[ppt]powerpoint presentation - association of municipal … 2007... · web vieweskom’s unique...

20
Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 1 of 20 Eskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented at: AMEU Convention 2007 Author & presenter: Rossouw Theron (IARC) Co-author: Hendri Geldenhuys (IARC)

Upload: dinhngoc

Post on 15-Apr-2018

222 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 1 of

20

Eskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors

Presented at: AMEU Convention 2007

Author & presenter: Rossouw Theron (IARC)

Co-author: Hendri Geldenhuys (IARC)

Page 2: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 2 of

20

Arrester

Arrester

GLD

GLD

Typical surge Typical surge arresterarrester

Page 3: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 3 of

20

Arrester

Grading resistor

Grading resistor

Spark gapSpark gap {

Ground lead disconnector (GLD)Ground lead disconnector (GLD)

• 22 Blank cartridge

• 22 Blank cartridge

Page 4: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 4 of

20

Spark gap Grading resistor

Arrester

• 22 Blank cartridge

• 22 Blank cartridge

Ground lead disconnector Ground lead disconnector (GLD)(GLD)

Page 5: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 5 of

20

IEC 60099-4: GLD test IEC 60099-4: GLD test requirementsrequirements

IEC 60099-4: Specification for metal-oxide surge arresters without gaps for a.c. systems

Type test requirements for GLDs according to IEC 60099-4 are:•Disconnector operation test •Disconnector withstand tests

Page 6: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 6 of

20

IEC 60099-4: GLD test IEC 60099-4: GLD test requirementsrequirementsDisconnector operation test:

The time delay for the operation of the disconnector is determined for three values of current, 20 A, 200 A and 800 A

GLD Operating curve

Page 7: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 7 of

20

IEC 60099-4: GLD test IEC 60099-4: GLD test requirementsrequirementsDisconnector withstand tests:

When an arrester is fitted with a GLD it shall withstand, without operating, each of the following tests:

• Long-duration current impulse testThe arrester and GLD are subjected to a series of 18 long-duration current impulses (2000 μs square wave).

• Operating duty testThe arrester and GLD is subjected to a series of 20 lightning current impulses (10 kA, 8/20 μs) and 2 high current impulses (100 kA, 4/10 μs).

Page 8: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 8 of

20

Field failuresField failures

• GLDs that fail to operateGLDs that fail to operate• Premature GLD Premature GLD operationoperation

Page 9: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 9 of

20

Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate

Arresters failed

GLDs did not operate

Page 10: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 10

of 20

Field failures: Premature GLD Field failures: Premature GLD operationoperation

GLD operated

Undamaged arrester

Page 11: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 11

of 20

GLD operating curves

SEF setting philosophy• Trip delay: 3 s to 15 s• Pick-up: 3 A to 6 A

SEF setting range

Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate

Page 12: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 12

of 20

Typical SEF setting: 5 s @ 5 A

Specified minimum GLD operating time: 3 s @ 5 A

GLD operating curves

Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate

SEF setting range

Page 13: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 13

of 20

Field failures: GLDs that fail to Field failures: GLDs that fail to operateoperate

New GLD operating curves

Page 14: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 14

of 20

Field failures: Premature GLD Field failures: Premature GLD operationoperation

GLD current impulse test points according to IEC 60099-4

Effective duration of typical lightning current impulses

Page 15: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 15

of 20

Field failures: Premature GLD Field failures: Premature GLD operationoperation

Surge arrester “X”: MOV failure level

Page 16: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 16

of 20

Field failures: Premature GLD Field failures: Premature GLD operationoperation

MOV failure level vs transient operation curve for GLD X

Page 17: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 17

of 20

Field failures: Premature GLD Field failures: Premature GLD operationoperation

MOV failure level vs transient operation curves for GLD X & X1

Page 18: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 18

of 20

Field failures: Premature GLD Field failures: Premature GLD operationoperation

Benchmarking with 30/80 μs current impulses

Page 19: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 19

of 20

Eskom’s GLD test Eskom’s GLD test requirementsrequirements

1. Disconnector operation test GLD operating time is determined at 20 A, 200 A and 800 A, as well as at 5 A / 3 s 2. Long duration current impulse withstand test 18 x 2000 μs square wave current impulses GLD resistance measurements and 5 A operation verification test3. Operating duty withstand test 20 x 8/20 μs, 10 kA and 2 x 4/10 μs, 100 kA current impulses GLD resistance measurements and 5 A operation verification test4. High lightning duty current impulse withstand test 2 x 30/80, 30 kA current impulses GLD resistance measurements and 5 A operation verification test5. Repetitive surge withstand ability test 1000 voltage impulses, sufficient to ensure spark-over of the GLD’s internal gap GLD resistance measurements and 5 A operation verification test6. Moisture ingress test GLD is immersed in boiling water for 42 hours

Page 20: [PPT]PowerPoint Presentation - Association of Municipal … 2007... · Web viewEskom’s unique type test requirements for Lightning Surge Arrester Ground Lead Disconnectors Presented

Industry Association Resource Centre By: Rossouw Theron Date: 15-10-2007 Slide: 20

of 20