES Draft speeches of VIPs to be sent to MOP forDraft speeches of VIPs to be sent to MOP for

    approvalapproval

    To prepare altermative routes and mode of travelTo prepare altermative routes and mode of travel

    including availability/booking of helicopterincluding availability/booking of helicopter

    Travel plan of the VVIP on the day of programmeTravel plan of the VVIP on the day of programme

    to be ascertained and travel arrangements to beto be ascertained and travel arrangements to be

    made including booking of tickets/Escort etc.made including booking of tickets/Escort etc.

    Food habits & Blood group of VIPs to be sent toFood habits & Blood group of VIPs to be sent to

    SiteSite

    Photograph of VIPs to be collected and send to sitePhotograph of VIPs to be collected and send to site

    Control RoomControl Room

    Memento-Co-ordination with ProjectMemento-Co-ordination with Project

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    23/49

    VIP VISITS/PROTOCOLVIP VISITS/PROTOCOL

    ISSUESISSUES Standard Checklist is to be sent to SiteStandard Checklist is to be sent to Site

    Preparation of Folder for CMD/Dais alongwithPreparation of Folder for CMD/Dais alongwith

    programme sheetprogramme sheet

    MP/MLA List for IR Issue/VIP Reference etc.MP/MLA List for IR Issue/VIP Reference etc. Placement of foundation stone/wall at a distance ofPlacement of foundation stone/wall at a distance of

    15 ft. from the front end of the stage.15 ft. from the front end of the stage.

    Making a photographers pedestal in front of theMaking a photographers pedestal in front of the

    podium/Rostrumpodium/Rostrum For barricades:For barricades:

    a)a) Specification of height of D balliesSpecification of height of D ballies

    b)b) Clear design/layout of isles andClear design/layout of isles and

    pathways/gangwayspathways/gangways

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    24/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    The Vehicle Norms for Projects were circulated inThe Vehicle Norms for Projects were circulated in

    year 2003year 2003

    The Committee has been nominated to review andThe Committee has been nominated to review and

    recommend the Vehicle Norms for the Regionalrecommend the Vehicle Norms for the Regional

    HQ, Projects/Stations including Coal MiningHQ, Projects/Stations including Coal Mining

    Projects, Hydro Projects, etc. The terms andProjects, Hydro Projects, etc. The terms and

    reference for the Committee for review of Vehiclereference for the Committee for review of Vehicle

    Norms are as follows:Norms are as follows:

    a)a) The Vehicle Norms for different type/size ofThe Vehicle Norms for different type/size ofProjectProject including Gas Projects, Hydro Projects,including Gas Projects, Hydro Projects,

    Captive CoalCaptive Coal Mining Projects & Regional HQsMining Projects & Regional HQs

    etc.etc.

    b)b) The number of vehicles to be maintained byThe number of vehicles to be maintained by

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    25/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    No Norms for Hydro Projects except Koldam. EvenNo Norms for Hydro Projects except Koldam. Even

    Koldam Norms are inadequate.Koldam Norms are inadequate.

    No Norms for Coal Mining Projects.No Norms for Coal Mining Projects.

    Projects are feeling that existing Norms are notProjects are feeling that existing Norms are notadequateadequate

    CISF demands vehicles beyond Norms.CISF demands vehicles beyond Norms.

    Separate Committee working for Norms forSeparate Committee working for Norms for

    Vehicles of Large Power Stations likeVehicles of Large Power Stations likeSipat/Vindhyachal/TalcharSipat/Vindhyachal/Talchar

