    TITAN PNEUS DO BRASIL LTDA

    PRODUCT & PROCESS QUALITY AUDIT

    Based on Audit Revision 0

    DATE:

    AUDIT TEAM:

    NAMES: SIGNATURES:

    _______________________________________

    _______________________________________ ___________________________________

    ___________________________________

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    2/60

    Area Week

    Training & Communication 7/18/2011

    Raw Materials, Mixing & Labs. 19 e 20/7/11

    Component Prep 21 e 22/7/11

    Truck 7/25/2011

    Rear Farm & OTR 7/26/2011

    Product &

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    3/60

    External PPQA 8/3/2011

    New Tire Development 8/4/2011

    Total

    Outghoing Quality Audit

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    4/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    5/60

    14(0)

    10(0)

    291 (120)

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    6/60

    PendingNr of

    OpportunitiesPending

    o Brasil

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    7/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    8/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    9/60

    Area WeekNr of Aplic.

    Items% OK N N C Pending

    Nr of

    OpportunitiesPending

    New Tire Development 10

    Training & Communication 8

    Raw Materials, Mixing & Labs. 40

    Component Prep 54

    Truck 27

    Rear Farm & OTR 34

    Curing & Final Finish 50

    Monitoring & Lab. Testing 15

    Warehouse & Shipping 8

    Engineering Requirements & Calibration 31

    External PPQA 14

    291Total

    Outghoing Quality Audit

    Product & Process Quality Audit - Titan Pneus do Brasil

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    10/60

    NR NC Opp AreaQuestion

    NrQuestion (check list)

    Reviso: 01

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    11/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    12/60

    Description of nonconformity or

    opportunity for improvementRoot cause and correvtive action Responsible

    CORRECTIVE ACTIONS

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    13/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    14/60

    Final Date Status / Comments

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    15/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    16/60

    Area SubArea Ques# Question

    Tire Release System.

    4.1*Do tire releases meet requirements of GQMTS 19Rand the appropriate

    S19R* (Subsections depending on specific product line)?

    4.2 Is there a system for planning tire release activities?

    4.3When developing a new tire, is the necessity for a new bladder size

    (curing and building) considered?

    4.7 Are all tires released through a formal release meeting?

    4.8 Is there a release package?

    4.1Is there a system to follow the performance of new tire codes and tune

    as required?

    No existe no check list de

    offtake

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    17/60

    GUIDELINES

    GQMTS 19R (and S19R* subsections for specific product lines) specifies the different releases applicable to new

    They give detailed information on the tests to be performed and their frequency. Only tires meeting all the releas

    introduced into the manufacturing process. Are all steps of the process followed?

    Must include planning of all projects development as well as individual projects activities with promised date for i

    There should be evidence of a visual display board (or equivalent system) detailing tire builds & ship dates (SOP

    Plant commitments to the visual board (or equivalent) should be communicated to the Region.

    Is bladder fitment analyzed during feasibility assessment ? Review records of manufacturing feasibility.

    The release procedure(GQMTS 19R) calls for a local release committee including a regional dev. Repr. for "A"

    committee has to meet when all test results are on hand for review. The formal signed release is given by the co

    the results. OTR releases conform to GTC* A (Dept. 460E) requirements for tire release.

    All original test data + the release documentation will be compiled in a package and kept on

    record. This info is used as baseline.

    Special follow-up of a newly introduced tire code is required per QAI-2017All Tire Lines: Production Tuning/Mon

    This is done in the minimum of 2 weeks tuning phase. Records of the performance and tuning items must be av

    code specific information.

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    18/60

    Area SubArea Ques# Question

    Training & Communication

    1 Is there a machine operator certification system available?

    5.1.6*Are critical elements which effect final product identified in the training

    material for each area?

    2 Is there a list of certified operators by machine type?

    3Do training manuals exist for all functions in the tire rooms/curing/final

    finish/ etc?

    4 Are there designated labor trainers for each job or operation

    5.1.1AIs there an initial machine operator certification system available for

    contract associates (non-permanent labor)?

    5.1.3Is there a system to recertify or verify operators on an annual bases

    (SP procedures)?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    19/60

    GUIDELINES

    Is there a documented training certification system

    Is there a formal signoff (Labor Trainer/manager)

    Randomly select an associate from each Business Center & Verify certification/training records

    Are Labor Trainers included in the certification program?

    Is there a documented training certification system?

    Verify requirements for certification

    Is there a formal signoff?

    Randomly select an contractor from each Business Center & verify certification / training recordsAre assigned personnel included in the Certification Program?

    Verify documented recertification or verification program

    The frequency for recertification/verification must be triggered by an annual occurrence, i.e. service date, birthda

    Check if recertification or verification frequency is being followed (random check from each Business Center)

    Review OBT material/ contractor training to verify the critical elements are included. Is there a formal approval s

    new training material?

    Verify list of Certified Operators by machine typeIs the list available for Area managers to fill vacancies?

    Does the list show certification date? When is recertification due?

    - Verify manuals exist for all areas.

    Have they been instructed on the training systems & procedures?

