![Page 1: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/1.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 1 of
20
Eskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors
Presented at: AMEU Convention 2007
Author & presenter: Rossouw Theron (IARC)
Co-author: Hendri Geldenhuys (IARC)
![Page 2: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/2.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 2 of
20
Arrester
Arrester
GLD
GLD
Typical surge Typical surge arresterarrester
![Page 3: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/3.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 3 of
20
Arrester
Grading resistor
Grading resistor
Spark gapSpark gap {
Ground lead disconnector (GLD)Ground lead disconnector (GLD)
• 22 Blank cartridge
• 22 Blank cartridge
![Page 4: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/4.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 4 of
20
Spark gap Grading resistor
Arrester
• 22 Blank cartridge
• 22 Blank cartridge
Ground lead disconnector Ground lead disconnector (GLD)(GLD)
![Page 5: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/5.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 5 of
20
IEC 60099-4: GLD test IEC 60099-4: GLD test requirementsrequirements
IEC 60099-4: Specification for metal-oxide surge arresters without gaps for a.c. systems
Type test requirements for GLDs according to IEC 60099-4 are:•Disconnector operation test •Disconnector withstand tests
![Page 6: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/6.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 6 of
20
IEC 60099-4: GLD test IEC 60099-4: GLD test requirementsrequirementsDisconnector operation test:
The time delay for the operation of the disconnector is determined for three values of current, 20 A, 200 A and 800 A
GLD Operating curve
![Page 7: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/7.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 7 of
20
IEC 60099-4: GLD test IEC 60099-4: GLD test requirementsrequirementsDisconnector withstand tests:
When an arrester is fitted with a GLD it shall withstand, without operating, each of the following tests:
• Long-duration current impulse testThe arrester and GLD are subjected to a series of 18 long-duration current impulses (2000 μs square wave).
• Operating duty testThe arrester and GLD is subjected to a series of 20 lightning current impulses (10 kA, 8/20 μs) and 2 high current impulses (100 kA, 4/10 μs).
![Page 8: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/8.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 8 of
20
Field failuresField failures
• GLDs that fail to operateGLDs that fail to operate• Premature GLD Premature GLD operationoperation
![Page 9: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/9.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 9 of
20
Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate
Arresters failed
GLDs did not operate
![Page 10: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/10.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 10
of 20
Field failures: Premature GLD Field failures: Premature GLD operationoperation
GLD operated
Undamaged arrester
![Page 11: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/11.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 11
of 20
GLD operating curves
SEF setting philosophy• Trip delay: 3 s to 15 s• Pick-up: 3 A to 6 A
SEF setting range
Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate
![Page 12: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/12.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 12
of 20
Typical SEF setting: 5 s @ 5 A
Specified minimum GLD operating time: 3 s @ 5 A
GLD operating curves
Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate
SEF setting range
![Page 13: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/13.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 13
of 20
Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate
New GLD operating curves
![Page 14: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/14.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 14
of 20
Field failures: Premature GLD Field failures: Premature GLD operationoperation
GLD current impulse test points according to IEC 60099-4
Effective duration of typical lightning current impulses
![Page 15: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/15.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 15
of 20
Field failures: Premature GLD Field failures: Premature GLD operationoperation
Surge arrester “X”: MOV failure level
![Page 16: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/16.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 16
of 20
Field failures: Premature GLD Field failures: Premature GLD operationoperation
MOV failure level vs transient operation curve for GLD X
![Page 17: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/17.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 17
of 20
Field failures: Premature GLD Field failures: Premature GLD operationoperation
MOV failure level vs transient operation curves for GLD X & X1
![Page 18: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/18.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 18
of 20
Field failures: Premature GLD Field failures: Premature GLD operationoperation
Benchmarking with 30/80 μs current impulses
![Page 19: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/19.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 19
of 20
Eskom’s GLD test Eskom’s GLD test requirementsrequirements
1. Disconnector operation test GLD operating time is determined at 20 A, 200 A and 800 A, as well as at 5 A / 3 s 2. Long duration current impulse withstand test 18 x 2000 μs square wave current impulses GLD resistance measurements and 5 A operation verification test3. Operating duty withstand test 20 x 8/20 μs, 10 kA and 2 x 4/10 μs, 100 kA current impulses GLD resistance measurements and 5 A operation verification test4. High lightning duty current impulse withstand test 2 x 30/80, 30 kA current impulses GLD resistance measurements and 5 A operation verification test5. Repetitive surge withstand ability test 1000 voltage impulses, sufficient to ensure spark-over of the GLD’s internal gap GLD resistance measurements and 5 A operation verification test6. Moisture ingress test GLD is immersed in boiling water for 42 hours
![Page 20: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented](https://reader031.vdocument.in/reader031/viewer/2022022007/5ad34fd37f8b9a482c8d7dbf/html5/thumbnails/20.jpg)
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 20
of 20