    Due to large size of projects & rake movement,Due to large size of projects & rake movement,

    crimes & theft of coal, the CISF is insisting for morecrimes & theft of coal, the CISF is insisting for more

    vehicles for patrolling duty.vehicles for patrolling duty.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    26/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Due to large area in Hydro Projects &Due to large area in Hydro Projects &

    rough terrain they are insisting forrough terrain they are insisting for

    more vehiclesmore vehicles

    With the construction activities andWith the construction activities and

    commissioning of 3000 plus MWcommissioning of 3000 plus MW

    projects involving more no. of unitsprojects involving more no. of units

    coming shortly more vehicles arecoming shortly more vehicles arerequired during project constructionrequired during project construction

    phasephase

    Vehicles required before ProjectVehicles required before Project

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    27/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Following aspects need to beFollowing aspects need to be

    considered by Stations/considered by Stations/

    Projects/Rhqrs in this regard:Projects/Rhqrs in this regard:

    1.1. Project having shortfall ofProject having shortfall of

    vehicles:vehicles:

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    28/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    a)a) Will first make effort to get surplus vehiclesWill first make effort to get surplus vehicles

    fromfrom otherother project, if anyproject, if any

    b)b) In case, other projects are not having surplusIn case, other projects are not having surplus

    vehicle,vehicle, thethe project may go in for hiredproject may go in for hired

    vehicles to meet thevehicles to meet the urgent need subject tourgent need subject to

    approval of project Head.approval of project Head.

    Project/RHQ requiring drivers for departmentalProject/RHQ requiring drivers for departmental

    vehicles:vehicles:

    a)a) Will first make effort for transfer of surplusWill first make effort for transfer of surplus

    driversdrivers fromfrom other projectother project

    b)b) In case, other projects are not in a position toIn case, other projects are not in a position to

    shiftshift surplus drivers, needy project/RHQsurplus drivers, needy project/RHQ

    having shortagehaving shortage ofof drivers may engagedrivers may engage

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    29/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    inducting drivers by way of recruitment. Noinducting drivers by way of recruitment. No

    recruitment of Drivers shall be made forrecruitment of Drivers shall be made for

    any reasonany reason

    Project/Stations/RHQs having departmentalProject/Stations/RHQs having departmental

    vehicles and/or drivers in excess to the norm mayvehicles and/or drivers in excess to the norm may

    consider the following alternatives in order ofconsider the following alternatives in order of

    priority to ensure optimum utilizationpriority to ensure optimum utilization

    a)a) To transfer willing drivers to these projectsTo transfer willing drivers to these projects

    wherewhere requirement existrequirement exist

    b)b) To redeploy drivers after suitable training toTo redeploy drivers after suitable training to

    otherother areasareas in the project/RHQin the project/RHQ

    c)c) To reduce the hired vehicles and useTo reduce the hired vehicles and use

    departmentaldepartmental

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    30/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Vehicles so as to use drivers.Vehicles so as to use drivers.

    d)d) In any case the more numbers of driversIn any case the more numbers of drivers

    should notshould not be thebe the reason for increasingreason for increasing

    the nos. of departmental Vehicles asthe nos. of departmental Vehicles as prescribedprescribed

    in the normsin the norms

    The ration of departmental to hired vehicles mayThe ration of departmental to hired vehicles may

    vary from project to project depending upon thevary from project to project depending upon the

    availability of departmental vehicles. However, inavailability of departmental vehicles. However, in

    any case the total no of vehiclesany case the total no of vehicles(Departmental+Hired) should not exceed as(Departmental+Hired) should not exceed as

    recommended by the committeerecommended by the committee

    The number of departmental vehicles as well asThe number of departmental vehicles as well as

    hired vehicles may be further reduced, ifhired vehicles may be further reduced, if

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    31/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    The requirement of Vehicles for ProjectThe requirement of Vehicles for Project

    Construction areas, where-ever applicable, isConstruction areas, where-ever applicable, is

    assessed separately. The requirement of vehiclesassessed separately. The requirement of vehicles

    during the concurrent phase (i.e. when bothduring the concurrent phase (i.e. when both

    generation and project construction are going on)generation and project construction are going on)can be more than the ultimate requirementcan be more than the ultimate requirement

    suggested in the norms. These requirements havesuggested in the norms. These requirements have

    to be met only through hired vehicles as thisto be met only through hired vehicles as this

    requirement will be temporary in naturerequirement will be temporary in nature

    The engagement of departmental vehicles duringThe engagement of departmental vehicles during

    the construction phase should be so assessed thatthe construction phase should be so assessed that

    there will be total absorption of these vehicles inthere will be total absorption of these vehicles inultimate O&M

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    32/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    phase and no drivers are rendered surplus.phase and no drivers are rendered surplus.