    Have they been instructed on the proper training method (4 step method)?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    20/60

    Area SubArea Ques# Question

    Raw Materials, Mixing & Labs.

    Mixing/Qual

    & Labs

    Mixing/Qual &

    Labs6 Are routine audits being performed in the Mixing area?

    6.1.3Is the CAR system used to notify supplier concerning issues of non-

    conformance and is cost assigned systematically?

    6.1.4Is there a procedure in place to evaluate raw materials and second

    sources?

    7Is there a documented system to receive, store and release raw

    materials?

    8 Are age limits followed?

    9 Are release procedures being followed?

    10 Are released materials correctly identified?

    11 Are materials awaiting disposition correctly identified?

    12Are incoming pallets of halobutyl and butyl marked or identified as being

    incompatible?

    13 Are storage conditions adequate and free from contamination?

    14 Are incompatible materials separately stored in a well identified area?

    6.2.2 Are only specified compounds, raw materials being used?

    6.2.3Is there a procedure to introduce new compounds and compound

    changes?

    6.2.3aIs there a system to insure that changes to mixing specifications are

    implemented correctly?

    6.2.3.b Is automatic discharge system in place

    6.2.4Are the correct workaway and disposition procedures being followed for

    off test compounds/components?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    21/60

    GUIDELINES

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    22/60

    GUIDELINES

    Is there documentation to verify these audits are performed on a regular basis?

    The plant must have a system to record supplier non-conformance. CARs for the plant can be viewed as well as the C

    Action Plan. Refer to QAI 2205

    Review in SISCARCAR reports CAR cost summaryReview plant system and documentation to record the evaluation.

    Procedure must have a documentation showing materials authorized to be used in the plant ("approved material list") w

    to the last evaluation.

    You must have documentation on your process to receive, store and release raw materials. The documentation must i

    FIFO release or it is "NO".

    You must have age limits assigned for all raw materials equal to or less than the Corporate Spec. Corporate age limits

    on the web (http://techweb/MaterialSpecs/agelimits.pdf). A gatekeeper (system or person) is required to ensure limits a

    Randomly selected raw materials must be within age limit spec.

    Documentation of the release procedure is required (item 1 above). The operators in charge of identifying released maknow the system. Randomly selected materials in production use must show they are probably released and within age

    In storage and mixing production area, randomly checked released materials must have proper release ID (green stripe

    Stamp, etc.) and proper material code.

    There must be an area assigned for out of process raw materials (out of spec, overage, contamination, etc). The curre

    a raw material must be easily identified according to the plant system.

    All incompatible rubbers must have at least one red stripe on each skid. This applies to material as soon as it is receiv

    clearly identified as incompatible.

    Raw materials should be stored in a covered area to prevent contamination. The storage area requires good housekee

    wooden and cardboard pallets, strapping, etc. Materials stored in an open area outside without adequate covering resu

    answer.

    This area should have a sign stating only incompatible rubbers are stored here. It is preferred that this area have a col

    painted on the floor/poles/walls to further identify it. There should be two areas (one in the warehouse area and one in t

    area by the mixers) otherwise it is a "NO".

    All materials must be properly identified and match the run card spec exactly. A trial or temporary spec is required for d

    Review procedure and records. Does it comply with requirements of GQMTSS19Q1

    A system for mix spec changes must include: 1) How the new spec is introduced to the mixer operator and scheduler, 2

    old spec is removed, 3) a method to record when the mix spec was active in production. The spec changes must incorpspec. 4) There should have a double check for all specifications, made by QTECH.

    All mixing setup must include max mix time and temperature over-rideGQMTS P09C, CTI-055-11-00287There must be designated area for out of process (nonconforming material) and NO CURES. Workaway procedures m

    GQMTS: S09E & P09Eor prohibited by a booksheet notes. Verify plant'sprocedure.

    Check reformulation

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    23/60

    The operator must provide the following: 1) the schedule he is working from, 2) a run card (paper or electronic) show

    compound name and serial, all raw materials (with tolerances), mixer RPM, ram pressure, ram raise times, oil injectio

    black time, surge time, drop temperature, drop time. Some of these may be set by the control room in which case the

    checked there.

    Is set up card (electronic or paper), available at the Mixer?

    Is the set up card completed according to specs & tolerances. Check for calibration of appropriate tools where applic

    (pressure gauges, temperature gauges, etc) .All raw material age limits must be followed as well as age limits for blends, preweighed bags, non-productive rubber,

    Plants without age limits for blends and preweighed bags must put "NO". Age limits for non-productive rubber, scrap

    miscellaneous materials are recommended, but not required.

    Rubber, oil, carbon black and pigment tolerances must be available to the operator and all materials on a random batc

    within tolerance.

    There must be a separate area for incompatible compounds to be stored. They must be marked with red on the skid

    batches are required before and after an incompatible run.

    Rubber compound should be marked with colored identification.

    With the ram pressurized, the gauge should agree with the mixing spec. Confirm that the oil is injected at spec tempe

    batch is dropped at the correct temperature. The two thermocouples should read within 15 degrees F or this is a "NO

    Is there adequate documentation to verify bags are from an approved source, are the proper gauge and have the corr

    Bags are not knotted when loaded into mixer. If knots are used to close bags, they are cut out prior to loading on cha

    conveyor.