    The norms for providing vehicles to CISF are basedThe norms for providing vehicles to CISF are based

    on the norms as given by Ministry of Home Affairs.on the norms as given by Ministry of Home Affairs.

    The above norm will be reviewed as and whenThe above norm will be reviewed as and when

    considered necessary by the managementconsidered necessary by the management

    The existing Stations have been divided into 3The existing Stations have been divided into 3

    categories based on the size 10 & 7 capacity of thecategories based on the size 10 & 7 capacity of the

    station.station.

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    33/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Category ACategory A Dept.Dept.HiredHired

    (Cool Station(Cool Station CarsCars 33 11

    aboveabove JeepsJeeps 44 1818

    1000MW1000MW Heavy VehiclesHeavy Vehicles 8866

    Category BCategory B Dept.Dept.

    HiredHired

    (Cool Station(Cool Station CarsCars 33 11

    Medium sizeMedium size JeepsJeeps 441616

    700MW-1000MW Heavy Vehicles700MW-1000MW Heavy Vehicles 7766

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    34/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Category CCategory C Dept.Dept.HiredHired

    (Cool Station(Cool Station CarsCars 33 11

    Small sizeSmall size JeepsJeeps 11 88

    Gas StationGas Station Heavy VehiclesHeavy Vehicles 4422

    Dept.Dept.

    HiredHired

    Regional Head QuarterRegional Head Quarter CarsCars 11 11

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    35/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Dept.Dept.

    HiredHired

    KoldamKoldam CarsCars 22

    --

    ProjectProject JeepsJeeps --1414

    Heavy VehiclesHeavy Vehicles 11

    33

    CISF VehiclesCISF Vehicles Dept.Dept.

    CarsCars (DIG/Comdt.)(DIG/Comdt.) 11

    JeepsJeeps DC/ACDC/AC 11

    Patrol DutyPatrol Duty 11

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    36/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Pick upPick up 11 utp 125 Strengthutp 125 Strength

    Heavy VehiclesHeavy Vehicles 11 125-400 Strength125-400 Strength

    addl. per 200addl. per 200

    StrengthStrength

    Vehicle during Project Construction PhaseVehicle during Project Construction Phase

    Dept.Dept.

    HiredHired

    Category A andCategory A and CarsCars 22--

    Category B Proj.Category B Proj. JeepsJeeps 11

    1212

    HeavyHeavy -- 33

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    37/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    Dept.Dept. HiredHiredCategory CCategory C CarsCars 22

    --

    ProjectProject JeepsJeeps --66

    Heavy VehiclesHeavy Vehicles --33

    Projects/Stations may maintain the Departmental VehiclesProjects/Stations may maintain the Departmental Vehiclesas per above normsas per above norms

    Lease and fleet management agreementLease and fleet management agreement

    DETAILS OF MARUTI N2N FLEET SOLUTIONS: TheDETAILS OF MARUTI N2N FLEET SOLUTIONS: TheComprehensive Maruti N2N Fleet Solutions being offeredComprehensive Maruti N2N Fleet Solutions being offeredconsists of the following sub modulesconsists of the following sub modules

    Acquisition Module: This sub module comprises of completeAcquisition Module: This sub module comprises of completemaintenance requirements during the entire tenure. Othermaintenance requirements during the entire tenure. Otherservices that NTPC get along with it are:services that NTPC get along with it are:

    Replacement VehicleReplacement Vehicle during repairduring repair

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    38/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    b)b) Tyre & Battery as and when required during 80,000Tyre & Battery as and when required during 80,000

    kms.kms. Contract mileage, if there be a technicalContract mileage, if there be a technical

    need.need.

    c)c) Chauffeur ServicesChauffeur Services

    This sub module comprises of a 24x7x365 emergencyThis sub module comprises of a 24x7x365 emergencyassistance support wherein a Maruti team would visitassistance support wherein a Maruti team would visit

    the problem site on intimation to a given hotlinethe problem site on intimation to a given hotline

    number, attend to NTPC vehicles problem and trynumber, attend to NTPC vehicles problem and try

    rectifying the defect there itself. If not possible then therectifying the defect there itself. If not possible then the

    vehicle would be towed to the workshop and the uservehicle would be towed to the workshop and the userdropped home.dropped home.

    Accident Management Module: This sub moduleAccident Management Module: This sub module

    comprises of all accident management requirementscomprises of all accident management requirements

    right from attending to accidental vehicle at site tillright from attending to accidental vehicle at site tillclaim rocessin from the Insurance Com an therebclaim rocessin from the Insurance Com an thereb

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    39/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    transaction from NTPC side. The maximum extent oftransaction from NTPC side. The maximum extent of

    cash outflow form NTPC side would be the depreciationcash outflow form NTPC side would be the depreciation

    & compulsory deductible component being disallowed& compulsory deductible component being disallowed

    by the insurance company. The insurance productby the insurance company. The insurance product

    being offered by M.U.L. provides the following specialbeing offered by M.U.L. provides the following specialcoverage apart from the common comprehensivecoverage apart from the common comprehensive

    cover.cover.

    a)a) Third party coverage upto a maximum of Rs. 7.5Third party coverage upto a maximum of Rs. 7.5

    LakhsLakhs

    b)b) Legal Liability towards paid driversLegal Liability towards paid drivers

    c)c) Personal Accident Cover for driver (other than paidPersonal Accident Cover for driver (other than paid

    driver)driver) upto a limit of Rs. 2,00,000.upto a limit of Rs. 2,00,000.

    Salient FeaturesSalient Features

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    40/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    b)b) Maruti Udyog Ltd. tied up with Citi Corp forMaruti Udyog Ltd. tied up with Citi Corp for

    FinancingFinancing

    c)c) Maruti Udyog Ltd. tied up with Group IV for DriversMaruti Udyog Ltd. tied up with Group IV for Drivers

    ServicesServices

    d)d) Maruti Udyog Ltd. Provides repair & maintenanceMaruti Udyog Ltd. Provides repair & maintenanceservices through its dealerservices through its dealer

    e)e) Monthly EMI is paid to MULMonthly EMI is paid to MUL

    f)f) MUL distributes payments to Finance, Group IVMUL distributes payments to Finance, Group IV

    g)g) Directors are provided Baleno CarsDirectors are provided Baleno Carsi)i) Executive Directors are provided Esteem CarsExecutive Directors are provided Esteem Cars

    j)j) Regional Executive are Provide Esteem CarsRegional Executive are Provide Esteem Cars

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    41/49

    NORMS FOR VEHICLESNORMS FOR VEHICLESDISPOSAL OF VEHICLESDISPOSAL OF VEHICLES

    A vehicle shall be considered as unserviceable and beA vehicle shall be considered as unserviceable and be

    recommended for disposal, if any one or more of therecommended for disposal, if any one or more of the

    following conditions are satisfied:-following conditions are satisfied:-

    a)a) A vehicle, if it is light vehicle, should have alreadyA vehicle, if it is light vehicle, should have already

    run forrun for more than 1,50,000 Kms. and should bemore than 1,50,000 Kms. and should bemore than 5more than 5 years old in age. In case of a heavyyears old in age. In case of a heavy

    vehicle, it should have already run for more thanvehicle, it should have already run for more than

    2,00,000 kms. and should be more than 8 years old in2,00,000 kms. and should be more than 8 years old in

    ageage

    b)b) In case a vehicle has met with a major accidentIn case a vehicle has met with a major accident

    and theand the cost of repairs to bring it back to road worthycost of repairs to bring it back to road worthy

    condition iscondition is estimated to be prohibitively high i.e.estimated to be prohibitively high i.e.