    Bags are to be loaded in the middle of the batch to avoid hanging on the rotor or ram.

    Each type of compound requires specific release and low frequency tests. Each compound must meet these requirem

    Review plant procedure and verify against GQMTS P09E.

    Compound physical properties are within the PPS limits and release limits (Rheometer 191C/200C). If release proper

    consistently failing, the answer is "NO". If some low frequency testing is failing and there is a plan to bring them back

    answer is "Yes". If no plan, the answer is "no".

    For the Rheometer, calibration should be done per QAI2003which includes use of calibrated torque sta

    PCPS plugs (ODR) and meeting the QA Premonth limits For RPA calibration should be do

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    24/60

    Area SubArea Ques# Question

    Component Prep

    Comp Prep Comp Prep 28 Are routine audits being performed in Component prep areas?

    Comp Prep

    Extruders

    29

    Does your PH level spec comply with specification ?

    30

    Does your % suspended solid spec comply with specification?

    31

    Does your % dissolved solids spec comply with specification?

    32Do the alert / shutdown limits comply with specification ?

    33

    Are running cards posted at machine and being followed?

    34Identification of extrudates?

    7.1.1 *Do you have a QTECH procedure for regular inspection of all extruder

    cooling lines?

    7.1.2 *Is there documented evidence that the tank has been cleaned when

    required?

    7.1.3 Is there a cooling water temperature control system?

    7.1.13Is water hardness audited at the frequency specified in Section 10N of

    the GQMTS?

    7.1.14Are the limits for % solids established in relation to the level of water

    hardness as per GQMTS section 10N?

    Is there a system approved by plant QTECH to maintain consistency o

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    25/60

    7.1.24

    Is there a compound traceability system for the extruder and is it

    effective?

    7.1.26 Is there a system to pre-heat dies prior to use?

    Extruders - Booked Components

    7.2.1 Is component length within tolerance? (minimum 3/run)

    7.2.2 Is component weight within tolerance? (minimum 3/run)

    7.2.3 Is component width within tolerance? (minimum 3/run)

    7.2.4 Is component contour within tolerance?

    Mill Practices

    7.3.1 Are mills properly loaded?

    7.3.4 Are the cooling channels of the mills functioning per specification?

    Comp PrepGum Cal

    35Are compounds identified properly?

    36Is compound age specified & observed?

    37Are running cards at machine and being followed?

    38Is the calendered sheet released according to spec?

    7.4.5

    Is there a compound traceability system at the gum calender and is it

    effective?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    26/60

    7.8.4 Is treatment / ply traceability adequate at the cutter?

    7.8.6 Is treatment / ply angle correct at the cutter?

    7.8.7 Is treatment/ ply splicing correct at the cutter?

    7.8.9 Are gum strip/squeegee applications controlled properly at the cutter?

    7.8.12 Is treatment storage adequate at the cutter?

    Comp PrepBead Winding

    60Is bead diameter checked / documented?

    61Are beads properly identified?

    62Are marking paint and cements properly released, ID'd & stored?

    63Is bead compound (strip stock) retested (rheometer) prior to use?

    7.9.1 Is the running card available at the bead builder and is it being followe

    7.9.3 Is wire coverage good at bead winder?

    7.9.6 Is there a good traceability system for beads going to tire room?

    7.9.10 Is bead wrapping done properly and as specified?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    27/60

    GUIDELINES

    Is there documentation to verify these audits are performed on a regular basis?

    Is spec posted?Are checks being done according to the stablished frequency? Are results available to review? Are

    inside the spec range?Is there evidence of corrective action? There must be a continuous monioring device, includ

    system.

    Is spec posted?Are checks being done according to the stablished frequency? Are results available to review, inclu

    studies in case of using na indirect measurament method? Are the results inside the spec range? Is there evidenceaction?

    Is spec posted?Are checks being done according to the stablished frequency? Are results available to review? Are

    inside the spec range?Is there evidence of corrective action? There must be a continuous monioring device, includ

    system.

    Are procedures in place if alert limits are exceeded?Are components held for disposition? There must be evidence

    Are the latest revisions being displayed- Are the spec being religiously followed

    Is the spec for identification available Is the marking legible at all time

    The procedure must be in agreement with GQMTS 10N requirements and must have assigned responsibility and do

    Review records to verify tank cleaning frequency? The tank must be inspected during the audit.

    Is there sufficient capacity to allow for component cooling? Spray heads working properly? Cooling water not expose

    cooling?

    Are results available for review?

    See % solids/water hardness in GQMTS section 10N. Are components held for disposition if spe

    exceeded?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    28/60

    Is the tag retention system available and is being followed? Is correct identification on the tags and date of manufa

    batched-off compounds properly identified?Is the component traceable back to a run at the BB?

    Is the preheater available? Is it running at the appropriate temperature? Where die cabinets are used all active

    kept in the heated cabinet. (GQMTS: P10E)

    Review records for all Legal / Monitoring testing samples that did not meet spec. Is there evidence that corrective

    initiated? If automatic system are available and in use, the 3 per run is waived.