    (repairs and(repairs and maintenance expendituremaintenance expenditure

    already incurred and to bealready incurred and to be incurred exceeds theincurred exceeds theoriginal cost of the vehicle)original cost of the vehicle)

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    42/49

    NORMS FOR VEHICLESNORMS FOR VEHICLES

    The committee shall take into accountThe committee shall take into accountCommittee shall be nominated aboveCommittee shall be nominated aboveconditions for declaration of a vehicle asconditions for declaration of a vehicle asunserviceable, and other suchunserviceable, and other such

    related/relevant factors like the cumulativerelated/relevant factors like the cumulativerepairs and maintenance cost of the vehiclerepairs and maintenance cost of the vehicleexpenses incurred in the last 12 months, theexpenses incurred in the last 12 months, therate of fuel consumption and condition of therate of fuel consumption and condition of theengine and body of the vehicle; and submitengine and body of the vehicle; and submitits recommendations to the competentits recommendations to the competentAuthority in format suggested and enclosed.Authority in format suggested and enclosed.

    The intention is to consider the condemnationThe intention is to consider the condemnationof the vehicle on age-cum-condition basisof the vehicle on age-cum-condition basis

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    43/49

    MOU with MTNL & BSNLMOU with MTNL & BSNL

    NTPC Signed as MOU with MTNL & BSNL on 6NTPC Signed as MOU with MTNL & BSNL on 6 thth July 2004 forJuly 2004 forproviding all telecom services to us as a special customer.providing all telecom services to us as a special customer.

    MTNL is coveringMTNL is covering NCRNCR area (Delhi, Faridabad, Ghaziabad,area (Delhi, Faridabad, Ghaziabad,NOIDA and Gurgaon) and Mumbai.NOIDA and Gurgaon) and Mumbai.

    BSNL is providing mobile phone service to us in rest ofBSNL is providing mobile phone service to us in rest ofIndia.India.

    NTPC is given CUG scheme for all the mobile phone byNTPC is given CUG scheme for all the mobile phone byMTNL and BSNL on circle basis i.e. in each circle the CUGMTNL and BSNL on circle basis i.e. in each circle the CUGuser will talk to each other free of cost for any duration.user will talk to each other free of cost for any duration.

    Intra-circle usages will be charged as per prevailing rates.Intra-circle usages will be charged as per prevailing rates. 20% rebate is allowed to NTPC on over all billing of BSNL20% rebate is allowed to NTPC on over all billing of BSNL

    subject to Rs. 5 Crore per annum and 10% for less than 5subject to Rs. 5 Crore per annum and 10% for less than 5crores of telephone chargescrores of telephone charges

    20% rebate is allowed to NTPC by MTNL subject to over all20% rebate is allowed to NTPC by MTNL subject to over allbilling of Rs. 50 Lacs per annumbilling of Rs. 50 Lacs per annum

    Waival of security deposit registration activation & CUGWaival of security deposit registration activation & CUGmonthly rental chargesmonthly rental charges

    MOU is valid up to 5 yearsMOU is valid up to 5 years

    E i l f M bilE titl t f M bil

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    44/49

    Entitlement of MobileEntitlement of Mobile

    PhonePhoneCeiling ofCeiling of ISD AutoISD Auto Ceiling ofCeiling of RangRang

    Cost InstrumentCost Instrument Roam(Global)Roam(Global) Tel.Tel.

    ChargeCharge

    PaymentPayment

    CMDCMD as per actualas per actual YesYes Full PaymentFull Payment --

    DirectorDirector as per actualas per actual YesYes dodo --

    EDED Rs. 10000/-Rs. 10000/- STD with AutoSTD with Auto dodo --

    GMGM Rs. 7000/-Rs. 7000/- dodo dodo --

    AGMAGM Rs. 4000/-Rs. 4000/- dodo Rs. 18000/-Rs. 18000/- LandLand+ Taxes+ Taxes +Taxes M.+Taxes M.