    Is correct weighing scale in use? Is scale calibrated at specified frequency? Is component weight checked at spec

    Are weights taken documented? If automatic system are available and in use, the 3 per run is waived.

    Is correct measuring tape used? Is frequency of component width check followed? If automatic system are avail

    the 3 per run is waived.

    Is the LMAC or profiler available and functioning? Are components released by contour? Is contour of released co

    spec? Without LMAC, minimum of 1/cavity/run.

    Is the correct compound used? Is correct identification on the tags? Is there a tag retention system and does it wo

    batched-off compound properly identified? Is lab approval stamped on tags for plants with out ASRS?

    Are mills being acid cleaned and spray pipe checks done on periodical basis? Are checks documented?

    Correct compound used- Correct identification on the tags- Is the tag retention system properly working- All batch

    are properly identified- Lab approval stamped on tags

    Is the age limit specified on the running card- Is the time/date stamped on the tag- Is the system being followed

    Is latest revision of running card available on machine- Is it being followed

    Is spec with latest revision available- Correct wind-up temperature, gage and width to the specification

    Is the tag retention system available and is being followed? Is correct identification on the tags? Is lab approval sta

    tags? Is all batched-off compound properly identified?Are defective components being held-up at specified locatio

    compound easily traceable?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    29/60

    Is the treatment traceability system available and is being followed? Is correct identification on the tags?

    Is there a procedure to check angle? Are checks documented? (see GQMTS: S03B for tolerances)Is specification for splicing available? Is it being followed? Is corrective action taken and documented? see

    for tolerances)

    Are gumstrip dimension correct? Is the application correct and wrinkle free?

    Is the treatment storage adequate and does it enable FIFO system?

    Is Bead Diameter Check tool available- Is it in use- Are checks documented

    Is identification system available- Is it being followed

    Are they properly specified and released- All paints have proper ID and properly stored

    Is the test being done- Test result are documented

    Are running cards visibly displayed? Are running cards of the latest revision? Are running cards being followed?

    Is coverage being checked across the width? Is corrective action taken and documented?

    Is the traceability system available? Is it being followed?

    Is the specification available to the operators? Is it being followed?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    30/60

    Area SubArea Ques# Question

    Truck

    Tire Bldg Tire Bldg65 Are routine audits being performed in Tire Building area?

    BREAKER BAND BUILDING:

    8.1.10 Is traceability system in place?

    TIRE BUILDING PROCESS

    8.3.5

    Is there a process to check machine set-up and components at

    beginning of shift and after every code change?

    8.3.9

    Is there a system to identify and segregate nonconforming materials

    and components?

    8.3.12 Is component traceability effective?

    8.3.13 Is spotting specified?

    8.3.14 Is spotting followed?

    8.3.19 Is there a process to measure and control critical process parameters?

    8.3.24 Are FIFO procedures observed?

    8.3.28 Is the necessary EQ in good working condition and properly stored?

    GENERAL

    Transferir p/

    OBT 8.4.1

    Are visual aids showing misplaced component effect on cured tire

    displayed in the tire building area?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    31/60

    Tire BldgBldg Inst 71 Are the correct quality requirements available to the operator?

    72Are requirements for machine set-up correctly identified?

    73Are latest set-up and running cards available to the operator?

    74Is there a component traceability system?

    75 Is the tire room directly notified in case of repeating defects and areactions taken?

    76Are green tires/carcasses stored to prevent damage and distortion?

    77Are age limits followed for green tires/carcasses?

    78Are scrap carcasses / green tires properly segregated?

    79Is there a system to follow code changes to insure tire codes are

    started up correctly?

    Tire BldgGeneral

    80Is there evidence that specifications and run cards are being

    followed by associates?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    32/60

    GUIDELINES

    Is there documentation to verify these audits are performed on a regular basis?

    All produced components must be stored with tags showing dates and product codes. Tags to be registered and

    traceability.

    Review documentation, must include basic machine settings, component checks to dimensional requirements an

    Documentation may include operator check sheets, signatures on material tags, computer sign-on, etc.)

    All off spec material must be identified and segregated. There must be baskets/bins for each component cut off

    identified. No material left on tire machine railing/floor. Non compatible material must be clearly identified.

    Green component tags must be recorded and filed in relation to the green tire for easy later retraceability?

    The specified splice spotting for the tire code running on the building machine should be posted at easy access f

    each code change, the correct spotting must be checked.

    At machine set up, the splice spotting is checked. If for uniformity/downstream reasons the spotting is changed,

    must be revised and posted at the machine.

    Documented measurements for critical parameters, as defined in plant control plan, should be available for revie

    measurements are out of tolerance, corrective action should be noted.

    First In First Out procedures must be observed for all components and green carcasses tires. Components bein

    the machine from the same production run/date will be considered to be in compliance.

    All EQ equipment must be properly stored and kept in good working condition.

    Observe signage or placards in tire building area

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    33/60

    Has the operator been correctly instructed and are the quality requirements for his function clearly defined and ava

    Each tire code has to have an up-dated and complete set-up card. This card has to be available to the machine a

    the operator when the tire code is up.

    Latest revisions of set-up and running cards should be available at the building station. The cards relevant to the r

    should be posted for easy access by the builder at the machine.All components should be properly tagged indications. Material code-dimensions-production date, the final green t

    marked with builder sticker.

    In case of repeating defects occurring, the tire classifier or his representative should immediately inform the affect

    Records of these occurrences should be kept together with the corrective actions and subsequent results.

    Green tire / carcasses should be stored / transported in trucks / conveyors free of damage to prevent tire damage

    deformation or contamination. System to define number of tires/carrier.

    Age limits as specified by plant specification should be respected.

    All scrap carcasses / green tires should be stored separately from the regular ones at a specific location / truck to

    usage in the manufacturing process.

    A written procedure for tire code changes should exist. All operators / service personnel / supervisors should be p

    this matter. A copy of the procedure should be available at the machine for reference.

    Question operators, review equipment set-up/measurement documentation, compare run card to eq

    settings.

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    34/60

    Area SubArea Ques# Question

    Rear Farm & OTR Y N

    TT/OTR Laminadora STRIP LAMINATOR

    7.13.1Is the correct compound being used and is there a

    compound traceability system for the strip laminator?

    7.13.2Are the drum and the program correct to produce the

    tire?

    7.13.3Is the tire weight being monitored according to the

    established frequency and is within tolerance?

    7.13.4 Are the tires correctly painted and identified?

    7.13.5Are all the quality information required available to the

    operator?

    7.13.6Is the TCU in good working condition and controlling to

    the specified temperature?

    7.13.7Is there maintenance planned for the strip laminator and

    is being done?

    Tire Bldg Tire Bldg65 Are routine audits being performed in Tire Building area?

    BREAKER BAND BUILDING:

    8.1.10 Is traceability system in place?

    TIRE BUILDING PROCESS

    8.3.5

    Is there a process to check machine set-up and components at

    beginning of shift and after every code change?

    8.3.9

    Is there a system to identify and segregate nonconforming materials

    and components?

    8.3.12 Is component traceability effective?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    35/60

    GENERAL

    Transferir p/

    OBT 8.4.1

    Are visual aids showing misplaced component effect on cured tire

    displayed in the tire building area?

    Transferir p/

    OBT 8.4.2

    Is there effective communication such as video showing impact of

    cause & effect of yield issues (performance issues)

    Tire BldgBrkr Band Bldg

    66Are the correct quality requirements available to the operator?

    67Are requirements for machine set-up correctly identified?

    68

    Have age limits been established?

    69Are age limits followed?

    70Does segregation for off-spec bands exist?

    Tire BldgBldg Inst

    71Are the correct quality requirements available to the operator?

    72

    Are requirements for machine set-up correctly identified?

    73Are latest set-up and running cards available to the operator?

    74Is there a component traceability system?

    75Is the tire room directly notified in case of repeating defects and are

    actions taken?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    36/60

    GUIDELINES

    Is correct identification on the tags and date of manufacture ? Are all batched-off compounds properly

    approved and identified? Is the traceability system effective?

    Review if the drum and the CLP program are the specified to the tire being produced.

    specified frequency? Are weights taken documented? Are the tires segregated and corrective actions

    The painting should be according to the specification. The tire should be identified with type, date and

    hour. All tires from a car should be identified. Each car should have only one type of tire.

    Review if the last set up specification revision is available.

    Is the cooling temperature specified in the running card? Is there any leak on the TCU? Are actual

    temperatures following the spec at all zones?

    Is the frequency established, documented and being followed? Are the records of check lists

    available? Is there evidence of corrective actions taken in response to nonconformist items?

    Is there documentation to verify these audits are performed on a regular basis?

    All produced components must be stored with tags showing dates and product codes. Tags to be registered and filed for easy

    traceability.

    Review documentation, must include basic machine settings, component checks to dimensional requirements and age limits.

    Documentation may include operator check sheets, signatures on material tags, computer sign-on, etc.)

    All off spec material must be identified and segregated. There must be baskets/bins for each component cut off - must be clearly

    identified. No material left on tire machine railing/floor. Non compatible material must be clearly identified.

    Green component tags must be recorded and filed in relation to the green tire for easy later retraceability?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    37/60

    Observe signage or placards in tire building area.

    Record of training for those who can impact - component prep, tire builders, etc.

    Has the operator been correctly instructed and are the quality requirements for his function clearly defined and av

    Each tire code has to have an up-dated and complete set-up card. This card has to be available at the machine a

    the operator when the tire code is up.

    Age limits should be included in the local working specs and should be known to the operators and service people

    tire components.

    Records on actual vs spec for age limits should be available on the individual material tags.

    Off-spec bands should be clearly identified and immediately segregated from the good ones. They must be stored

    identification on separate racks.

    Has the operator been correctly instructed and are the quality requirements for his function clearly defined and av

    Each tire code has to have an up-dated and complete set-up card. This card has to be available to the machine a

    the operator when the tire code is up.Latest revisions of set-up and running cards should be available at the building station. The cards relevant to the

    should be posted for easy access by the builder at the machine.