    Ph.Ph.

    DGMDGM Rs. 4000/-Rs. 4000/- dodo Rs. 12000/-Rs. 12000/- dodo

    + Taxes+ Taxes +Taxes+Taxes

    M.Ph.M.Ph.

    E i l f M bilE titl t f M bil

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    45/49

    Entitlement of MobileEntitlement of Mobile

    PhonePhoneSr. Mgr.Sr. Mgr. Rs. 3000/-Rs. 3000/- dodo Rs. 18600/-Rs. 18600/- Land/Land/

    + Taxes+ Taxes + Taxes+ Taxes M. Ph.M. Ph.

    usageusagechargecharge

    ManagerManager Rs.Rs. 3000/-3000/- dodo Rs. 14400/-Rs. 14400/- dodo

    + Taxes+ Taxes

    E1 to E4E1 to E4 Rs.Rs. 2000/-2000/- do Rs. 3600/-do Rs. 3600/- M.Ph. ChargesM.Ph. Charges

    + taxes+ taxes

    The life of mobile phone instrument is 4 yearsThe life of mobile phone instrument is 4 years

    Replacement of battery only once in a 4 years lifeReplacement of battery only once in a 4 years life

    E i & k lE i & k l

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    46/49

    Ergonomics & workplaceErgonomics & workplace

    designdesign work environment requires the balance betweenwork environment requires the balance between

    form and functionform and function

    Striking the perfect balance requires knowledgeStriking the perfect balance requires knowledge

    gained through experience & expertisegained through experience & expertise

    Ergonomics help us creating ideal workErgonomics help us creating ideal work

    environment that enhance productivity in the workenvironment that enhance productivity in the work

    placeplace

    Space is a constraint in the office proposal are forSpace is a constraint in the office proposal are for

    creating modular office setcreating modular office set Work stations provides independent work areas,Work stations provides independent work areas,

    thus making for privacy and avoidingthus making for privacy and avoiding

    The colour combinations impart a sophisticatedThe colour combinations impart a sophisticated

    corporate touch to the work environment.corporate touch to the work environment.

    E i & k lE i & k l

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    47/49

    Ergonomics & workplaceErgonomics & workplace

    designdesign The work station are spaciousThe work station are spacious

    With the increase in Manpower and paucity ofWith the increase in Manpower and paucity of

    space comfort of modern furniture is beingspace comfort of modern furniture is being

    adoptedadopted

    For stages compactors are being provided insteadFor stages compactors are being provided instead

    of conventional Almirahof conventional Almirah

    Comfortable working environment is beingComfortable working environment is being

    provided to give employees their maximum outputprovided to give employees their maximum output

    Modular furniture gives the environment ofModular furniture gives the environment of

    oneness and aesthetical friendly atmosphere andoneness and aesthetical friendly atmosphere and

    transparencytransparency

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    48/49

    Space and FurnitureSpace and Furniture

    LEVELLEVEL DESCRIPTIONDESCRIPTION

    E7A & AboveE7A & Above Cabin (Carpet area 250Cabin (Carpet area 250

    Sq.ft.)Sq.ft.) E7E7 CabinCabin

    (Carpet area 200 Sq.ft.)(Carpet area 200 Sq.ft.)

    E6E6 Cabin (Shoulder Height)Cabin (Shoulder Height)

    (Cabin are 100 Sq.ft.)(Cabin are 100 Sq.ft.)

    E5-E1, S&WE5-E1, S&W HallHall

  • 7/31/2019 Ppp by Nhk for Ets at PMI

    49/49

    Furniture Items ProvidedFurniture Items Provided

    Table Chair Almirah

    Call Bell Carpet Chair

    Compactor Filing Cabinet Glass Top

    Sign Board Sofa Chair Side Rack

    Book Case Visitor Chair Name Plate

    Task Board Pinup Board White Board

    Small

    Almirah

    Centre Table Computer

    TableAir Conditioner (E7A & Above)

    Conference Rooms are Provided at eachFloor