    All components should be properly tagged indications. Material code-dimensions-production date, the final green t

    marked with builder sticker.

    In case of repeating defects occurring, the tire classifier or his representative should immediately inform the affect

    Records of these occurrences should be kept together with the corrective actions and subsequent results

    Area SubArea Ques# Question GUIDELINES

    C i & Fi l Fi i h Y N

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    38/60

    Curing & Final Finish Y N

    Curing

    ProcessCuring 81

    Are routine audits being performed in the curing area? Is there documentation to verify these

    General

    9.1.4Is spotting specified?(Radial) Spotting should be specified for all con

    9.1.5Is spotting being followed?(Radial) Confirm spotting is being followed.

    9.1.8Is bladder pull policy established and being followed?

    Is there a defined bladder pull policy t

    is being followed.

    9.1.10Is EQ identified, in good working condition and properly stored?

    Updated EQ equipment inventories mu

    inspection/condition of PCI rings. Mold

    9.1.11*

    Are shaping pressures correctly defined and monitored?

    Is there a set-up sheet? Verify press s

    at each mold change. If plant uses EO

    press (one measurement every 2 seco

    9.1.15Do all molds have a tracing or digital photo on file? A record of the tracing (or digital photo

    9.1.16*Do all incoming molds, (new, repair, plant transfer), have correct

    stamping?

    conforms to the Corporate Design Spe

    chart, RACI chart, etc)

    9.1.17*

    Are Mold Set-up Cards and 1st & Last Tire Check Sheets correct?

    A record that Mold Set-up Cards, and

    Design Specification must be available

    in service. Records must be maintaine

    include signature of responsible assoc

    9.1.19* Is there e a second Qtech verification that the 1st Tire Check is

    correct?

    A verification of the tire tracing versus

    appropriate authorized associate), to

    must be made within 24 hours.

    9.1.21

    Does the plant have and adhere to a mold cleaning cycle system?

    Is there a written mold cleaning system

    damage or missing slugs after mold cle

    authorized?

    9.1.23 Are appropriate corrective actions taken in response to world class

    appearance standards (mold appearance and flash)?

    Tires must be sampled and graded acc

    2 or 3. Records must be maintained an

    repair program.

    9.1.35Are project cure audit results documented? Are project cure audits documented D

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    39/60

    83Are age limits followed? Verify that there is a system in place

    84Is there a system in place to reduce/eliminate the possibility of loading

    the wrong green tire in a press? Are there documented procedures/tr

    85 Are the correct quality requirements available to the concerned

    operators/ monitors?

    Are the last revision of curing specs

    graphs for services and tolerances p

    86 Are requirements for machine set-up correctly identified? Are the set-up sheet posted on each

    87

    Is there a first tire system in place?

    A system must be in place to check

    tire sheet must be placed in a visible

    running without a First Tire Check S

    88Is there evidence that specifications and run cards are being followed

    by associates? Question operators, review equipme

    89 Are automatic or manual alarms for temperature/pressure in place forpresses, pot heaters and services?

    Verify alarms are in place and in wo

    reaction to the different alarm definequality known?

    91Are the cures being extended for low green tire temperature?

    Is there a written procedure/spec/run

    procedure to measure green tire tem

    Curing

    Process

    OTR Inserter

    Oper92

    Are requirements for machine set-up correctly identified? Is there a set-up sheet?

    93Have green tire age limits been established? Green to cure limits must be specifie

    94 Are age limits followed?

    Verify system that identifies age of g

    within age limits.

    FinlFinish General 95Are routine audits being performed in the Final Finish area? Is there documentation to verify thes

    10.1.7Are repair materials properly identified? Compound and cements must have

    10.1.27*Is there a check tire procedure to check dynamic balance machine

    accuracy? Review procedure (1X3) and data.

    10.1.35*Is there a tire weight system in place? Review documented procedure.

    10.1.42*Are correct limits being utilized for commercial tires being checked for

    LRO/RRO/balance, and is the system being audited?

    Pull a copy of the plant's grading cha

    records to verify l imit tables are bein

    FinlFinish

    Prod

    Test&Feedbac 96 Is there an inspection / classification system to insure compliance to

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    40/60

    Area SubArea Ques# Question

    Warehouse& Shipping

    FinlFinish Whse/Ship 108Are Warehouse & Shipping adequate to ensure a quality product

    reaches the customer?

    109 =

    100

    Is there a documented system to assure that the correct tires are

    shipped to and have the proper customer markings (i.e., force marks,

    balance marks, customer specific labeled, etc)?

    110 Is there a system to trace and analyze customer returns?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    41/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    42/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    43/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    44/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    45/60

    9.1.28

    Are green tires holders/pans aligned correctly with every mold change

    9.1.46 re a r ven s an s eam raps on s eam ea er unc ona

    9.1.50* Is there a list of critical instruments which require calibration?

    9.1.51* Are calibration records available and up-to-date and correct tolerance

    used?

    9.1.52 Are calibrated instruments identified correctly?.

    9.1.53 Is the PCI system in good working condition?

    90 Are automatic cure extension timers in place and operational?

    Final

    FinishingFinal Finishing 10.1.6 Are repair presses and heaters calibrated?

    10.1.32Are dynamic balance calibrations conducted as required with

    documented results available?

    Tire

    Monitor&

    Lab Testing

    Tire Monitor&

    Lab Testing11.1.7*

    Is there a list of critical instruments which require calibration?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    46/60

    GUIDELINES

    The calibration of all scales must also be current (quarterly). Verify calibration at Instrument Lab.

    Each size banbury has Goodyear specifications for correct lube oil distribution blocks and correct lube oil flow rates ba

    RPM's. This information can be found in Engineering Knowledge Database listed under Mixing /0004 How

    To...(Equipment)/Reductions in Dust Ring Oil and Waste.

    Each size banbury has Goodyear specifications for correct process oil distribution blocks and correct process oil flow

    on RPM's. This information can be found in Engineering Knowledge Database -Mixing /0004 How To...(Equipment)/R

    dust ring oil and waste.

    Each size banbury has Goodyear specifications for correct yoke pressure. This information can be found in EngineerDatabase - Mixing/0004 How To.(Equipment)/Reductions in Dust Ring Oil and Waste.

    Are the inspection reports available and was the required frequency respected?

    For other lab equipment than Rheometer, like load cells, timers and thermocouples should b

    calibrated by instrument tech. Verify calibration frequency and records.Is the schedule available? Is it being followed? Is the check being performed? Is the result documented? Is the corre

    being taken and documented?

    Is the schedule available? Is it being followed? Is the check being performed? Is the result documented? Is the corre

    being taken and documented?

    Is the schedule available? Is it being followed? Is the belt speed synchronization being performed? Is the result docum

    the corrective action being taken and documented?

    Accurate up-to-date calibration records of all critical instruments must be available. The records must show the actua

    dates and results as well as the name of the checker. Eventual adjustments, repairs or replacements must be record

    The instruments requiring calibration should be tagged with the instrument identification number, as well as next requi

    calibration. Alternated ID placement optional (inlet line, door panel, etc) for situations not conducive to placing the st

    instrument/gauge.

    Control sheets must exist in the drum booth for each giving the nominal value and tolerances for each drum type.

    Any repair on a drum must be recorded in the individual drum log books.

    Each drum leaving the drum booth must be checked and certified for the settings specified on the set up card.

    Bladder leak detectors currently available work in Standing post and Bag in Well presses running steam-gas cures. A

    bladder detectors and press combinations are being evaluated. As they are approved, they will be added to the requ

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    47/60

    Is there a written procedure that includes frequency?Do records confirms the system is being followed?

    (Enter N/A for green tire loading trucks and robotic systems.)

    ev ew ea er a a er y a ar ven s an s eam raps are opera ona

    All critical setting tools should be identified. A list should be available with an indication of the type and frequency

    checks.

    Accurate up-to-date calibration records of all critical instruments should be available at Calibration Lab. The reco

    the actual calibration dates and results as well as the name of the checker. Eventual adjustments, repairs or repl

    be recorded. Tolerance must be in line with GQMTS 16J1, review the plant procedure. Reference standards mu

    national standards and up to date.

    The instruments requiring calibration should be tagged with the instrument identification number, as well as next

    calibration.

    Is the PCI system in good working condition? Are the correct pressure and alignment set-up correctly?

    anua y c ec a au oma c cure ex en ers wor on one press.

    Review plant procedures for calibration and review documentation.

    Review procedure and results.

    All critical machine setting tools (Pressure gauges, setting gauges,) should be identified. A listing should be av

    Testing (based upon QMS_ADM_CAL_0001 for North America plants or those plants referencing Goodyear's QM

    PM Quality, Environment, Health & Safety Policy Manual for the Design and Manufacture of Tires).

    For those International plants that do not reference Goodyear's Global QMS system, local documentation should

    instruments requiring calibration. Required frequency of calibration checks should be part of the documentation.

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    48/60

    Area SubArea Ques# Question

    External PPQ Audit

    13.07 Is there evidence of corrective action taken when cured defect trends

    are identified in the plant?

    13.10

    Are all new defective returns being analyzed?

    13.11*

    Is there a system to audit outgoing appearance quality?

    13.12 Are all tires (from the PPQ Audit of Outgoing Quality reinspection) free

    of "functional" irregularities?

    13.13

    Are all tires (from the PPQ Audit of Outgoing Quality reinspection)

    within specified uniformity and balance limits?

    13.14 Is the WCA average (from the PPQ Audit of Outgoing Quality

    reinspection) equal to or better than 1.25?

    13.15

    Is there evidence (inspector stamp/sticker) of a finished tire inspection

    process?

    13.16 Is there a system to follow up with inspectors when irregular tires are

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    49/60

    13.26

    Is there an active customer / dealer visit program?

    13.28Are returned tires put on display and communicated to manufacturing

    associates? Do all associates know the defectives that cause

    adjustment? Are corrective actions taken?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    50/60

    GUIDELINES

    For repeating defectives are there records that indicate corrective actions have taken place? Are there documente

    when corrective actions are made?

    Are new defective ( excluding uniformity) from local market being returned to the Plant?

    In others market, are you tracking by adjustments data or special return for analysis?

    Refer to QAI-2500and QMS_ADM_IAT_0001. Do the audit teams' audit results verify the p

    an outgoing quality audit system?

    If one or more tires have "functional" irregularities, answer NO.

    - If a tire exceeds any force parameter, repeat 3 times and obtain an average reading. The average must be within

    for RFV, R1H and LFV and within 3 lbs of the limit for conicity. For RRO/LRO, undulation (bulge & valley), average10% of the limit.

    - Dynamic balance cannot exceed the limit by more than .5 ozs.

    If any tire exceeds these requirements, the answer is NO.

    Overall average of tires checked during WCA rating must be equal to or below 1.25 to answer YES.

    Do all tires have inspector stamps/st ickers? For plants with bar codes and computerized inspection records in Fina

    application of inspector stamps is optional (per Regional QTECH's direction, but computer records must be able to

    and who inspected the tire. Any code selected as part of the OQL inspection that is not 100% compliant (with stam

    bar code traceability) will be considered to have never been inspected and will be held for reinspection by the plan

    Review records of outgoing quality inspection results- is there evidence of documented follow up when any irregular

    b d?

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    51/60

    Look for evidence of customer / dealer communications and visitation documentation.

    Customer/dealer visits must include plant personnel (Qtech, Manufacturing, hourly associates, etc.)

    Look for evidence of returned tire displays / communication with manufacturing associates. Interview associates

    are aware about the main causes of adjustment. Look for evidences of actions taken to solve adjustment causes

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    52/60

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actual

    Weight

    COMMENTS:

    Spec Specs ===> x

    !! The cells for the Spec values above

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actual

    Weight

    Factory Code:

    Factory Code:

    TIRE SIZE/Type:

    Plant : OUTGOING QUALITY AUDIT Date

    TIRE SIZE/Type:

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    53/60

    COMMENTS:

    Spec Specs ===> x x

    !! The cells for the Spec values above

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actual

    Weight

    RF

    COMMENTS:

    Spec Specs ===> x x

    !! The cells for the Spec values above

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actual

    Weight

    RF

    Factory Code:

    Factory Code:

    TIRE SIZE/Type:

    TIRE SIZE/Type:

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    54/60

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if notchecked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if notchecked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)(Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actu

    Weig

    COMMENTS:

    Spec Specs ===> x

    !! The cells for the Spec values

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actu

    Weig

    COMMENTS:

    Spec Specs ===> x

    !! The cells for the Spec values

    Factory Code:

    TIRE SIZE/Type:

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    55/60

    !! The cells for the Spec values abov

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actual

    Weight

    COMMENTS:

    Spec Specs ===> x

    !! The cells for the Spec values abov

    Serial Number:

    Usage/Customer:

    Barcode

    INSPECTOR

    STAMP

    Force Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    Balance Mark

    (Y or N)

    (Leave blank if not

    checked or not

    required)

    X-Ray Stamp

    MRT Only

    (Y or N)

    (Leave blank if

    not checked or

    not required)

    MOLD PN GRADE APPEARANCE RATING

    (WORLD CLASS STANDARDS)

    Actual

    Weight

    Factory Code:

    Factory Code:

    TIRE SIZE/Type:

    TIRE SIZE/Type:

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    56/60

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    57/60

    x

    Static

    Balance(MRT only)

    x

    Static

    Balance

    (MRT only)

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    58/60

    Static

    Balance

    (MRT only)

    x

    Static

    Balance

    (MRT only)

    x

    Static

    Balance

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    59/60

    Static

    Balance

    (MRT only)

    x

    Static

    Balance

    (MRT only)

    U if it S (I l di Ti W i ht ) Ti W i ht S

  • 8/12/2019 Ppqa Titan Pneus Do Brasil Rev Original

    60/60

    # over spec #Measured

    Within

    Spec

    +0.5% and

    Spec-1.5%

    Greater

    than

    Spec+.5%

    Less than

    Spec -1.5%

    RFV 0 0

    RF1H 0 0

    LF 0 0

    Con 0 0

    RRO 0 0

    LRO 0 0

    Undulation 0 0

    Total Dyn Bal 0 0 # %

    Static Bal(MRT Only) 0 0 Yes 0 #DIV/0!

    TOTAL 0 0 No 0 #DIV/0!

    Grades # % # %

    0 #VALUE! #VALUE! Yes 0 #DIV/0!

    1 #VALUE! #VALUE! No 0 #DIV/0!

    2 #VALUE! #VALUE!

    3 #VALUE! #VALUE!

    Average ==> #VALUE! # %

    OK 0 #DIV/0!

    Illegible 0 #DIV/0!

    Graded 2 Graded 3 Missing 0 #DIV/0!

    # %

    Yes 0

    No 0

    Inspector Stamps

    Tire Appearance - Tires Graded >1

    Reason

    X-Ray Marking (MRT only)

    0.0%

    Force Marking

    Appearance Summary Balance Marking

    % 0.0% 0.0%

    Uniformity Summary (Including Tire Weights) Tire Weight Summary

    % Total Uniformity

    Measurements withinspecs

    # Tires 0 0 0